TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Similar documents
SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Issues Requiring Future Study

Welcome to the. Open House

Blake C. Kronkosky, PE, Ph.D.

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

This Review Is Divided Into Two Phases:

Capital Projects in and near Odenton Town Center

Mississippi Skyway Preliminary Engineering Report

Implementation Guide Comprehensive Plan City of Allen

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Fall 2017 Construction Update

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Southern Gateway Project and Public Green

Drexel, Barrell & Co.

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

BAGBY STREET RECONSTRUCTION PROJECT OCTOBER 2, 2015

Executive Summary. NY 7 / NY 2 Corridor

Public Meeting May 20, 2014

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

4.1 Build Alternative 1 Construction Phasing

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Mavis Road Class Environmental Assessment

Cottage Grove Road Reconstruction. City of Madison Engineering

Advance Engineering & Surveying PLLC

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

C. Westerly Creek Village & The Montview Corridor

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

ESTABLISH AN EFFICIENT TOWN CENTER

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

TEMPLE MEDICAL & EDUCATION DISTRICT

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Capital Projects impacting Odenton Town Center

MURRAY CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

CHAPTER 7: Transportation, Mobility and Circulation

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

Appendix I. Access Management & Land Use Zoning Strategies Memo

Route 9 Gateway Project. October 9, 2014 Informational Meeting

2017 General Obligation Bond

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

Developer s Program. The Station at East 54

Urban Planning and Land Use

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

4 CIRCULATION AND TRANSPORTATION

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

South Bismarck Watershed Model Update and Stormwater Improvement Project

Location. Served. Category. Units Start Year. Previous Appropriations

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

UNIVERSITY CITY AREA PLAN. Volume Two: Implementation Plan

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

Engineering Department

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

TRANSPORTATION. Part 1: Background. Section 1: Introduction. P a g e 70

Sustainable Development Call for Projects Western Infrastructure Project Submissions

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

PLAN ELEMENTS WORKSHOP. April 5, 2016

DRAFT. October Wheaton. Design Guidelines

4/8/2015 Item #10D Page 1

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

DRAFT. Draft Addendum 1 to Visual Impact Assessment Technical Report

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

COLLIER BOULEVARD (CR 951) CORRIDOR

WELCOME TO OPEN HOUSE TWO November 28, 2018

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Public input has been an important part of the plan development process.

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Chapter 5: Natural Resources and Environment

Farmersville Parkway Phase III

A larger version of this map is located on the last page of this PDF.

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Pine Island Road Corridor Master Plan

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Drexel, Barrell & Co.

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

City of Meriden Harbor Brook Flood Control Project Overview

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

Project Overview. Get Involved. Public Information Meeting. Contact Information

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

JOB CREATION PROJECTS

The University District envisions, in its neighborhood

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Green Infrastructure The Indianapolis Greenways Connection

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Transcription:

Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by installing two 8 ft. X 5 ft. box culverts, and enhance the streetscape. Where: Gessner Road between IH-10 and Barryknoll Lane When: Phase One of the project is nearly complete. This includes building the east side of the roadway and installing the 8 ft. X 5 ft. box culverts. Groundbreaking began in June 2008. Construction completion along with the streetscape installation is forecasted for the end of 2009. Why: Adding additional travel lanes, improve turning movements and traffic flow, improve surface drainage with added detention, wider sidewalks, and enhanced streetscape is necessary because Gessner Road is a busy commercial corridor and home to retail, medical facilities and restaurants. The increased sewer system will benefit the immediate roadway and adjacent property owners and the drainage channels. W153 or Buffalo Bayou will benefit from the reduction from sheet-flow runoff. W151 will benefit due to the increased watershed storage from the oversized culverts. The increased detention will reduce sheet-flow runoff to the Memorial City Medical Center and the Memorial Hollow neighborhood. Who: The project is a jointly funded effort between the TIRZ 17 Redevelopment Authority and the Texas Department of Transportation (TxDOT). The TIRZ was responsible for design engineering and TxDOT will oversee construction management. How much: The cost for improving this segment of Gessner Road is approximately $10,085,223. This includes planning, design, construction, construction management and owner s representation costs. The TIRZ 17 has contributed $6,672,423 and TxDOT has committed as much as $3,404,800 for construction costs. Bunker Hill Widening Project: T-1702 What: Widen to a four-lane boulevard street section from Interstate Highway 10 to the Briar Branch drainage channel. The road section will transition to one travel lane in each direction with a center turn lane from north of the drainage channel to Long Point Road. Improve drainage and safety by having a curbed street section with storm sewers and a 6 ft. wide sidewalk. Where: Bunker Hill Road from IH-10 to Long Point Road When: Conrad Construction has completed the widening of Bunker Hill from IH-10 to Cedardale. The reconstruction of the north bound lanes from Westview to Long Point is underway. Work on the south-bound lanes from Long Point to Westview will follow. Groundbreaking began in April 2008. The projected substantial completion is scheduled July 2009. Why: Additional travel lanes, improving turning movements and traffic flow, better surface drainage, wider sidewalks and enhanced landscape is necessary because Bunker Hill Road has evolved into an active urban travel way. Who: The project is a jointly funded effort between TIRZ 17 and the City of Houston. The TIRZ is responsible for design engineering and oversight of the construction. How much: The cost of improving this segment of Bunker Hill Road is approximately $6.2 million including construction, construction management, owner s representation services, and material testing. TIRZ 17 has committed to fund the project based upon an agreement with the City of Houston. The City has reimbursed the TIRZ for the cost of improving a segment of Bunker Hill road, north from Pine Lake Drive to Long Point Road which extends beyond the TIRZ 17 boundary (from Pine Lake Drive to Long Point Road). Time Frame: 15 months Time Frame: 18 months

