BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

Similar documents
BEST PRACTICES FOR DETAILED APPLICATIONS TA/SRTS Program

FDOT D4 Complete Streets

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Clay Street Bridge Replacement Project

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Pennsy Greenway Trail

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Corridor Beautification Partnership

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

This page left intentionally blank.

Shift Rapid Transit Public Participation Meeting May 3, 2017

The Lincoln Neighborhood Corridor Plan. The LiNC

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

City of Hermosa Beach Administrative Policy #

PLAN ELEMENTS WORKSHOP. April 5, 2016

2017 General Obligation Bond

Enhance the High Line Canal Projects

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES. Community Technical Assistance Program Building Active Communities Institute March 2016

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Public may provide comments on the GDP within the next two weeks (December 24)

Introduction and Overview

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

Right-of-Way Acquisitions and Relocations Technical Memorandum

New Stanton Project Update July 3, 2012

Atlanta BeltLine Subarea 3 Master Plan Update

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Abingdon Urban Path System

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

SECTION 4(f) DE MINIMIS DOCUMENTATION

AGENDA ACTION ITEMS INFORMATION ITEMS

PARKLET PROPOSAL PACKAGE & PROCESS

BeltLine Corridor Environmental Study

South Davis County COMMUNITY SPOTLIGHT

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Transportation Alternatives Program (TAP) Experience

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Location. Served. Category. Units Start Year. Previous Appropriations

GOALS, OBJECTIVES, POLICIES & PROGRAMS

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Regional and Local Perspectives

ULI St. Louis Technical Assistance Panel

DESIGN CRITERIA PACKAGE

Mississippi Skyway Preliminary Engineering Report

Johnson Street Bridge Public Realm Update

Historic Bridge Adoption Information Packet

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

ESTABLISH AN EFFICIENT TOWN CENTER

The University District envisions, in its neighborhood

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

Route 1 Corridor Study

LOCATION AND DESIGN DIVISION

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Public input has been an important part of the plan development process.

Lesson 6. Corridor Planning

Ten Mile Creek Planning Area

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Capital Projects in and near Odenton Town Center

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Project Overview. Get Involved. Public Information Meeting. Contact Information

4.1 Build Alternative 1 Construction Phasing

Q:%4~ Memorandum CITY OF DALLAS

TRANSPORTATION ELEMENT

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

TRANSIT ORIENTED DEVELOPMENT PINELLAS COUNTY MPO LIVABLE COMMUNITIES INITIATIVE PINELLAS COUNTY COMPREHENSIVE PLAN AMENDMENTS

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

4.500 Preston Road Overlay District

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

TORONTO COMPLETE STREETS GUIDELINES

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

N Watt Avenue Corridor Plan. STOREFRONT WORKSHOP May 15-17, 2007

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

STREETSCAPE MANUAL ONLINE TRAINING SESSION 3: Decision-Making

Transcription:

BEST PRACTICES FOR PROJECT NOMINATIONS 2017 TA Set-Aside Program

Focus of this presentation Photos Public Support Maps & Exhibits Proposed Budget Design Details Project Evaluation & Selection Criteria Project Readiness

Selection Criteria Categories (Tables 1-3) Safety Mobility & Congestion Mitigation Regional Connectivity Accessibility Environmental Benefits Economic Development Project Readiness Local Funding Planning Public Support

Criteria Evaluation Factors 4

Design details What do design details convey? A complete picture of the project How the project meets current standards and state-of-the-practice Constructability Safety, accessibility, and durability (economic dev) criteria Where does the project sponsor address design details? Project Dimensions (topic 7 Project Location Information) Project Description (topic 9) Project Details (topic 10) Itemized Construction Cost Estimate (topic 23) discussed later 5

Project Description (#9 in Nomination Form) Create a complete picture with words Focus on details not covered elsewhere in the form Address evaluation criteria 6

Sample project descriptions The project would construct a 12-foot-wide shared use path along Dillon Creek from the Dowling Apartments (public housing) to Lamar Elementary School. The project would include a flashing beacon, ADA-curb ramps, crosswalks, and signage at both termini, as well as a 60-foot-long, 14-foot-wide (clearance inside rail to inside rail) pre-fabricated bicycle/pedestrian bridge over Dillon Creek. The proposed project would construct new 6-foot wide, 5-inch reinforced concrete, ADA-compliant sidewalks on both sides of Market St from Yates St to Bend Ave (1 mile), including replacing damaged, non-compliant sidewalks on the north side of Market St between Main St and Bend Ave (0.3 mile of total project length). The sidewalks would provide residents of northwest Adamsville an alternative, non-motorized route to the downtown retail and employment center. 7

Project Details (#7 and #10 in Nomination Form) 7. Project Location Information Project Dimensions Total length Facility width Material depth 10. Project Details 30% or more plans for review Facility type Surface type/material Bridge details Construction Number Length Width Superstructure material 8

Typical sections (10. Project Details recommended) Demonstrates compliance with standards Shows how the project fits into existing footprint as well as the built and natural environments 9

Typical sections (10. Project Details recommended) 1 * *1 minimum required, 2 recommended streetmix.net 10

Designs must comply with TxDOT manuals and specifications 11

Nationally recognized design guides AASHTO (adopted by TxDOT) NACTO 12

Design criteria Americans with Disabilities Act (ADA) 36 CFR Part 1190 - Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way The proposed guidelines apply to pedestrian facilities in the public right-ofway. The proposed guidelines define the public right-of-way to mean "public land or property, usually in interconnected corridors, that is acquired for or dedicated to transportation purposes". 13

