Piping for and installation of radiators in accordance with 'Safe Water Installation'

Similar documents
Uponor Comfort E AL-Foil Mat

UPONOR Ltd. Specification for UPONOR Q&E PEX Shrinkfit Plumbing Systems

INSTRUCTION. Danfoss heating cable mats type 100/150 Danfoss heating cable mats for thin floors. Danfoss heating cable mat type 100/150

Installation Instruction

Guidelines for Specifying Structured Plumbing Systems January, 2007

Underwood Heater Installation Manual

Secondary systems used in Europe.

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

How to install underfloor heating

Making Crimp Connections

Assembly instructions for LK PressPex

Electric Warm-Stretch under floor heating

Installation Guide. Heating cables. Thin concrete (< 3 cm) Intelligent solutions with lasting effect. Visit DEVI.com

CERTIFIED UNDERFLOOR HEATING WITH 15 YEARS GUARANTEE

Staying Independent. A Fall Prevention Checklist

Underfloor Heating Cable Installation Manual

A Home Safety Checklist

Meeting the One-Cup Challenge

Overview Frost Heave Prevention for Freezer floors on ground.

Short-Term & Accessory Short-Term Rental Safety Certification

City of Philadelphia

Water Underfloor Heating Kit

WATCH OUT! UNDERNEATH THE WOODEN FLOORING IS A 230 VOLT HEATING FOIL SYSTEM! NEVER DRILL OR SCREW INTO THE FLOOR!

floor heating system

Underfloor Heating Mat Installation Manual

4 1 Heating. wooden floors or renovated floors.

Merloni Elettrodomestici. Technical Fitting Manual DISHWASHER. Language Issue/Edition Page GB /

Tube Clamp Submittal Information Revision A: July 25, 2013

ELECTRIC HEATING THERMOSYSTEM

Warm Feet For Uncoupling Membrane Pour membrane de désolidarisation. Installation Guide Floor Heating Cable

Heating Installation Guide published by

VITUS BERING, CENTRE FOR HIGHER EDUCATION

SINTEF Building and Infrastructure confirms that. LK Universal pipe in tube system

DOMESTIC HOT AND COLD WATER SUPPLY AND CENTRAL HEATING SYSTEMS. Guidance Notes

Underfloor Heating Inscreed Cable System

LIFETIME. INSTALLATION MANUAL emat Pro 100w/150w/200w WARRANTY

INSTRUCTIONS FOR LAYING OF WOOD FLOORING ON UNDERFLOOR RADIANT HEATING AND COOLING

Intumescent Fire Dampers

IMPORTANT NOTES. Electric Underfloor Heating Mats For use with Touchsceen underfloor heating Thermostat

A new age in HEATING. ROTEX Monopex The natural way to save energy! The complete heating system

Water Underfloor Heating Kit

FOR ENGCON STONE AND SCRAP HANDLING GRAB SK05ST-SK30ST THE WIDEST RANGE ON THE MARKET

METIS. Installation instructions. Riser rail kit INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER.

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HYDRONIC PIPING.

Installation Guide. Maximum Area 20m 2

bout your HOUSE Hydronic Radiant Floor Heating CE 4

HeATING. VENTILATION. COOLING. in ONE SYSTEM.

Assembly instructions for Minib convectors

Improved Chilled Water Piping Distribution Methodology for Data Centers

Foil Heaters. Installation Manual: TECHNICAL HELPLINE

Silent Gliss. Venetian Blind Systems

electric floor heating Heating mats Heating cables Temperature controllers

Technical Checklist - Plumbing and Heating Fittings - UK Sizes

A. ASHRAE Handbook HVAC Applications, Snow Melting and Freeze Protection

ROOM AIR CONDITIONER INSTALLATION MANUAL

Undertile Heating Mat. Instructions. CORGI Underfloor Heating - Quality, Flexibility, Safety 1

Simple. Smart. Solutions. ROOM PACK Z2105/239/0812. Step by Step Installation Guide

SAFETY INSPECTION REPORT

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

Electronic Standard Devices. Annunciator Relay. MR 11 and MRE 11 MR 21 and MRE 21

Polymer solutions Heating mat EM2-CM

A Home Safety Checklist

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

RESCOM 2100 HOT WATER BASEBOARD RADIANT HEATING Unique, slim-design baseboard radiators

Section Plaster Accessories

electric floor heating Heating mats Heating cables Temperature controllers

INSTALLATION INSTRUCTIONS

Assessment Schedule - TS.6

Introduction. Overview DOMESTIC HOT AND COLD WATER SUPPLY AND CENTRAL HEATING SYSTEMS

Installation Manual Water Tempering Manifold

Home Safety Checklist *

Air Excellent. Straightforward, effective air distribution

Installation Manual Loose cable underfloor heating. A large print version can be downloaded from our website. www. underfloorheatinghq.co.