Improvements to Lumpkin from IH-10 to Westview T1709 What: This project was among the recommendations from the North/South Mobility Improvement Study. It includes the widening of Lumpkin Road from a two lane roadway to a fourlane median divided road. Where: Lumpkin Road from IH-10 to Westview When: Proposed 2010 Why: Large traffic volume from the Houston Community College s Town & Country campus and the adjacent retail development requires additional roadway capacity. Who: A TIRZ 17 funded project. LAN would serve as construction manager on behalf of the TIRZ 17. How much: $2,967,000. This cost includes all project phases including planning, design, construction, and construction phase services. This cost does not include ROW acquisition Time Frame: 32 months Bunker Hill S. Drainage and Mobility Improvements: T-1712 & T-1723 What: Improve the existing storm sewer, in conjunction with the road improvement of Bunker Hill, which will benefit drainage channel W151 by supplying more storage for rain runoff and help alleviate sheet-flow runoff to the Memorial Village Estates neighborhood in the City of Bunker Hill. Re-stripe the roadway and modify the existing traffic signals to accommodate the increasing traffic concern as identified by the North/South Mobility Study. Where: Bunker Hill south between IH-10 and Barryknoll. When: Proposed 2009-2011 Why: The existing storm sewer has been identified by the TIRZ 17 Drainage Study as a key area of improvement to adequately convey water to drainage channel W151. How much: Total cost to improve traffic, without ROW acquisition, is estimated at $2,666,000 for the design, planning, construction, Total Time Frame: 24 months Memorial near Beltway 8 Drainage & Mobility Improvements: T-1713 What: A Preliminary Engineering Report (PER) was performed to examine the adequacy of the drainage and the mobility in the area. The PER concluded the storm sewer system is sufficient, however, the mobility analysis revealed the need for two left turn lanes for east bound side of Memorial. Where: Along Memorial Drive at the Beltway 8 frontage road When: Proposed 2009-2010 Why: The intention of the PER was to learn whether storm sewer improvements are needed to help watershed performance to drainage channel W156 (Rummel Creek) and the adjacent property owners located in the Town & Country development and the Fonn Villas and Memorial Bend neighborhoods. How much: $1,146,000 for planning, design, construction, Time Frame: 18 months

