New Build Depot, Ashford

Similar documents
North Somerset Council Local Development Framework

HS2 Interchange Station Design

TRANSPORT & INFRASTRUCTURE

Sheffield Victoria Station Development Prospectus January 2014

Start of works exhibition

Slough International Freight Exchange Proposals, Colnbrook+

Plumstead Temporary Railway Sidings and Associated Permanent Works

Infrastructure and the environment

Welcome to the Public Consultation Exhibition

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Environmental Statement Review for Infrastructure

TRANSPORT ARCHITECTURE. JOHN McASLAN + PARTNERS

Longbridge Town Centre Phase 2 Planning Application

A DIFFERENT TYPE OF TRANSPORT PLANNING BUILDING A BRIDGE BETWEEN EUROPEAN RESEARCH AND SUSTAINABLE MOBILITY PLANNING

Advanced Fire Rated Ductwork Solutions

Electrifying the South Wales Mainline ABC Electrification Cardiff 26 th February 2016 Swansea 11 th March 2016

Has there been interest in the site from other parties since St. Modwen owned it? No

Chapter 1. Introduction

Enabling Works Fox Primary School, Kensignton, London. Presentation for Drop-in Session for Fox Primary School Staff & Parents

UK-GBC Project Case Study Smithfield, Manchester

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

New pockets of a city. Three Elizabeth line stations London

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 1 Concept & Approach

Welcome to our exhibition

Welcome to our latest public exhibition to show the final proposals prior to submission for the Homebase site on Manor Road.

River Thames Scheme. Jenny Marshall-Evans Environmental Scientist. Handing over design to the public did it make a difference?

for Access for All Footbridge at Stratford-upon-Avon Railway Station Station Road Stratford-upon-Avon Warwickshire CV37 6PL

Jury Report for the European Green Capital Award 2015

WELCOME. Thanks for visiting Hadley Property Group s exhibition on its initial plans to redevelop land at Bath Road in Totterdown.

Refurbishment of Purple Car Park

Infrastructure for London. Perspective

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

an inspirational new destination residential commercial retail leisure education CW brochure FINAL version NEW.indd 3-4

PEGASUS GROUP. Leeds Manchester Liverpool. East Midlands. Birmingham Cambridge. Cirencester London Bristol

Strasbourg SUMP Award: Finalist factsheet. Local Transport facts. Urban transport policy objectives of the city:

Who Is Parkside Regeneration?

High Speed Rail (London- West Midlands)

12. Environmental baseline and assessment of impacts: Southeastern section

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

Cambrian North Basin, Llanelli

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Legal & General Launches Walbrook Square

E16: MAINTENANCE OF LANDSCAPED AREAS

Overview Report. Proposed Development

SAMPLE OF CURRENT PROJECTS. Page 1

AMENDMENTS. Date Effective. Amendment No. Council. DCP 14 Davidson St, Greenacre Page 2

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Welcome to our public exhibition

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG

Fire Suppression Systems. Heavy Duty Mobile Plant Protecting Your Business. Head Office: 14 Baynes Place, Chelmsford, Essex, CM1 2QX

Rannoch 132 / 33 kv Substation Extension

The redevelopment of the National Museum of Scotland, Chambers Street, Edinburgh

here today Public exhibition

Delivering sustainable development in construction and its relation to structural monitoring & assessment

Welcome to the community information evening about Taylor Wimpey Central London s proposed development of Mount Pleasant.

IIRSM UAE 69 th Branch Meeting. Name of Facilitator: Matt Cox Date: 7 th March, 2018

THE COMPLETE SOLUTIONS PACKAGE

The journey so far. The new masterplan for Dargavel Village

RAILWAYS CREATING CONTROL AND SIGNALLING SOLUTIONS FOR HARSH ENVIRONMENTS

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Development and Conservation Control Committee Director of Development Services

Waterside Shopping Centre, Lincoln

Over 500,000 of work won by Cornish construction firms

Grounds Management Solutions

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

Environmental Impact Assessment

HERITAGE COUNTS 2017 East of England

THE THATCHED COTTAGE CROWMARSH F OXFORDSHIRE.

