WARNING: BEFORE INSTALLING READ ALL OF THE MANUFACTURERS INSTALLATION AND MAINTENANCE The 2SD04700524 Smoke Detector Kit contains the parts and hardware to mount the smoke detector in the following applications: De ter mine which ap pli ca tion is to be in stalled. 15-25 Ton Sup ply Air Stream (Blower Compartment) 15-25 Ton Re turn Air Stream with Econo mizer, or with out Econo mizer Supply or Return Duct (Use Factory Installation Instruction) C B J A E H G D F K L Figure 1 Check the correct number of parts. See the list be low 1 ea. Smoke Detector with Wire Harness (A) 1 ea. Smoke Detector 15-25 Return Bracket (B) 1 ea. Smoke Detector 15-25 Supply Bracket (C) 1 ea. Sampling Tube - 23" (D) 1 ea. Sampling Tube - 36" (E) 1 ea. Sampling Tube - Copper 28" (F) 1 ea. Sampling Tube - Copper 33" (G) 1 ea. Wire Extension - 10" (H) 1 ea. Wire Extension - 120" (J) 1 ea. Factory Installation and Maintenance (IM) Instructions (K) 1 ea. Hardware Bag (L) 5 ea. Screw AB Hex 10-16 x ½" 2 ea. Screw Hextec 10-16 x 1" 2 ea. Snap Bushing UB875 252104-UAI-B-1006 1
Supply Air Application Step 1: Re move pan els as needed to ex pose the fresh air and blower access sections. See Figure 2 and 3. Step 2: Determine the wiring configuration of the unit by locating unit socket S18. If S18 is located in the fresh air compartment, proceed to Step 3. If S18 is located in the blower section proceed to Step 9. See Figure 6 and 7. Figure 2 Step 3: Drill two 5 32" holes. See Figure 4. * One at 5 1 8" in and 4 7 8" up from the lower left cor ner of the sup ply air par ti tion panel. * One at 19 1 8" in and 4 7 8" up from the lower left cor ner of the sup ply air par ti tion panel. Figure 3 HOLES DRILLED IN STEPS 3 & 4 Step 4: Drill two 1 3 8" holes. See Figure 4. * One at 12 ¼" in and 4 7 8" up from the lower left cor ner of the sup ply air par ti tion panel. * One at 17 5 8" in and 4 7 8" up from the lower left cor ner of the sup ply air par ti tion panel. Figure 4 Step 5: Place foam gas kets over sam pling tubes of the smoke de tec tor and mount in the sup ply air par ti tion panel. Se cure with the two #10-16 x 1" Hextec screws (pro vided). See Figure 5. Figure 5 2 252104-UAI-B-1006
Step 6: Re move the clear cover of smoke de tec tor. In sert the metal sam pling tube in the in let tube of the smoke de tec tor. Make sure the air holes of the sam pling tube face into the air flow. Se cure with screws pro vided. Note that the sam pling tube may need to be cut to the ap pro pri ate length to span the sup ply air open ing. S18 Step 7: Place the sam pling tube fil ters into both the ex haust tube and in the in let tube and re place cover. Figure 6 Step 8: In sert red tube plug into the end of the sam pling tube. S18 Step 9: Remove the (2) 7 8 knock-outs from the upper and lower blower plates. If the blower assembly is not equipped with knock-outs, drill (2) 7 8 holes. The holes are to be located 4.25 from the right edge and 7.25 (6.00 on 15-ton unit) from the front edge of the blower plate. See Figure 8. Figure 7 4.25" Step 10: Insert the 90-degree copper sampling tube through the (2) 7 8 holes in the blower assembly. Next, slide a 7 8 snap bushing over each end of the sampling tube and insert into the blower assembly. See Figure 9. Figure 8 7.25" Step 11: Place the foam gaskets over the sampling tubes of the smoke detector and secure the detector to the supply air mounting bracket with two #10-16 x 1 hextec screws (provided). Figure 9 252104-UAI-B-1006 3
Step 12: Remove the clear cover of the smoke detector and place the sampling tube filters into both the exhaust tube and in the inlet tube and replace the cover. Step 13: Insert the 90-degree copper sampling tube into the inlet opening of the smoke detector and secure the mounting bracket to the inner frame post. See figures 10 and 11. Figure 10 Step 14: Remove jumper plug from unit socket (S18). Insert plug (P18) of the smoke detector into unit socket (S18). See Illustration 1 and 2. Step 15: Test per smoke detector manufacturer spec. See (IM) instructions. Step 16: Replace all panels removed during installation. Figure 11 ROUTE ALL EXTENSION HARNESSES FOR SMOKE DETECTORS THRU THIS OPENING IN ECONOMIZER FILLER PANEL Illustration 1 ROUTE HARNESS EXTENSION FOR RETURN AIR SMOKE DETECTOR THRU THIS OPENING Illustration 2 4 252104-UAI-B-1006
