Introduction to the Seahurst Park Ecosystem Restoration Project: A Process of Transformation. Presented by Peter Hummel, ASLA, LEED AP

Similar documents
Sustainable Waterfront Redevelopment Case Study: Seattle, Washington. By Nicole Faghin, LEED AP

1. Seattle Central Waterfront Park

Shoreline Master Program Town of La Conner, Washington

New Brighton Park Shoreline Habitat Restoration Project

Pine Flat Lake Master Plan Update FACT SHEET September 2014

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Improving access to regional conservation assessments through an online encyclopedia

Blue/Green Infrastructure Study Accomack County, VA

400 Seventh Street SW 1904 Third Ave, Suite 105 Washington, D.C Seattle, WA Phone: (202) Phone: (206)

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

BEACH AND INLET PROJECTS UPDATE

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

City of Tacoma Planning and Development Services

Your Marine Waterfront

Rhode Island Shoreline Change Special Area Management Plan

Hunts Point Landing, Bronx, New York

TITLOW SHORELINE AND ESTUARY RESTORATION PROJECT DESIGN DEVELOPMENT

Linking Ecological Restoration and Economic Recovery at a Great Lakes Area of Concern: Muskegon Lake, MI. Heather Braun Great Lakes Commission

Gibsons Foreshore & Seawalk Improvements

Gibsons Foreshore & Seawalk Improvements

Baylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.

Design Around Waterways and Wetlands

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

CHAPTER 1 Introduction

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Daylighting Madrona Creek. It takes a neighborhood

Scarborough Waterfront Project

PARKS AND RECREATION

City of Tacoma Shoreline Master Program Update Stakeholder Advisory Committee Meeting September 10, 2009

Nature-Based Adaptation Projects Challenges and Opportunities in California Marilyn Latta, Project Manager California State Coastal Conservancy

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Climate Change and Physical Development Threats, Challenges and Adaptation Responses in Coastal Communities: Grand Riviere, Trinidad

Restoring Water Ecosystems in NYC Parks

Sunshine Coast Council Coastal Management Overview. January 2016 edition

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

ROSS Appendix F Land Conversion. Ecosystem Services Value Lost from Land Conversion in the Central Puget Sound Region ( )

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Conserving Illinois North Shore Ravines

New York City, 19 th c.

Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017

Yes Local NOAA Marine Fisheries (expertise and assistance)

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

OYSTER LAKE RESTORATION PROJECT


South King County High Capacity Transit Corridor Report. Figure Other Infrastructure

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

RIVERFRONT REDEVELOPMENT PLAN

Public Information Meeting

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Introducing Green Infrastructure for Coastal Resilience

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

11/21/2016. Landscaping on the Edge Needs to be Different LANDSCAPES ON THE EDGE ARE DIFFERENT DIFFERENT RULES APPLY. things happen on the edge

Local Planning to Advance Implementation of Living Shorelines at Municipal Properties

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

FISH RESTORATION PROGRAM AGREEMENT Implementing Habitat Restoration Requirements Of The Biological Opinions

BEFORE THE HEARINGS EXAMINER FOR THURSTON COUNTY

Green Infrastructure. NYS Department of Environmental Conservation

MAYFIELD WEST SECONDARY PLAN PHASE 2

Iona Island Wastewater Treatment Plant Project. Welcome to Community Workshop 1 January 9, 2019

Introduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.

The Napa River Flood Protection Project

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE. Auburn, Washington

1.16 million KM 2 5 States, 2 Provinces Integrated Partnerships with neighboring LCCs, NW and NC Climate Science Centers, PNW

Lower Columbia River and Coastal Landscape Conservation Design

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY

Ottawa County Parks, Recreation & Open Space Plan. February, 2006

(Exhibit A) Site Plan Adoption Detail and Support Information

Ashbridges Bay Erosion and Sediment Control Project

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

NJ Department of Environmental Protection

Slope Stability Management Framework

Welcome! Agenda. South Downtown

The Benefits and Challenges Associated with Green Infrastructure Practices

Lake O the Pines Master Plan Revision Public Information Meeting April 25 & 27, 2017

Clallam County Shoreline Master Program Update. Salt Creek and Tongue Point, 2006

Jefferson County Marine Resources Committee ANNUAL SUMMARY REPORT Jan 1, 2015 Dec 31, 2015

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

TERMS OF REFERENCE MALASPINA COMPLEX COASTAL PLAN

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance

D RAFT MEMORANDUM CURRENT PLANTING TECHNIQUES. Technique 1: Bioengineered Brush Layering. To: Date: January 20, 2016

BAY AREA PARKS & RECREATION

Southwest Fleetwood Enclave

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

The Rocky Mountain Arsenal and the Northeast Greenway Corridor Project:

Acknowledgements Town of Qualicum Beach

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Subject: Sea Level Rise Constraints and Opportunities for India Basin

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

Meta-Analysis of Project Effectiveness: Learning at the Regional Scale

Transcription:

Introduction to the Seahurst Park Ecosystem Restoration Project: Presented by Peter Hummel, ASLA, LEED AP September 16, 2014 Environmental Science Center Public Education Series 0

Acknowledgements Project Partners City of Burien (Owner) U.S. Army Corps of Engineers, Seattle District Other Major Funding Sources Federal National Oceanic and Atmospheric Administration U.S. Environmental Protection Agency State Salmon Recovery Funding Board Aquatic Land Enhancement Acct. Estuary and Salmon Restoration Prg. Land & Water Conservation Fund Puget Sound Acq. & Restoration Fund County Green/Duwamish Watershed/WRIA 9 King Conservation District 1

