WELCOME NEIGHBORS! April 11, 2019

Similar documents
WELCOME NEIGHBORS! January 17, 2019

Public input has been an important part of the plan development process.

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

Bexar County Public Works Department Flood Control Program

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

2

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

The Ambassador Bridge/ Gateway Project

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative. June 27, 2012

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Welcome & Introductions

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

MEMO 1. INTRODUCTION PURPOSE & PROCESS REQUEST

PROJECT SHOWING MINUTES

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Coxwell Station Easier Access

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

SCTPO Project Summary September 2014

TRANSIT-ORIENTED DEVELOPMENT PLAN PRESENTATION RED-PURPLE BYPASS PROJECT AREA

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Town Center (part of the Comprehensive Plan)

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

2002 TAC Sustainable Transportation Award

Iowa s Statewide Urban Design Standards Promote Improved Access Management

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

Highway 15 Project - Hutchinson

The Lincoln Neighborhood Corridor Plan. The LiNC

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

DC Clean Rivers Project Green Infrastructure Program Potomac River Project A

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Project Overview. Get Involved. Public Information Meeting. Contact Information

PUBLIC NOTIFICATION PLAN

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

A. INTRODUCTION B. PROJECT LOCATION

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

Welcome to the Sellwood Bridge Project Pre-Construction Open House

open house 3 CITY OF SALEM Downtown Streetscape Plan

Fall 2017 Construction Update

Citizen Information Meeting

Speedway Mall Project Frequently Asked Questions

Program Schedule, Budget and Scope

Pinellas County. Staff Report

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

The Lower SaLuda Greenway

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

The Van Ness Campus. Weekly Construction Bulletin #259

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Monroe Street Reconstruction. Business Roundtable March 29, 2017

Guiding Principles. People dance, and to share culture. Place consistency and internal connections. Management community for years to come

Chesterfield County Project Update

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

DETROIT RIVER INTERNATIONAL CROSSING STUDY. Walpole Island First Nations Meeting December 13, 2007

Route 9 Gateway Project. October 9, 2014 Informational Meeting

WURZBACH PARKWAY WURZBACH PARKWAY

Southern Gateway Project and Public Green

Maplewood Avenue Downtown Complete Street Project

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

2

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

Construction Engineering & Inspection

COMMUNITY PARTNERING TEAM

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

Rights-of-Way Preservation Guidelines

Victoria Bridge Municipal Class EA Civic Works Committee

Capital Projects in and near Odenton Town Center

Proposed Staging Plan For:

Transcription:

District of Columbia Water and Sewer Authority David L. Gadis, CEO and General Manager Clean Rivers Project Northeast Boundary Tunnel Tunnel Forum Meeting WELCOME NEIGHBORS! April 11, 2019 0

Welcome! 1

Tunnel Success DC Water opened the first 7-mile segment of the Anacostia River Tunnel system in March 2018. This massive structure stores combined sewage during rain events, keeping sewage from overflowing to the river. From March through December 31, 2018, the tunnel prevented 4.57 billion gallons of sewage, and nearly 900 tons of trash, solids and debris, from entering the Anacostia River. The Northeast Boundary Tunnel will add approximately 90 million gallons of storage when it is placed into service in 2023. 2

Agenda Welcome NEBT Outreach and Tunnel Forum Member Recruitment Responses to March 14 th Tunnel Forum Concerns Bryant Street Alternative Parking Area Construction Sites Schedules First Street NW Pumping Station Florida Avenue NW R Street NW Local Business Partnership with North Capitol Main Street Questions Note: Return your comment sheets to the front desk. 3

Responses to March 14 th Tunnel Forum Concerns CONCERN Uber like or shuttle service between Bryant Street APA and residents homes. Does NEBT traffic study consider the expansion of Howard University housing and other local development and future parking needs? Reaching ALL affected community stakeholders in our outreach efforts. Temporary suspension of street cleaning during construction. Closure of 3 rd Street NW: lack of access to the alleyway behind their homes, as well as lack of access to the alleyway for trash pickup Traffic calming measures: signal timing, calm alley speeding Increased traffic on side streets as traffic is rerouted due to street closures. Detailed summary of local road closures and durations. Notification timing Coordination with DC Health for vector control Media Outreach Plan RESPONSE Uber service between the Bryant Street APA and eligible addresses is approved for residents who have registered for the APA. The 2016 study took into consideration Howard University plans at that time. Since that time new plans have gone forward. We will prepare mailings to residents near the construction site areas. This was arranged during the First Street Tunnel construction. We will work with the Tunnel Forum to temporarily suspend street cleaning during construction. DPW will use a small truck allowing them to back out of the alley. We will monitor traffic and speeds in the neighborhood. Possible traffic calming measures include speed humps, speed trailers and narrowing of lanes to lower speeds. We can also work with MPD for enforcement. The construction site updates will detail the travel restrictions, including road closures and parking restrictions along with the durations. The construction site updates provide work sequence as a y look ahead for 2019 along with anticipated dates that work will begin. Robust vector control is already required for to be implemented by SIH. Upon feedback from Tunnel Forum Members and working with the ANCs that range can be extended with the assistance of the Dept of Health. The Commuter Outreach Plan includes radio advertising that directs listeners and readers to the project website hotline for more project 4 information.

