APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue I April 16. Appendix C

Similar documents
Dear Customer. Section Old F8 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B

NZS 4517:2010. New Zealand Standard. Fire sprinkler systems for houses. Superseding NZS 4517:2002 NZS 4517:2010

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

Loss Prevention Standards

FIRE SAFETY POLICY. Executive Management Team. Health, Safety and Fire Steering Group.

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS

AUTOMATIC FIRE SPRINKLER SYSTEMS

C i t y o f G r o v e r B e a c h ADMINISTRATIVE SERVICES DEPARTMENT

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

4. Reason for making this application for Trade Waste Agreement of consent (tick appropriate) Date:

TENANT FIT OUT GUIDE

SECTION : FIRE PROTECTION SYSTEMS

Plan Submittal Checklist

- CONSTRUCTION FIRE SAFETY STANDARDS

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

Dispute over the requirement for fire door signage to hotel suites at 124 Devon Street West, New Plymouth

Statutory Compliance Checklist

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

Design of Fire safety in Multi Occupancy Residential Accommodation

You are required to READ ALL PAGES. of this application

Personal Protection Systems (PPS)

Sprinkler Permit Applications

Design & Construction Standards, Revised January

PRIVATE FIRE SERVICE INSTALLATION PACKET

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations

LYHA Fire Safety Policy

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

APPENDIX H (DESIGN SUBMISSION CRITERIA)

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

ACORD 42 (2014/08) - RESIDENTIAL PROPERTY REPLACEMENT COST INFORMATION SUPPLEMENT

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Newport City Council Bettws High School Fire Fighting Performance Specification CONTRACT C1

DRIVEWAY LOCATION APPROVAL RULES AND REGULATIONS

Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS

RIBA response to the second phase of the Independent Review of Building Regulations and Fire Safety

Fire Permit Application

CITY OF BERKELEY. Permit Service Center 2120 Milvia St Berkeley, CA 94704

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Prescriptive Requirement for Smoke Control

Fire Risk Assessment (FRA) Checklist

ADMINISTRATIVE ORDER # CERTIFICATES OF USE AND OCCUPANCY FOR EXISTING BUILDINGS

Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels

Fire Safety in Communal Areas Policy

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS

Residential Rebate Program Available to NYSEG and RG&E residential natural gas and electric customers.

FIRE RISK ASSESSMENT CHECKLIST

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS

Eligibility criteria

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

TENANCY DESIGN REVIEW PROCESS GUIDE

Fire Risk Assessment

Emergency Lighting. This is a free 7 page sample. Access the full version online. Irish Standard I.S. 3217:2008

Florida Building Code 2010

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

Fire precautions in dwellings

Certificate of Occupancy Application

HCJ/LJ/B100841/JR Issue M July Fit Out Guide

Roof: sound attenuation Category B. 4.0 DOORS

INDEPENDENT QUALIFIED PERSON APPLICATION

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034

TGD Part B Fire Safety Volume 2 Dwelling Houses. Chris Barry B.Sc.,M.Sc., Pg. Dip. FSP, H.N.C. NDFEM

Fire Sprinkler Submittal Requirements and Acceptance Testing

Maintenance of Fire Systems

HOT WORK PERMIT PROCEDURES

INITIAL FIRE SAFETY ASSESSMENT

A GUIDE TO THE REGULATORY REFORM ORDER (FIRE SAFETY) 2005 (RRO)

Secondary Suites. Guidelines for the construction of Accessory Secondary Suites in the City of Abbotsford August

Single Dwelling Unit Hot Water System Distribution Project Name: Enforcement Agency: Permit Number:

Example Codes. City of Brentwood, Tennessee Brentwood Hillside Protection Overlay District Summary

MGN 453 (M) Maritime and Coastguard Agency Logo MARINE GUIDANCE NOTE

THE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

F I R E S A F E T Y R E G I S T E R

INITIAL FIRE SAFETY ASSESSMENT

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

FIRE SAFETY RISK ASSESSMENT

Barnsley Accredited Landlord Scheme Accredited Property Registration Form

SAC 100 Automatic Smoke Curtain System. - Specifier Information -

Shipboard incinerators with capacities up to 4000 kw

Apartment Fire & Safety Inspection. City of Guadalupe

Fire Risk Assessment

Detail Notice Inviting Expression of Interest for Survey & Fire Safety Audit

Brighton Area Fire Authority

PLAN REVIEW SUBMITTAL GUIDE

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

IN THIS ISSUE// POP UP SHOPS OVER 6 MONTHS. How to meet Hammerson s design standards and create an outstanding pop up shop design, including...

