Flow Reversal in Primary/Secondary Systems by John Siegenthaler, P.E. April 17, 2007

Similar documents
A Primary Concern by John Siegenthaler, P.E. October 1, 2005

hydronics WHAT S WRONG WITH THIS SCHEMATIC?

SAMPLE. added benefit of reduced operating costs during low demand periods, such as spring and fall.

HYDRONICS BY JOHN SIEGENTHALER

"Best Practices in Modern Hydronic Heating - THE DETAILS

Hydraulic Separation Moving Beyond Priamry / Secondary Piping...

ICONE DRAFT Proceedings of the 16th International Conference on Nuclear Engineering ICONE16 May 11-15, 2008, Orlando, Florida, USA

Applications and Piping Strategies for Condensing Boilers - Introduction

The electrical wattage needed by the circulator is:

Selecting Circulators TD10 EFFECTIVE: SUPERSEDES:

6 PIPING ARRANGEMENTS

Chiller Plant Design. Julian R. de Bullet President debullet Consulting

TOTAL SYSTEM EFFICIENCY: CONDENSING BOILER SYSTEM MYTH BUSTING. David Grassl PE Mechanical Engineer Principal

Distribution Efficiency: The Under-appreciated Benefit of Hydronics

Outdoor Reset Control Theory FULL versus PARTIAL reset

Effects of Ultra-High Turndown in Hydronic Boilers By Sean Lobdell and Brian Huibregtse January 2014

LOW TEMPERATURE HYDRONIC HEATING FOR COLD CLIMATES TRAVIS SMITH PRESIDENT T AND T MOUNTAIN BUILDERS INC

WHITE PAPER. ANSI/AHRI Standard for Fan and Coil Evaporators - Benefits and Costs

Acca Residential Load Calculation Manual Also Called Manual J

A: The last radiators might not be able to heat the rooms they serve on the coldest days of the year. Your system would be out of balance.

Study and Design Considerations of HRSG Evaporators in Fast Start Combined Cycle Plants. Govind Rengarajan, P.E.CEM, Dan Taylor

Course FP100 BACKFLOW PREVENTERS (BFPs) 101 FOR AUTOMATIC FIRE SPRINKLER SYSTEM M. Nabeel Waseem, M.Eng, PE, CFPS 2018

HEAT EXCHANGER FORMULAS & EXAMPLE

Adding More Fan Power Can Be a Good Thing

Why steam trap survey?

Hot-Water Circulation

HOW IT RELATES TO PERFORMANCE IN REFRIGERATED COMPRESSED AIR DRYERS

Circulators high efficiency ECM Circulators

union swing check valve spring loaded check valve purging valve pressure relief valve relief valve metered balancing valve

QUALITY PRODUCTS, INC. OIL-TO-AIR HEAT EXCHANGERS

The Current (2017) State of the Art for Air Leakage in Ductwork

InDEX. A Technical Journal from Caleffi Hydronic Solutions

A hydronic system controls comfort by delivering heated or cooled fluid to the conditioned space through pipes.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

1997 STANDARD for APPLICATION OF SOUND RATING LEVELS OF OUTDOOR UNITARY EQUIPMENT. Standard NORTH FAIRFAX DRIVE! ARLINGTON, VIRGINIA 22203

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL /

Combining Old and New Systems in Existing Buildings and Other Retrofit Tales. By Paul Jewett CFAA Technician Number 11

MINIMISING THE RISK OF WATER HAMMER AND OTHER PROBLEMS AT THE BEGINNING OF STAGNATION OF SOLAR THERMAL PLANTS- A THEORETICAL APPROACH

Function of the FENIX Hydrodynamic Trap working on Variable Load Applications

TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS. David Grassl PE Mechanical Engineer Principal

The Electronic Newsletter of The Industrial Refrigeration Consortium Vol. 11 No. 1, 2011

Air-to-Water Heat Pumps + Boilers A Dynamic Duo

*NORMALLY CLOSED - ENTRAPMENT PROTECTION FAQ. UL Standard for Safety Frequently Asked Questions

Helicoil and Shell-Tube Heat Exchanger. Abdullah AlThomairi, Ahmed Sajjad, and Faris AlShuaibi. October 25, 2014

Threaded. Flanged. Model PSH. Primary Secondary Header A-451

ASHRAE JOURNAL ON REHEAT

Solar & Hydronic Heating

Product Instructions. Hydronic Mixing Block Version Wiring Terminal Block Pressure/Temperature Sensor Delivery Fitting (3) Display Screen

What Is Liquid Subcooling?

