Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Similar documents
GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Building Great Neighbourhoods. Strathcona

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Portage Parkway Environmental Assessment Public Information Centre No. 1

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Commissioners Road West Realignment Environmental Assessment

Welcome to the Oakridge Centre Open House

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Johnson Street Bridge Public Realm Update

Public input has been an important part of the plan development process.

Implementation Guide Comprehensive Plan City of Allen

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

The purpose of tonight s PIC is to:

City of Toronto. Emery Village Transportation Master Plan

Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No.

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

9 North Downtown Master Plan & Saskatchewan Polytechnic

1.0 INTRODUCTION & BACKGROUND

Potential Green Infrastructure Strategies May 6, 2015 Workshop

FDOT D4 Complete Streets

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Downtown Whitby Action Plan

Urban Planning and Land Use

The Lincoln Neighborhood Corridor Plan. The LiNC

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Emery Village Road 2A Municipal Class Environmental Assessment Study

PLAN ELEMENTS WORKSHOP. April 5, 2016

CITY COUNCIL AGENDA REPORT

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Local Growth Planning in North Central Green Line Communities

Mavis Road Class Environmental Assessment

North Commuter Parkway and Traffic Bridge Project Market Sounding

Bridge Type Assessment and Evaluation

Toronto Complete Streets Guidelines

Victoria Bridge Municipal Class EA Civic Works Committee

38 Queen s University Campus Master Plan Part 1

Richmond Road Complete Street Meeting #1, April 25, 2016

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Town Center (part of the Comprehensive Plan)

Green Line North Centre City Alignment

WELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

In surveys, Dallas residents say what they want to change most

c. DTAH Toronto Complete Streets Guidelines

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Route 5 Corridor Land Use and Transportation Plan

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

Rapid Transit Implementation Working Group September 14, 2017

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

Route 1 Corridor Study

18 May 2016 CAMPUS MASTER PLAN UPATE

SECTION E. Realizing the Plan

TRANSPORTATION COMMITTEE

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

Shift Rapid Transit Public Participation Meeting May 3, 2017

Executive Summary. NY 7 / NY 2 Corridor

Gas Works Site Land-Use Study

DOWNTOWN GEORGETOWN PLANNING STUDY

Dyersville Downtown Plan. Open House October 24, 2017

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Port Lavaca Future Land Use

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

The Project. In 2013, construction was completed between 100 Street and 102 Street.

South of Eastern Strategic Direction Status Update

North York Centre South Service Road

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Downtown Cleveland s Main Avenue Bridge

CHAPTER 7: Transportation, Mobility and Circulation

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Key Themes and Responses May 2016

Asheville Design Center March 2010

Chapter 1: Introduction

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

Eglinton West LRT Update

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

PART 1. Background to the Study. Avenue Study. The Danforth

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Animating the Rideau Canal December 2013

TORONTO COMPLETE STREETS GUIDELINES

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Transcription:

Update JANUARY 2010 Neighbourhood Advisory Committee (NAC) ARTS AND CULTURE Gas Station Theatre BUSINESS Osborne Village BIZ Downtown BIZ COMMERCIAL PROPERTY OWNER Great-West Life COMMUNITY ORGANIZATIONS Osborne Village Community Gardens Gertrude McMillan Neighbourhood Group West Broadway community organizations representative CYCLING/ACTIVE TRANSPORTATION Bike to the Future GOVERNMENT Legislative Building HERITAGE Manitoba Historical Society PROPERTY MANAGERS RESIDENTIAL Globe General Agencies Manitoba Property Managers Association REGIONAL Winnipeg Chamber of Commerce RELIGIOUS INSTITUTIONS Augustine United Church SOCIAL SERVICES Oak Table Ministries CITY OF WINNIPEG DEPARTMENTS Public Works Planning, Property and Development Transit Community Services CONSULTANTS Wardrop Engineering Dillon Consulting Hilderman Thomas Frank Cram Landscape Architects CONSULTANTS COLLABORATIVE PLANNING/PUBLIC CONSULTATION Susan Freig and Associates What is the Osborne Bridge Rehabilitation project all about and how is it being planned? A collaborative planning process has been underway since last summer to prepare for the scheduled rehabilitation of the twin Osborne Street Bridge beginning in 2011. The project will preserve and upgrade the bridge and its approach roadways from River Avenue to Broadway so they meet current City of Winnipeg standards. The planning process is taking into account present and future social, economic, land use and transportation considerations consistent with City Council policies and guidelines. A Neighbourhood Advisory Committee (NAC) was formed including representatives of sectors and communities that are affected by or interested in the project. Committee members participated as representatives of a broader constituency. At meetings in the fall, NAC members received important background information about the project and shared information about their constituencies interests and concerns. The NAC developed project goals and then, working with municipal representatives and the consulting team, developed conceptual options for the project. Building on the knowledge and wisdom of local community organizations, specialized interest groups and City of Winnipeg department representatives, the project consultants helped develop creative solutions to best meet the project goals. These options are now being presented to the general public for feedback, which will be shared with the NAC and City of Winnipeg for their consideration in the next stage of project development.

What options did the NAC develop? After exploring many ideas, the NAC developed two options that fulfilled the project goals while remaining consistent with the scope of the project. They are presented here for public feedback. What factors guided the planning process? The committee s decisions were guided by a number of limitations. The project must: Stay within the capital budget of $17 million. Upgrade the facility to current City of Winnipeg standards without an additional row of girders or substructure modifications. Work within the limited City of Winnipeg right of way on either side of the approach roads. Carry out the work in accordance with City bylaws, policies and guidelines. What were the project goals? The NAC s collaborative planning process was guided by a set of established project goals. The rehabilitated bridge must be: Q Technically sound Q Environmentally responsible Q Cost effective Q Reflective of the needs of the community and city in general Q Generally understood and accepted by most of those affected The group discussed these goals to provide a more specific framework for decision-making. Some of the key points on which the NAC agreed were: Q Improve services for pedestrians and cyclists and coordinate with the City s Active Transportation strategy while ensuring fair accommodation for all modes of transportation; Q Maximize the use of the existing structure in the rehabilitation; Q Incorporate features to make it self-sustaining and more cost effective to maintain; Q Design an aesthetically pleasing bridge that is respectful of neighbourhood identities on both sides of the river; Q Ensure a safe environment for all users. The first option features a 2.7 m (8.9 ft.) sidewalk and a 1.8 m (5.9 ft.) shoulder on both sides of the bridge to separate cyclists from pedestrians. Sidewalks 2.7 m (8.9 ft.) (both sides) Shoulders 1.8 m (5.9 ft.) on both sides for cyclists Barrier between cyclists and pedestrians 0.45 m (1.5 ft.) The second option features a wide multi-use lane on the west side of the bridge that is shared by cyclists and pedestrians and ties-in effectively to existing and future Active Transportation routes to the north along Assiniboine Ave. and south along Roslyn Rd. Cyclists do not have to dismount here as they must on a standard width sidewalk. The shoulders for cyclists travelling on the road are not as wide as. 4.1 m (13.5 ft.) multi-use lane for pedestrians and cyclists on the west side, travelling in both directions 2.5 m (8.5 ft.) sidewalk on the east side Shoulders of 1.2 m (3.9 ft.) on both sides for cyclists Barrier between multi use lane and traffic lanes 0.45 (1.5 ft.) Some private property must be bought for to proceed. The City of Winnipeg is working on this. After evaluation of traffic movement patterns and consultation with stakeholder groups, a controlled pedestrian crossing is being considered across Osborne Street at Mostyn Place in both options. Also, due to concerns expressed about conflicts between pedestrians crossing north and cyclists turning east onto Assiniboine Ave. (behind the Legislature) there are plans to move the crosswalk further east. The sidewalks will be redesigned so that pedestrians have a direct northbound crossing path. The steep slope of the path at the northwest corner will be considered during the design phase of the project.

Osborne Bridge Rehabilitation Project - Plan Views Connections to the City s Active Transportation routes will be ensured, specifically at Roslyn and north of the bridge. Various routes will be considered and integrated with the Osborne Bridge Rehabilitation project. Traffic flow concerns for both vehicles and cyclists at the Roslyn intersection were discussed. Possible solutions include signal optimization and cyclist priority signals. The former will be done through the City s overall review of signal timing for major streets. The latter and other methods used in other jurisdictions will be reviewed. 2700 1800 3500 3500 3500 3500 3500 1800 2700 SIDEWALK SHY SB LANE SB LANE SB LANE NB LANE NB LANE SHY SIDEWALK 4100 1200 3500 3500 3500 3500 3500 1200 2500 MULTI-USE SHY SB LANE SB LANE SB LANE NB LANE NB LANE SHY SIDEWALK PEDESTRIAN CYCLE LANE Existing 300 SHOULDER 300 SHY 300 SHY 1200 SHOULDER 610 2743 3356 3356 3356 2462 + 3658 3658 2743 SIDEWALK SB LANE SB LANE SB LANE NB LANE NB LANE SIDEWALK

