DC INDUSTRIAL PLANT SERVICES

Similar documents
BOTTOM ASH & FLY ASH HANDLING SYSTEMS SYSTEMS AND CURRENT TRENDS OF ASH HANDLING VENDORS

ASPHALT PLANT. atlastechnologiesindia.com

ASPHALT PLANT. atlastechnologiesindia.com. MOBILE VARIANTS: MDDM 45 (40-60 tph), MDDM 50 (60-90 tph), MDDM 60 ( tph)

ASPHALT PLANT. atlastechnologiesindia.com. MOBILE VARIANTS: MDM 45 (40-60 tph), MDM 50 (60-90 tph), MDM 60 ( tph)

STEAM & POWER ENGINEERS

Matsui Technologies India Limited

ASPHALT DRUM MIX PLANT - MDM 25 (20-30 TPH) I TECHNICAL SPECIFICATIONS COLD AGGREGATE FEEDER

ASPHALT DRUM MIX PLANT - MDM 25 (20-30 TPH) I TECHNICAL SPECIFICATIONS COLD AGGREGATE FEEDER. Gathering cum slinger conveyor 500 mm x 7.

DM 45 (40-60 TPH) ASPHALT DRUM MIX PLANT - DM 50 (60-90 TPH) I TECHNICAL SPECIFICATIONS DM 60 ( TPH) COLD AGGREGATE FEEDER.

ASPHALT PLANT. atlasindustries.in

ASPHALT PLANT. MOBILE VARIANTS: MDDM 45 (40-60 tph), MDDM 50 (60-90 tph), MDDM 60 ( tph) atlasindustries.in

DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OF "JANUARY" 2018 ABOVE THRESHOLD LIMIT

ENVIRO INTERNATIONAL CORPORATION

ASPHALT PLANT. AtlasTechnologiesIndia.com

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Westinghouse Cementation Facility of Solid Waste Treatment System 13503

2x58 MW Coal Fired Power Plant at Mauritius

Content Copy Of Original

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

Dust Collectors. Unique Design & Engineering Approaches for Dust Collection and Pneumatic Conveying

RemoteVac Hopper Loader

SURGING AND BLOW OUT OF LOOP SEALS IN A CFBC BOILER. By K.K.Parthiban Venus energy audit system

Cleantek.

E q KESHAR. Product Range : Asphalt Stationary Drum Mix Plant. Wet Mix Macadam Plant. Asphalt Mobile Drum Mix Plant.

Introduction to Bulk Solids. The Basics

Quality Construction Equipment

Material Design for Central Chutes

THE "STRIPPER" BLAST-IT-ALL

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

P Square Technologies

ANNEXURE 1 KEY PLAN. Project site. Application Form 1 for Amendment in Environmental Clearance for M/s. Windson Chemical Pvt. Ltd.

Annexe: Width 9 mtrs (4+2), length 130 mtrs divided into following sections: Impulse Test Lab. Routine Test Lab. Stores. Works offices.

McQuay Climate Control. Horizontal Water Source Heat Pump. CC, CG, CW, UC, UG, UW Vintages E, F, G. Last Manufactured: 1988

FLUID BED DRYERS, COOLERS AND MOISTURIZERS

ProcessBarron is a leader in the design, fabrication, installation, maintenance, and repair of air, flue gas and bulk materials handling system

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017

AS PER US SPECS. Offering High Quality Asphalt Drum Mix Plants Both In Stationary & Mobile Versions ASPHALT & CONCRETE EQUIPMENT.

World class solutions in Cleaning, Grading, Sorting & Handling of all kinds of Fruits & Vegetables

Fluid Bed Processor LFP LÖDIGE ALWAYS THE RIGHT MIX

1. Raw Material Handling: 2. Roaster Furnace: 4. Waste Heat Boiler: 5. Boiler Chain Conveyors:

RECORDS OF ENERGY CONSERVATION COMPARISION OF LAST TWO YEARS

HYDRATED LIME STORAGE SYSTEM PROCESS DESCRIPTION Document No

APPLICATION PROFILE EXPLOSIONS IN CEMENT PLANTS EXPLOSIONS IN CEMENT PLANTS CEMENT PLANT EQUIPMENT WITH HIGHEST EXPLOSION POTENTIAL. Form No.

