Teacher Control Center

Similar documents
Lighting Application Guide for K-12 Classrooms

Product Specifications Dialog Room Controller* (*patent pending)


" canopy bracket assembly

SCENE 2x2 INSTALLATION INSTRUCTIONS. Recessed T-Bar GENERAL SAFETY INSTRUCTIONS: NOTE:

Waste not, want not. As part of our efforts to ensure we practice sustainability in our business, we ve printed this brochure on recycled paper.

USER MANUAL INSTALLATION GUIDE FOR: 2X2: MLFP22DS4035 MLFP22DS4041 MLFP22DS4050

Project Name. Date. Cat. Number. Type

Inde-Pendants Family. 32L Cylinder with Ring Open Ceiling Types. Document No Installation instructions for 32L-CRxx-P-ID 32L-CRxx-P-D

The only lighting product that is designed, approved, and patented to replace the cross members in a suspended grid ceiling system.

C ontrolsystems Themostadv ingenious a n cedsensor-basedcontrols.now integratedintoourmostpopularfixtures.

MaxLite LED MICRO-T PANEL

MaxLite 4, 6, 8 & 9 LED Architectural & Commercial Downlights

Lincoln Public Schools

Catalog # Project. Comments. Prepared by. Warranty Five year warranty

Connecting Lighting & Controls

Acoustical tee. Acoustical Tee

E2 Indirect/Direct Linear Recycling Luminaire Disassembly Instructions

WARNING Risk of fire and electrical shock. DISCONNECT POWER AT ELECTRICAL PANEL before installing or servicing this product.

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.

M100 My White LED Direct Tunable White

LED RETROFIT CONVERSION KITS

Indoor Controls. SpaceWise SWZG2. Wireless technology

Project Name. Date. Cat. Number. Type

INSTRUCTION MANUAL IMPORTANT SAFEGUARDS. When using electrical equipment, basic safety precautions should always be followed, including the following:

Inde-Pendants Family. 32L Cylinder Plaster Trim, Grid and Drywall Ceiling Types. Document No

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

Essentials Series 4.0

AMERICAN AIR & WATER, INC.

IMPORTANT SAFETY INSTRUCTIONS:

Integrated Classroom Control System. Installation and Operation Manual

Caliber Series LED Edgelit Exit Sign EXPORT AC Only or Emergency Operation READ AND FOLLOW ALL SAFETY INSTRUCTIONS

PH:

New LED Product Offerings

PRODUCT BROCHURE. Steel City 5 SQUARE boxes It s time for an upgrade

Installation Instructions

M36 My White LED Direct

ST. KITTS CEILING FAN

A Simpler and Smarter Wireless Lighting Control Solution. Design & Application Guide

1 x4 Dimmable LED RetroFits

OPTION CA1, CA2, AND CA3 POWER VENTERS

Alcon Lighting P Continuum 44 Architectural LED Linear Pendant Mount Direct/Indirect Light Fixture

Maxim3 TM Series IP66. LED Vapor Tight - Waterproof Key Features

SPECIFICATIONS HYLYTR. with DOUBLE SLOT OPTICS

BAS SDL8' LED Strip Diffused Lens

UMA-1020 Light Weight Suspended Ceiling Kit

Installation & Operation Manual for WarmlyYours Towel Warmers

NOTICE: The information contained on the following page(s) was produced prior to May 1, On that date Reznor became part of Nortek, Inc.

Excellence in LED Lighting. e-solis Edge Lit LED Panels.

Infrared Wall Mount Occupancy Sensor

Lighting Control Strategies. to meet code requirements save energy and improve building performance

P R O D U C T C A T A L O G U E

ELSTON 52 CEILING FAN

Installation & Operation Manual for WarmlyYours Towel Warmers

Installation Guide. Model: IC15- MF Model: IC15- MFSilent Model: IC30- MF Model: IC30- MFSilent

CMA-440 Light Weight Suspended Ceiling Kit

ARTEMIS Series of Low Occupancy LED Ceiling Mounted Fixtures (Including Stairwells) Installation & Operation Guide

IECC. nlight Applications Guide.

