Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Similar documents
South Dakota 100 Corridor Preservation

2040 Long Range Transportation Plan

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

4.1 Build Alternative 1 Construction Phasing

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

WELCOME TO OPEN HOUSE TWO November 28, 2018

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT

2017 General Obligation Bond

New Stanton Project Update July 3, 2012

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Rich Valley Greenway Master Plan. Central Greenway Connectivity Study

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

US-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

OPEN HOUSE #3. Project Manager Kristi Sebastian, PE, PTOE

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

5.8 Visual Resources and Aesthetic Qualities

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

East Corridor Final Environmental Impact Statement

Eglinton West LRT Update

Route Planning and Environmental Assessment Study Highway 17 Four-Laning from Sudbury to Markstay GWP

Commissioners Road West Realignment Environmental Assessment

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

Mississippi Skyway Preliminary Engineering Report

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Capital Projects in and near Odenton Town Center

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Project Overview. Get Involved. Public Information Meeting. Contact Information

Planning Districts INTRODUCTION

7.5 Impacts on the Section 4(f) Properties

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

Clay Street Bridge Replacement Project

Mavis Road Class Environmental Assessment

Berkshire Regional Planning Commission Clearinghouse Review Report

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Pennsy Greenway Trail

Northern Branch Corridor SDEIS March 2017

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

SR 483 Clyde Morris Boulevard FDOT District 5

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Southern Gateway Project and Public Green

4.500 Preston Road Overlay District

2290+ STADIUM VILLAGE STATION ABOVE FIELD) (T.O "

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

PROPOSED IMPROVEMENTS

Construction Engineering & Inspection

Transportation Committee

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

2 ALTERNATIVES AND OPTIONS

VISUALIZATION TOOLS FOR COMMUNICATION & DECISION MAKING REAL MINNESOTA EXAMPLES

Asheville Design Center March 2010

Highway & Bridge Capabilities

FY 2005 TRANSPORTATION CAPITAL PROGRAM

DESIGN PUBLIC HEARING. Phase II

5-Year Street Reconstruction Plan ( )

YORK COUNTY GOVERNMENT

Cottage Grove Road Reconstruction. City of Madison Engineering

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

AGENDA ACTION ITEMS INFORMATION ITEMS

Alta Vista Transportation Corridor Environmental Study Report November 2005

510 Highways, Streets & Roads Comprehensive Plan Section 510

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Reconnecting New Haven: Downtown Crossing

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

WELCOME TO OPEN HOUSE # 3

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Asbury Chapel Subdivision Sketch Plan

Lake Hazel/Gowen Relocation Alignment Study Report

A PPEARANCE REVIEW BOARD

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Transcription:

Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments

2003 EA Preferred Alternative Alternative was selected in the FONSI From I-29 to I-90 2006 Open House Public Comments: o Corridor Speed o Intersection Safety o Traffic Capacity 2003 EA Preferred Alternative Reassessment determined this alternative no longer meets purpose and need (highway capacity)

Revised Build Alternative Addressed Public Concerns: o Minimize train and vehicle conflicts o Increase design speed o Increase to 6 lane facility (three each direction) o Realigned 60 th St North and Redwood Blvd o Allows dual turn lanes at full intersections Utility Regulations and Requirements Changed Revised Build Alternative Reassessment determined this alternative was no longer practical or feasible.

Alternative 4 Alignment modifications at Rice Street, 60th Street, and Redwood Boulevard Reconstruction of I-90 and N Timberline Avenue Interchange Bridge crossing for Slip-Up Creek and Big Sioux River Diagonal alignment through Cactus Hills Construction of two railroad overpasses and one at-grade crossing Alternative 4 Alternative 4 was not recommended as the preferred alternative due to more utility impacts in comparison to Alternative 4a.

Alternative 7 Alignment modifications at Rice Street, 60th Street, and Redwood Boulevard Reconstruction of I-90 and N Timberline Avenue Interchange Bridge crossings for Slip-Up Creek and Big Sioux River Alignment is west of Cactus Hills Alternative 7 Alternative 7 eliminated from further consideration due to regulations associated with limiting impacts to Aquatic Resources.

Preferred Alternative Alternative 4a Alignment modifications at Rice Street, 60th Street, and Redwood Boulevard Reconstruction of I-90 and N Timberline Avenue Interchange Bridge crossing for Slip-Up Creek and Big Sioux River Diagonal alignment through Cactus Hills Construction of two railroad overpasses and one at-grade crossing Alternative 4a

Preferred Alternative Alternative 4a Segment- Madison Street to Maple Street Avoid Xcel Energy pipeline adjacent to Powderhouse Road Reconstructs intersections of Madison Street and Maple Street Constructs multi-use path on west side of Hwy 100 to approximately ¼ mile north of Madison Street then switches to east side

Preferred Alternative Alternative 4a Segment- Maple Street to Rice Street Constructs multi-use path on east side of Hwy 100 Rice Street realigned to meet design standards Mitigation measures provided for lined snake Potential need for 750,000 cubic yards of fill material

Preferred Alternative Alternative 4a Segment- Rice Street to I-90 Requires two acquisitions Avoids acquisition of businesses Realigns 60 th Street to avoid floodway impacts and meet design standards Constructs two railroad overpasses Potential need for 1.5 million cubic yards of fill material

Bicyclists and Pedestrians 10-Foot Wide shared use path along western side - 1/4 mile north of Madison Street and switches to the eastern side