Complete Waste Tire Recycling Line

COMPANY MANAGEMENT TREE

Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate

Tube press Booster range. Superior performance

The Clearer Solution to Washing

Cedar Innovations Ltd Pilmore Growers Whitesheet Holt Wimborne Dorset BH21 7DA

EMVO SINGLE STAGE OIL SEALED ROTARY VANE VACUUM PUMPS SUPERVANE (ROTARY VANE+BOOSTER COMBINATION VACUUM SYSTEMS)

C&W specializes in dust control for a variety of sand-related applications.

National Grid Residential & C&I Active Demand Reduction Demonstration Projects. MA EEAC March 15, 2017

Air Pollution Control Equipment & Service Needs

Brief Reference List (As on January, 2016)

BLAST-IT-ALL BUMPER BLASTER

SECOND HAND ASPHALT PALANT FOR SALE

2018 Annual Landfill Inspection Report

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

User s Manual YTA610 and YTA710 NEPSI Certification

WINDFERN ROAD HOUSTON, TEXAS D-500 Dry Polymer Make Up System

Pulse Jet Baghouse ASTEC PULSE JET BAGHOUSE. for Asphalt Facilities

AAF. Water Source Heat Pump Ceiling Mounted. CCW Vintage E. Last Manufactured: Replacement Parts List No Revision D 08/2016

Boiler Division HPS. Triveni Boiler

Air Cooled Scroll Compressor Condensing Unit

Heat Consumption Assessment of the Domestic Hot Water Systems in the Apartment Buildings

Coal Handling and Processing. Advanced Solutions for Coal-Related Environmental Dust Control. Better Air is Our Business

D-1000 Dry Polymer Make Up System WINDFERN ROAD HOUSTON, TEXAS

A beneficial resource

VACUUM CLEANERS TOUGH, RUGGED AND BUILT TO LAST!

Quality Construction Equipment. ASPHALT BATCH MIX PLANT ANP Series tph. Star Export House

Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field.

Infra-Red Transit Heat and Flame Sensors. Early warning fire detection to protect conveyors, product and plant

Concrete Water Recycling MIXER WASHING PLANT

Australian Standard. Fire hydrant installations. Part 1: System design, installation and commissioning AS

3-1, Shinchi, Fuchu-cho, Aki-gun Hiroshima , Japan TEL : 81(82) FAX : 81(82) Repair Guidance

TECHNICAL CATALOGUE SILO VENTING DUST COLLECTORS. Manual No. FIL T.EN Issue: A Latest Update: January 2017 ORIGINAL INSTRUCTIONS IN ENGLISH

Reverse-Air Dust Collectors

Plastic Blow Molding Sale - Multiple Facilities

Beyond The Barriers of Performance Through Sound TM

ingle phase three phase hoppers central systems single phase three phase hoppers central syste CONVEYING

Mill Master Machinery Pvt. Ltd.

Tenova MINING & MINERALS

Roots TM Blowers, Compressors & Controls

Munkebo Production A/S Profile

A D D E N D U M N O. 1 To The Contract Documents Date: Project: Facilities Development & Planning Portable Building Relocation

ENERGY CONSERVATION IN COMPRESSED AIR SYSTEMS

IRD INFRAROT DREHROHR IRD INFRARED ROTARY DRUM ERWÄRMEN. TROCKNEN. KRISTALLISIEREN. COATEN. HEATING. DRYING. CRYSTALLIZING. COATING.

Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES. Illustrated Commentary. Office of the Ontario Fire Marshal

venting method will work for all pressure conveying systems, analyzing your available equipment, your material s characteristics, and your conveying c

Cryogenics for Neutral Beam Injector System

Installation Summary - Dairy Plant

Key Question. What is the most important aspect to the removal and cleaning of material?

IRD INFRARED ROTARY DRUM HEATING. DRYING. CRYSTALLIZING. COATING.