Installation Guide. For Models: E-MLV36BNK4LK1 E-MLV36ESP4LK1 E-MLV36WW4LK1 READ THESE INSTRUCTIONS AND AND SAVE THEM FOR FUTURE USE

Manufacturer of HVAC Equipment Since ,000 sq. ft. on 16 acres. Colton, California USA

Light control solutions

design guide for wireless l i g h t i n g c o n t r o l

INSTALLATION INSTRUCTIONS

MANDATORY MEASURES INDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.1)

HighLINER 2. General Information: FOR YOUR SAFETY. Installation Guide for C1I75, L1C1I75, C2I75, L135C2I75

1. Section [ Lighting Control Panel Boards:] Lighting panels (switching) controlled by ControlKeeper

FCSENS0R Occupancy Sensor. Long Description. Manufacturer Information. Taxonomies, Classifications, and Categories

Installation Instructions

DIMMING 0-10V Continuous

The Bahen Centre for Information Technology. Meeting Room Lighting Redesign. Introduction. University of Toronto ~ Toronto, Ontario, Canada

ThermoCable Linear Heat Detection System

High Ceiling TV Mount - 8.2' to 9.8' Long Pole - For 32" to 75" TVs - Full Motion

LED RETROFIT CONVERSION KITS

52 SAN LUCAS CEILING FAN

USER MANUAL. Galil 8-C Closed-back Ceiling Speakers MODEL: P/N: Rev 2

LOSBAY800. BAY SENSOR Installation Manual. LOSBAY800 Specifications

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

PRESCRIPTIVE APPROACH

TABLE 1 Electrical Specifications

Premium. Universal LED Vapor Tight T20G. Commercial lighting Industrial lighting Vapor tight light Linear High Bay Canopy

Vive PowPak Fixture Controls

Light Control guide for Soundlight Comfort Ceiling OccuSwitch DALI Control Guide

CANOPY TYPE (see images below) CANOPY COLOR HARDWARE CABLE OR STEM LENGTH CUSTOM OPTIONS. +SEM 5" round canopy. Air Craft Cable. +SLC 5" square canopy

Linergy II. England and Wales Cricket Board, Truro Linergy

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

LIGHTING CONTROLS

Main Lobby Area (North Vestibule thru South Vestibule):

SDL4 LED Strip Diffused Lens

Experience the future of lighting with SR

v3 360 Dual Technology Low Voltage Occupancy Sensor with Light Level, Isolated Relay and Manual On feature

Proximity Series. features: specifications: options: in-wall box. what great systems are built on.

1. SAFETY RULES WARNING WARNING. 8. Avoid placing objects in the path of the blades.

F series. Complete Room Controller. echoflex Powered by ETC. Product Overview ERDRC-FC

Technical Rescue Incidents

Dimensions (111mm) 3 (76mm) (111mm) (48mm)

CXB Series SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. LED Luminaire TO INSTALL: INSTALLATION INSTRUCTIONS INSTRUCTIONS D INSTALLATION

Ceiling Mount Sensors B4-B9. Occupancy and Vacancy Sensors B10-B15 B16-B17. Wall Mount Occupancy Sensors B-1

TABLE 1 Electrical Specifications. Phase

Corra/Clad MC Cable The contractors cable of choice in place of conduit and wire.

ARCHWAY TM PASSAGE TM

Transcription:

ICLS Template High performance schools focus on construction elements that provide maximum benefit for the learning environment, while delivering superior energy performance. The Integrated Classroom Lighting System (ICLS) meets the needs of the high performance classroom, requires just 5 integrated components to complete the system, and is backed by a 5-year single source warranty from Finelite the company that sets the standard for service in the lighting industry. Indirect/Direct Luminaires Luminaire Teacher Control Center Sensors Master On/Off Switch Two rows of two-scene indirect/direct luminaires are mounted perpendicular to the main teaching wall (parallel to the window wall) and spaced 14-15 apart. A dedicated luminaire is used to illuminate the whiteboard on the main teaching wall. The Teacher Control Center (TCC) is placed at the front of the classroom. Place teacher controls within 6 of the whiteboard for easy access. Sensors are placed in the center of the classroom and always include occupancy and daylight harvesting, (added where appropriate). Master On/Off Switches are installed by every door of the classroom. 2