Acknowledgements Planning Design Team Prime Consultant: Anchor QEA Subconsultants: Coastal Geologic Services Shannon & Wilson Berger ABAM Patano+Hafermann Architects Roth Hill Engineering Partners Cross Engineers Pre- and Post-project Monitoring Anchor QEA Coastal Geologic Services Univ. of Wash. Fisheries/WET Construction Contractors Phase 1: MarVac, A-1, Segale Phase 2: CKY Environmental Science Center Environmental Science Center Foundation Bassetti Architects 2

Presentation Overview 1. Introduction and Project Background 2. Project Overview by Key Issues 3. Implementation and Monitoring 4. Summary and Conclusions 3

1. Introduction and Project Background Site and Project History Purpose and Need, Goals, and Challenges Project Context 4

Site History: Timeline 1946 1965 1970 1996 Pre-settlement: Uses by Native Americans included extensive clam digging and fishing Early 1900s: Site is logged 1930s: Fox family purchases, establishes residence, and uses site for clandestine rum running operations 1940s 1970 South Basin used for Wa 85 Water Su 5

Site History: Timeline 1996 1993: City of Burien established 1996: King County transfers park to City of Burien 1997 1999: Washington Department of Fish and Wildlife denies proposal to place more rock (gabion) to protect south seawall 2000: Puget So listed as under th Species A 6

Project History: Timeline 2001: Master Planning Begins 2002: Master Plan adopted by City Council 2005: Phase 1A (City/USACE) South Seawall removal completed 2006: Phase 1B (City/NOAA/SR FB): Phase 1 vegetation restoration completed 2007: City acq (31acres Brown fa increasin to prese 183-acre 7

Project Purpose, Need, and Constraints Extensive park armoring has degraded nearshore habitat There are significant restoration benefits on site and downdrift Rare opportunity, landscape position, size of park s shoreline Significant recreational and educational use is constraint/opportunity 8

Ecosystem Restoration Goals Preserve existing high-functioning nearshore habitats Restore and protect the natural bluffto-beach sediment process Restore beach slopes and substrates Restore forage-fish spawning, juvenile salmon rearing, and migration intertidal habitats Restore upland and shallow intertidal habitat connectivity Diversify habitat in the freshwater/saltwater interface Before After 9

Habitat Preservation and Restoration Zones 10

Process-based Restoration Approach Wave energy Sediment Process delivery Sediment transport Conceptual Model: The role of Puget Sound nearshore beaches in sustaining forage fish Beach profile Sediment Structure grain size Beach temperature Forage fish spawning Function and production Food web support Source, Conceptual Model: PSNERP and Simenstad et al. 2006; Penttila 2007 11

Park Renovation Goals Locate Park Facilities Where Compatible with Habitat Processes Improve Disabled (ADA) Access Improve Access to Beach Protect and Support Educational Facilities and Programs No Net Loss of Recreational Facilities Improve Functionality and Availability of Recreation Amenities Long-term Sustainability/Durability 12

Key Project Challenges Uncertainties with Funding a $11 Million Project Balancing Habitat Restoration with Recreation and Educational Uses Cultural Resources Long Implementation Timeframe Sea-level Rise Construction Timing, Access, and Seasonal Site Conditions Utility Relocations Landslide Management and Environmentally Critical Areas 13

Context: Puget Sound Nearshore CANADA WASHINGTON STATE Seahurst Park Source: Puget Sound Nearshore Ecosystem Restoration Project 14

Context: Park Setting Greater Seattle/ Tacoma Discovery Park (534 acres) Alki Beach (136 acres) Lincoln Park (127 acres) SEATTLE Seahurst Park (183 acres) Saltwater State Park (96 acres) Dash Point State Park (398 acres) Point Defiance Park (702 acres) TACOMA 15

Context: Park Setting Local/Burien Shorewood Park Salmon Creek Ravine Salmon Creek Park Arbor Lake Park Puget Sound Park Hazel Valley Park Southern Heights Park Hilltop Park Seahurst Park Chelsea Park BURIEN Eagle Landing Park Burien Community Center Lake Burien School Memorial Park Mathison Park Moshier Park Town Square Park 16

Project Site and Phasing: 2001 17

Project Site and Phasing: 2007 Park Addition 18

Project Site and Phasing: 2003 2008, Phase 1 19

Project Site and Phasing: 2011 ESC Building 20

Project Site and Phasing: 2008 2014, Phase 2 21

2. Project Overview by Key Issues 1 2 3 4 5 6 Supporting Habitat-forming Processes Habitat Diversity and Connectivity Public and Stakeholder Priorities Balancing Park Use and Habitat Supporting Educational Use Relocating and Redesigning Infrastructure 22

Source: King County WRIA 9 Issue 1: Supporting Habitat-forming Processes 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 23 / Redesigning Infrastructure

Issue 1: Bluff-to-beach Sediment Supply Processes Accretion zone Accretion zone Net Shore Drift 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 24 / Redesigning Infrastructure

Issue 1: Drift Cell and Feeder Bluffs Sources: Johannessen et al. 2005 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 25 / Redesigning Infrastructure

Issue 1: On-site Unstable Hillsides Map Source: Shannon & Wilson 2002 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 26 / Redesigning Infrastructure

Issue 1: Pre-project Bulkheading Source: Anchor QEA 2002 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 27 / Redesigning Infrastructure

Issue 1: Summary Diagram Pre-project landslide 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 28 / Redesigning Infrastructure

Issue 1: Summary Diagram Completed Project 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 29 / Redesigning Infrastructure

Source: King County WRIA 9 Issue 2: Habitat Diversity and Connectivity 2: Habitat Diversity and 1: Supporting Habitat Forming Processes Connectivity 3: Public and Stakeholder Priorities 4: Balancing Park Use and Habitat 5: Supporting Educational Use 6: Relocating 30 / Redesigning Infrastructure