Sink faucet Kohler 2007 X 5:

Similar documents
ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

The school s metal push-out windows were assessed and nothing of concern was noted.

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

HAVE A SAMPLING AND ANALYSIS PLAN (SAP)

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

NYC Department of Education

Lead in Priority Area Sampling Report Naval Air Station Patuxent River

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER:

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

EMSL Analytical, Inc.

NYC Department of Education

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

PBS did not observe any paint chips on soil at the school, and no areas of major concern were observed.

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

NYC Department of Education

NYC Department of Education

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

Master Facility Planning Update School Board Meeting May 26, 2016

CUSTODIAL CUSTOMER SERVICE GUIDE

NYC Department of Education

DESIGN GUIDELINES AND TECHNICAL STANDARDS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYC Department of Education

School District of Milton 5- Year Capital Maintenance and Improvement Plan

NYC Department of Education

NYC Department of Education

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Quality and durability. Interchangeability. Bath Shower Valve/Eyewash Laboratory Faucet Water conservation.

NYC Department of Education

New High School Concept

Explain in writing if the address of the building is different than the address on this form:

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Updated: 5/6/16. Facility and Property Information Package

NYC Department of Education

NYC Department of Education

NYC Department of Education

Tillamook High School Bond Projects

Yale University Design Standards

NYC Department of Education

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

Updated: 8/16/ Facilities Profile

GENERAL PLUMBING REQUIREMENTS

MONROE-WOODBURY C E NTRAL S C HOO L DI S TRICT

WATER WISE SURV EY. Santa Barbara City College

NYC Department of Education

LOT # DESCRIPTION QTY

If the address on this form is different than the address of the building, submit a written explanation.

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

IEQ SCHOOL DATA BASE

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition.

Inspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY

November 29, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

GENERAL PLUMBING REQUIREMENTS

dusty. Room shakes and Student restrooms across All vents need cleaning

NYC Department of Education

NYC Department of Education

Alternative Parking Spaces + 80 under building. Bike Path Access. New Toilet Facility. Pre-school. Drop-off. Drop-off. mbta Mass Ave.

NYC Department of Education

Explain in writing if the address of the building is different than the address on this form:

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Adjustable Back Pressure Flow Controller Instructions

2014 Bond Project Guide

NYC Department of Education

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

Tech Report. September 9,

NYC Department of Education

NYC Department of Education

EXISTING CONDITIONS SUMMARY

Explain in writing if the address of the building is different than the address on this form:

RADON SCREENING SURVEY FOLLOW-UP SPRINGBROOK HIGH SCHOOL

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

Mechanical Inspection Plumbing

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com

DOMESTIC WATER PACKAGED BOOSTER PUMPS

NYC Department of Education

Master Planning Committee Meeting #8 Notes

REPORT CARD TO THE COMMUNITY MAY 15, 2018

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

Explain in writing if the address of the building is different than the address on this form:

Plant Operations Cleaning and Sanitation Audits.

NYC Department of Education

Transcription:

