Minto In Kensington Open House. Thursday March 23, pm Hillhurst Sunnyside Community Association Ave NW

Similar documents
ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

Bow to Bluff Public Realm Plan Design Update

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

Clairtrell Area Context Plan

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Welcome to the Oakridge Centre Open House

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

Stadium District Masterplan

Figure 3-1: Public Realm Plan

Highland Village Green Design Guidelines

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Public Open House #1

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1071 King Street West Zoning Amendment Application - Preliminary Report

An amendment to the Bridgeland-Riverside Area Redevelopment Plan is required to allow for the proposed redesignation.

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

March 21, 2018 ALCA Meeting. March 21, 2018

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Historic Yonge Street HCD Study Public Meeting #2

edmonton.ca/ribbonofgreen #ribbonofgreen

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Arbour Lake Development Application

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

(DC1) Direct Development Control Provision DC1 Area 4

Enhanced Planning Process

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

TONIGHT S PURPOSE INFORMATION SESSION CANORA & WEST JASPER PLACE SIDE STREETS CONCEPT PLANNING STUDY. Share draft side streets concept plan

GOLD BAR WASTEWATER TREATMENT PLANT OPERATIONS CENTRE PROJECT AND REZONING NOTIFICATION

Midtown Greenway Land Use and Development Plan Executive Summary

Rezoning Frequently Asked Questions

Local Growth Planning in North Central Green Line Communities

This application has been applied for with support of an Outline Plan to provide the technical details for the site s development.

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

Mill Woods Town Centre Proposed Rezoning LDA

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

burlington mobility hubs study Downtown Burlington Mobility Hub

Bloor St. W. Rezoning - Preliminary Report

178 Carruthers Properties Inc.

appendix and street interface guidelines

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

JASPER PLACE. Area Redevelopment Plan

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Bank Street Secondary Plan

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

Official Plan Review: Draft Built Form Policies

WELCOME and introduction

Corridor Transformation Strategy

Future Proposed Development

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

Urban Design Brief. 583, 585 and 589 OXFORD STREET EAST. Salt Clinic Canada Inc.

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

NEC of Central Avenue and Indian School Road

DOWNTOWN PARKS & PUBLIC REALM PLAN

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

AGINCOURT SECONDARY PLAN

Community Information Meeting

TOWN COUNCIL / PLANNING COMMISSION

BASIC SITE PLAN AND DESIGN PRINCIPLES FOR REDEVELOPMENT OF 114 RICHMOND ROAD

PART 1. Background to the Study. Avenue Study. The Danforth

CREATE A VIBRANT MIXED-USE COMMUNITY

1-17 Anndale Drive, Bales Avenue and Glendora Avenue Zoning Amendment Application Preliminary Report

COURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN

ADMINISTRATION RECOMMENDATION 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

LAND USE AMENDMENT CORNERSTONE (WARD 3) COUNTRY HILLS BOULEVARD AND STONEY TRAIL NE BYLAW 9D2017

333 College Street and 303 Augusta Avenue - Official Plan Amendment, Zoning Amendment Applications - Preliminary Report

DRAFT DRAFT DRAFT DRAFT

Community Meeting #2.1

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

BROADVIEW PLANNING STUDY Community Consultation Meeting 4. January 2016

Urban Design Brief to 1557 Gordon Street & 34 Lowes Road West

HIGHLAND VILLAGE GREEN URBAN DESIGN PRINCIPLES/GUIDELINES

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Complete Neighbourhood Guidelines Review Tool

Yonge Eglinton Centre Urban Design Guidelines

WHAT WE HEARD REPORT - Summary Bonnie Doon Mall Redevelopment Application (LDA )

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

East Bayshore Road Neighbourhood

CITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY

Report to: Development Services Committee Report Date: April 24, 2017

Transcription:

Minto In Kensington Open House Thursday March 23, 2017 6-8 pm Hillhurst Sunnyside Community Association 1320 5 Ave NW

