\JIL1 u ) i r. [ouu r fo. /~ap< s 4^ (*7 S (0. uul ooo

Similar documents
MEMORANDUM. Date: May 31, West Windsor Township Planning Board

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

Existing Transportation System 5-1

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Amendment C146 Melton Planning Scheme Expert Evidence Statement Traffic & Transport Beattys Road, Plumpton

Access Management: An Overview

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

Pine Island Road Corridor Master Plan

Whitehurst Freeway Deconstruction Feasibility Study

2040 Long Range Transportation Plan

Evaluation of Strobe Lights in Red Lens of Traffic Signals

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

Micco Park Village Development

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Advance Engineering & Surveying PLLC

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

4.11 TRAFFIC Existing Conditions Existing Project Site. Existing Street System

Transportation Research Center

BUILDER LOTS FOR SALE

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

City Of Sparks Planning Commission Item

11 May 9, 2012 Public Hearing APPLICANT: KROGER LIMITED PARTNERSHIP I

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Section 1. Executive Summary

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

CHAPTER 7: Transportation, Mobility and Circulation

TOWNSHIP OF WEST WINDSOR

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Issues Requiring Future Study

Equity and Environmental Justice B. MINORITY, ELDERLY, AND LOW INCOME POPULATIONS IN THE STUDY AREA

OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics

PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES

ANTONIO R. VILLARAIGOSA MAYOR. Transmitted herewith, is the City Engineer's report dated September 28, 2006 for Council review and approval of:

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

Further input invited as Colchester Growth Strategy nears final phase

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

OP Council Resolution June 16, Planning and Development Services

Integrating Land Use and Transportation

GENERAL LAND USE PLAN ELEMENT

Services Department B September 10, 2007

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Hastings Area Roadway System Study. February 2009

RESOLUTION NO R

D3 January 14, 2015 Public Hearing

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Chapter V-Transportation

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

5.1 Site Plan Guidelines

E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

4.1.3 LAND USE CATEGORIES

GDP BOUNDARY Christopher A. Brooks, PLS for and on behalf of Matrix Design Group, Inc. VICINITY MAP SCALE: N.T.S.

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

include playgrounds, sports fields, community gardens and picnic areas.

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

NOTE: PLEASE REFER TO MISSISSAUGA PLAN FOR ADDITIONAL CITY-WIDE POLICIES WHICH APPLY TO THIS DISTRICT.

Transportation. Strategies for Action

Right-of-Way Acquisitions and Relocations Technical Memorandum

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

September 25th, 2018 $2000 fee pd CC

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROTOTYPE DESIGN/INTRODUCTION

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

Department of Community Development Engineering Office NJDOT Municipal Aid Program - Cottrell Road Pedestrian Safety

Executive Summary. NY 7 / NY 2 Corridor

Director, Community Planning, Toronto and East York District

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

PORT UNION VILLAGE COMMUNITY SECONDARY PLAN

ARTICLE VI: SITE PLAN REVIEW

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)

MEMORANDUM. California State University Channel Islands Evacuation Planning Analysis

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Public Information Centre #1

NEIGHBORHOODS ELEMENT

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Be it enacted by the Town Board of the Town of Guilderland that the following new A (Transit Oriented Development (TOD) District) is adopted:

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

New Auburn Village Center Study Auburn, Maine

SHEFFIELD PARK Paulding County, GA DRI #588

Ref: March 21, Ms. Jody Kablack Director of Planning and Community Development Town of Sudbury 278 Old Sudbury Road Sudbury, MA 01776

Transcription:

\JIL1 u ) [ouu r fo i r /~ap< s 4^ (*7 I S (0 uul ooo B

ML000776E Consulting Engineers Land Surveyors * Professional Planners James P. Kovacs, P.E., L.S. Henry J. Ney, P.E. Peter R. Gallo, P.E. Andre Groenhoff Lawrence E. Kovacs, P.E. J u n e 1 7» J Thomas Krakow, P.E. File No. 5236 Chester P. DiLorenzo, P.E. Kevin P. McDonough William T. Wentzien, P.E. Sterns, Herbert & Weinroth 186 West State Street P.O. Box 1298 Trenton, N.J. 08607 Attn: Re: Cranbury Mount Laurel 11 Litigation Dear Mr. Herbert: As requested, I have reviewed the Zirinsky property in Cranbury to determine the traffic implications resulting from the development of this site in accordance with the Mount Laurel housing proposal. It is proposed to develop the subject property at 8 dwelling units per acre for a total of 1,152 dwelling units. The Zirinsky property, also known as Site 6, contains approximately 144.2 acres of land and is located in the northern portion of Cranbury Township, west of U.S. Route 130. Access to the site would be provided from Main Street and Plainsboro-Cranbury Road. The scope of this study included a review of the roadway conditions in the general site vicinity, a review of existing traffic flow patterns and a determination of the anticipated access locations as they relate to the historic district of Cranbury Township. A number of documents were reviewed prior to the preparation of this report, including the Mount Laurel II Compliance Program for Cranbury Township, New Jersey, prepared by the Cranbury Township Committee and Cranbury Township Planning Board; the Masters Report, prepared by Philip B. Caton, AICP; and the Cranbury Township Land Use Plan. Gibson East Buildino 90. Gibson Plare Freehold New Jersev O772R 701 /4R9-9414 411-1440