Page _1_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy NY 12182 Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh HighSchool BLDG ADDRESS: 320 Seventh Ave Troy NY 12182 CONTACT NAME & NUMBERS: Bob Schongar 518-858-5580 (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: 1965 2007 2014 2015 SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # Outlet Information BOCES Sample # Location Outlet Description Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper 82 LHS-GF-SC-P-82 Pump room Service connection 2007 6:10 15.2 200 Remediati on 83 LHS-GF-KS1-P-83 Kitchen Sink Faucet 2015 X 4:52 0.97 101 84 LHS-GF-KS2-P-84 Kitchen Sink faucet 2015 X 4:52 3.2 216 85 LHS-GF-KS3-P-85 Kitchen Sink faucet 2015 X 4:53 1.8 120 86 LHS-GF-KS4-P-86 Kitchen Sink faucet 2015 X 4:53 1.4 76.3 87 LHS-GF-KS5-P-87 Kitchen Sink faucet 2015 X 4:53 0.35 69.8 88 LHS-GF-KS6-P-88 Kitchen Sink faucet 2015 X 4:53 0.27 84.2 89 LHS-GF-KS7-P-89 Kitchen Sink faucet 2015 X 4:56 1.5 125 90 LHS-GF-DW-P-90 Cafeteria Water fountain Elkay 2015 X 5:00 1.6 134 91 LHS-GF-CF-P-91 Cafeteria Sink faucet Delta 2015 X 5:00 6.2 273 92 LHS-GF-BF-P-92 Boys room Sink Faucet Chicago 1965 X 5:01 0.2 124 93 LHS-GF-BF-P-93 Girls room Sink faucet Chicago 1965 X 5:01 0.36 166 94 LHS-GF-CF-P-94 Auto shop Sink faucet Speakman 1965 X 5:05 4.2 52.5 95 LHS-GF-CF-P-95 Wood shop Sink faucet 1965 X 5:05 3.6 143 96 LHS-GF-DW-P-96 Corridor by locker rooms Water fountain Halsey Taylor 1965 X 5:07 29.9 54.4 Shut off 97 LHS-GF-BF-P-97 Girls PE coach office Sink faucet Kohler 2007 X 5:08 4.8 42

98 LHS-GF-GIM-P-98 Girls PE coach office Ice Machine Marvel Scientific 2007 X No result 99 LHS-GF-BF-P-99 Girls locker room Sink faucet Chicago 2007 X 5:08 4.2 79.3 100 LHS-GF-DW-P-100 Girls locker room Water fountain 2007 X 5:08 6.3 98.8 101 LHS-GF-BF-P-101 Boys PE coach office Sink faucet Kohler 2007 X 5:10 1.5 29.8 CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

Page _2_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny 12182 Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY 12182 CONTACT NAME & NUMBERS: Bob Schongar 518-858-5580 (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: 1965 2007 2014 2015 SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # BOCES Sample # Location Outlet Description Outlet Information Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper Remediaito n 102 LHS-GF-BIM-P-102 Boys PE coach office Ice Machine Marvel Scientific 2007 X 5:10 0.29 1.7 103 LHS-GF-BF-P-103 Boys locker room Sink faucet Chicago 2007 X 5:12 5.2 141 104 LHS-GF-DW-P-104 Weight room Water fountain Elkay 2007 X 5:12 3.4 255 105 LHS-GF-HC-P-105 Outdoors of weight room Hose connection 2007 X 5:14 1.2 123 106 LHS-GF-KF-P-106 Outside concession stand Sink Faucet 2007 X 5:14 15.5 75.6 Shut off LHS-GF-DW1-P- ADA water 107 Gym lobby Elkay 2007 X 5:20 0.15 124 107 fountain LHS-GF-DW2-P- 108 Gym Lobby Water fountain Elkay 2007 X 5:20 0.14 129 108 109 LHS-GF-KF-P-109 Inside concession stand Sink faucet Moan 2007 X 5:21 2.5 192 110 LHS-GF-BF-P-110 Girls room Sink faucet Chicago 2007 X 5:22 0.2 183 111 LHS-GF-BF-P-111 Boys room Sink faucet Chicago 2007 X 5:22 0.64 182 112 LHS-GF-BF1-P-112 Girls room off gym Sink faucet 1 Chicago 2007 X 5:23 0.15 120 113 LHS-GF-BF2-P-113 Girls room off gym Sink faucet 2 Chicago 2007 X 5:23 0.22 139 114 LHS-GF-BF1-P-114 Boys room off gym Sink faucet 1 Chicago 2007 X 5:23 0.18 110 115 LHS-GF-BF2-P-115 Boys room off gym Sink faucet 2 Chicago 2007 X 5:23 0.26 124 116 LHS-GF-HC-P-116 Outdoors of boys room Hose connection 2007 X 5:19 0.53 89.8 117 LHS-GF-BF-P-117 Athletic director office Sink faucet Chicago 2007 X 5:24 4 581