Project Background & Timeline Background Project Highlights Minto Communities continues their commitment to building in the community of Hillhurst-Sunnyside with a proposed Multi-Family residential development located at 613-621 9A street Northwest. As the first step in the planning approval process, Minto has submitted a land use amendment (rezoning) application to the City of Calgary. Located within a 1 minute walk to both the Hillhurst-Sunnyside LRT Station and the neighbourhood main street (10 Street) the site provides an ideal opportunity for transit and sustainable transportation supportive development. This proposed development will contribute to the continuing redevelopment of Hillhurst-Sunnyside into a bustling urban neighbourhood by increasing intensity adjacent to transit and supporting local neighbourhood shops and services. A sensitively designed 8 storey building comprising between 70 and 90 units; Improvement and activation of the back lane by introducing at grade residential uses, pedestrian mobility, activity and vehicular movement; Increased safety of the pedestrian sidewalk on the east side of the subject site by adding eyes on the street through increased sightlines of the space; Integration of the proposed development with the City of Calgary s Bow to Bluff urban design framework project that proposes improvements to the public realm alongside the LRT alignment. Project Timeline SITE ACQUISITION MEETINGS WITH THE COMMUNITY ASSOCIATION LAND USE APPLICATION SUBMISSION APPLICATION CIRCULATION + RESPONSE PUBLIC OPEN HOUSE APPLICATION REVIEW AT CALGARY PLANNING COMMISSION LAND USE APPROVAL AT CITY COUNCIL DEVELOPMENT PERMIT Minto begins process to Discussions about the future Submission of formal land use City of Calgary s review of Community information Development authority Approval of land use Submission and approval of purchase the site of the site and engaging application application session on the project and approval of application application development permit neighbouring communities land use application 1 2 3 4 5 6 7 8 DEC 2016 JAN 2017 FEB 2017 FEB - MAR 2017 MAR 2017 HAPPENING TONIGHT APR - MAY 2017 JUNE - JULY 2017 AUG - DEC 2017

Minto Communities About Minto Portfolio Founded in Ottawa in 1955, the Minto Group has grown into one of Canada s largest and most respected real estate development, construction and management companies. With unsurpassed quality and unrivaled integrity, innovation and commitment, every Minto home - from thoughtful design through to construction and occupancy - is built to promote healthier lifestyles in connected communities. The remarkable story of Minto s growth is an inspiring saga of family values, social purpose, professional excellence and ethical responsibility. Bringing together the skills, energy and talents of over fourteen hundred employees, Minto has been instrumental in the design and construction of more than 70,000 residential and commercial properties in Toronto, Ottawa and South Florida. Minto Era - Bridgeland Minto 9A - Kensington Minto s distinctive logo stands for its strong values deeply rooted in tradition and its commitment to the environment. Over the years, the company has won numerous awards and accolades honouring its excellence in community planning and design, construction and customer services. Most recently, Minto won the prestigious Home Builder of the Year Award from the Ontario Home Builders Association in both 2012 and 2014. Minto 775 King West - Toronto Minto Beechwood

Site Context Minto in Kensington is located on 9A street NW, and north of 4th Avenue NW, and is nestled in between the communities of Hillhurst and Sunnyside. The subject site sits approximately 100 metres (1 minute or less walking distance) from the Sunnyside LRT station. Additionally, the site is situated near frequent bus routes that run along 10 street NW. The subject site is embedded in the bustling Kensington business area. Future residents of project will have immediate access to the many local shops, businesses, services, and amenities that the area offers. Many public amenities are within walking distance of the site including a library, community centre and numerous parks such as Riley Park and McHugh Bluff. Additionally, Minto in Kensington sits along the Bow to Bluff corridor, where a urban design strategy establishes a public realm vision to enhance the area along the LRT corridor. Legend Minto 9A2 Subject Site PEACE BRIDGE Kensington / Louise Crossing Buisness Revitalization Zone Bow To Bluff Urban Design Framework Sites BOW RIVER Parks + Open Spaces School Site Community Centre LRT Station LOUISE BRIDGE LRT Line Bow River Pathway Approx. 1 Minute Walk to LRT 0 0 50 50 100 100

