Phase 2 Public input: engagement

Similar documents
Keele Finch Plus: September 28, 2017 Open House & Public Workshop

EX Memo. John Tory, Chair of the Executive Committee

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Transit-supportive development and city-building

RESEDA - WEST VAN NUYS COMMUNITY PLAN

Welcome. Walk Around. Talk to Us. Write Down Your Comments

WELCOME and introduction

Keele Finch Plus Downsview Airport Operational Needs Assessment Executive Summary

In surveys, Dallas residents say what they want to change most

URBAN DESIGN ACTION PLAN. Community Design and Environmental Services Committee April 20, 2009

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

CITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY

burlington mobility hubs study Downtown Burlington Mobility Hub

GOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018

Burnside Gorge Neighbourhood Plan. Engagement Summary

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

Local Growth Planning in North Central Green Line Communities

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Lehigh Acres Land Development Regulations Community Planning Project

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

DOWNSVIEW AREA SECONDARY PLAN

Director, Community Planning, North York District

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

Mount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach. Planning and Growth Management Committee

CREATE A VIBRANT MIXED-USE COMMUNITY

Public Open House. YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m.

Planning Board Briefing

178 Carruthers Properties Inc.

Laird in Focus Community Information Session

York University Precinct Plan for the Southwest Precinct (North) April 2014

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

TSAWWASSEN TOWN CENTRE REDEVELOPMENT BLOCK A 004

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE

Midtown Greenway Land Use and Development Plan Executive Summary

Town Center (part of the Comprehensive Plan)

Official Plan Review

3. Urban Design in the Central Area

Public input has been an important part of the plan development process.

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

CHAPTER 7: Transportation, Mobility and Circulation

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

Building out the Regional Growth Strategy in Surrey: a Strong Centre & a Connected Transit City

Trafalgar Road Corridor Planning Study FINAL REPORT

DALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

Director, Community Planning, North York District

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Clairtrell Area Context Plan

Rapid Transit Implementation Working Group

Equitable Growth Through TOD Planning

401/Keele Provincial Campus Ontario Realty Corp.

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

City of Long Beach. creating vibrant and exciting places

The West College Avenue Corridor Redevelopment Plan

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation

11.3 Steeles West Secondary Plan

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

DRAFT DRAFT DRAFT DRAFT

Niagara GO Hub and Transit Stations Study

1 Welcome! UBC Okanagan Master Plan Update - Open House

b r a n c h av e n u e tr a n s it co r r i d o r r e vita lization pl a n a m o d el fo r s u b u r ban retro fit

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

South Yonge Street Corridor

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Port Credit Local Advisory Panel October 20 th Meeting

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017

QUEEN-RIVER SECONDARY PLAN

St. Clair Avenue West Area Transportation Master Plan

Plan Framework Report. Attachment A

UPDATE ON THE INDEPENDENCE BOULEVARD AREA PLAN. Citizen Advisory Group Meeting March 3, 2011

*** DRAFT 2 FOR PUBLIC REVIEW ***

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Agincourt Mall Planning Framework Review Status Report

planning toronto s downtown Parks and Public Realm Plan Request for Proposals Information Meeting Andrew Farncombe, Project Manager August 19, 2015

What We Heard. Downtown Georgetown Planning Study. April 4, 2018

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

O'Connor Drive Avenue Study Toronto and East York District and North York District Final Report

Weston 2021 Design Charrette / may 2011 Part 1 of the Weston 2021 Initiative led by the City of Toronto

The University District envisions, in its neighborhood

1 Adapted from the Statewide Transit-Oriented Development Study by CalTrans, 2006

Public Forum. Kelley s Corner: The Corner that Connects Us. The Cecil Group. March 7, Acton 2020 Town of Acton.

Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017

WQW Study Community Meeting June 26, 2017

Status Report: MD 355 Project

Comprehensive Plan Advisory Panel Meeting #3

Vision Plan Kickoff Meeting Summary Report

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

City of Toronto. Emery Village Transportation Master Plan

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

Transcription:

Phase 2 Public input: engagement Public Meeting Planners in Public Spaces (PiPS) A PiPS event was held at the York University Station (May 27, 2017). There were approximately 30 discussions about Keele Finch Plus among the hundreds of attendess. More PiPS events are being planned for the Fall 2017. Other Outreach The second open house and public workshop took place on March 7, 2017, at James Cardinal McGuigan Catholic Secondary School. About 60 people participated. Photos above show participants involved in activities and writing comments, and an audience watching the presentation. Planners visited schools and spoke with students, attended DUKE Heights Business Improvement Area events, and conducted other outreach to learn from local residents and businesses about what is important to them as the area grows. Over 200 people were signed up to the email listserv.

