Safe Operating Procedure

Similar documents
HOT WORK OPERATIONS March 23, 2018

POLICY STATEMENT: Policy Number: Section 600 Physical Plant. Date Adopted: May 7, Date(s) Revised: September 4, 2012

HOT WORK SAFETY PROGRAM:

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

Fire Prevention STANDARD. LME-12: Uen Rev A

Hot Work Program & Operational Guidelines. Environmental Health, Safety and Emergency Management (828)

Progressive Safety Services LLC 2

Title: Fire Prevention During Welding, Cutting and Other Hot Work Plan (formerly the Cutting & Welding Policy)

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

Chapter 18 Welding Table of Contents

Hot Work Policy and Procedures

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

FIRE PREVENTION IN THE USE OF CUTTING OR WELDING PROCESSES

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

Bloomsburg University of Pennsylvania Hot Work Safety Program Effective Date: July 1, 2015

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

ADMINISTRATIVE SERVICES MANUAL

HeatExchangerSpares.com Ltd HRS Heat Exchangers Ltd HRS Hevac Ltd HRS Hevac Engineering Ltd HRS International Ltd HRS Investments Ltd

Office of Risk Management EHS Hot Works Program

HOT WORK PERMIT PROCEDURES

Safety & Security Services Services de Sûreté et Sécurité. Hot Work Protocol

Combustibles - Gases, liquids or solid materials that will ignite in the continued presence of an ignition source.

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Fire Prevention Plan

Fire Prevention Plan

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Ls Vegas, NV (702) FAX (702)

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

Chapter 12 HOT WORK OPERATIONS. Purpose:

Builders Risk - Fire Prevention Inspection Checklist

Winnipeg Fire Department Fire Prevention Branch

Stillwater Area Community Services Center Inc.

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

This policy applies to all Hot Work jobs performed on the Calhoun mill property by AbitibiAbitibiBowater employees.

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

Demolition Permit Application (Please print and complete ENTIRE form)

Phase 2 Security Response

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14

Procedure DESCRIPTION/OVERVIEW

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days.

JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM

Electrical Safety Program

GENERAL FIRE REQUIREMENTS SELF INSPECTION CHECKLIST

Purpose: To establish procedures for identifying fire hazards and preventing fires. Scope: All Central New Mexico Community College (CNM) Community.

Fire Department HEADQUARTERS Cathedral Oaks Road Santa Barbara, CA (805) FAX: (805) CODE SUMMARY

INTRODUCTION... 1 OBJECTIVES... 1 RESPONSIBILITIES...

New Facilities. Minimum Requirements

2010 FIRE CODE OF NEW YORK STATE

Fire Precautions for Welding

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

Doc #: 2100-AD Revision: - 4M Fire Watch Procedures. Author(s): Tammie Lavoie

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

This policy is applicable to all DMS-owned, -leased and -managed facilities.

Fire Safety Risk Assessment for Treowen, Wonastow, Monmouth, NP25 4DL

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

Safe Schools: A Health and Safety Check

FORM MUST BE SIGNED AND RETURNED FOR VENDOR PARTICIPATION

OUTLINE FOR FIRE PREVENTION ACTIVITY

STATE OF MARYLAND DEPARTMENT OF STATE POLICE OFFICE OF THE STATE FIRE MARSHAL

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Fire Watch Program. Building Administrators Building Administrators will inform building occupants about fire watch events and building evacuations.