How will the Osborne Bridge Rehabilitation project connect with the surrounding community? In addition to the bridge and roadway options, the NAC also considered and discussed other related areas of interest to ensure a well-integrated plan. The NAC learned a great deal about the surrounding communities at the outset of the project, and through presentations made by neighbourhood and regional organizations, agencies and community leaders. There is a strong desire to maintain Osborne Village as an urban village and gathering place. In fact, this is a guiding policy for the project as described in the City of Winnipeg s Osborne Village Secondary Plan. Even though the area has a large amount of commuter traffic, the pedestrian-focused and human-scale environment must be enhanced. This urban village contrasts with the grandeur and stateliness of the Legislative buildings and surrounding grounds, Memorial Park and an architecturally notable corporate head office at the north end of the bridge. A subtle gateway to mark the transition has been suggested. Also, views of the bridge and from the bridge, need to be considered, both from the roadway and the river. The area and bridge have a colourful and significant history. Ideas on how to honour that history include recognizing the Winnipeg street car system that originally crossed the bridge by using pieces of rail line in the bridge handrail, or commemorating the lives of individuals of renown who grew up in the area like Marshall McLuhan, who coined the phrase the medium is the message, or William Osborne Smith, after whom the street is named. These ideas could tie in with public art, preferably through a collaborative process between the Winnipeg Arts Council, the City and the community. Ideas from other cities include coloured lighting, sculpted finials and custom railings. Bridge aesthetics were emphasized by community participants. The NAC noted the desire to incorporate sustainability and recycled materials. This would include salvaging, reusing or reassigning any reusable components of the existing bridge, and maximizing opportunities for Active Transportation throughout the project area. There was discussion about reflecting Winnipeg as a winter city in both landscape and design and doing it sustainably. For example, to create an aesthetically pleasing surrounding, the project should not rely solely on landscaping that is only visible in the summer. Building on presentations about the City s Universal Design Policy and Crime Prevention through Environmental Design, safety on, around and under the bridge for all users is paramount. This can be accomplished through careful planning of pathways, design details, a high level of lighting both on and under the bridge, well-pruned plantings that leave clear sightlines, and maintenance to keep the area attractive for all users. The importance of engaging the community in different ways can be explored further to build feelings of community ownership about the bridge. Complex social issues affecting the surrounding neighbourhoods, in particular the homeless and street youth who live around and under the bridge, have been identified by local social agencies, representatives of the Winnipeg Police Service and community members. The NAC has considered various ideas to address their needs both during and after construction. Numerous organizations and stakeholders have met and are looking at forming a group to further address the situation in the long term. Public feedback on these and other potential areas of interest is welcomed. You are invited Please come out to an Open House to learn more about the project. Chat with project representatives, read storyboards and view the project options and drawings. We want to know what you think. Saturday January 30, 2010 11:00 a.m. - 4:00 p.m. Holy Rosary Church Hall 510 River Avenue Project Timelines Public Consultation Broad public input Winter 2010 Conceptual Design March 2010 Preliminary Design Summer 2010 Detailed Design Winter 2011 Construction Spring to Fall, in both 2011 and 2012

Managing traffic and neighbourhood concerns during construction Traffic over the bridge will be maintained at all times in both directions, except for minor closures which will be short and well communicated. However, traffic will likely be restricted to one lane in each direction for both construction seasons (spring to fall 2011 and 2012). Utilities such as MTS and Hydro have to be accommodated. One sidewalk will be available throughout construction. Due to the need to maintain emergency services, and because the Osborne Bridge is one of the City s key transit corridors, total closure that would allow completion of the project in a much shorter period of time is not feasible. Concerns of businesses and residents must also be taken into account. Extended construction work hours to finish the project might occur. The City s noise bylaw will be considered given the large number of residents near the bridge as well as public and worker safety. Some mitigation strategies to reduce traffic congestion are being considered and a plan will be prepared and communicated well in advance that includes identifying alternate traffic routes. How can I have a say in the project? In addition to this newsletter, which has been produced for the neighbourhoods adjacent to the project area, information is being shared with the public and feedback collected through display ads in the major newspapers, random and targeted surveys of residents and businesses, and an open house. Feedback received about the options will be considered by the NAC before completing the planning process. After the final NAC meeting and preparation of the public consultation report, the recommended plan will be presented at a community meeting. Project Contact More detailed descriptions of the development and components of the project are provided on the project website at www.winnipeg.ca/publicworks/majorprojects/ OsborneBridge/ For further information contact: Matt Chislett, P. Eng., Project Manager City of Winnipeg Public Works Department 106 1155 Pacific Ave., Winnipeg, MB R3E 3P1 Fax: 986-5302 Email: mchislett@winnipeg.ca Media inquiries please call: 986-0 Response coupon (Please return within one week to the project contact, information above.) 1. Please rate each option, using a scale of 1 to 5, where 1 means your opinion is very negative and 5 means your opinion is very positive. Very negative Very positive 1 2 3 4 5 1 2 3 4 5 2. Of the two options presented, which do you prefer? OPTION 1 OPTION 2 3. Why do you prefer this option? 4. Please share with us any other comments.