Tunnel Forum Recruitment Construction Site Representative Alternate First Street Pumping Station T Street Florida Avenue R Street Bloomingdale Civic Association Advisory Neighborhood Commissioners Tunnel Forums are reoccurring, collaborative meetings to share information about the project, gather community input, and collectively resolve issues while building relationships. Participants Drive Solutions! Get Involved to: Learn about what is happening Ask questions Provide feedback Get results! Local Blogs Sign up today to be a member! Contact Us: NEBT Outreach Team: Hadiah Jordan, dccleanrivers@dcwater.com Northeast Boundary Tunnel Project: dcwater.com/nebt 24/7 NEBT Hotline: 1-800-988-6151 5

Update on Bryant Street Alternative Parking Area (APA) Security guards posted at the APA Uber service has been approved for residents with parking permits to move between the APA and their registered address. 6

First Street NW Pumping Station Construction Site Construction Site Work Sequencing Overview APRIL 2019 DECEMBER 2019 Mobilization on Site/Site Preparation Install Geotechnical and Monitoring Instrumentation Median Removal Jet Grout / Ground Improvement All construction dates are approximate and could change. 7

First Street NW Pumping Station Construction Site Rhode Island Avenue NW Median Removal Phase 1: The contractor will remove the median on Rhode Island Avenue NW between 2nd Street NW and First Street NW to prepare for detours and lane shifts. Expected begin date, 4/17/19. Duration 2.5 weeks. Travel and Parking Restrictions: Traffic on Rhode Island Avenue will be reduced from three lanes to two lanes and 24-hour parking restrictions will be in place: The Eastbound side of Rhode Island Avenue NW between 3rd Street NW and First Street NW. The Westbound side of Rhode Island Avenue NW between North Capitol Street NW and 2nd Street NW. All construction dates are approximate and could change. 8

First Street NW Pumping Station Construction Site Rhode Island Avenue NW Median Removal Phase 2: The contractor will remove the median along Rhode Island Avenue NW between First Street NW and North Capitol Street. Expected begin date, beginning of May 2019. Duration 2.5 weeks. Travel and Parking Restrictions: Traffic on Rhode Island Avenue will be reduced from three lanes to two lanes and 24-hour parking restrictions will be in place: The Eastbound side of Rhode Island Avenue NW between 2nd Street NW and North Capitol Street NW. The Westbound side of Rhode Island Avenue NW between North Capitol Street NW and First Street NW. All construction dates are approximate and could change. 9

First Street NW Pumping Station Construction Site Tree Replanting Plan Willow Oak When NEBT construction is complete, the medians will be restored and new trees will be planted. Robert O Brien 10

First Street NW Pumping Station Construction Site Jet Grout Installation Jet grouting is a construction method for ground improvement or soil stabilization. Work is expected to begin in May 2019. Duration 3 weeks. Travel Restrictions: Northbound traffic will be closed on First Street between Rhode Island Avenue and Thomas Street NW. All construction dates are approximate and could change. 24-Hour Parking Restrictions: Parking will be restricted on the westbound side of Rhode Island Avenue NW near the intersection of First Street NW. Parking will also be restricted on First Street NW between Thomas Street NW and Rhode Island Avenue NW. 11

First Street NW Pumping Station Construction Site Jet Grouting The contractor will install jet grout columns at the intersection of First Street NW and Rhode Island Avenue NW. We will update you when Phase 3 work is expected to begin. Duration 6 weeks. Travel and Parking Restrictions: Rhode Island Avenue NW between 2nd Street NW and North Capitol Street will be reduced to two lanes of traffic in each direction. 24-Hour parking restrictions will be in place on the eastbound and westbound sides of Rhode Island Avenue NW between North Capitol Street and 2nd Street NW. All construction dates are approximate and could change. 12

First Street NW Pumping Station Construction Site Monitoring Noise and Vibration 24-hour noise and vibration meter continuously uploads data to our server for review The noise and vibration specialist checks meter regularly Meters are programmed with an alarm that when triggered, the specialist and others on the team, receive a notification Determine if alternative construction methods or additional mitigation is required based on meter readings A portable meter is available if a resident informs us of excessive noise or vibration impacts 13