Special Occupancy Requirements

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

polyurethane & polyisocyanurate foam Six Steps for

FIRE SAFETY AND PREVENTION POLICY

Impairments to Fire Protection Equipment

Hot Work Permits. Corporate Environment Safety & Health

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

Fire Prevention Plan Program

University of Maryland FIRE EVACUATION PLAN

Renovation Program. Renovation Program GENERAL

Introduction. Program Description. Section C.20 University of South Carolina Safety Program Guide FLAMMABLE AND COMBUSTIBLE LIQUIDS

UNIVERSITY OF TOLEDO

PROSPECT COLLEGE HEALTH AND SAFETY PLANS FIRE PREVENTION PLAN

Prepared by: Ronny J Coleman Jeff Shapiro Hugh Council IMPORTANT NOTICE

University of Maryland FIRE EVACUATION PLAN Columbus Center POLICE FIRE MEDICAL EMERGENCY - 911

Fire Prevention Plan. California State University, Chico

SANDUSKY FIRE DEPARTMENT Fire Prevention Bureau. Dear Prospective Food Vendor:

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Xavier Field Office Fire Prevention Plan. for. Xavier Field Office Dana Avenue

Compliance Guidance for non-technical managers

Fire Safety Plan (FSP) Review Checklist 1

Fire Safety Plan (FSP) Review Checklist 1

Element 14.7 Fire Prevention and Control 2018

Fire Prevention Plan for Alter Hall 3743 Ledgewood Drive

Fire Prevention Plan Program Prepared by: Allied Insurance Brokers, Inc.

FIRE PREVENTION 29 CFR Ursinus College, Collegeville, PA

NFPA 33 Standard for Spray Applica4on Using Flammable or Combus4ble Materials

SCALES NW EMERGENCY ACTION PLAN

Risk Management Services

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference:

Fire Prevention Plan for Campus Services Building 1630 Musketeer Drive

SPECIAL AMUSEMENT OCCUPANCIES HAUNTED HOUSE, SCARE HOUSE OR MAZE

a) Establishment of emergency procedures to be followed at the time of an emergency;

Transcription:

Safe Operating Procedure (Revised 10/17) HOT WORK PERMIT OPERATIONS Authority In recognition of the inherent hazards posed by certain hot work processes, the National Fire Protection Agency adopted Standard 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work. The United States Occupational Safety and Health Administration (OSHA) incorporated NFPA 51B by reference at 29 CFR 1910.252. Purpose The purpose of this SOP is to summarize regulatory requirements. Individual departments may adapt this SOP to meet their unique needs, to the extent that regulatory requirements are met or deviations are acceptable to the Authority Having Jurisdiction (AHJ). At UNL, the AHJ is the University Code Official (Facilities Planning and Construction, Building & Fire Safety). The University Code Official has been delegated authority by the State Fire Marshall and is responsible for overseeing and enforcing compliance with fire and life safety codes at UNL. Scope Hot work means processes involving burning, welding, or similar operations that are capable of initiating fires or explosions through spark, flame, or heat, such as: Welding and allied processes (e.g., oxy-fuel gas welding, open-flame soldering, brazing, thermal spraying, oxygen cutting, arc cutting) Heat treating Grinding Thawing pipe Powder-driven fasteners Hot riveting Torch-applied roofing (in conjunction with the requirements of NFPA 241, Standard for Safe Guarding Construction, Alteration, and Demolition Operations) Hot work does not include: Candles Pyrotechnics or special effects (UNL s AHJ has a separate permit process for these activities) Cooking operations Electric soldering irons Design and installation of gas cutting equipment and welding equipment covered in NFPA 51, Standard for the Design and Installation of Oxygen-Fuel Gas Systems for Welding, Cutting, and Allied Processes