118 LHS-GF-IM-P-118 Athletic director office Ice machine Manitowoc 2007 X 5:24 0.23 <1.0 119 LHS-GF-HC-P-119 Outdoors Northeast end of gym Hose connection 2007 5:25 8.5 340 120 LHS-01-BF-P-120 Music wing faculty ladies room Sink faucet 1 1965 X 5:30 8.7 125 121 LHS-01-BF-P-121 Music wing faculty ladies room Sink faucet 2 1965 5:30 5 84.5 122 LHS-01-BF-P-122 Music wing boys room Sink faucet 1 1965 X 5:32 11 157 All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

Page _3_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny 12182 Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY 12182 CONTACT NAME & NUMBERS: Bob Schongar 518-858-5580 (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: 1965 2007 2014 2015 SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # Outlet Information BOCES Sample # Location Outlet Description Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper Remediati on 123 LHS-01-BF-P-123 Music wing boys room Sink faucet 2 Kohler 1965 X 5:32 9.7 77.1 124 LHS-01-BF1-P-124 Girls room near 156 Sink faucet 1 Chicago 1965 X 5:36 0.73 165 125 LHS-01-BF2-P-125 Girls room near 156 Sink faucet 2 Chicago 1965 X 5:36 0.31 82 126 LHS-01-BF1-P-126 Boys room near 156 Sink faucet 1 Chicago 1965 X 5:36 0.27 77.3 127 LHS-01-BF2-P-127 Boys room near 156 Sink faucet 2 Chicago 1965 X 5:36 0.17 113 128 LHS-01-DW-P-128 Corridor across from 152 Water fountain Haley Taylor 1965 X 5:37 15.6 37.9 Shut off 129 LHS-01-CF1-P-129 150 Sink faucet 1 1965 X 5:38 17 111 Shut off 130 LHS-01-CF2-P-130 150 Sink faucet 2 1965 X 5:38 1.7 253 131 LHS-01-CF1-P-131 147 Sink faucet 1 T&S 1965 X 5:38 0.54 224 132 LHS-01-CF2-P-132 147 Sink faucet 2 1965 X 5:38 0.28 237 133 LHS-01-CF3-P-133 147 Sink faucet 3 T&S 1965 X 5:39 1.5 720 134 LHS-01-DW-P-134 Corridor across from 147 Water fountain Elkay 1965 X 5:40 <0.10 170 135 LHS-01-CF1-P-135 148 Sink faucet 1 Chicago 1965 X 5:41 1.8 187 136 LHS-01-CF2-P-136 148 Sink faucet 2 Chicago 1965 X 5:41 1.3 212 137 LHS-01-CF3-P-137 148 Sink faucet 3 Chicago 1965 X 5:41 3.4 167 138 LHS-01-BF1-P-138 Boys room Sink faucet 1 1965 X 5:41 0.51 75.8 139 LHS-01-BF2-P-139 Boys room Sink faucet 2 1965 X 5:41 6.1 59.1

140 LHS-01-BF1-P-140 Girls room Sink faucet 1 1965 X 5:42 0.87 73.4 141 LHS-01-BF2-P-141 Girls room Sink faucet 2 1965 X 5:42 4.2 68.1 142 LHS-01-BF3-P-142 Girls room Sink faucet 3 1965 X 5:42 2.2 89.7 143 LHS-01-BF4-P-143 Girls room Sink faucet 4 1965 X 5:42 2.1 71.2 All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

