SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Similar documents
Beckett Bridge PD& E Study. Presentation to: Board of County Commissioners

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Kick-off Meeting. FM No: ETDM No: 14050

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

I-95 Interchange & Ellis Road PD&E Study

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Purpose of Tonight s Meeting

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Community Workshop. City of Richmond. January 25, 2011 SF Bay Trail Connection - Castro St to Richmond-San Rafael Bridge

ITS Concept Development Activity Descriptions

Pennsy Greenway Trail

SECTION 4(f) DE MINIMIS DOCUMENTATION

SR-2 Freeway Terminus Improvement Project

Howard Frankland Bridge Regional Transit Corridor Evaluation

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

2040 Long Range Transportation Plan

Clay Street Bridge Replacement Project

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Interchange Justification Report (IJR) and PD&E for S.R. 8 C.R. 4 (Antioch Road) Interchange

Pinellas County Greenways

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Wiles Road from University Drive to Riverside Drive

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

FDOT D4 Complete Streets

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

TAC/CAC, TPO Project Update February 2016

WELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

State Project No Heroes Tunnel

Construction Engineering & Inspection

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Pine Island Road Corridor Master Plan

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Public Information/Cultural Resources Committee Workshop August 15, Florida Department of Transportation District One

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

CENTERTON ROAD BRIDGE REPLACEMENT

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION

Categorical Exclusion (CE) Determination Project Narrative

I-90 Mississippi River Bridge & Interchange Project

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

AGENDA ITEM 3A Red Hills Coastal Parkway

Poinciana Parkway Extension Project Development & Environment Study

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Southern Gateway Project and Public Green

HISTORIC PRESERVATION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

COLLIER BOULEVARD (CR 951) CORRIDOR

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

T H A T E V E R Y O N E

Access Management and Site Plan Review. Robert W. Hofrichter Asst Administrator, Transportation and Mobility Planning Division April 2014

Places29: List of Implementation Projects

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Public Meeting December 1 st, 2011

SELMON GREENWAY FEASIBILITY STUDY. For: Hillsborough County Metropolitan Planning Organization By: Renaissance Planning

ORDINANCE NO WHEREAS, the recommendations from the Pinellas County Local Planning Agency have been received and considered.

Welcome to the 2018 FRPA Conference!

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

DESIGN CRITERIA PACKAGE

Capital Projects impacting Odenton Town Center

2017 Asphalt Contractors Association of Florida Pavement Awards

Mississippi Skyway Preliminary Engineering Report

Public Information Meeting

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

Project Overview. Get Involved. Public Information Meeting. Contact Information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Rezoning Transportation Analysis Petition Number: General Location Identifier:

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Creating a Supportive Organizational and Policy Framework Luisa Paiewonsky. John D. Pagini, AICP USDOT CCAPA PDO

September 28, 2017 Wentworth Avenue (CR 8) Sidewalk Improvements Open House

Route 1 Corridor Study

1.0 Circulation Element

26/Old Dominion Task Force

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

PRELIMINARY PUBLIC NOTICE 1-161

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Asbury Chapel Subdivision Sketch Plan

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

ESTABLISH AN EFFICIENT TOWN CENTER

Introduction and Overview

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

This page left intentionally blank.

Transcription:

KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1

2 PROJECT LOCATION

PROJECT HISTORY 2012 Bridge Replacement Study 2013 Trail Alignment Study 2001 Gandy Blvd. Causeway Enhancements 2003 City Trails Program North Bay Trail Extension #19 Priority on MPO TA Program Bridge Replacement CIP 1036A Construction Funding 2018/19 3

PROJECT OBJECTIVES Address the bridge deficiencies Built in 1962 (52 years old) Sufficiency Rating = 66.7/100 Functionally Obsolete w/ Unknown Foundations Provide trail and pedestrian features consistent with the City s Trails Program & 2040 LRTP Provide Connection from North Bay Trail (Macoma Dr.) to Friendship Trail (Gandy Blvd.) Determine Bridge Configuration for Trail Identify Safe Crossing Locations Develop Environmental Documentation Necessary to Maintain Funding Opportunities 4

PROJECT LIMITS & SCOPE Project Approach: Document as PD&E for Bridge Replacement with a trail enhancement component add-on Simplify level of documentation Address different funding sources San Martin Blvd. over Riviera Bay Bridge Replacement PD&E Meet National Environmental Policy Act (NEPA) requirements Follow the Minor Categorical Exclusion (MiCE) process per FDOT PD&E Manual Potential to become Type 2 Categorical Exclusion Evaluate Alternatives: No Build Rehabilitate Replacement North Bay Trail Extension Evaluation 5 Evaluate Alignment Alternatives Evaluate Crossing Locations