Additional requirements for hot work operations in confined spaces Lockout/tagout procedures during hot work. Applicability This SOP applies to all UNL personnel conducting hot work on University owned or leased property, whether indoors or outdoors, in areas that have not been permanently established, designated, and maintained for this type of work. Contractors acting on behalf of UNL must adhere to an effective and compliant hot work permit system. This SOP is intended to summarize the requirements for conduct of hot work. It is not inclusive of every aspect of NFPA 51B. Persons involved with hot work processes must consult and adhere to all aspects of NFPA 51B. Conditions Requiring a Hot Work Permit When work is conducted outside of a permanently established area that is designated and maintained for this type of work, a hot work permit may be required, as depicted in the following decision tree. * Source: NFPA 51B Is there an acceptable alternative to hot work? Yes- complete the job with cold work. No hot work permit is needed No- continue to next question Can hot work be performed in a designated area? Yes- examine designated area, then complete hot work at that location. No hot work permit is needed No- continue to next question Is the proposed work to be performed in a nondesignated area? Yes- obtain a written hot work permit No- continue to next question Is the work to be performed in a nonpermissible area? Yes- hot work and permit are not authorized No- obtain a written hot work permit Designation of a Permit Authorizing Individual (PAI) Assuming a hot work permit is required, it must be issued by a Permit Authorizing Individual (PAI). It is the responsibility of the department employing and supervising the hot work operator to designate a PAI. In general, the PAI may not be the same

person as the hot work operator. Persons designated as a PAI must meet the following qualifications: Aware of the hazards posed by the hot work process; Familiar with applicable regulations. Pre-Operational Review by PAI Prior to conducting hot work requiring a permit, the PAI must determine the type of hot work operation to be conducted, the identity of the hot work operator, completion of preoperational fire safe precautions, and determine whether a fire watch is required. Preoperational fire safe precautions include verification of: Available sprinklers, hose streams, extinguishers, and smoke/heat detectors are present and in service/operable, including an appropriately classed portable fire extinguisher. Hot Work equipment is in good repair. Persons conducting hot work shall don appropriate personal protective equipment, to include clothing that minimizes potential for ignition, burning, trapping of hot sparks, and electric shock. Floors are swept clean of combustibles within 35 of the hot work. Combustibles within 35 of the hot work have been removed or protected by listed welding curtains, blankets, pads, or equivalent. When fire curtains are used, they shall be tight to the floor to prevent escape of errant sparks. Flammable liquids, dust, lint, and oil deposits have been removed within 35 of the hot work. Explosive atmospheres have been eliminated within 35 of the hot work (including scheduling of other processes that could introduce an explosive atmosphere during the hot work period). Combustible floors have been wetted down, covered with damp sand, or listed welding blanket or pad, as appropriate, and within 35 of the hot work. Where floors have been wetted down, personnel operating arc welding or cutting equipment shall be protected from possible shock. All wall and floor openings have been covered within 35 of the hot work. If hot work is done near walls, partitions, ceilings, or roofs of combustible construction, they shall be protected by listed welding curtains, blankets, pads, or equivalent. Hot work shall not be attempted on a partition, wall, ceiling, or roof that has combustible covering or insulation or on walls or partitions of combustible sandwich type panel construction. Ventilation is and will remain sufficient to prevent development of a hazardous atmosphere during the hot work process. Hot work will not be conducted in a confined space, or all appropriate confined space entry permit requirements are in place. Containers which will be subject to hot work have been rendered free of flammable vapors and other combustibles. For work on walls or ceilings:

Construction is noncombustible and lacks combustible covering or insulation. Combustibles have been moved away from the opposite side of the wall. Conduction of heat will not pose danger to adjacent areas. Building occupants (likely in cooperation with the Building Maintenance Reporter) have been notified of the hot work activity and the need to support the implemented fire safety precautions. Fire Watch The PAI will determine if a fire watch is required, and; if so, the PAI will also determine the number of fire watch individuals required. In general, the fire watch may not be the same person as the hot work operator. The role of the fire watch is to ensure that safe conditions are maintained during hot work operations and to take appropriate action in the event of a fire or other adverse event. The fire watch is responsible to stop hot work operations if unsafe conditions develop or are observed; initiate alarms/notify emergency personnel in the event of a fire, and; attempt to extinguish fires only when the fire is obviously within the capacity of the available extinguisher. Persons designated as a fire watch must meet the following qualifications: Aware of the hazards posed by the hot work process; Aware of the hazards of the work site; Aware of work area fire alarm initiation/emergency responder notification procedures (including access to alarm pull stations, communication devices, and like equipment, as appropriate); Trained in use of portable fire extinguishers At least one fire watch is required under the following conditions: Work is conducted in an area where other than a minor fire might develop. Work is done where flammables or combustibles are more than 35 away but are easily ignited by sparks. Work is done in an area where wall or floor openings could expose combustibles in adjacent areas. Work is done where combustibles are adjacent to partitions, ceilings, or roofs being worked on. Additional fire watch individuals are required when combustible materials could be ignited by hot work operations that cannot be directly observed by the initial fire watch (i.e., combustibles on opposite sides of a wall, etc.). The fire watch must remain on-site to monitor for potential fires for a minimum of 30 minutes following completion of the hot work operation, and longer as specified by the PAI. The work site must be attended at all times until conclusion of the permit, including break times. Sole Proprietors and Individual Operators NFPA 51B contains provisions whereby a single person could serve as the PAI, hot work operator, and fire watch. This provision is limited to sites where hot work