Marketing and commercial information of KAN GROUP. Winter novelties in KAN-therm offer!

Product Name: Guardrail Receiver

VERTICAL VONOVA & VERTICAL VONOPLAN. 20 VERTICAL VONOVA & VERTICAL VONOPLAN PANEL RADIATORS. VERTICAL VONOVA Type 20. VERTICAL VONOPLAN Type 20.

GASTEC QA. Approval Requirements 69-1

Floorless-Engineering

Method Statement. General Site preparation by others: Preparation for screed system by others: Preparation for plate system by others:

Home Safety Checklist. Cambridgeshire and Peterborough Falls Prevention Services

ALL THE HELP YOU NEED TO MAKE YOUR DREAM KITCHEN A REALITY. 4 STEPS TO YOUR NEW KITCHEN Planning guide 2018

DEMO REPORT. LOCATION : BUILDING 01 Building 01/ Compartment 2

Fire safety advice for all our residents

QUALITY CONTROL Passive House Checklist

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

QuickNet System Installation Manual Manuel d installation du système QuickNet Manual de instalación del sistema QuickNet

Choosing the installation site. Installation. 07 Choosing the installation site

Instructions for Operation and Maintenance of Containers

HOME SECURITY. 2 - Basic security

Element Z General Design Requirements Existing Facilities Information

Home Safety Checklist For Older Adults

August Safety Subject

Ensure nut and olive are in place before inserting pipe insert.

Home Safety Checklist From Adaptive Remodeling Solutions, LLC Monona, WI

Your home and your maintenance responsibilities as a tenant

CoziMat. 1. Introduction and Brief Description COZIMAT INSTALLATION INSTRUCTIONS & SAFETY REQUIREMENTS

Installation Instructions

Become familiar with the subject areas in the table of contents for OSHA standards through and

INSTALLATION INSTRUCTIONS ONE LARGE ZONE

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT

Transcription:

84 PTB.1 Heating and sanitation Piping and installation of radiators Piping for and installation of radiators in accordance with 'Safe Water Installation' Pre-conditions Preparation Self-control Execution This work instruction is designed for use in detailed planning and preparation of work on construction projects. With thorough planning high levels of personal safety and optimal work apportionment can be achieved at the same time as the work can be organized efficiently and cost effectively.

Pre-conditions 1(4) Explanations Building component: 84 Heating and sanitation Piping and installation of radiators 2 (14) Plumbing safely means that works are: installed according to installation instructions. checked against the attached checklist. performed according to certain rules by an installer who is authorized and who possess branch legitimacy. documented by certificates are submitted to the client. See also: www.sakervatten.se The rules have been established for the following reasons: * Health aspecta: * Safety: Risk of burns, legionella infection and other infections. Secure Installation = lower life cycle cost.

Pre-conditions 2(4) Safety Protective gear Building component: 84 Heating and sanitation Piping and installation of radiators 3 (14) Requirements of Safe Water Installation: Materials from different manufacturers should not be mixed. Examples of piping

Pre-conditions 3(4) Safety Risk assessment Building component: 84 Heating and sanitation Piping and installation of radiators 4 (14) Work activity & Problem P C Risk= P*C Action Overloading, stretching 10 70 700 Use the transport and lifting aids for radiators Fall from ladder, fall injuries 10 15 150 Wider use of scaffolding Cluttered workplace =Twisting or fall injuries 10 15 150 Regular tidying Assessment of probability Assessment of consequences Probability = P P = 0,1 Very unlikely (<1 times/10 years) C=0,5 Trifle Consequence = C P = 1 Unlikely (1 times/10 years) C=1 Tiny ( 1-2 days sick leave) Risk = P * C P = 3 Low probability (1 times/3 years) C=5 Small ( 3-7 days sick leave) P = 10 Relative probability (1 times/year) C=15 Tactile ( 8-29 - - ) P = 30 Probable (1 times/month) C=70 Severe (30-299 - - ) C=500 Very severe (>300 - - )

Pre-conditions 4(4) Safety Protective gear Building component: 84 Heating and sanitation Piping and installation of radiators 5 (14) Text from the Working Environment Authority s brochure Safer Construction Work First Aid 31 First aid should be provided. Staff who are trained to provide first aid should always be made available. Facilities and first-aid equipment should be marked with signs. There will also be signs indicating telephone numbers for ambulance and police, address and, if necessary, a route description. Provisions for First Aid is also available in AFS 1999:7 "First aid and emergency support. Access routes 63 For each location where work is performed, there shall be safe means of access such as stairway or gangway. Leaning ladder is usually not suitable as an access. Access and transportation 38-41 and 53 Between different levels there shall normally be a stair or ramp. If the level difference between the two levels is more than ten metres and this means that workers have to walk a lot on stairs, a lift shall be provided in addition to stairs.