Conservation Statement

What Christchurch Did Next Chapter 06 AN ACCESSIBLE CITY: getting the city moving again

Welcome to our exhibition

Ingenuity at the service of sustainable regional development: four cases in point

INTRODUCTION. Sir David Steel Chief Executive. Mr Niall Dickson Chairman, Leeds Castle Foundation

CALA HO ME S WELCOME

About ITC Concepts. Leisure Environments

Energy Efficient Strategies for Urban Transportation Planning

KQ Liverpool. Contents. Executive Summary

Notting Hill Housing & The Development Team

RE: QUEENSLAND GOVERNMENT PLANNING POLICY REVIEW

Sustainable Urban Development

PROPOSED CARE HOME & ASSISTED LIVING DEVELOPMENT (C2), PYRTON LANE, WATLINGTON

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

Wednesbury to Brierley Hill Extension

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

FORMER TESSENDERLO SITE, WIDNES

ISIS BCC MADE. Warwick Bar Development in Eastside Birmingham. Artist s Brief

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

DELIVERING LONDON BRIDGE STATION THE DESIGN TEAM PERSPECTIVE

COMPANY PROFILE. Sellhorn Middle East Engineering

Control Of Points. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue One Date July 1997

In your area. Ravenfield to Clayton LA13. June Introduction

Fire protection for rolling stock. Innovative solutions from Siemens Building Technologies. Answers for infrastructure and cities.

Manywells, Cullingworth

WELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.

TRANSPORT. creative minds safe hands

Jim Harkins DUNDEE WATER FRONT CIRCULATOR DUNDEE WATER FRONT CIRCULATOR. Specialists in Affordable & Sustainable Tramways. A short presentation by

Become a Corporate Member of

New Homes at Winton East

RICHMOND FELLOWSHIP GREENACRES and WILTSHIRE OUTREACH

Transcription:

Ashford Project: New Build Depot, Ashford Value: 52m Client: Hitachi Completed: 2007 Our people supported Hitachi in achieveing their goal of providing turnkey service support to the train operator based at Ashford Train Maintenance Centre, through the design and build of their first UK maintenance centre. The new build depot included the implementation of 20.5km of track, an isolated test track, two train-wash plants, automatic inspection equipment, a bogie drop, a six car synchronous train lift and a tandem wheel lathe. These features allow Hitachi to perform who life maintenance, repair, overnight servicing and cleaning as well as ad-hoc repairs and servicing. This new build depot was built in seven phases, with a two year program scheduled, however despite it being a complex build due to the site being an operational railway stabling facility, the asset was successfully delivered on time due to the use of cutting edge technology aligned with excellent communication.

Etches Park Project: New Build Depot, Etches Park Value: 20m Client: East Midlands Trains Completed: 2014 Our people have been involved in the feasibility planning of the 20 million, new build depot at Etches Park. This new build depot development incorporated a 400m²storage and workshop area with associated office and staff welfare facilities, alongside a new wheel lathe outbuilding. This was a large-scale, highly complex depot construction, providing regular routine servicing for all rolling stock. In addition to a storage facility and staff quarters, our people provided feasibility expertise to support the reduction of risk throughout the build of a new covered three road seven car set with two through roads, one buffer stop road and two service pit roads. In order to meet the client requirements, a lowered floor with the track on steel supports was installed aligned with one road with a flat floor fitted with a seven car set, and an overhead gantry crane with access to all three roads.

Ardwick Project: New Build Depot, Ardwick Value: 30m Client: Siemens Completed: 2006 The creation of this new build depot in Ardwick, Manchester has created a gateway to the Trans Pennine route, bringing new life to what was a redundant area of land within the city. The asset totals 10 acres, accommodating a total of eight trains at a time in the maintenance shed which covers 6000m2. Within the area is a wheel lathe, train jacks and under floor bogie and engine drops, which were designed and developed with the support of our people. Alongside this, Waldeck people were also responsible for engineering design aspects of the offices, workshops, a stores area and a First TransPennine Express simulator unit for driver training. Douglas Alexander MP, First TransPennine Express shared that the depot was great news for passengers in the north of England and that he welcomed the investment. Allowing trains to be maintained to a high standard and raise the quality of rail journeys. The use of cutting edge technology and excellent communication allowed all involved to provide the best possible technical solution to support the 51 strong fleet of newly built trains.