Return Air Application with Economizer Step 1: Re move pan els as needed to ex pose Re turn air par ti tion panel. Step 2: Pre pare the Re turn air par ti tion panel to mount Smoke De tec tor. Step 3: Drill two 5 32" holes. See Figure 12. * One at 12 3 8" in and 3 ½" up from the lower left cor ner of the econo mizer par ti tion panel flange. * One at 26 3 8" in and 3 ½ up from the lower left corner of the economizer partition panel flange. HOLES DRILLED IN STEPS 3 & 4 Figure 12 Step 4: Drill two 1 3 8" holes. See Figure 12. * One at 19 ½" in and 3 ½" up from the lower left cor ner of the econo mizer par ti tion panel flange. * One at 24 7 8" in and 3 ½" up from the lower left cor ner of the econo mizer par ti tion panel flange. Step 5: Place foam gas kets over sam pling tubes of the smoke de tec tor and mount in the Re turn air par ti tion panel. Se cure with the two #10-16 x 1" Hextec screws (pro vided). See Figure 13. Figure 13 Step 6: Re move the clear cover of the smoke de tec tor; in sert the metal sam pling tube in the in let tube. Note: The sam pling tube may need to be cut to the ap pro pri ate length to span the Re turn Air open ing, or cut to al low serv ice of the Sup ply Air Smoke De tec tor. Make sure the air holes of the sam pling tube face into the air flow. Se cure with screws pro vided. See Figure 14. Step 7: Place the sam pling tube fil ters into both the ex haust tube and in the in let tube and re place cover. Step 8: In sert red tube plug into the end of the sam pling tube. Figure 14 Step 9: Remove jumper plug from unit socket (S17). Insert plug (P17) of the smoke detector into unit socket (S17). See Illustration 1 and 2. Step 10: Test per smoke detector manufacturer spec. See (IM) instructions. Step 11: Replace all panels removed during installation. 252104-UAI-B-1006 5
Return Air Application without Economizer Step 1: Re move fresh air and return air pan els to ex pose re turn air sec tion. See Figure 15. Step 2: Re move ex ist ing screws from unit. See Figure 16. Step 3: Se cure Smoke De tec tor to bracket with the two #10-16 x 1" Hextec screws (pro vided). See Figure 17. Step 4: Re move the clear cover of the smoke de tec tor; in sert the metal sam pling tube in the in let tube. Note: The sam pling tube may need to be cut to the ap pro pri ate length to span the Re turn Air open ing, or cut to al low serv ice of the Sup ply Air Smoke De tec tor. Make sure the air holes of the sam pling tube face into the air flow. Se cure with screws pro vided. Step 5: Place the sam pling tube fil ters into both the ex haust tube and in the in let tube and re place cover. Step 6: In sert red tube plug into the end of the sam pling tube. Step 7: Mount Smoke De tec tor As sem bly in Re turn Air open ing us ing ex ist ing screw removed in Step 2. See Figure 18. Step 8: Remove jumper plug from unit socket (S17). Insert plug (P17) of the smoke detector into unit socket (S17). See Illustration 3. Step 9: Test per smoke detector manufacturer spec. See (IM) instructions. Step 10: Replace all panels removed during installation. Re turn Air with duct cover, and power exhaust removed Figure 15 Existing screws shown in place REMOVE SCREWS Figure 16 RETURN SMOKE DETECTOR HARNESS PLUGS INTO S17 OF ECONOMIZER HARNESS Figure 17 Bracket mounted with ex ist ing screws Illustration 3 Figure 18 6 252104-UAI-B-1006
252104-UAI-B-1006 7
Supercedes: 252104-UAI-A-0606 Sub ject to change with out no tice. Printed in U.S.A. Copy right by Uni tary Prod ucts Group 2005. All rights re served. 252104-UAI-B-1006 YKISMK04 Unitary 5005 Norman Products York OK Group Drive 73069