LIMESTONE HANDLING AND LIME MILLING SYSTEM

DeDusting Solutions for the plastics industry

SEMIANNUALLY 29 November 1996 SUPERSEDING QPL September 1996 QUALIFIED PRODUCTS LIST PRODUCTS QUALIFIED UNDER MILITARY SPECIFICATION

and Closed Circuit Blaster

ViVi UNGARO. EN 303-5:2012 class 5 EN PELLET BOILERS AND BOILER-STOVES. Certificate: Catalogue 2016

HYDRAMAX. Dry Polymer Wetting Technologies & Hydration Systems

Megawatt Solutions Private Limited

Transcription:

ANNEXURE - B MAJOR ASH HANDLING CONTRACTS NOW UNDER EXECUTION BY DC INDUSTRIAL PRIVATE LIMITED DC INDUSTRIAL Page 1 of 7 REF. 01 DVC - Chandrapura Thermal Power Station, Extn. Unit #7 #8 (2 x 250 MW) 02 DVC - MejiaThermal Power Station, Unit #5 #6 (2 x 250 MW) Damodar Valley Corporation, Thru BHEL/ISG, Bangalore Damodar Valley Corporation, BHEL/PS-ER, LOI No. : 77/05/0015/ SRK Dt.26.04.2005 PSER:SCT: MJA-M530:04: PO:0024 Dt.23.05.2005 Unit # 7 Wet System September, 2009. Unit # 8 Wet System March, 2010. Unit #7 Dry System July, 2012. Unit #8 Dry System Commissioning in June, 2014 Unit # 5 Wet System March, 2008 Unit # 6 Wet System May, 2008 Dry System Commissioned in September, 2009. Water Recovery System (with Clariflocculator) to be commissioned in June, 2014 hopper and jet pumping (2 x 60 TPH) upto slurry sump. Fly ash vacuum conveying system (2 x 60 TPH) upto bag filter and surge hopper for dry collection, fly ash wet disposal system through wetting unit-collector tank (2 x 60 TPH). Pressure conveying system from surge hopper (1 x 120 TPH) to a remote silo (approximately 850 M distance), slurry pumping (620 m 3 /hr.), water and instrument air system along with complete electrical civil design work on turnkey basis for the complete ash handling system. hopper and jet pumping (2 x 60 TPH) upto slurry sump. Fly ash vacuum conveying system (2 x 60 TPH) upto bag filter and surge hopper for dry collection, fly ash wet disposal system through wetting unit-collector tank (2 x 60 TPH). Pressure conveying system from surge hopper (1 x 120 TPH) to a remote silo (approximately 500 M distance), slurry pumping (620 m 3 /hr.), water and instrument air system along with complete electrical/ci civil/structural works on turnkey basis for the complete ash handling system.

Page 2 of 7 REF. 03 Barh Super Stage-I (3 x 660 MW) 04 Korba Super Stage-III (1 x 500 MW) 01/CS-9558-162-2-FC- NOA-4662 Dt.22.03.2006 01/CS-9558-162-2-SC- NOA-4663 Dt.22.03.2006 CS-2140-162-2-FC- NOA-4863 Dt.09.04.2007 CS-2140-162-2-SC- NOA-4864 Dt.09.04.2007 Revised Schedule of Unit #1 Dec., 2014 Unit #2 July, 2015 Unit #3 Dec., 2015 Wet System November, 2010 Dry System Commissioning : June, 2014 (3 x 89 TPH/Unit) upto slurry sump. Fly ash vacuum conveying system (6 x 54.44 TPH/Unit) upto surge hopper for dry Collection, fly ash wet disposal system through wetting unit-collector tank. Pressure Conveying System from surge hoppers (3 x 108.88 TPH/Unit) to remote silos (approximately 750 M away), slurry pumping system (each stream 1390 m 3 /hr.) along with slurry disposal piping (500 NB MS, 5 x 10 km), water and instrument air systems along with associated electrical civil works on turnkey basis for the complete Ash Handling System. Bottom Ash Handling System with dry BA hopper, Scraper Conveyor (49.5 TPH), BA slurry pumping up to combined slurry sump. Fly ash Vacuum Conveying System with mechanical exhauster (4 x 59.4 TPH) up to local surge hopper/wetting unit. Pressure Conveying System (2 x 118.8 TPH) from surge hopper to remote silo using Screw Compressor. Ash Slurry disposal system employing slurry pumps (943 cu.m/hr.) up to booster pump house and from booster pump house to dyke, 400 NB 9.52 thk. slurry piping (total 60 km).