Example: Safety Project Description: Upgrade 4 intersections with Accessible Pedestrian Signals and countdown timers 10 pedestrian accidents in the last 3 years according to Mayberry Police Department. 9, 10, 23 14

Maps and exhibits What do maps and exhibits convey? Context Community features Communities served by the project Safety, mobility/congestion mitigation, regional connectivity, accessibility, environmental benefits, and economic development criteria Where does the project sponsor provide maps and exhibits? Project Details (topic 10) as Attachment B 15

Project location map - REQUIRED Identifies: Street names Transit stops Interconnecting bike/ped network Parks Public housing Government facilities Retail establishments 16

Project layout - REQUIRED Identifies: Bicycle and pedestrian accommodations Safety features Interactions between auto and non-motorized traffic Transit connections Preserved landscape features Includes: Scale Context Street names 17

Example: Regional/Local Connectivity 18

Photographs What do photographs convey? Context, including built and natural environment Existing conditions Safety, accessibility, and environmental benefits criteria Where does the project sponsor provide photographs? Project Details (topic 10) as Attachment B 19

Photographs provide context Historic districts Environmental features Separated vs onstreet pathways Repurposed bridges Adjacent historic buildings along SH 29 facing west (7/19/16) Historic truss bridge repurposed for bike/ped use on SH 150 facing south (5/14/16) 20

Photographs demonstrate existing conditions 1. Poor conditions 2. Absent facilities 3. Worn paths 1 3 2 21

TAP projects proposed to remedy unsafe conditions Kids walking in streets Unsignalized crossings 22

Example: Accessibility 23

Public and stakeholder support What does public/stakeholder support convey? Community awareness and acceptance of project Coordination and transparency Consistency with local planning Safety, mobility/congestion mitigation, regional connectivity, accessibility, environmental benefits, and economic development criteria Where does the project sponsor document public and stakeholder support? Public Involvement and Support (topic 14) Attachment E Property Ownership and Acquisition Information (topic 16) Attachment G Local Bicycle, Pedestrian, or other Transportation Plan (topic 18) Attachment I Safe Routes to School Plan (topic 19) Attachment J 24

Public involvement summary 25

TxDOT letter of consent 26

Project identified in regional plan 27

Project located in priority planning area Project location 28

Example: Congestion Mitigation Project location 29

Itemized budget What does the itemized budget convey? Project scope and scale Prevention of potential overruns Supports activities described elsewhere in nomination form Safety, accessibility, economic development, project readiness, and local funding criteria Where does the project sponsor provide the itemized budget? Itemized Construction Cost Estimate (topic 23) Additional Construction-Related Costs (topic 24) 30

Average low bid unit prices 31

Budget items to remember Mobilization Site preparation Erosion control Lighting Traffic control Demolition Remediation of hazardous conditions Remember: Federal TA Set-Aside funds are fixed based on the estimate in the nomination form! 32

Examples of eligible vs ineligible activities Eligible activities Incidental landscaping, environmental mitigation, utility adjustments Land survey for ROW demarcation Construction engineering and inspection Project administration Ineligible activities Major landscaping, environmental mitigation, utility adjustments Survey for design or ROW acquisition Legal services Contingency 33

Example: Safety 4.5 in. Concrete 34

Project readiness What does project readiness convey? Represents 25% of evaluation score Awareness of potential pitfalls, challenges, and delays Consideration of all phases of project development Understanding of TxDOT s project development processes Where does the project sponsor demonstrate project readiness? Project Details (topic 10) Attachment B MPO TIP Inclusion Letter (topic 13) Attachment C Environmental Documentation (topic 15) Attachment F Property Ownership and Acquisition Information (topic 16) Attachment G Railroad Support/Right-of-Entry (topic 17) Attachment H Project Timeline (topic 21) and Attachment L Itemized Construction Cost Estimate (topic 23) 35

Advanced coordination may be necessary Environmental permits Resource agency coordination ROW acquisitions Utility relocations Railroad agreements 36

Environmental documentation for categorical exclusions Maps and diagrams TxDOT environmental scoping tool/process Historical resource review Archeological resources/cemeteries Water resources Hazardous materials Biological evaluation Public involvement Coordinate with your local TxDOT Environmental Coordinator! 37

Historical resources Be proactive! Check the Texas Historical Commission atlas: atlas.thc.state.tx.us Search for Historic Resources Toolkit on txdot.gov THC coordination occurs prior to environmental approval Historical properties can affect design and cost Use TxDOT pre-certified professionals Contact your district environmental coordinator to learn more! 38

Additional thoughts Use the Program Guide as a tool Visit with your District representatives Use key words and phrases Back up claims with data Be concise Make good use of the space provided Go back through the nomination before turning it in 39

Summary Provide good project details Use maps, diagrams, and photos that tell a story Demonstrate good public awareness and support Include a thorough, comprehensive budget Plan, plan, plan Focus on the evaluation criteria 40

Questions? Teri Kaplan TxDOT Public Transportation Division Statewide Bicycle/Pedestrian Program TA Set-Aside Program Manager (512) 486-5973 Bonnie Sherman TxDOT Public Transportation Division Statewide Bicycle/Pedestrian Program Planner (512) 486-5972 http://www.txdot.gov/inside-txdot/division/public-transportation/bicycle-pedestrian.html 41