Back to basics. Setting HEVs for Liquid Overfed Evaporators. 13 th Annual IRC R&T Forum May 8-9, 2013

Optical Time Domain Reflectometry for the OMEGA EP Laser

In the past, contractors sized heating and cooling systems GETTING HVAC RIGHT

Lignite fired power station in Romania fits FGD with Wet Booster Fans and Pennguard lined Concrete Chimneys for maximum Efficiency

Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark

Who Needs a Better Mousetrap?

Design of Precast Concrete Grease Interceptors

SCHULTE & ASSOCIATES Building Code Consultants 3500 Creighton Road, K5 Pensacola, FL

Eliminating Condensation and Resulting Corrosion. Sulphur Tail Gas and De-Gas Lines

BRIDGING THE SAFE AUTOMATION GAP PART 1

Product Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm

Dual-Purpose Air Conditioner

Applications of Thermodynamics: Heat Pumps and Refrigerators

RECORD SUBMITTAL COVER SHEET

of the liquid prior to it entering the expansion device. By doing so, the capacity for

Air Conditioning Clinic

EXAMPLES OF INDIVIDUAL DOWNHOLE HEAT EXCHANGERS SYSTEMS IN KLAMATH FALLS

TOTAL SYSTEM EFFICIENCY: CONTROL STRATEGIES & SYSTEM DISTRIBUTION. David Grassl PE Mechanical Engineer Principal

Fan Laws. Keith Miller. Samuel Tepp Associates. Paul Cenci, P. E.-Principal Brian England-Principal. Samuel Tepp Associates 1/6/10

02 21st Century Trends Resources 8/24/2017. Trends in Human Machine Interface (HMI) Old School Trends. The Future of HMI

CEHA Fall Chloride Workshop. Chloride Treatment Options Presented by Paul Hurlbut Professional Water Systems, Inc.

Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates

CONTROLLED CHILLED BEAM PUMP MODULE

Best Practices for Condensing Boilers

Chapter 2.3: Steam System

Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful

By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE

BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application

REFRIGERATION CYCLES

7. MECHANICAL SYSTEM DESIGN

GETTING THE MOST OUT OF HYDRONIC HEATING SYSTEMS

compressed air or left to consume air even when the associated production machine has been turned off.

NEW CD WARP CONTROL SYSTEM FOR THE CORRUGATING INDUSTRY

PRESSURE-ENTHALPY CHARTS AND THEIR USE By: Dr. Ralph C. Downing E.I. du Pont de Nemours & Co., Inc. Freon Products Division

FEMA Recommendations for Protection of Curtained Limited Finishing Workstations using UL 1254 Listed Pre engineered Dry Chemical Systems

Donʼt do this with ANY hydronic heat source! Heat transfer between the water and the upper floor surface is severely restricted!

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money. How hydronic heating systems work

precision controlled industrial process chillers cooling capacity: ,255,668 BTU /hr ( tons) improved productivity & reduced costs

SCHULTE & ASSOCIATES Building Code Consultants 3500 Creighton Road, K5 Pensacola, FL

Earth-Coupled Air Conditioner / Heat Pump

SHELL AND TUBE HEAT EXCHANGER (STHE) - part b

Modular Panel System for Radiant Floor Heating.

Hydronic Expansion Joints (Part 2): It's All About the Guides

Cold Weather Operation Of Cooling Towers

Numerical Simulation of a New Cooling System for Commercial Aircrafts

THE HEATING BOX. Training Manual. Model KD-HBO100 & KD-HBC100. * KD-HB100 (Open-Loop System) * KD-HBC100 (Close-Loop System)

Ancient Greek and Roman planners recognized the importance of centralized gathering spaces within urban

Survey. Water. Hydronic. Systems. Pre-Installation Survey and Checklist for Water Systems

Advisory Brief to Prince George City Council On the Matter of Bylaw 8727, 2013, Fire Protection and Emergency Response Bylaw

Plant Application Guide

Fire Pump Supervision - Part 1 by Dean K. Wilson, P.E.

Transcription:

Flow Reversal in Primary/Secondary Systems by John Siegenthaler, P.E. April 17, 2007 When flow reversal occurs, the heat transfer from the secondary circuit is mostly unaffected, as are the other secondary loads in the system. Our industry has used primary/secondary piping systems for years. Most engineers currently designing hydronic systems are familiar with how these systems operate, as well as how they are designed. Still, based on discussions I ve had, it s evident that questions remain, particularly on this issue of flow reversal when secondary circuit flow rate exceeds primary loop flow rate. The notion of flow reversal runs counterintuitive to the idea of a single primary loop supplying heat to several secondary loops. It s easy to conceptualize a primary circulator as having to produce enough flow to feed all the operating secondary circulators. However, this is not the correct way to look at primary/secondary systems. Although the primary loop does supply heat to each secondary circuit, it does not supply flow to each secondary circuit.supplying heat to a secondary circuit is evidenced by a drop in temperature of the primary loop flow as it passes a pair of closely spaced tees. This is entirely different from supplying flow to the secondary circuit. In animated terms, the primary circulator isn t aware of the existence of the secondary circuits and vice versa. Each circulator operates as if the circuit in which it is installed is completely isolated from the other circuits. Figure 1 Let s look at a typical system in which a primary loop serves a secondary circuit having a design load

of 40,000 Btu/hr. Assume the primary loop flow rate is 10 gpm and that the water arriving at the first tee (of the closely spaced pair of tees) is at 160 F. Also assume that the circulator/piping design used for the secondary circuit allows a flow rate of 4 gpm to develop. Figure 1 shows a close up of the situation, along with the calculations for temperature drops. Following the Energy The best method for predicting the output of a situation in which multiple energy flows converge is to simply account for all energy carried in and out of the process. Just as the flow of water into and out of a tee must balance, the energy carried into a mixing point must equal the energy carried out of that point. This concept is based on the first law of thermodynamics. Since the secondary circuit load removes 40,000 Btu/hr of heat, the temperature drop in the secondary circuit is (see equation above): Hence, the temperature returning from the load at design conditions is 160 20 = 140 F. The temperature drop along the primary loop also can be determined by accounting for the fact that heat is being removed at the primary/secondary interface at a rate of 40,000 Btu/hr. Hence, the temperature drop in the primary loop is (see equation below). You might be wondering why the temperature drop in the primary loop is different than the drop in the secondary loop. It s because of the different flow rates in these loops (10 gpm in the primary and 4 gpm in the secondary). Heat transfer into or out of a fluid stream is always based on the product of flow rate and temperature drop. For a given rate of heat transfer, when flow is increased, temperature drop decreases and vice versa. It s also possible to calculate the water temperature leaving the downstream tee by applying the mixed stream formula, which also is based on conservation of thermal energy at a mixing point (see equation below):

In this formula (see equation above), ƒ1 and ƒ2 are the flow rates of the two streams being mixed, and T1 and T2 are the temperatures of these streams as they enter the mixing point. In the situation being analyzed, the mixing point is the downstream tee. There is a bypass flow from the upstream to the downstream tee of 6 gpm at 160 F. So T1 = 160 F and ƒ1 = 6 gpm. T2 and ƒ2 are the temperature and flow rate of the secondary circuit return (T2 = 140 F and ƒ2 = 4 gpm). Putting these numbers into the formula yields 152 F. Thus, in Figure 2: Overpumping Option Now assume a circulator capable of generating a flow rate of 15 gpm was installed in the secondary circuit, and the piping was scaled up accordingly. Figure 3 shows the resulting flows:<br><br> Notice that flow between the closely spaced tees has reversed. This reversal is the only possibility given the flow rates in the surrounding pipes, and rest assured it does not damage the system in any way. <br><br> Also notice that the flow rate in the primary loop, for all practical purposes, does not change. That s because the insignificant pressure drop between the closely spaced tees effectively prevents the primary

loop from feeling any change in its hydraulic resistance. Remember, the primary loop doesn t even know the secondary circuit exits.<br><br> An even more interesting result is what happens to temperatures and heat transfer in the secondary circuit. Again, we have to follow the energy into and out of the tees to predict what will happen.<br><br> The flow reversal between the tees now creates a mixing point at the upstream tee just the opposite of what occurred in the first scenario where the mixing point was at the downstream tee.<br><br> This mixing point will lower the water temperature supplied to the secondary circuit. How much? Just use the mixed stream formula again. Where: Tmix = supply temperature to the secondary circuit ( F) TR = return temperature from the secondary circuit ( F) Unfortunately, we don t currently know the value of the return temperature from the secondary circuit (TR), and without this, we can t calculate Tmix. We can, however, make a couple more observations that get us out of this situation. One is that the heat output from the load will increase slightly based on the increased flow rate through the heat emitters. For fin-tube baseboard, the increased heat transfer can be estimated as follows (see equation below). The heat output from most hydronic heat emitters increases very slowly as the flow rate increases beyond typical operating conditions (e.g., conditions that yield temperature drops of say 15 F to 20 F across the circuit). The higher the flow rate, the smaller the increase in heat output. It s definitely a situation with very diminishing returns. This fact strongly supports the argument against using oversized circulators based on the assumption that they significantly improve heat transfer. Anyway, let s conservatively assume the load is now 5.4% higher (42,160 Btu/hr rather than 40,000 Btu/hr) due to the flow rate increase. It s a conservative assumption because we already realize that the supply temperature to the load will be reduced because of mixing at the upstream tee. The temperature drop across the secondary load is now (see equation below): Hence, the return temperature from the secondary circuit (TR) is (see equation below):

This can be combined with the mixing equation and solved for the mixed supply temperature (see equation below): Solving this equation yields the result of Tmix = 157.2 F. Hence, we ve estimated that the supply to the secondary circuit is about 2.8 F lower due to mixing at the upstream tee. Knowing this, we further recognize that the lower supply temperature also lowers heat output from the secondary circuit. How much? Here s an estimate, again assuming the heat emitters are fin-tube baseboard and a room air temperature of 70 F. The increased flow rate (by itself) increases heat output about 5.4%, while the decreased supply temperature (by itself) would lower heat output about 4.6%. In other words, it s essentially a wash. One effect compensates for the other, and any net change in heat output is insignificant. Refer to equation above. Figure 4 shows the final picture of the flow reversal situation.

So where does this leave us? Well, we ve conceptually installed a larger secondary circulator and managed to reverse flow between the tees. However, for all practical purposes, we ve not changed the heat output of the secondary circuit, nor have we changed the temperature of the water leaving the downstream tee. If we had installed this scenario, we would have wasted money on a larger secondary circulator as well as larger secondary piping. We also would have created a system that requires substantially more electricity to operate the larger secondary circulator for years to come. Over a typical 20-year design life, this added operating cost could approach or exceed $1,000. Is this a wise choice? Not in my opinion. By the way, if you installed a larger primary circulator under the premise it would prevent flow reversal, you are just wasting even more pumping energy. We ve seen that flow reversal is possible in a P/S system, but when it occurs, the heat transfer from the secondary circuit is mostly unaffected, as are the other secondary loads in the system. The only significant difference is a needless increase in both installation and operating cost for the oversized secondary circulator and piping. This is something our industry can do without. Pumping energy is a terrible thing to waste. John Siegenthaler, P.E. john@hydronicpros.com John Siegenthaler, P.E., is principal of Appropriate Designs, a consulting engineering firm in Holland Patent, NY, and author of Modern Hydronic Heating. Visit www.hydronicpros.com for information on his recently released second edition, as well as the new Hydronics Design Studio software. E-mail John at john@hydronicpros.com.