ICLS - Single Source Solution Installing ICLS takes just 10 man hours! Finelite products install faster and easier than traditional lighting products. Our luminaires arrive at the jobsite fully assembled with all the necessary hanging hardware, and the ICLS system uses robust plug and play wiring components with patented technology to reduce the number of electrical connections required. The times listed below are conservative estimates that can be used to estimate your next ICLS project. Start Up 1 HOUR 15 MINUTES Every project is different. This labor estimate factors in these differences for a more realistic approach. Assess unique site conditions 45 min. Identify and organize parts 30 min. Rough-In 5 HOURS 35 MINUTES The rough-in phase of the project involves installing junction boxes, ceiling supports, and running electrical conduit. Rough-in Power Control Center 120 min. Rough-in Teacher Control Center 45 min. Rough-in Main Switch Bank 60 min. Rough-in Occupancy Sensor 30 min. Rough-in Luminaire Supports 80 min. Luminaire Installation 2 HOURS 15 MINUTES Finelite has a rich history of developing easy-to-install products and you will see that our luminaires install faster than traditional lighting products. Hang and level indirect/direct luminaires 72 min. Hang and level whiteboard luminaires 18 min. Make electrical connections 45 min. Controls Installation Plug and play wiring reduces labor and makes your job easier. Install Teacher Control Center Install Main Switch Bank Install Occupancy Sensor 35 MINUTES 10 min. 10 min. 15 min. Clean-up and Finish Work 35 MINUTES Finelite makes clean up and finish work easy. Our luminaires are shipped in protective plastic bags that can remain on until all the trades are off the job. Remove Luminaire Bags 10 min. Install Faceplates 10 min. Test System 10 min. Total Installation Time 10 HOURS 15 MIN. 3

Power Control Center The Power Control Center (PCC) takes line voltage from building power and then carries power to, and communicates with ICLS system components. This robust unit is constructed of heavy duty 16-gauge steel, is easy to install and maintain, and is built to last the life of the installation. Occupancy Sensor Teacher Control Center Row 1 Row 2 Master On/Off Switch Product Features that Reduce Installation Time QUICK & EASY Installation Plug & Play Plenum rated plug and play wiring is used to connect the PCC to the TCC and sensors. Plug and play wiring is provided by Finelite for each job. The PCC comes pre-wired and ready to be installed. Installation is easy just mount the PCC, connecting building and fixture power as indicated, and run low voltage plug and play wiring to the TCC and sensors. Terminal Strips Terminal strips are used to speed installation and ensure the electrical connections are secure. Knockouts Heavy duty knockouts accommodate 1/2" to 3/4" conduit. The box is constructed of 16-gauge steel. Wiring Label Panel The wiring label panel clearly identifies every wiring connection for ease of installation and maintenance. Diagnostic Tools Diagnostic LED s show installers and maintenance teams when the unit is receiving power and when power is reaching the whiteboard luminaire, indirect luminaires, and occupancy sensor. 4

PCC Rough-In North 30' TCC PCC West 32' Row 1 OCC SENSOR DAYLIGHT SENSOR Row 2 Power Control Center Rough-In Steps Installing the PCC is quick and requires four easy steps. Installation Time Labor Estimate 1) Place and Install PCC 30 MINUTES The PCC is generally installed above ceiling by the Main Switch Bank at the classroom entrance. Four mounting tabs make it easy to attach to the wall. Simply screw it in. 2) Connect Building Wiring 30 MINUTES Building wire is brought into the PCC and connected via terminal strips. The PCC features heavy duty knockouts. 3) Connect Fixture Wiring 45 MINUTES Connect flex to the PCC for each of the luminaire rows. Three would be needed for the layout above 4) Connect Plug and Play Wiring 15 MINUTES Plenum rated plug and play low voltage wiring is used to connect the Teacher Control Center and any sensors to the system, reducing the labor. Total Installation Time: 2 HOURS 5

Component Rough-In Teacher Control Center Run plug and play cables from PCC. Install junction box or low voltage network bracket at desired location. In most cases, plug and play cabling can be run through the wall without conduit. (Check local regulations.) Low Voltage Bracket Installation Time: 30 minutes J-box with Conduit Installation Time: 60 minutes 3/4 Main Switch Bank J-box with Conduit Installation Time: 60 minutes Run power from PCC line voltage Install junction box or low voltage network bracket at desired location. (Refer to specifications for junction box size.) Install main switch bank. Occupancy Sensor Run plug and play cables from PCC. Cut hole in ceiling tile (if present) or place junction box. Occupancy Sensor Installed without J-box Installation Time: 30 minutes Occupancy Sensor Installed with J-box Installation Time: 45 minutes 6