Page _4_of _5_ CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny 12182 Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY 12182 CONTACT NAME & NUMBERS: Bob Schongar 518-858-5580 (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: 1965 2007 2014 2015 SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # BOCES Sample # Location Outlet Description Outlet Information Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper Remediaiton 144 LHS-01-CF-P-144 146 Sink faucet Chicago 1965 X 5:44 2.2 109 145 LHS-01-CF-P-145 144 Sink faucet Chicago 1965 X 5:44 1.6 138 146 LHS-01-CF1-P-146 142 Sink faucet 1 Chicago 1965 X 5:45 8 164 147 LHS-01-CF2-P-147 142 Sink faucet 2 Chicago 1965 X 5:45 0.89 174 148 LHS-01-CF3-P-148 142 Sink faucet 3 Chicago 1965 X 5:45 0.83 161 149 LHS-01-DW-P-149 Corridor outside 142 Water fountain Halsey Taylor 1965 X 5:46 26 85.4 Shut off 150 LHS-01-CF1-P-150 140 Sink faucet 1 Chicago 1965 X 5:48 1.7 140 151 LHS-01-CF2-P-151 140 Sink faucet 2 Chicago 1965 X 5:48 0.96 256 152 LHS-01-CF3-P-152 140 Sink faucet 3 Chicago 1965 X 5:48 0.97 199 153 LHS-01-HC-P-153 Courtyard media center side Hose connection 1965 X 5:49 46.2 699 Capped off 154 LHS-01-HC-P-154 Outside southeast corner of Cafeteria Hose connection 1965 X 5:04 29.6 202 Shut off/capped 155 LHS-01-BF-P-155 Media center Sink faucet Chicago X 5:51 0.32 200 156 LHS-01-SF-P-156 Media center office Sink faucet X 5:51 0.37 297 157 LHS-01-DW-P-157 158 LHS-02-DW-P-158 Corridor across from 1st floor media center Corridor across from 2nd floor media center Water fountain Elkay X 5:52 0.15 556 Water fountain Elkay X 5:54 0.14 633

159 LHS-02-BF-P-159 Media center 2nd floor Sink faucet Chicago X 5:54 0.42 244 160 LHS-02-BF1-P-160 Boys room across from 248 Sink faucet 1 1965 X 5:55 1.4 75.4 161 LHS-02-BF2-P-161 Boys room across from 248 Sink faucet 2 1965 X 5:55 1.3 97.2 162 LHS-02-BF3-P-162 Boys room across from 248 Sink faucet 3 1965 X 5:55 1.9 92.3 163 LHS-02-BF-P-163 Faculty men s room Sink faucet 1965 X 5:57 1.6 100 All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

Page _5_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny 12182 Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY 12182 CONTACT NAME & NUMBERS: Bob Schongar 518-858-5580 (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: 1965 2007 2014 2015 SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # BOCES Sample # Location Outlet Description Outlet Information Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper 164 LHS-02-BF-P-164 Faculty women s room Sink faucet 1965 X 5:57 0.98 167 Remediati on 165 LHS-02-CF-P-165 245 Faculty room Sink faucet Delta 1965 X 5:58 3.3 69.7 166 LHS-02-DW-P-166 Corridor outside 242 Water fountain Halsey Taylor 1965 X 5:58 20.8 63.3 Shut off 167 LHS-02-DW-P-167 Corridor outside 250 Water fountain Elkay 1965 X 5:59 2.8 118 168 LHS-02-DW-P-168 Corridor outside 251 Water fountain Halsey Taylor 1965 X 5:59 33.5 94.2 Shut off 169 LHS-02-CF1-P-169 260 Sink faucet 1 Kohler 1965 X 6:00 0.43 112 170 LHS-02-CF2-P-170 260 Sink faucet 2 Kohler 1965 X 6:00 0.46 119 171 LHS-02-BF-P-171 Boys room across from 260 Sink faucet Chicago 1965 X 6:01 0.32 287 172 LHS-02-BF-P-172 aculty across from 260 Sink faucet Chicago 1965 X 6:01 0.29 247 173 LHS-02-BF1-P-173 Girls room next to stairwell Sink faucet 1 2007 X 6:02 0.65 51.6 174 LHS-02-BF1-P-174 Girls room next to stairwell Sink faucet 2 2007 X 6:02 3 63.9 175 LHS-02-BF1-P-175 Girls room next to stairwell Sink faucet 3 2007 X 6:02 1.8 84.9 89A LHS-GF-KS8-P-89A Kithchen Kitchen Steam X 4:57 2.3 47.1 89B LHS-GF-KS9-P-89B Kitchen Kitchen Steam X 4:57 1.8 66 123A LHS-01-DW-P-123A Corridor near 185 X 5:34 0.52 66.4

All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody