The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City

Similar documents
New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

BRADENTON RIVERWALK EXPANSION MASTER PLAN

CAMPUS MASTER PLAN UPDATE

Capital Projects in and near Odenton Town Center

Capital Projects impacting Odenton Town Center

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

The Auburn Plan Designing the Future of Auburn February 28, 2005

38 Queen s University Campus Master Plan Part 1

UNCW CAMPUS MASTER PLAN

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Town of Peru Comprehensive Plan Executive Summary

Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

AUSTIN MEDICAL DISTRICT MASTER PLAN"

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

SOUTH UNIVERSITY Street Design Alternatives in Progress

TRANSPORTATION & STREET DESIGN

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Landscape Heritage Plan

Potential Green Infrastructure Strategies May 6, 2015 Workshop

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ESTABLISH AN EFFICIENT TOWN CENTER

11.0 TRANSPORTATION ELEMENT

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

SR-2 Freeway Terminus Improvement Project

Preliminary Sketch Plan for Fort Hunter Park

Planning Districts INTRODUCTION

Mavis Road Class Environmental Assessment

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

John Portman Boulevard Corridor

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN


DRAFT MAP AMENDMENT FLU 04-4

Executive Summary. NY 7 / NY 2 Corridor

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Bethlehem Pike Streetscape Master Plan

FY 2005 TRANSPORTATION CAPITAL PROGRAM

2017 General Obligation Bond

COMPLETE GREEN STREET CHECKLIST

Section4 Design Vision & Implementation Plan

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

VIRGINIA KEY CONSENSUS MASTER PLAN

Southern Gateway Project and Public Green

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Fall 2017 Construction Update

CITY OF NORCROSS LILLIAN WEBB PARK REDEVELOPMENT AREAS

4 CIRCULATION AND TRANSPORTATION

Johnson Street Bridge Public Realm Update

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Cottage Grove Road Reconstruction. City of Madison Engineering

VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Daniels Park Master Plan

FIRST BAPTIST CHURCH SITE DARTMOUTH

theme 4 : Penn connects...

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

Public input has been an important part of the plan development process.

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Commissioners Road West Realignment Environmental Assessment

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update

TABLE OF CONTENTS. Transportation Chapter 1 - Introduction and Purpose of Planning to 1-3. Utilities

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Civic Center District

Town Center (part of the Comprehensive Plan)

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

SECTION 4(f) DE MINIMIS DOCUMENTATION

Beckett Bridge PD& E Study. Presentation to: Board of County Commissioners

Phasing and Implementation

East Whiteland Township Current Land Development Projects

Access Management: An Overview

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Citizen s Advisory Committee

SECTION TWO: Urban Design Concepts

SPRINGHILL LAKE TRANSIT VILLAGE

City of Dallas Complete Streets Program. SAME Infrastructure Forum February 2, 2018

South Davis County COMMUNITY SPOTLIGHT

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Transcription:

The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City Welcome April 21, 2010 Capital Design Advisory Presentation: Relocating Margaret Brent Hall Traffic Calming HSMC Woodshop Chancellor s Point Project Joint Maintenance Storage Facility Anne Arundel Hall/ Maryland Heritage Interpretive Center Update

Relocating Margaret Brent Hall Provides 4,500 GSF for Philosophy & Religious Studies Will not increase impervious runoff Will require archaeology study under the existing parking lot New ADA Walk + Graves Campus Center Margaret Brent Will improve ADA accessibility between the parking lot and the main entrance to the Campus Center Is not in the viewshed traveling northbound on Route 5 New Parking Recycles an existing structure Loss of parking for building offset by new parking lot (AAH/MHIC)

Traffic Calming - Refresher Review of Past Actions The College originally proposed a pedestrian bridge overpass on Rt. 5 The College conducted a traffic study with input from a traffic consultant, State Highway Administration, and Community Design Advisory After careful consideration, the concept of traffic calming was determined to be the most appropriate and effective method of improving safety along the campus Rt. 5 corridor This information was presented at open houses and the February 17, 2009 Community Design Advisory Meeting Traffic Calming Goals (as prioritized by community survey results) Improve pedestrian safety Preserve environment Preserve archaeology Cost Improve bicycle safety Preserve viewshed Improve vehicle safety Improve accessibility Minimize vehicular congestion Enhance sense of arrival

Traffic Calming Conceptual Ideas Traffic Calming Project Limits Traffic Calming May Include: Narrowed traffic lanes from 11ft-12ft to 10ft- 11ft Median islands Enhanced crosswalks with colored/textured pavement and improved pavement markings Bicycle lanes in road shoulders Sidewalks with curbs for pedestrians Landscaping to alert motorists that they have entered a more urban area Street lighting at crosswalks and along sidewalks Improved intersection at Route 5 and Trinity Church Rd. Sidewalks leading to the North Field Landscaped medians to serve as gateways with signage welcoming travelers to St. Mary s City and the College Realigning Mill Field Drive with State House Road Traffic circles at intersections Improved access to the post office parking lot