Controls & Luminaires Rough-In Non-Feed Locations Screw ceiling support wires into upper structure. Attach the caddy clip to the T-Bar and secure aircraft cable and canopy. Installation Time: 10 Min. per support Feed Locations Finelite's exclusive GridBox is the first electrical box that enables indirect lighting to be mounted On-Grid and meet all national codes. Attach the GridBox to the T-bar, connect the flex and ceiling support wire, and secure aircraft cable and canopy in place. Pre-level the bottom nut for faster luminaire installation. Installation Time: 10 Min. per support TCC North 30' Template Totals / Rough-In Qty Time Per Total PCC Power Control Center 1 120 min. 120 min. Teacher Control Center 1 45 min. 45 min. West 32' Row 1 OCC SENSOR DAYLIGHT SENSOR Row 2 Main Switch Bank 1 60 min. 60 min. Occupancy Sensors 1 30 min. 30 min. Non-Feed Supports 5 10 min. 50 min. Feed Supports 3 10 min. 30 min. 335 min. Total Rough-In Installation Time: 5 HOURS 35 MINUTES = Suspension Point 7

Finelite Luminaires install FASTER & EASIER than traditional lighting systems. Hang & Level Luminaires 1.5 MINUTES PER FOOT ICLS luminaires arrive on site fully assembled and pre-wired. They incorporate many labor saving elements, including On-Grid mounting, plug together wiring, and our exclusive Gridbox. Follow these simple steps for a successful installation. TCC North 30' ~ ~ PCC Hang Starter Fixture OCC SENSOR Install the starter unit by lowering the bottom kep nut to the desired location and secure to the balancer cable attached to luminaire, repeating at joining end. West 32' Row 1 Row 2 DAYLIGHT SENSOR Installation ~= Feed Template Totals / Luminaire Installation Qty Time # of Luminaire Feet 60 90 min. # of Electrical Feeds 3 45 min. 8 Total Luminaire Installation Time: 2 HOURS 15 MINUTES Position Luminaire Locate the adjustable mounting brackets in the proper position and secure them in place for easy installation.

Installing Luminaires Make Electrical Connections 15 MINUTES PER FEED Connect Wiring and Join Fixtures Hang the far end of joiner fixture while supporting both ends. Connect plug together wiring and join fixtures using two screws (provided). For Indirect/Direct & Installation Hang & Level Fixture Finelite's exclusive Gridbox is the first electrical box that enables indirect lighting to be mounted On-Grid and meet all national codes. Pull flex into the GridBox, thread through the strain relief and make the electrical connection. Attach the hanging hardware to the mounting bracket, level the luminaire, and secure the hardware in place. 9

Plug & Play makes installing ICLS controls and sensors EASY! North 30' TCC PCC OCC SENSOR West 32' Row 1 DAYLIGHT SENSOR Row 2 ICLS is an integrated system with luminaires and controls connected together using patented technology. Low voltage wire or plug and play cables connect the controls to the system, reducing labor, materials, and ensuring connections are right every time. Quiet Time Occupancy Sensor Install the occupancy sensor in the middle of the room with or without a junction box (depending on local codes). Plug and play wiring connects the sensor to the system. Some room configurations require additional sensors, which can easily be daisy chained with the supplied Cat5 cable. Installation Time: 15 Minutes 10

Installing Controls Teacher Control Center (TCC) Install the TCC with its unique Quiet Time switch on the teaching wall next to the whiteboard. The low voltage TCC is shipped fully assembled, requiring only one plug and play connection, thus reducing labor costs. Main Switch Bank () Install the main on/off switches by each door using line voltage with the power coming from the Power Control Center (PCC). Installation Time: 10 Minutes Installation Time: 10 Minutes North 30' TCC Template Totals / Installing Controls Qty Time Per Total PCC Teacher Control Center 1 10 10 min. OCC SENSOR West 32' Row 1 Row 2 Main Switch Bank 1 10 10 min. DAYLIGHT SENSOR Occupancy Sensor 1 15 15 min. 35 Min. Total Controls Installation Time: 35 MINUTES 11

Finelite, Inc. 30500 Whipple Road Union City, CA 94587-1530 Phone 510/441-1100 Fax 510/441-1510 www.finelite.com Form No. CBR0071 2008 Finelite, Inc. All rights reserved. Photography Credits: JDN Photography. Steve Talmadge Photography.