PD&E APPROACH Environmental / Engineering Data Collection Alternatives Development Alternatives Analysis and Evaluation Select Recommended Alternative Alternatives Public Meeting with Stakeholders Development of Technical Documents Public Hearing (Optional) Finalize NEPA Documents Location and Design Concept Approval 6

PUBLIC INVOLVEMENT 7 Stakeholders Pinellas County Government City of St. Petersburg Neighborhood Associations Riviera Bay Civic Association Riviera Bay Subdivision Homeowners Association Renaissance Neighborhood Association Residents Boaters Weedon Island Organized Recreational Users Duke Energy Florida Department of Transportation Tampa Bay Estuary Program Documentation Agencies Federal Highway Administration US Army Corps of Engineers United States Coast Guard Southwest Florida Water Management District

PUBLIC INVOLVEMENT OUTREACH Proactive interaction with stakeholders Project specific Public Involvement Program Alternatives workshop Outreach through community media sources Project website San Martin Boulevard Project Development and Environment Study 8

KEY ISSUES 9 Community Considerations Community Cohesion Right-of-Way Relocation Potential Archaeological and Historical Sites Bridge lacks distinction therefore it s not considered historic Channel Navigation Needs During Construction Environmental Considerations Wetlands Protected Species / Habitat Section 4 (f) (Public Use Facilities) Weedon Island Preserve Tampa Bay Outstanding Florida Waters Physical Environmental Air or water quality impacts Noise (Traffic & Construction) Contamination or hazardous materials involvement

KEY ISSUE - ALTERNATIVES EVALUATION Meet requirements of NEPA Process Maintain integrity of NEPA process by documenting evaluation of low, mid and high level profiles Document benefits, costs and impacts of each horizontal alignment and vertical alignment evaluated Balance Stakeholder desires with impacts Evaluate feasible alignment alternatives such as highest constrained profile Clearly address benefits of low impact alternatives with respect to constructability Clearly present Alternatives to Public Develop preliminary analysis and meet with County staff to evaluate alternatives to move forward to public involvement Support alternatives workshop meeting to solicit input 10

ALIGNMENT ALTERNATIVES Original, East & West Shifted Alignments Maintaining original alignment necessitates closing the road during construction Shifted alignments evaluated to maintain road open during construction 11

PROFILE ALTERNATIVES High Level (± 70 ft. of clearance) Mid Level (± 45 ft. of clearance) Low Level (± 20 ft. of clearance) Highest Constrained (± 18 ft. of clearance) Constrained by adjacent intersections (Tallahassee Drive and Weedon Drive) Maintaining traffic on bridge during construction impacts clearance attainable Movable Option Evaluated for Cost Comparison Existing Clearance = ± 10 ft. 12

NORTH BAY TRAIL EXTENSION EVALUATION OBJECTIVES Determine Best Trail Configuration Provide connectivity to adjacent trails & Weedon Island Preserve Minimize environmental impacts Evaluate Safe Locations for Trail Crossings North Bay Trail Existing Terminus Weedon Island/Duke Energy Trail Savora Dr. Trail Gandy Blvd. Friendship Trail 13

NORTH BAY TRAIL EXTENSION EVALUATION TYPICAL SECTIONS Macoma Drive to Weedon Island Drive Curb and Gutter Roadway with Trail on West/North due to R/W constraints Minimal Environmental Impacts Maintain existing pavement while adding trail and sidewalk 14 Design Speed = 40 MPH

NORTH BAY TRAIL EXTENSION EVALUATION TYPICAL SECTIONS Weedon Island Drive to Gandy Blvd. Rural Roadway with Unpaved Shoulders Trail Location Affected by Environmental Constraints and Connectivity Add paved shoulders, trail and sidewalk 15

SCHEDULE TASK 2014 2015 2016 2017 D J-M A-J J-S O-D J-M A-J J-S O-D J-M Receive Survey Data from County Public Involvement Alternatives Workshop Public Hearing (Optional Service) Engineering Data Collection Engineering Analysis/Documents Environmental Data Collection/ Analysis/Reports Prepare Environmental Document Submit Final Docs to FDOT for FHWA FHWA Review/Issue LDCA FHWA Review/Issue LDCA 16 Construction programmed in County CIP for 2018/2019 Schedule contingent on acquisition of 50% grant funding. Actual construction time frame will be dependent on acquisition, timing and amount of available grant funding.

QUESTION & ANSWER CONTACT INFORMATION Pinellas County Project Manager Nancy McKibben, MPA 727-464-4812 nmckibben@pinellascounty.org 17