Traffic Calming Upcoming Process Hire Traffic Engineer - Summer 2010 Hold 1 st public meeting to discuss the full palette of traffic calming options Fall 2010 Develop 3 option packages considering general feedback from 1 st public meeting - Fall 2010 Present option packages at 2 nd public meeting Winter 2011 Develop a final schematic design considering feedback from 2 nd public meeting - Winter 2011 Present schematic design at 3 rd public meeting Winter 2011 Develop design and present at 4 th public meeting Spring 2011 Complete construction documents Summer 2011 Bid project for construction Fall 2011 Construction project Spring/Summer 2012

HSMC Blue Barn Replacement: Woodshop CONSTRUCTION OF A TIMBER FRAME WOODSHOP MEETS A VARIETY OF NEEDS Workshop for maintenance and repair of Museum exhibits Maryland Dove Historic reconstructions Proposed timber frame woodshop is sympathetic to existing architecture Space for Instruction in Timber Framing Classes with SMCM Workshops for the public Opportunities for demonstrations of historic skills and crafts Proposed Woodshop

Chancellor s Point: Historic St. Mary s City Part of Historic St. Mary s City Commission 66 acre site on St. Mary s River St. Mary s College Special features of the property Nature Center building Archaeology Possibilities for water access Mostly wooded Views across the Bay Accessible on HSMC trail system Route 5

Chancellor s Point Project Once the site of HSMC Nature Center and the Woodland Indian Hamlet Now being rehabilitated for use as an environmental field station and to support study of: Water quality Shoreline Flora Art Literature Perma-culture/Sustainable farming Astronomy Leave No Trace (human impact)

Joint Maintenance Storage Facility Water Tower Barn Gated Driveway Entrance New Storage Facility 50 x 144 Graveled Area Wooded Areas Garage Existing HSMC Maintenance Building Shared Use HSMC/SMCM 7200 Sq. Ft. Pre-Engineered Metal Building Minimal Tree Removal No Archaeological Concerns No Increase of Impervious Surface 500 Set Back From Mattapany Road Mattapany Road

SITE PLAN Parish hall Rectory Anne Arundel Hall SMCM Academic Anne Arundel Hall SMCM Academic Anne Arundel Hall HSMC Archaeological Curation Maryland Heritage Interpretive Center Farthing s ordinary

Program goals Anne Arundel Hall: College Academic Anthropology/Archaeology Colonial History Museum Studies Language & Cultures City archaeologists teach College courses Students work in City labs City archaeologists & College faculty mentor senior projects using collections Artifacts, Archives, and Research Library accessible for faculty research Promotes collaboration between College faculty and City archaeologists and curators Anne Arundel Hall: Archaeological Curation Research & Processing Collection Storage Library & Archives Interpretive Center serves as real life teaching lab for Museum Studies program Museum Studies senior projects develop changing exhibits for Interpretive Center Promotes collaboration between College faculty & City interpretive center staff Archaeology/Curation labs become exhibits of themselves and integrated into the visitor experience Interpretive Center Permanent Exhibits Changing Exhibits Theater

Project goal: Avoid areas of high archaeological significance Archaeology for construction: A practiced process In accordance with State and Federal requirements: Step 1- Survey the site, identify archaeology and its significance Step 2- Develop building plans that preserve/avoid archaeology to the extent possible Step 3- Develop an archaeological mitigation plan to be approved and permitted by the Maryland Historic Trust Step 4- Complete the excavations, then begin construction State House Legend Calvert Hall Kent Hall Area of high archaeological significance Anne Arundel Hall Interpretive Center

Archaeological Investigation Status Report Anne Arundel Hall Site Previous archaeological work in the site area was examined to best determine areas of high versus medium and low archaeological sensitivity. Existing parking lots: Findings show that each lot has varying amounts of preservation. Below the 1950s building:. Some areas are fully disturbed from 1950s construction, but other portions have varying levels of preservation in place. The project design is deliberately avoiding areas of high archaeological sensitivity. NEXT ACTION: Begin archaeological mitigation of specified areas of impact within the project area. Mill Field Site New parking entrance: 5 test pits were dug. Findings show that the archaeological deposit was already heavily disturbed by previous road and utility work. Mill Field: 21 additional test pits were dug further infield and demonstrated that, in this area, the archaeological deposits are intact. Cultural features and artifacts are present in this portion of the project area. The project design preserves the areas of high archaeological significance and most archaeological zones of lesser significance by constructing on graded fill rather than excavating into the existing soils. NEXT ACTION: Complete mitigation of areas directly impacted by utilities, drainage facilities and other services when project design is completed.