ECONOMIC DEVELOPMENT DISTRICT MASTER PLAN

Similar documents
Appendix C: Interim Mixed-Use Evaluation Criteria

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

Behnke Ranch Property, Pasco County: Master Plan Development Approach

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

Welcome. Walk Around. Talk to Us. Write Down Your Comments

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am

Selected Area Study. Vision Plan Draft

Palisades Outline Plan

Planned Residential Neighborhoods Land Use Goals

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

Chapter 5: Natural Resources and Environment

Woodburn Comprehensive Plan Growth Management Goals and Policies

CONCEPT PLAN APPLICATION

3. Project Description

North Oakville East Parks Facilities Distribution Plan. November, 2009

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

COUNTY OF SACRAMENTO CALIFORNIA PLANNING COMMISSION REPORT

I. INTRODUCTION. Project Background and Study Area

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

DRAFT MAP AMENDMENT FLU 04-4

PROPOSED URBAN STRUCTURE

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

Newcourt Masterplan. November Exeter Local Development Framework

S C O P E O F W O R K A P R I L

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

CITY OF FARGO PARKING RAMP SITE EVALUATION

Waverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

Goals & Objectives (best derived from an input

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

ARTICLE 6: Special and Planned Development Districts

Miami Valley Regional Planning Commission Regional Land Use Planning

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Chapter 3 Site Planning and Low Impact Development

Section 4 BUILDING THE MASTER PLAN

Future Land Use and Development Policies

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Local Growth Planning in North Central Green Line Communities

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

SUMMERSIDE / MT. CARMEL REINVESTMENT CORRIDOR COMMUNITY DEVELOPMENT STRATEGY

City of Heath. Town Center Concept

Glenborough at Easton Land Use Master Plan

Public Consultation. Land at Monks Farm, North Grove. Welcome

Isabel Neighborhood Plan: Alternatives

Chapter 2: Vision, Goals and Strategies

SPECIFIC PLAN Requirements

COMMISSION ACTION FORM

CITY OF PUYALLUP. Background. Development Services

Land Use Element. policy areas are discussed in this Element:

Jackson Highway Master Plans

Planning, Property and Development Department Report. To the Riel Community Committee

Municipal Development Plan Update Urban Service Area and Hamlets

systems is available on the Colorado Wetland Information Center (CWIC) website.

Osceola County Board of County Commissioners 1 Courthouse Square, Suite 1100 Kissimmee, FL

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Asbury Chapel Subdivision Sketch Plan

Complete Neighbourhood Guidelines Review Tool

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Planning Districts INTRODUCTION

Planning & Zoning Commission Staff Report

ORANGE COUNTY AT A GLANCE

Issues Requiring Future Study

Auburn Bay Community Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

BRIDGES OF LANGDON CONCEPTUAL SCHEME

Municipal Development Plan. Summer Village of ROCHON SANDS. Bylaw #241-18

City of Tacoma Planning and Development Services

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Community Information Meeting

Gather information from online resources covering the following topics:

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Planning Primer Legislative Background, Policy Documents and Development Review Processes. Presented by: Planning Services Date: April 6, 2017

CHAPTER SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS

Prosperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015

Conservation Development

Natomas Joint Vision Open Space Plan

The transportation system in a community is an

Natomas Vision Plan and PLNP

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

hermitage town center

Sustainable Growth. Sustainable Growth

HAZARD MITIGATION GOALS AND OBJECTIVES

Midtown Greenway Land Use and Development Plan Executive Summary

Additional information about land use types is given in Chapter 5. Design guidelines for Centers and Neighborhoods are given in Chapter 7.

The following principles guide the development of goals and strategies to protect and promote these amenities:

Phase I Ecological Network Report Terms of Reference

Transcription:

ECONOMIC DEVELOPMENT DISTRICT MASTER PLAN E Orange Ave Legend for the CIT Y OF MOUNT DORA/LAKE COUNT Y County Boundary Wekiva Corridor (Proposed Alignment) Public Land and Parks Park Public CityLimits JPA_Parcels 5 US Hwy 441 Limit Ave 6 y4 41 Grandview St Hw N Donnelly St Old 4 E Lincoln Ave 7 E 5th Ave SR 46 3 E 1st Ave S Highland St 2 April 15, 2014 Submitted by: In association with: Real Estate Research Consultants

5 US Hwy 441 Limit Ave 6 y4 41 Grandview St Hw N Donnelly St Old 4 E Lincoln Ave E 5th Ave 3 E 1st Ave S Highland St 2

7 SR 46

renaissance planning group

Table of Contents Introduction...3 Context Map...4 Inventory...5 Jurisdiction...6 Zoning...7 Future Land Use...8 Topography...9 Soils...10 Wetlands / Flood Plains...11 Trails...12 Wekiva Parkway...13 Analysis...15 Composite Base...16 Issues / Opportunities...17 Synthesis...19 Utility Service Lines...20 Transportation...21 Conceptual Master Plan...22 The City of Mount Dora / Lake County 1

This page was intentionally left blank. Economic Development District Master Plan