What options did the NAC develop? Osborne Bridge Rehabilitation Project - Plan Views After exploring many ideas, the NAC developed two options that fulfilled the project goals while remaining consistent with the scope of the project. They are presented here for public feedback. Connections to the City s Active Transportation routes will be ensured, specifically at Roslyn and north of the bridge. Various routes will be considered and integrated with the Osborne Bridge Rehabilitation project. What factors guided the planning process? The committee s decisions were guided by a number of limitations. The project must: Stay within the capital budget of $17 million. Upgrade the facility to current City of Winnipeg standards without an additional row of girders or substructure modifications. Work within the limited City of Winnipeg right of way on either side of the approach roads. Carry out the work in accordance with City bylaws, policies and guidelines. What were the project goals? The NAC s collaborative planning process was guided by a set of established project goals. The rehabilitated bridge must be: Q Technically sound Q Environmentally responsible Q Cost effective Q Reflective of the needs of the community and city in general Q Generally understood and accepted by most of those affected The group discussed these goals to provide a more specific framework for decision-making. Some of the key points on which the NAC agreed were: Q Improve services for pedestrians and cyclists and coordinate with the City s Active Transportation strategy while ensuring fair accommodation for all modes of transportation; Q Maximize the use of the existing structure in the rehabilitation; Q Incorporate features to make it self-sustaining and more cost effective to maintain; Q Design an aesthetically pleasing bridge that is respectful of neighbourhood identities on both sides of the river; Q Ensure a safe environment for all users. The first option features a 2.7 m (8.9 ft.) sidewalk and a 1.8 m (5.9 ft.) shoulder on both sides of the bridge to separate cyclists from pedestrians. Sidewalks 2.7 m (8.9 ft.) (both sides) Shoulders 1.8 m (5.9 ft.) on both sides for cyclists Barrier between cyclists and pedestrians 0.45 m (1.5 ft.) The second option features a wide multi-use lane on the west side of the bridge that is shared by cyclists and pedestrians and ties-in effectively to existing and future Active Transportation routes to the north along Assiniboine Ave. and south along Roslyn Rd. Cyclists do not have to dismount here as they must on a standard width sidewalk. The shoulders for cyclists travelling on the road are not as wide as. 4.1 m (13.5 ft.) multi-use lane for pedestrians and cyclists on the west side, travelling in both directions 2.5 m (8.5 ft.) sidewalk on the east side Shoulders of 1.2 m (3.9 ft.) on both sides for cyclists Barrier between multi use lane and traffic lanes 0.45 (1.5 ft.) Some private property must be bought for to proceed. The City of Winnipeg is working on this. After evaluation of traffic movement patterns and consultation with stakeholder groups, a controlled pedestrian crossing is being considered across Osborne Street at Mostyn Place in both options. Also, due to concerns expressed about conflicts between pedestrians crossing north and cyclists turning east onto Assiniboine Ave. (behind the Legislature) there are plans to move the crosswalk further east. The sidewalks will be redesigned so that pedestrians have a direct northbound crossing path. The steep slope of the path at the northwest corner will be considered during the design phase of the project. Traffic flow concerns for both vehicles and cyclists at the Roslyn intersection were discussed. Possible solutions include signal optimization and cyclist priority signals. The former will be done through the City s overall review of signal timing for major streets. The latter and other methods used in other jurisdictions will be reviewed. Existing 2700 1800 3500 3500 3500 3500 3500 1800 2700 SIDEWALK SHY SB LANE SB LANE SB LANE NB LANE NB LANE SHY SIDEWALK 4100 1200 3500 3500 3500 3500 3500 1200 2500 MULTI-USE SHY SB LANE SB LANE SB LANE NB LANE NB LANE SHY SIDEWALK PEDESTRIAN CYCLE LANE 300 SHOULDER 300 SHY 300 SHY 1200 SHOULDER 610 2743 3356 3356 3356 2462 + 3658 3658 2743 SIDEWALK SB LANE SB LANE SB LANE NB LANE NB LANE SIDEWALK