Page -2- An assessment was conducted of existing and proposed developments in an effort to establish existing and future travel desire lines from the subject property. Estimates of traffic to be generated by the 1,152 dwelling units were developed based on studies published nationally by the Institute of Transportation Engineers and from research data compiled by this firm at similar developments. Based on the anticipated travel desire lines, site traffic was distributed to the adjacent street system and an assessment made of the impact on the historic district in downtown Cranbury Township. The anticipated access locations for the subject property were assessed to determine the impact said locations would have on traffic movements through the historic district. The accessibility to the Village area and the commercial facilities provided therein was reviewed with respect to pedestrian and vehicle access. Upon a review of the foregoing information, a final conclusion was reached as to the overall impacts anticipated to occur within the historic district of Cranbury Township, should the development of Site 6 for 1,152 dwelling units receive approval. The roadway system in the general Cranbury Township area consists of principal arterial highways, major and minor collector roadways and local roadways. The principal arterial roadways in the general site vicinity are U.S. Route 130 located east of Site 6 and U.S. Route 1 located to the west of the subject property. These roadways are multi-lane, divided arterials, providing region wide service. The New Jersey Turnpike, also located to the east of the site, is a multi-lane, north-south limited access arterial providing interchange location from New Jersey Route 32 in Monroe Township and New Jersey Route 33 in Hightstown. The New Jersey Department of Transportation is presently studying the location and construction of Route 92 which has been proposed as an east-west connector roadway in the general area. Several alternative alignments for Route 92 are presently under consideration. Although the westerly terminus is anticipated to occur at Route 206 in Montgomery Township, the location of the easterly terminus is still in question. The primary locations for the easterly terminus include New Jersey Route 33 in Hightstown and New Jersey Route 32 near^ the turnpike interchange in Monroe.

Page -3- The major collector roads in the general site vicinity include County Route 535-, Dey Road, Station Road, and Main Road. Plainsboro-Cranbury Road is also a collector type roadway, providing a direct connection from County Route 535 west to U.S. Route 1. A review was conducted of the anticipated development in the region as outlined in the "Mount Laurel II Compliance Program for Cranbury Township, New Jersey". The major developments presently proposed or under construction are oriented primarily to the U.S. Route 1 corridor located west of the subject development. The following figure depicts the location of the major developments located proximate to Cranbury Township.

Page -5- As can be seen from Figure 1, the Route 1 corridor represents the substantial growth area from the standpoint of industrial and commercial activity. With respect to Site 6, Plainsboro-Cranbury Road provides direct access to the Route 1 corridor without the need to traverse the Historic Village area of Cranbury Township. It is this firm's judgment that the majority of site generated traffic will be drawn in a westerly direction as a result of the extensive Route 1 corridor development. It is estimated that approximately 50% of site generated traffic will be oriented toward the Route 1 corridor. Twenty-five (25%) percent of site generated traffic is anticipated to be oriented toward the New Jersey Turnpike and Monroe Township area, with 10% oriented toward East Windsor Township, and the remaining 15% oriented to the south and west toward the West Windsor area. With respect to the impact on the Historic Village of Cranbury, it is anticipated that only the 10% of site generated traffic oriented toward the East Windsor Township area would require the use of roadways traversing the Historic Vi1lage area. Based on studies published nationally by the Institute of Transportation Engineers, as well as research data compiled by this firm, trip generation estimates have been developed for the 1,152 multi-family units proposed. Table I has been prepared to outline this anticipated trip generation. TABLE I Trip Generation A.M. Peak Street Hour P.M. Peak Street Hour ie Out Total Hi Out Total 138 507 645 507 253 660 As can be seen from Table I, and as is typical of residential developments, the primary movements will occur as outbound movements during the A.M. Peak Street Hour and inbound movements during the P.M. Peak Street Hour. Based on the site traffic distribution outlined above, the following figure depicts the traffic volumes anticipated to be generated by the proposed development and the orientation of said volumes.