Florida Avenue Construction Site Construction Site Work Sequencing Overview APRIL 2019 AUGUST 2019 Utility Location Mobilization on Site Remove portions of Florida Avenue sidewalk Install Secant Piles for Shaft and Near Surface Structures All construction dates are approximate and could change. 14

Florida Avenue Construction Site Utility Location Utility location work is located on the east side of 3rd Street NW between Rhode Island Avenue NW and Florida Avenue NW. Duration 2.5 weeks. Travel Restrictions: 3rd Street will remain open to traffic with one lane closed and the sidewalks will remain open to pedestrians. 15

Florida Avenue NW Construction Site 3 rd Street NW Mobilization Mobilization Work is expected to begin in April 2019. All construction dates are approximate and could change. Travel Restrictions: Duration Until end of 2022. Mobilizing the construction staging area requires closing the 1700 block of 3rd Street NW in both directions between Rhode Island Avenue NW and Florida Avenue NW. The 200 block of S Street NW will be accessible to traffic from 2nd Street NW only. The alley between the 200 blocks of Rhode Island Avenue NW and S Street NW will be closed at the 3rd Street entrance. The alley entrances from 2nd Street NW and S Street NW will remain open. Trash Pickup: DPW will use a narrow truck to pick up trash and will reverse to exit the alley between Rhode Island Avenue NW and S Street NW. 16

Florida Avenue NW Construction Site Remove Portions of Sidewalk on Florida Avenue Sidewalk Work is expected to begin in late April 2019. A portion of the sidewalk on Florida Avenue near 4 th Street NW will be removed to provide space for lane shifts. Duration approximately 2 weeks. Travel Restrictions: 3 rd Street will be closed to traffic. One eastbound lane will be closed on Florida Avenue. All construction dates are approximate and could change. 17

Florida Avenue NW Construction Site Install Drop Shaft Secant Piles Secant Pile Work is expected to begin in May 2019. Installation of secant piles work will take place on 3rd Street NW between Rhode Island Avenue NW and Florida Avenue NW. Duration approximately 9 weeks. Travel Restrictions: 3 rd Street will be closed to traffic. All construction dates are approximate and could change. 18

Florida Avenue NW Construction Site Install Drop Shaft Secant Piles Secant Pile Work is expected to begin in July 2019. Installation of secant piles work will extend onto Florida Avenue NW. Duration approximately 6 weeks. Travel Restrictions: 3 rd Street will be closed to traffic. One lane in each direction will be open on Florida Avenue. 19

3 rd Street NW 3 rd Street NW Florida Avenue NW Construction Site Tree Removal and Replanting Plan S Street NW S Street NW X = Trees to be removed. = Trees to be replanted. Bur Oak Robert O Brien 20

R Street NW Construction Site Construction Site Work Sequencing Overview R Street NW Completed Utility Relocation MAY 2019 DECEMBER 2019 Mobilization at Cooper Gordon Park Install Slurry Walls for R Street Drop Shaft Support of Excavation Permeation Grouting JANUARY 2020 JUNE 2020 Near Surface Structures, Shoring Shaft Excavation Install Concrete Final Line to Shaft Remove Tunnel Boring Machine from Shaft R Street NW Construction Site 21

R Street NW Construction Site Cooper Gordon Park Mobilization Mobilization in the park includes setting up a fenced area around the perimeter of Cooper Gordon Park, removing park trees and park features, and setting up the site for construction. Duration approximately 26 weeks. Travel Restrictions: One eastbound lane closed on Rhode Island Avenue NW. 6 th Street NW between Rhode Island Avenue and R Street NW: Southbound will be reduced to one lane. Northbound will be two lanes, including a dedicated right turn lane. 600-block of R Street will maintain one lane for traffic and a bicycle lane. Parking restrictions along R Street between Marion Street and 5 th Street NW, Rhode Island 22 Avenue NW, and on 6 th Street NW.

R Street NW Construction Site Restoration Plan Restoration Plan and Renderings of Cooper/Gordon Park 23

North Capitol Main Street Partnership Service Description Business Impact Mitigation Assistance Construction Impact Mitigation Plan Wayfinding Signage and Beautification Plan Needs Assistance and Health Check Economic Vitality Web, Social Media, and Mobil Delivery Marketing and Branding Negotiation Assistance Design Storefront Enhancement Storefront Signage North Capitol Main Street Contact Information 202-588-5340 northcapitoldc.com 24

Questions? 25