Bow to Bluff Framework Bow to Bluff is a citizen-initiated project that is funded by the City of Calgary Council Innovation Fund. While working with the community, the main objective was to develop an urban design framework that would transform a public corridor along the Light Rail Transit alignment with recommendations that include an active living park at Memorial Drive, triangular pocket parks, a central civic space, 9A Street as a wooner, LRT separation, McHugh Bluff access, and laneway mews. The Minto in Kensington site has an immediate relationship with two proposed Bow to Bluff projects. The 9A street pathway improvement project proposes to enhance the safety and landscape and safety of the pedestrian walkway between the site and the LRT corridor while the Laneway Mews project proposes to improve the condition of the rear lane. Minto looks forward to working with the City of Calgary in implementing these projects in coordination with the development. 9A Street Pathway Improvement Laneway Mews Bow Gateway Park Bluff Stairway Connection (Completed) Map Insert Triangle Park Development LRT Station Platform Improvement (Completed) Central Corridor Civic Space Triangle Park Development Triangle Park Development 9A Street Pathway Improvement 9A Woonerf 9A Woonerf Bluff Gateway Park Laneway Mews Laneway Mews Laneway Mews

Existing Site Conditions SITE SITE PEDESTRIAN PATHWAY EAST OF SITE LANEWAY CONDITION WEST OF SITE SITE SITE VIEW OF SITE FROM EAST PATHWAY NORTH EDGE OF SITE

Land Use Application The rezoning application proposes to change the land use of the subject site from Multi-Residential - Contextual Medium Profile (MC-2) land use district to a Direct Control (DC) land use district. The building design will be determined during the Development Permit process and will have to follow the rules of the proposed DC land use district. The diagrams on this page illustrate the key rules that will apply. Existing Land Use Proposed Land Use approx: 1,390 m² Existing Land Use CITY REZONING PROCESS Proposed Land Use Proposed Setbacks Side Parcel - 1.2 metres Rear Lane - 0 metres Front Street - 0 metres Maximum Height: 26 metres / 8 storeys Maximum Density: 5.0 FAR (5 times site area) Total Allowable Development: approx 6,950 m²

Hillhurst - Sunnyside Area Redevelopment Plan The proposed development requires an amendment to the Hillhurst- Sunnyside Area Redevelopment Plan (ARP). The maps illustrate the existing land use, density (FAR) and height of the ARP and the proposed amendments. ARP - Max Height (PROPOSED) ARP - Max Height (EXISTING) ARP - Land Use (PROPOSED) ARP - Max Density (PROPOSED) ARP - Land Uses (EXISTING) ARP - Max Density (EXISTING)

Building Concept The drawing on this page demonstrates the scale and massing of a building that would be built based on the proposed land use district. The photos surrounding the drawing illustrates the design principles that will inform the design of the building during the development permit process. 1. Laneway Mews 2. Rooftop Terrace 3. Four Sided Facade 1 8. Ground Floor Terraces 8 7 2 3 4. Garden Suites 6 4 5 7. Expressive Facade 1 6. Ground Level Articulation 5. Ground Oriented Base

Potential Building Types The images below are examples of the types of architecture, building massing, and scale expected to be built. Minto anticipates that the proposed residential mid-rise will incorporate ground level articulation that is appropriate for the immediate street context of the community.

Potential Ground Level Treatment The images below are examples of the types of design characteristics that can be integrated as part of the ground level treatment and street integration of the overall project.

Share your thoughts! If you have any additional comments or ideas, please take a sticky note and post your thoughts below. Your feedback is important to us. Thank you for attending our open house!