Frostwood Drive Drainage Improvements: T-1714 What: The project would replace the existing storm sewer to meet the current City of Houston drainage standards and benefit both drainage channels W151 & W153 from a storage and watershed perspective. Where: Along Frostwood between IH-10 and Barryknoll. When: Proposed 2011-2012 Why: The existing storm sewer system has been identified by the City of Houston s Frostwood Drainage Improvements Project as being inadequate and unable to properly convey the two-year storm event. The benefits are intended to provide improved water flow to drainage channel W151 and minimize sheet-flow runoff to the Memorial Meadows and Memorial Hollow neighborhoods. How much: $2,090,000 for planning, design, construction, Time Frame: 22 months Barryknoll East Drainage Improvements: T-1715 What: The storm sewer improvements would benefit the immediate roadway section, watershed performance and the homeowners in the Memorial Hollow and Memorial Woods neighborhoods. Why: Information from various studies obtained for the TIRZ 17 Drainage Action Plan has revealed drainage improvements are needed to adequately convey sewer water from Barryknoll Lane to drainage channel W151 and alleviate watershed to the adjacent neighborhoods. How much: $3,612,000 for planning, design, construction, Time Frame: 26 months Queensbury Drainage Improvements: T-1716 Who: The TIRZ 17 funded the project, LAN oversaw the construction management. Huff & Mitchell completed the work. What: The project replaced approximately 685 feet of storm sewer with a larger 4 ft. X 5 ft. box culvert. Where: Along Queensbury between Town & Country Boulevard and Beltway 8 When: The project is complete Why: This project brought the existing storm sewer along Queensbury into compliance with the City of Houston drainage criteria. How much: The cost of improving and bringing into compliance the Queensbury storm sewer was approximately $976,842 to include planning, design, construction, construction management, owner s representation services and material testing. Time Frame: Complete Where: Barryknoll Lane from Bunker Hill to drainage channel W151 When: Proposed 2009 to 2012

Town and Country West Drainage & Mobility Improvements: T-1717 & T-1721 What: The objective of this project is to improve drainage, in conjunction with the roadway expansion, by updating the existing storm sewer system by supplying more storage to improve watershed performance. Additionally, the project will extend existing four-lane undivided roadway west to intersect with Beltway 8 north frontage road. Improvements to the intersection of Town and Country Way and Town and Country Blvd. to better align the Town and Country Blvd. alignment. Where: Town and Country Way between Town and Country Boulevard and Beltway 8 north frontage road and Town and Country Boulevard between IH-10 and Town and Country Way. When: Proposed 2010-2011 Why: The storm sewer improvements are intended to upgrade the drainage infrastructure to comply with the City of Houston drainage criteria. The existing storm sewer system was identified by the City of Houston Comprehensive Drainage Plan as being unable to adequately convey the two-year design storm event. Improving the drainage system wound benefit the immediate roadway section, improve watershed performance to W156 and minimize sheet-flow runoff to neighboring redevelopment. Kimberley near Beltway 8 Drainage Improvements: T-1718 What: The object of this project is to improve the existing storm sewer system by reducing sheet-flow runoff to the commercial area and efficiently redirecting rain runoff to an existing north/south conduit, underneath the Beltway 8, that leads to W153 (Buffalo Bayou). The current roadway is lower than the surrounding areas and does not meet the minimum City of Houston drainage criteria. The proposed improvements will reconstruct Kimberley from the BW-8 frontage road to West Bough. Additional storm sewer will be installed to compensate for the lost storage and to increase the system level of service to a 10-year event. Where: Along Kimberley between Beltway 8 and West Bough When: Proposed 2009-2010 will serve as construction manager on behalf of the TIRZ 17. Why: The existing storm sewer system has been identified by the City of Houston Comprehensive Drainage Plan as being unable to adequately convey the two-year design storm event. The upgrades would benefit W153 by improving watershed performance by reducing the overland sheetflow through residential areas in the W153 watershed. How much: $1,755,242 for planning, design, construction, Time Frame: 18 months Kingsride East Bound at Gessner: T-1719 What: This project was among the recommendations within the East-West Mobility Improvement Study. A 300 ft. long eastbound turn lane has been added on Kingsride Lane at Gessner Road. The additional lane functions as a right-turn lane with associated signal modifications. Where: Kingsride Lane at Gessner Road Why: To improve traffic flow When: The project is complete. The notice-to-proceed date was issued March 10, 2008. The final walk-through was completed August 29, 2008. The TIRZ Chairman signed the project completion documents December 2, 2008.

Who: The TIRZ 17 funded the project and oversaw construction management. Craven Partners, the low bid contractor, was awarded the contract for construction. How much: The cost of improving Kingsride Lane is approximately $869,208 which includes planning, design, construction, construction management, owner s representation services and material testing. Time Frame: Complete Kingsride at Frostwood Signalization: T-1720 What: As recommended by the East-West Mobility Improvement Study, the addition of a traffic signal at this intersection would decrease congestion by improving the flow of traffic. Where: The intersection of Kingsride at Frostwood When: Proposed 2011 Why: Information collected from daily traffic volumes indicate a strong need for signalization and improved pedestrian safety. Traffic volumes will likely increase as the Memorial City Medical complex continues to expand. Who: The project would be funded by the TIRZ 17. LAN How Much: $270,500. This cost includes the warrant study, the design, and the construction. Time Frame: 11-12 months Town and Country Blvd at Queensbury Signalization: T-1722 What: Adding a traffic signal to improve rush hour traffic conditions. Where: Intersection of Queensbury at Town & Country Boulevard When: Proposed 2009-2010 Why: Results from the North/South Mobility Improvement Study show the Town and Country Boulevard intersection with Queensbury produces failing conditions in the PM peak hour. A traffic warrant study conducted by LAN concluded the need for a signal light due to the anticipation of increased traffic from the City Centre development. Who: The TIRZ 17 would fund the project. LAN would serve as the construction manager on behalf of the TIRZ 17. How much: The estimated cost of this project to include warrant study, acquisition, design and construction is $263,000. Time Frame: 8 to 12 months Gessner at Barryknoll Intersection Improvements: T-1724 What: Recommended by the North/South Mobility Study as a spot improvement to decrease intersection congestion by providing a 325-foot right turn lane to channel traffic. Accepted by the TIRZ 17, TxDOT and the contractor (JD Abrams) for the Gessner Widening Project as a change order. Where: Gessner northbound at Barryknoll Lane When: November 2009 Why: Improve traffic flow through the intersection as recommended by the North/South Mobility Study which indicates failing conditions during the peak AM and PM hours because traffic is impeded by northbound traffic turning a right onto Barryknoll. Who: The TIRZ 17 will fund the project and TxDOT will oversee construction management.

How much: The cost of improving the Gessner northbound intersection at Barryknoll by adding a right-turn lane was originally estimated at $689,000, but as a change order to the existing Gessner Widening Project, the new reduced estimate is $347,708. This cost includes planning, design and construction. Time Frame: 7 to 10 months Park and Green Space Improvements: T-1725 What: To provide a pedestrian friendly environment throughout the TIRZ 17 by adding trails, bikeways and public green space to include linear parks and esplanade improvements. Where: Within the TIRZ 17 boundary When: Proposed 2009-2011 Why: To improve the quality of life for the people who work and live in or near the TIRZ 17, and to make the area a more attractive place to live, invest and visit. Who: The TIRZ 17 would take responsibility for funding these areas of opportunity, but it will seek partnerships with management districts, property owners associations and the Harris County Precinct 3 office to maintain the amenities. How much: The $1,004,500 pledged to park and green space improvements will include funding for route studies, design, and construction and ROW acquisition. West Bough Roadway Improvements: T-1726 What: To widen the existing two-lane road to a four-lane section and to include drainage improvements. Where: West Bough Lane from Kimberley to Memorial Drive When: 2010-2011 Why: Large traffic volume from the Town & Country retail development. Additional storm sewers will help reduce flooding by replacing the existing drainage ditch with a storm sewer. Who: The TIRZ 17 will fund the project. LAN will serve as construction manager on behalf of the TIRZ 17. How much: $2,862,235. This cost includes planning, design, construction, and construction related costs. Time Frame: 21 months North Gessner Area Thoroughfare Improvement Project: T-1727 What: Analyze access management and intersection improvements. Where: Gessner and Witte Roads from IH-10 to Long Point When: 2010-2012 Why: To enhance mobility and safety through road widening, intersection improvements, drainage upgrades and the embellishment of the esplanades. Due to the close proximity of Gessner to Witte it s appropriate to examine both thoroughfares in a single analysis. This includes advancing the project to a logical terminating point, i.e., Although Long Point extends outside the TIRZ boundary, an adequate review of Long Point is necessary to compliment the improvements to Gessner and Witte roads. Who: The TIRZ 17 will fund the project. LAN will serve as construction manager on behalf of the TIRZ 17. How much: $7,273,750. The estimated cost for improving this segment of Gessner and Witte Roads includes the planning, design, construction, construction management and owner s representation. Time Frame: 36 months

Westview and Lumpkin Enhanced Sidewalk/Bus Stop/ Park: T-1728 What: Improving pedestrian mobility and safety along with and providing a friendly environment for residents, retail customers and HCC students by installing a sidewalk system, adding a METRO bus stop and developing green space. Where: Intersection of Westview and Lumpkin. When: 2010-2011 Who: The TIRZ 17 will fund the project. LAN will serve as construction manager on behalf of the TIRZ 17. Why: To fulfill the responsibility for pedestrian safety, mobility access and the desire for recreational enjoyment. How much: $1,150,000 for planning, design, construction, Time Frame: 16 months