operations are not under the control of another authority and where the work is customarily performed by one person. The provision requires the person to meet all qualifications/training to allow them to effectively serve in each role and to complete a checklist to serve as the permit. This provision should be implemented at UNL only after discussion with the State Fire Marshall s Office. Conclusion of the Permit After the area has been attended for the prescribed amount of time following conclusion of the hot work process, the fire watch carefully inspects the work and adjacent areas to verify the absence of smoldering fires. This inspection may extend to floors above and below the work and adjacent rooms depending on the location/type of hot work. When the fire watch verifies absence of fire hazards, (s)/he signs the permit and notifies the PAI. The PAI then conducts a final inspection of the area and signs the permit. The permit is filed for one year.

Hot Work Permit INSTRUCTIONS: A. Verify the precautions listed at right (or do not proceed with the work.) B. Complete and retain this permit for one year. Date: Location - Building & Floor: Work to be done by: (Name). Nature of work to be done: Special precautions: Fire watch required? Yes No Name(s) of fire watch (if required): The location where this work is to be done has been examined, necessary precautions taken, and permission is granted for this work. (See Part 2.) Permit Expires (Each permit is good for no more than 24 hours.) Signed Permit Authorizing Individual (PAI) Time Started: Completed: Signed Fire Watch or Individual performing the work FINAL CHECK Work area and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite side of wall(s) were inspected 30 minutes after the work was complete and were found fire safe. Signed Permit Authorizing Individual (PAI) Before approving any hot work permit, the PAI must inspect the work area and confirm that the following precautions have been taken to prevent fire in accordance with NFPA 51B. Precautions: Available sprinklers, hose streams and extinguishers are in-service/operable. Hot Work equipment in good repair. Requirements within 35 feet of work: Floors swept clean of combustibles. Combustibles removed or protected by fire resistant tarpaulins or metal shields. Flammable liquids, dust, lint and oil deposits removed. Explosive atmosphere in area eliminated. Combustible floors wetted down, covered with damp sand or fire-resistant sheets. All wall and floor openings are covered. Cover suspended beneath work to collect sparks. Work on Walls or Ceilings: Construction is noncombustible and without combustible covering or insulation. Combustibles moved away from opposite side of the wall. Work on Enclosed Equipment: (tanks, container, ducts, dust collectors, etc.) Equipment cleaned of all combustibles. Containers purged of flammable liquids/vapors. If entry is required, follow Confined Space Program. Fire Watch: To be provided during and 30 minutes after operation including during coffee or lunch breaks. Fire watch may be required for adjoining areas, above and below. Fire Watch trained in use of equipment and in sounding fire alarm. Means of initiating notification to 911 is available. Fully charged and operable fire extinguisher is available in the immediate work area. Other precautions taken: Area protected with smoke or heat detection. Ample ventilation to remove smoke/vapor from the work area. Lockout/tagout required. Final Check: To be made 30 minutes after completion of any operation unless fire watch is provided.