In March 2017, a public workshop was held. Participants were asked to identify where they would like to see new connections, improved connections, or where connections should be made formal. This board shows some of the results. A Consultation Summary is available at Better connect the area in general, especially the different residential communities. Make informal connections more formal. Make connections more direct (e.g. the eastwest hydro corridor trail connection across Keele Street). The maps above are a digital summary of all connections provided from the public in March 2017. On the left are pedestrian/cycling connections, with streets on the right. The images below show some of that work. Better access to community assets like the community garden & library. More pleasant connections with improved sidewalks, greenery, and public realm improvement....and many more comments. Thank you for your input & participation! More ways to get around with more streets.

Area of Development Focus In March 2017, a public workshop was held. Participants were asked to identify where they would like to see new development occur in the future. This board shows some of the results. A Consultation Summary is available at Several participants identified two nodes: 1) Keele & Finch, and 2) & Finch. Keele & Finch should be a retail/commercial node, with & Finch more residential. All areas should have improved green and open spaces with new development. The map above is a digital summary of where participants told us they would like development to be focussed. Where more tables selected an area, it shows up darker. Below are examples of participant work. Secondary development areas southeast of Keele & Finch, and along both major streets. Infill on tower sites - more so at Fountainhead than along Four Winds....and many more comments. Thank you for your input & participation! Some interest in redevelopment north of James Cardinal McGuigan.

Building Types In March 2017, a public workshop was held. Once participants were asked where development should be focussed, they were then asked about what type of development. This board shows some of the results. A Consultation Summary is available at There was general consensus that midrise and taller buildings should be considered at Keele & Finch, and at & Finch. Participants felt that office and commercial midrise buildings were appropriate on the east side of Keele south of Finch, as well as east of Tangiers. Participants at the March 2017 public workshop are shown here working with facilitators to identify what types of buildings should be considered in the future, and where they should be considered. There was some debate about development on the west side of Keele, and on the south side of Finch between the two nodes. Some suggested townhouses, while others suggested walk-up buildings and midrise...and many more comments. Thank you for your input & participation! buildings.

Guiding Principles Emerging Principles were reported to Council in 2016. These were based on a combination of research, technical assessment and public input obtained through Phase 1 of the Study. In March 2017, we asked participants to complete a survey on the the emerging principles. Results are shown below for each principle. Involve the community in transforming the area into a transit supportive place over the medium to long term. Ensure the complexity of the area is well understood and 76% Strongly Support 24% Support expressed. Investment and change in policy should reflect the differences in the area. 67% Strongly Support 24% Support Encourage compact development that frames public streets and the public realm of parks and open spaces at good proportion, and both supports and leverages the investment Support and encourage a more comfortable, walkable, cycle friendly and more beautiful public realm. 86% Strongly Support 10% Support Investment is needed in the public realm to make it more functional and connected, and to enhance the identity and liveability of the area. 76% Strongly Support 24% Support Encourage a vital employment area that supports a range of business activities. Improve the transportation network by making new connections, supporting goods movement, reducing 62% Strongly Support 33% Support block sizes and encouraging walkability. This supports active transportation options such as walking/cycling. 81% Strongly Support 10% Support in transit. 71% Strongly Support 14% Support Additional guiding principles based on March 2017 feedback: Encourage development that contributes to the vitality and vibrancy of the area, and provides amenities and services. Ensure that the future uses and built form support and complement the existing employment uses in the area, including nearby industry and Downsview Airport. 90% Strongly Suppor 10% Support 57% Strongly Support 19% Support Support a high quality of life for current and future residents and workers. 90% Strongly Support 4% Support t Make better use of existing green spaces, including parks, the ravine and hydro corridor. Leverage the transit to support new employment opportunities. Encourage flexible design of buildings and public spaces that can adapt as the area evolves.

Study boundary The Study Area The Pond Rd York University Secondary Plan Area Cook Rd Leitch Ave Haynes Ave Evelyn Wiggins Dr Keele St CN Rail Flint Rd Murray Ross Pky The boundary was informed by several inputs, Four Winds Dr including: Rapid Transit Areas in Provincial Policy; 800m Mobility Hub area in the Regional Derrydown Rd Fountainhead Rd Rd Broadoaks Dr Toro Rd Tangiers Rd LePage Ct Transportation Plan; existing City of Toronto planning framework, including the York University Secondary Plan; Hucknall Rd Paulvale Cr Romfield Dr Council Cr Catford Rd Finch Ave W Alexdon Rd Chesswood Dr Ashwarren Rd Input from the March 2017 public workshop on where development should be encouraged is shown in pink above. The darker the colour, the greater the consensus among participants. This feedback helped us identify the study boundary (black line). The Pond Rd natural and man-made boundaries such as York University Secondary Plan Area ravines and roadways; Cook Rd Haynes Ave Leitch Ave Evelyn Wiggins Dr Keele St CN Rail Flint Rd the impacts of heavy industries; and Murray Ross Pky public consultation and input from residents, Four Winds Dr businesses, and stakeholders as shown in the example on the upper right. Derrydown Rd Fountainhead Rd Rd Hucknall Rd Paulvale Cr Broadoaks Dr Romfield Dr Council Cr Catford Rd Toro Rd Tangiers Rd Finch Ave W Alexdon Rd LePage Ct Chesswood Dr Ashwarren Rd Grandravine Dr Downsview Park GO Transit

Public realm concept Plan Public Realm Concept Plan / ORK WOODS / YORK UNIVERSITY S UNIVERSITY S JACK EVELYN WIGGINS Romfield Dr. JACK EVELYN WIGGINS JAMES CARDINAL McGUIGAN Romfield Dr. JAMES CARDINAL McGUIGAN Villata Gardens Villata Gardens Council Crescent Catford Road Catford Road Broadoaks Council Crescent Keele Street Main Keele Street Main Lepage Court Lepage Court COMMUTER ING Finch Avenue West Finch Avenue West COMMUTER ING Tangiers Road Tangiers Road Toro Road DUKE HEIGHTS BIA Toro Road Alexdon Road 800m DUKE HEIGHTS BIA Alexdon Road 800m EXISTING BRT / KEY Parks and open spaces existing Potential new/improved parks Proposed City Parkland Plazas/POP s - new/proposed Keele/Finch streetscape stations / entrances stops rail and portal (approx.) Bus lane/connection - future Existing streets Streets (approved/ under construction) New public streets Potential (Street/path/walkway/lanes) Existing signalized intersection/ crosswalk Potential signalized intersection Trails Cycle connections Green edge to fuels distribution facilities Study Area York University Secondary Plan Area Public Realm Concept Plan S / YORK UNIVERSITY S JACK EVELYN WIGGINS Romfield Dr. JAMES CARDINAL McGUIGAN Villata Gardens Catford Road Broadoaks Council Crescent Keele Street Main Lepage Court COMMUTER ING Finch Avenue West Tangiers Road Toro Road DUKE HEIGHTS BIA Alexdon Road 800m EXISTING BRT / KEY Parks and open Potential new/ Proposed City Plazas/POP s - Keele/Finch str station stops rail and po Bus lane/conn Existing streets Streets (approv construction) New public str Potential (Street/path/w Existing signal crosswalk Potential signa Trails Cycle connecti Green edge to distribution fac Study Area York University Plan Area Broadoaks WALMART WALMART Ashwarren Road Ashwarren Road Keele Finch Plus Public Realm Plan 0m SCALE TO DOWNSVIEW 50 100 200m NORTH Greening WALMART Ashwarren Road Keele Finch Plus Public Realm Plan 0m SCALE TO DOWNSVIEW 50 100 200m The Public Realm Concept Plan includes the general location of connections. These connections may be paths or cycling connections, or new streets. The connections are based in part on your input. The Public Realm Concept Plan shows areas where new greening should be encouraged. This includes parks, open spaces, plazas, landscaped areas in front of buildings and some streetscaping elements. These greening areas are based in part on your input. An updated network of connections will help people reach their everyday needs more directly: shopping, parks and open spaces, school, work and to/from Station and stops. What do you think of these connections? A network of open spaces and greener streets could help improve the look and feel of the area, while making walking and cycling main streets more comfortable. What do you think of the greening strategy?