Page 3 of 7 REF. Associated water pump and piping, blowers, IA compressors etc. Complete Civil Structural Work. Complete Electrical Work in Booster Pump House. 05 Indira Gandhi Super Thermal Power Jhajjar (3 x 500 MW) Aravali Power Company Private Limited, APCPL/HQ/ CS/0330-162- 2/FC/ASH/ NOA/08/148 Dt.30.06.2008 APCPL/HQ/ CS/0330-162- 2/SC/ASH/ NOA/08/149 Dt.30.06.2008 (Thru HCSD) Unit #1 October, 2010 Unit #2 November, 2011 Unit #3 March, 2013 Commissioning (Dry System) :- Unit #1 November, 2013 Unit #2 January, 2014 Unit #3 Commissioning in July, 2014 hopper and jet pumping upto slurry sump. Bottom ash slurry pumping system along with slurry disposal piping (350 NB MS, 4 x 5.7 km). Fly ash vacuum conveying system (4 x 56.75 TPH/Unit) upto surge hopper for dry Collection, Pressure Conveying System from surge hoppers (2 x 113.5 TPH/Unit) to remote silos (approximately 1000 M away) or to HCSD silos. Fly ash wet disposal through High Concentration Slurry Disposal (HCSD) System along with HCSD Pumps (5 nos. PD Pumps) and HCSD piping (200 NB, Sch.-80, 5 x 3.6 km). Water and instrument air systems along with associated electrical civil works on turnkey basis for the complete Ash Handling System.

Page 4 of 7 REF. 06 WBPDCL - Santaldih Station, 1 x 250 MW, Unit # 6 The West Bengal Power Development Corporation Ltd., BHEL/PS-ER, PSER:SCT: SND-M851: 08:LOI-S:1458 Dt.03.10.2008 PSER:SCT: SND-M851: 08:LOI-E:1459 Dt.03.10.2008 Ash Handling System (Wet System) September, 2011 Dry System : December, 2013 Water Recovery System (with Clariflocculator) to be commissioned in July, 2014 Bottom ash with water impounded hopper and jet pumping (2 x 65 TPH) up to slurry sump. Fly ash vacuum conveying (3 x 60 TPH) to surge hopper with mechanical exhauster and pressure transportation from surge hopper to silo (2 x 90 TPH). Fly ash wet disposal from silo up to slurry sump. Slurry disposal system up to dyke by slurry pump (620 m 3 /hr.) along with slurry disposal piping (300 NB MS, 2 x 2.25 km). Water and instrument air systems along with associated electrical civil works on turnkey basis for the complete Ash Handling System. 07 Barh Super Stage-II (2 x 660 MW) CS-9560-162- 2-FC-NOA- 5293 Dt.01.06.2009 CS-9560-162- 2-SC-NOA- 5294 Dt.01.06.2009 Unit #4 June., 2014 Unit #5 Dec., 2014. (3 x 86.14 TPH/Unit) upto slurry sump. Fly ash vacuum conveying system (6 x 47.39 TPH/Unit) upto surge hopper for dry Collection, fly ash wet disposal system through wetting unit-collector tank. Pressure Conveying System from surge hoppers (3 x 94.77 TPH/Unit) to remote silos (approximately 750 M away), slurry pumping system (four streams) along with slurry disposal piping (500 NB MS, 4 x 10 km), water and instrument air systems along with associated electrical civil works on turnkey basis for the complete Ash Handling System.