Introduction A conceptual master plan is an organizational scheme that establishes relationships between the various working parts of a development program, with a goal of creating a place that is sustainable and adaptable to changing circumstances in social, economic and environmental conditions over time. The design process involves interaction with the community, gathering and consolidating both data and opinions, considering a variety of alternatives, building consensus and setting a direction for the project. The objective of the Mount Dora Economic Development District Master Plan is to create a framework for the marketing and development of property in the Lake County/Mount Dora Joint Planning Area for employment based uses. The City and County have adopted land use policies that incorporate industrial corridors along SR 46 east of US 441 and employment center/regional office uses east of Round Lake Road. The intent of these policies is to promote orderly and logical development of land for major office complexes, technology uses, and light, clean, green industrial development in attractively designed, park-type settings that complement the area s environmental and natural features. The framework developed by this Master Plan addresses the approximate mix, density, intensity, access, location and compatibility of uses. The map on the following page indicates the location of the Mount Dora Economic Development District in relation to other projects and improvements in the area. With the construction of the Wekiva Parkway extension and completion of the Beltway, Mount Dora becomes much more easily accessible to all parts of the greater Orlando region. The work involved in creating this Conceptual Master Plan occurred in three stages, as shown and described in the following pages. The City of Mount Dora / Lake County 3

Introduction: Context 4 Economic Development District Master Plan

Inventory The first portion of the project work established a context for the Conceptual Master Plan that guided its development and laid the groundwork for linking the Plan to larger community and regional goals such as economic development, multimodal connectivity and environmental preservation. The Consultant collected critical data necessary to identify existing area conditions and characteristics and compiled it in a form in which it could be mapped in a digital format. Data collected covered such items as topography, soils, vegetation, hydrology and drainage, views, structures, roads and railways and infrastructure. Policy designations (zoning and future land use) and parcel ownership information were also noted. In conjunction with City and County staff, available data from existing online and paper sources was obtained for mapping and analysis. Information from other online sources was collected and field work was used as necessary to fill in gaps in the data set and verify information. The City of Mount Dora / Lake County 5

Inventory: Jurisdiction 6 Economic Development District Master Plan

Inventory: Zoning The City of Mount Dora / Lake County 7

Inventory: Future Land Use 8 Economic Development District Master Plan

Inventory: Topography The City of Mount Dora / Lake County 9

Inventory: Soils 10 Economic Development District Master Plan

Inventory: Wetlands/Flood Plains The City of Mount Dora / Lake County 11

Inventory: Trails 12 Economic Development District Master Plan

Inventory: Wekiva Parkway The City of Mount Dora / Lake County 13

This page was intentionally left blank. Economic Development District Master Plan

Analysis The second portion of the project work provided a detailed examination of the gathered inventory items and identified the physical conditions, policies and community issues that may influence the Master Plan design. A Market Analysis was completed that framed the development opportunities to be considered during this site examination and subsequent program development. Relevant information from the background documents and inventory data was analyzed to determine its potential impact on development of the site. Existing site characteristics were mapped as a basis for developing a sense of the issues and opportunities provided by the site. Analysis was done through a series of map overlays that delineated the most suitable and least suitable areas of the site for each analysis factor. Potential linkages, focal points, access, centers and edges were also identified and mapped. The City of Mount Dora / Lake County 15

Analysis: Composite Base 16 Economic Development District Master Plan

Analysis: Issues & Opportunities The City of Mount Dora / Lake County 17

This page was intentionally left blank. Economic Development District Master Plan

Synthesis Creation of a preliminary development program was the bridging step between the analysis and the design phases of the project. The program was based on both the Market Analysis and the Site Analysis and it served as the guide to begin envisioning the Conceptual Master Plan design elements. The program was explicit enough to provide initial direction, but flexible enough to allow new ideas and direction to emerge as the design evolved. Conceptual design began with the creation of functional diagrams that explored the relationships of the different development program components. This was first accomplished as a series of quick non-site related diagram sketches that helped the designers understand abstract relationships and hierarchy among the various elements of the development program, including such things as access points, roads, key facilities, development pods, drainage ways, buffers, adjacency of uses, and open space/greenways. These diagrams were then applied to the project site, using the Issues and Opportunities Map as an underlying framework. The goal of this exercise was to start integrating project components into the site, highlighting and utilizing the positive elements of the site, while protecting sensitive elements and systems. The designers explored a series of alternative arrangements, evaluating each concept in terms of suitability with natural site features, adjacent land uses and proposed development. The result was a series of hand-drawn site-related diagrams or bubble plans. The selected conceptual design was refined into the Master Plan, resolving program elements into physical components that suggested basic form and size, as well as a road network that provided connectivity and spread out traffic patterns throughout the site. Based on the economic demand and opportunities presented in the Market Analysis, the Conceptual Master Plan illustrates a potential development program and mix of uses for the site that includes (approximately): Office: 326 acres (32%) Industrial: 416 acres (41%) Retail: 51 acres (5%) High Tech: 101 acres (10%) Residential: 123 acres (12%) Total Non-Residential SF: Total Employees: Total Residential: 8.5 million 17,000 people 1,000 units The City of Mount Dora / Lake County 19

Synthesis: Utility Service Lines 20 Economic Development District Master Plan

Synthesis: Transportation The City of Mount Dora / Lake County 21

Synthesis: Conceptual Master Plan 22 Economic Development District Master Plan