Fire Risk Assessment

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS

fire risk assessment For use by landlords of small premises Premises Address

Transcription:

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS

STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Jonathan Everitt jeveritt@oriumdesign.co.uk Terry Lailey t.lailey@oriumdesign.co.uk Checklist (tick as appropriate to show that it is attached) Schematic merchandise plan Schematic floor plan Schematic ceiling/lighting plan Schematic section Interior and exterior visuals Shopfront plan, section and elevation minimum scale 1:20 Materials board, specification and photographs of similar installations Variations or structural alterations required of Landlord s shell Other (please specify) Note to Retailer: All relevant documentation must be attached to this form and distributed to those listed above. Signed on behalf of Retailer

STEP 2B - DETAILED DESIGN SUBMISSION To: Edward Utteridge From: Jonathan Everitt jeveritt@oriumdesign.co.uk Terry Lailey t.lailey@oriumdesign.co.uk Please find enclosed (tick as appropriate) Fire Strategy and Means of Escape A statement with supporting documents to demonstrate how the Retailer s proposals comply with the Fire Strategy including the control of smoke and appropriate treatment of the shopfront where applicable Architectural A general scope of works and finishes schedule. 1:50 plan, section, elevations and reflected ceiling layout including levels/make up to floor and compartmentation. 1:50 and 1:20 shopfront drawings including sections and profiles. Samples of all shopfront and entrance finishes clearly labelled. Photographs of signs, similar shopfront and detailed construction drawings of signage. 1:1 and 1:5 details of junctions with Landlord s wall and floor finish and adjacent premises. Structural Plans, sections, calculations for any proposed variation and/or fixings to the Landlord s basic shell structure, including new openings through floors and infilling of existing openings. Information on new loadings proposed from plant, new floor make-up and security safe installations. Sprinklers Sprinkler design drawings and calculations by LPCB certified company.

Mechanical Plans and sections of equipment on roof or within unit including sections dimensions, weights, proposed support details and clear space around equipment required. Details of trims and weather proofing of any penetrations through roof or external envelope of building. Drainage layout, connections and rodding points. Technical specifications including full vibration and noise figures. Electrical Power, lighting, fire alarm and emergency lighting drawings, with containment details, cable types fittings and legend of symbols. Other (please specify) Drawing register of attached drawing information Signed on behalf of Retailer

STEP 3 PRE-START APPROVAL To: From: Edward Utteridge The following status is given by the Landlord to the Concept Design: Status A: Pre-Start Acceptance Proceed with the fit out. Status C: Pre-Start Rejected Provide information in line with the requirements for the Centre. Please note the comments below when further developing your detailed design:- Document Ref Comments Subject to compliance with Gunwharf Quays fit out guide. Signed on behalf of Land Securities

STEP 4 CONSENT TO TRADE To: From: Edward Utteridge I confirm receipt of the following documentation. Rec d N/a Building Regulations Completion Certificate. Fire Risk Assessment. Fire Alarm Design, Installation, Commissioning and Acceptance Certificates to BS 5839 Functional test records proving correct operation of fire alarm, control and tripping functions. Emergency Lighting Completion Certificate, including signed declarations of Design Installation and Verification to BS 5266. Electrical Installation Certificate for the Design, Construction, Inspection and Testing of the electrical installation (NICEIC format) to BS 7671 Sprinkler System Hydraulic test Certificate to BS 5306 Part 2/BS EN 12845 Sprinkler Contractor s LPCB LPS 1048 Certificate of Conformity Smoke extract commissioning certificate Compliance with BS EN 378: 2000 (refrigerant escape) Confirmation that Water supply Bylaws have been satisfied Certificate of Chlorination for the Retailers Domestic Water System Copy of Statutory requirement of Licensing Acts (if applicable) Any other Statutory Certification (e.g. Utility Service Providers) as may be required Health and Safety File (including as-built drawings) signed by CDM Co-ordinator where applicable Confirmation that all Landlord s accounts have been settled An inspection of the above unit was undertaken by.. on. Consent to Trade is hereby offered with the following comments: The above unit may trade on. Signed on behalf of Land Securities