North Pole & Stoke Gifford Project: New Build Depot, North Pole Value: 52m Client: Hitachi Completed: 2007 As part of the Intercity Express Programme (IEP), enabling the new Hitachi Super Express trains to be used on the capital s railway network, Waldecks people are involved with the construction of the new Intercity Express Depot at Stoke Gifford, Bristol. This is aligned with the redevelopment of the existing Eurostar North Pole Depot in London. Consulting services provided include Architecture, Civil and Structural Engineering, Fire Engineering and Acoustic in order to support the development of the maintenance facility. The Stoke Gifford site is located west of Bristol Parkway station, located on a brown field site previously used as a refuse tip. The site required extensive specialist planning including Fire Engineering and Acoustic Engineering as part of the redevelopment in order to provide the new purpose built, state of the art depot. The new build also incorporated an extensive 20 kilometres of new track and three new connections to the Great Western Main line.

Reading Project: New Build Depot, Reading Value: 54m Client: Network Rail Completed: 2013 Waldeck people were involved in completing the engineering design for this award winning 54m project to construct a new 6,500m2 rail depot, the new build forms part of the Reading Area Redevelopment Scheme. The new depot, which was completed in June 2013, has been built to the west of Reading Station to free up the depot s previous location for new rail routes that will increase rail transport capacity. The new 210m long, 37m wide depot shed has been built with a three road light maintenance through road shed and a single road heavy maintenance shed, main stores, a workshop, plant rooms, a signalling room, a three storey production management office with 17 associated buildings and a 30 space car park. The project installed the first overhead wires for Network Rail s 895 million Great Western Electrification Programme and the project team was awarded 56 STAR awards and two Platinum Badger Awards through Network Rail s STAR awards scheme. A scheme which was established in order to recognise and reward worksites that achieve high levels of health, safety and environmental risk control.

Northam Project: New Build Depot, Northam Value: Undisclosed Client: Siemens Completed: 2012 Not only was this land mark new build depot one of the first new maintenance depots in the UK for many years, it was also Siemens first depot in the UK. Waldeck people headed up the Civil & Structural engineering for the entire project, aligned with Architectural Design in order to see the successful delivery of the asset, which capitalises on a pit-stop environment for the servicing of trains. As one of the key depots within the network, the state of the art facilties enable important maintenance work to be carried out. Cutting edge technology planned and implemented by our people provides Siemens with the facilities to ensure their Siemens Desiro Class 185 and Class 350/4 trains can be maintained as required, therefore remaining safe and reliable for the travelling public. The depot also opened for Whistle Stop Tours allowing interested parties to visit the new build maintenance facility in action.

Ramsgate Project: New Build Depot, Ramsgate Value: 34m Client: Hitachi Completed: 2007 Ramsgate depot is the second major new state-of-the-art traincare facility, the project included wholly redeveloping a 10,000m2 area of land residing north of the station which saw the erection of a huge 8000m3 maintenance depot measuring 195 metres in length. The new build accommodates five tracks, with a three-storey-high office block, complete with workshop and stores running along its southern elevation. Revised foundation design saw the client save both time and money due to increased efficiency and the reduction of overall risk. Alongside this, efficiency and communication was maximised through the implementation of a web-based document and communication system for all stakeholders which facilitated speedy dissemination and sharing of information and design, which at the time was cutting-edge innovation. Above-ground attenuation tanks were used in order to minimise excavation within the aquifer and facilitate ease of future inspection and maintenance, along side the use of pre-cast concrete slabs within the construction of the swimming pool area which allowed the team to deliver an efficient and speedy construction solution.

Temple Mills Depot, London Project: Temple Mills Depot, London Value: 9.1m Client: VolkerFitzpatrick Completed: 2013 This project with client VolkerFitzpatrick involved the careful modification of parts of the existing locomotive maintenance facility at Temple Mills Depot, London followed by construction activities to create additional space in order to house a new fleet of Eurostar trains. Temple Mills has been designed to meet the specific requirements of high-speed trains, with eight 400-metre tracks inside the depot shed, Eurostar trains no longer have to be split in half for maintenance, saving the Client at least two hours of time per train visit. All engineering and construction modification works for this project were undertaken in a live rail depot environment. Eurostar Chief Executive, Richard Brown shared that Temple Mills will further improve the efficiency of maintaining our fleet. A feat of civil and railway engineering, Temple Mills is a truly world class depot, which has been finished on time and on budget.