Page 5 of 7 REF. 08 Matrishri Usha Jayaswal Mega Power Phase I (2 x 270 MW) 09 Matrishri Usha Jayaswal Mega Power Phase II (2 x 270 MW) Corporate Power Ltd. Abhijeet Infra Limited, Ranchi Corporate Power Ltd. Abhijeet Infra Limited, Ranchi III/AHP/424/ PO III/AHP/424/ WO III/AHP/424/ PO III/AHP/424/ WO.. December, 2014 July, 2015 Bottom ash hydraulic conveying with water impounded hopper and jet pumping (2 x 75 TPH streams per Unit) upto slurry sump. Fly ash pneumatic vacuum conveying system (3 x 60 TPH streams per Unit) either upto bag filter/ surge hopper for dry collection or to wetting unit-collector tank for wet disposal. Pneumatic positive pressure conveying system from surge hopper (2 x 90 TPH streams per Unit) to remote silo(s) (approximately 800 M away). Lean slurry disposal system to pond by slurry pumps (620 m 3 /hr) and 2 x 6.5 km 300 NB MS piping. Ash water recovery system from ash pond. High Concentration Slurry Disposal (HCSD) system for fly ash from storage silo to ash dyke (6.5 km pipe). Associated auxiliary systems such as, ash water, seal water, clear water and instrument air systems. Complete Electrics, CI and structural works for the entire Ash Handling System. Bottom ash hydraulic conveying with water impounded hopper and jet pumping (2 x 75 TPH streams per Unit) upto slurry sump. Fly ash pneumatic vacuum conveying system (3 x 60 TPH streams per Unit) either upto bag filter/ surge hopper for dry collection or to wetting unit-collector tank for wet disposal. Pneumatic positive pressure conveying system from surge hopper (2 x 90 TPH streams per Unit) to remote silo(s) (approximately 800 M away). Lean slurry disposal system to pond by slurry pumps (620

Page 6 of 7 REF. 10 KPCL Bellary Station, Unit 3 (1 x 700 MW) Karnataka Power Corporation Ltd., Thru BHEL/ISG, Bangalore LOI No. : 77/11/0054/AK Dt.05.07.2011 December, 2014 m 3 /hr) and 2 x 6.5 km 300 NB MS piping. Ash water recovery system from ash pond. High Concentration Slurry Disposal (HCSD) system for fly ash from storage silo to ash dyke (6.5 km pipe). Associated auxiliary systems such as, ash water, seal water, clear water and instrument air systems. Complete Electrics, CI and structural works for the entire Ash Handling System. (3 x 85 TPH) upto slurry sump. Fly ash vacuum conveying system (6 x 67 TPH) upto surge hopper for dry Collection, fly ash wet disposal system through wetting unit-collector tank. Pressure Conveying System from surge hoppers (3 x 134 TPH) to remote silos (approximately 1200 M away), slurry pumping system (two streams) along with slurry disposal piping (500 NB MS, 2 x 3.5 km), water and instrument air systems along with associated electrical works on turnkey basis for the complete Ash Handling System. 11 Nabinagar Super Project (3 x 660 MW) Nabinagar Power Generating Company Private Limited, Patna CS-0370-162C-2-FC- NOA-0015 Dt.22.03.2013 CS-0370-162C-2-SC- NOA-0016 Dt.22.03.2013 Unit #1 July, 2016 Unit #2 Jan., 2017 Unit #3 July, 2017 (3 x 78.2 TPH) upto slurry sump. Bottom ash slurry pumping system along with slurry disposal piping (450 NB MS, 4 x 10 km). Fly ash vacuum conveying system (6 x 58.48 TPH/Unit) upto surge hopper for dry Collection, Pressure Conveying System from surge hoppers (3 x 116.96 TPH/Unit) to

Page 7 of 7 REF. remote silos (approximately 1000 M away) or to HCSD silos. Fly ash wet disposal through High Concentration Slurry Disposal (HCSD) System (131.58 TPH per stream) along with HCSD Pumps (8 nos. PD Pumps) and HCSD piping (175 NB, Sch.-80, 8 x 7.5 km). Water and instrument air systems along with associated electrical structural works on turnkey basis for the complete Ash Handling System. Complete Ash Water Re-circulation System from ash pond comprising re-circulation water pump (3 nos. 1025 cu.m/hr. capacity) 600 NB M.S. pipe (7 km). 12 Sipat Super Stage-I (3 x 660 MW), Unit #1 and #2 01/CS-9518-162E-2-FC- NOA-6061 Dt.07.01.2014 01/CS-9518-162E-2-SC- NOA-6062 Dt.07.01.2014 July, 2015 Fly Ash Pneumatic Pressure Transportation System from existing buffer hoppers (3 x 96 TPH/Unit) to remote silos (approximately 1100 M away), ash water and instrument air systems along with associated electrics and electrical control system, civil structural works on turnkey basis for the complete Dry Fly Ash Transportation System for unit #1 unit #2.