Building component: 84 Heating and sanitation Piping and installation of radiators 6 (14) Preparation 1(2) Equipment and machinery Equipment for drawing PEX pipes Besides the plumber s usual equipment required for installation of PEX pipe Uponor Pipe For perpendicular and burr-free cutting of PEX pipe dimension 15-22 mm conduit with dimensions: 25/20, 28/23 and 34/29 respectively. Expander Tool: Manuell eller batteridriven

Preparation 2(2) Deliveries - logistics Radiators and convectors are heavy and bulky. Much time and effort is spent transporting them. The stockpile should be planned to minimize transportation and injuries. PEX pipes Wirsbo- PEX pipes are made of 'cross-linked polyethylene' which neither rusts nor gets covered with verdigrease. Qualities which can eliminate common causes of leaks. It is installed without joints and is provided with an outer protective pipe that flows into a 'safe' place and reveals any leaks. This is particularly important in embedded pipes. Building component: 84 Heating and sanitation Piping and installation of radiators 7 (14) The protection tube Heat conduction and cold water lines should be separated so that the heat transfer between the pipes is not effected. Shall protect against damage and lead lout leakage. It also meets the requirements of interchangeability in the same way as electrical cables may be replaced in their protective tubes can PEX pipes be replaced after many years even when cast into the building frame. Installation Requirements The tubes should be laid with gentle bends with large radii to facilitate any future interchanging of PEX pipe. The Uponor manifold cabinet requires wall thickness of 95 mm! Other requirements Max pressure of 1 MPa and 95 degrees C.

Self-control 1(2) Template & instructions Building component: 84 Heating and sanitation Piping and installation of radiators 8 (14) No Check Metod or equipment Frequency Result Date Signature 1 Leakage testing According Uponor, Checklist After installation Deviation/Remedy Approval/Non-A 2 Functional control After installation 3 4 5 6 7 8 9 10 11

Self-control 2(2) Key points Building component: 84 Heating and sanitation Piping and installation of radiators 9 (14) Quality criteria for the project and the product Study Drawings, Specifications and Control plan Think through the alternative methods of production and handling of materials, tools etc. that can meet the requirements Pay particular attention to Set out and check pipe routing Do not mix different brands Mount radiators according to the manufacturer's instructions Do not mount damaged or faulty radiators or pipes

Execution 1(5) Work activity Building component: 84 Heating and sanitation Piping and installation of radiators 10 (14) Routing of vertical sewage and waste pipes: In the basement up to the risers in stairwells. On the wall below shows the pipes for: Heat Circulation Cold and hot water Heating convectors Underfloor Heating In the stairwells the pipes lead up the shaft before the pipes are distributed to each apartment. Cast-in pipes are collected together in a 'central' in the apartment. This is built into the plasterboard walls.

Execution 2(5) Work activity Building component: 84 Heating and sanitation Piping and installation of radiators 11 (14) When embedding in floors and walls The pipes shall be laid with large radius given that PEX pipes must be capable of being replaced. Stable fixation, here on the reinforcement Cast-in heating pipes here seen sticking up for subsequent connection into a distribution cabinet.

Execution 3(5) Work activity Building component: 84 Heating and sanitation Piping and installation of radiators 12 (14) Heating pipes are embedded in the concrete screeding For frame constructions with pre- cast units, the installations are embedded in the concrete floor screeding. The building height is small, just a few centimeters, and, therefore, intersecting pipes, large bends etc. should be avoided. Collection of pipes at the sub-station

Execution 4(5) Work activity Building component: 84 Heating and sanitation Piping and installation of radiators 13 (14) Wall brackets fixtures At penetrations in plasterboard walls, it is necessary to fix the pipes. Many external walls are built using wooden studding. Otherwise steel is most common at the present time.

Execution 5(5) Work activity Building component: 84 Heating and sanitation Piping and installation of radiators 14 (14) Radiators and convectors mounted Some can be installed before laying the floor - here parquet. Others must be installed afterwards as evidenced by the photos. - Why? Mounting brackets for wall mounted radiators are carefully set-out and with fastenings adapted to the wall material. Finally: Covering and protection!