TRAFFIC Figure 2 DISTRIBUTION 5^36

Page -7- In comparison with other sites considered for Mount Laurel development, particularly those to the east of U.S. Route 130, it is evident that the development along the U.S. Route 1 corridor will tend to pull this traffic to the west and require crossing through the Historic Village of Cranbury Township. It is anticipated that the development of tracts to the east of Route 130 will have a more significant impact on the Historic Village than development of Site 6. As previously mentioned, access to the subject property is anticipated to be provided in the northeasterly corner of the site on Main Street and in the southerly portion of the site, on Plainsboro-Cranbury Road. This interconnected access system will enable much of site generated traffic to circulate through the site and onto the adjacent street system of Cranbury Township, at the same time minimizing the use of Main Street south of the site access location. Figure 3 has been provided to depict the anticipated location of the proposed site access.

Figure 3 SITE ACCESS LOCATIONS 5236

Page -9- As can be seen from the foregoing, access to Site 6 is such that impacts on the Historic Village area can be minimized. The link provided between Plainsboro-Cranbury Road and North Main Street provides in effect a diversion route enabling a bypass of the downtown area. Although it is not predicted that vast numbers of motorists presently using the downtown area intersections will utilize this diversion route, it is anticipated that some diversions will occur, further reducing overall impacts on the downtown village area. It is also important to consider that although the Department of Transportation has not finalized the Route 92 location, all of the locations presently under consideration would result in accessibility to Route 92 from Site 6, occurring primarily to the west of the site. Although an interchange for Route 92 has been proposed at Cranbury Road, westbound traffic from Site 6 would have more efficient access to Route 1 from Plainsboro-Cranbury Road and would in all probability not use the Cranbury Road interchange. Westbound traffic from sites east of Route 130 would utilize the Cranbury Road interchange with Route 92. Again, the anticipated locations for Route 92 and the development of the Route 1 corridor, as well as the proposed access concept, combine to reduce overall impacts from this site on the Historic Village of Cranbury Township. The downtown area of Cranbury Township provides commercial activity, police and fire services and elementary school services. Of all of the sites under consideration, Site 6 is the only site with significant proximity to the downtown area to foster pedestrian use of the facilities provided. Access to the village area would range from one-half to three-quarters of a mile from the subject property, well within reasonable walking distance for. minor shopping trips. The result of this proximity would be decreased automobile usage from the subject property to the downtown area than could be anticipated from the development of many of the other properties under consideration. It is certain that some additional vehicle movements will be generated through the village area as a result of shopping trips, however, the development of Site 6 lends itself well to minimizing these additional traffic movements. Referring to the Masters Report, "Site 6 is clearly the superior location among the four plaintiff sites" as it relates to pedestrian access. The Masters Report further states that n...this proximity would diminish the residents 1 reliance on the automobile and act to ease the traffic congestion which has been discussed previously."

Page -10- In conclusion, the development of Site 6 for 1,152 multi-family units is, in my judgment, a development scheme that will have minimal impacts on the downtown Historic Village of Cranbury Township. My conclusions are summarized as follows: Site generated traffic will be oriented primarily toward the Route 1 corridor, with a secondary impact north of the site toward Monroe, resulting in no impact to the village area. It is estimated that some 10% of site generated traffic may utilize the downtown area to gain access to locations southeast of the site, primarily the East Windsor Township area. This additional traffic volume generated is minor in comparison to the anticipated impact generated by developments east of Route 130 which, in light of the Route corridor distribution, will traverse the village area. o The site development plan calls for a connector road from Plainsboro-Cranbury Road to North Main Street, creating a bypass of the village area. This connector will provide a diversion for some percentage of traffic presently utilizing the village street system to gain access to the Turnpike and points north. The North Main Street access, as proposed, will service traffic oriented to Monroe and the New Jersey Turnpike from the site without the need to traverse the downtown village area. The construction of Route 92 is oriented primarily west of the site, further accommodating a westerly distribution from Site 6. A review of the location of Site 6 as it relates to the village area indicates said site to be particularly suited for pedestrian access to the village area. This should result in a reduced impact on the village from the standpoint of commercial trips. The advantage of this pedestrian access is further supported in the Masters Report. It is therefore my conclusion that Site 6 represents a feasible location for the proposed Mount Laurel units and the development of same will not have a detrimental impact on the Historic Village area of Cranbury Township. Very truly vours, HJN:KPM:ms Henr^Cff. Ney, P.E.