Arras General Hospital

Similar documents
CHSF Regional Hospital

About ITC Concepts. Leisure Environments

KUUTIO BESPOKE DESIGNS

design & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping

Designing Open Spaces for Recreation

More than just a brief. A hospital reimagined. Challenge accepted. HOARE LEA & ALDER HEY IN THE PARK

The Dreispitz in Basel / Switzerland: New economy on old sites

security WHAT MAKES US DIFFERENT? We Place A Huge Importance On Integrity.

MAGIRA LightPoints MAGIRA SmartView. Smart glasses

1. Introduction to Linköping

Town Hall, Freiburg. ingenhoven architects completes new town hall with administration center and day nursery in Freiburg im Breisgau.

Imagine. Design. Deliver.

Palladia, Inc. Improving Continuation between Levels of Care

FOUNDATIONS. People-Friendly News. In this Issue

Laminate and Decorative boards

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

UK-GBC Project Case Study Smithfield, Manchester

SA N T I AG O D ES EA D O 1 AILET S U STA I N A B L E C I T Y S I M U L ATO R R A 710/21/161

Freiburg Town Hall. World s first public netsurplus-energy. Location Freiburg im Breisgau, Germany. Built 2017

The Interlace. Winner Urban Habitat Award. Singapore

Product Brochure Low-profile air handling units ATpicco. Modular configuration with highly efficient energy recovery

Campus Identity & Design Guidelines

AQUATIC FACILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING. True Expertise + Working Ingenuity

Selected Commercial Interiors

Retail solutions by Tenos. Value engineered fire safety solutions for landmark retail developments.

Creative Group s Bold New Design

We provide exceptional solutions to help our clients achieve success.

GREEN WAYS TO HEALTH Case study New Craigs Hospital

Dispensary Solutions, RX Shelving & Pharmacy Design Smart solutions for your pharmaceutical storage requirements X Y Z series

The 20 Bedford Way Masterplan

New Hospital Tower Rush University Medical Center Chicago, IL, United States

ROYAL MINT COURT SECURES PLANNING CONSENT FOR 600,000 SQ. FT. COMMERCIAL SCHEME FOR OVER 6,000 LONDON WORKERS

New Street Proposed Redevelopment Architecture & Urban Design Brief

VALUEACT CAPITAL CORPORATE OFFICES

MAGALIESBURG DEVELOPMENT INITIATIVE (MDI)

Your specialized partner for intelligent building technology

Barking Riverside Gateways Housing Zone. Development Opportunity for 3,000 homes & modern commercial space

TEMPLE MEDICAL & EDUCATION DISTRICT


PH DESIGNS COMPANY PROFILE Office Furniture & Work Space Solutions COMPANY PROFILE 2017

TRINITY LUTHERAN SCHOOL RENOVATIONS

WWF International Danube-Carpathian Programme is seeking to contract an

A Building Area: (sf) 10,567 SF 20,321 SF total building. Cost per Square Foot: $ Construction Cost $4,424,163

Press Presse Press Presse

One call protects it all.

GUIDING PRINCIPLES IN THIS CHAPTER

insider 4 Directors Letter 5 A Design Driven Company 9 From Concept to Completion 12 Quality Standards 13 Warranty Sustainability

Access to Health. Complete door and architectural ironmongery scheduling and project management solutions for the healthcare industry.

Brandon Agency. Myrtle Beach, SC Interior Renovation 14,835 sf

Workplace DESIGN & BUILD MADE SIMPLE 1

A Building Area: 10,567 SF 20,321 SF total building

KAPSARC Competition Entry. Riyadh, Saudi Arabia

RA1.01. Project Description:

I331. St John s Theological College Precinct

BUSINESS PLAN CEN/TC 239 RESCUE SYSTEMS EXECUTIVE SUMMARY

Cutting edge washing systems

01 Welcome! About Ontario Shores

ESSENTIALS. Annual Report. The full version is available on online

REPORT BACK BROADSHEET 3 May 2016

Strasbourg SUMP Award: Finalist factsheet. Local Transport facts. Urban transport policy objectives of the city:

PROJECT HEART CREATES MAJOR NEW NATIONAL BUSINESS AND LEARNING CENTRE FOR TESCO

Draft Western District Plan

Lindsey Beane. Executive Summary

Valuing Historic Places

A DYNAMIC CITY AND ITS ASSETS

SUBMISSION GUIDE 2019

Lab Systems Furniture. Innovative laboratory solutions

The Professional Choice

Your investment is Bologna

SELF STORAGE SOLUTIONS

(DC1) Direct Development Control Provision DC1 Area 4

Innovating Lighting Design

Legacy Community Health. Project Profile

Competing in Architecture. Sara Grahn, partner in White Architects Professor in Sustainable Design, School of Architecture, KTH

THE ARCHITECTURAL POLICY OF ESTONIA. Passed at the Parliamentary sitting , protocol no. 43, item no. 5

CANADA 952.0M 7,500 SELECTED AWARDS NET REVENUES BY MARKET SEGMENT (%) 2016 ANNUAL REPORT TRANSPORTATION & INFRASTRUCTURE 25 PROPERTY & BUILDINGS 19

SUBMISSION GUIDE PRICING. Early bird 1 Jun - 30 Jun Regular 1 Jul - 30 Sep Late 1 Oct - 15 Oct

retail 26 retail retail 27

Welcome to our latest public exhibition to show the final proposals prior to submission for the Homebase site on Manor Road.

Welcome to Lyon, the city of light!

One Bangkok, Thailand s largest integrated development, set to transform Bangkok city-centre and become a new global landmark destination

Kaleida Health, Gates Vascular Institute and UB Clinical Translational Research Center A Buffalo research facility fosters interaction and innovation

Trust the experts - keep people safe and threats out with airport quality from Smiths Detection.

CASE STUDY Southmead Learning & Research and Pathology Buildings

Pioneering the Sustainable Future of Pakistan. A New Destination of Islamabad

City Introduction & Context

The fundamental requirements for lighting for healthcare could be as follows:

Medicontrol itcp Intelligent Theatre Control Panels

Town of Westport. Design Guidelines Development Committee Public Informational Presentation

RECRUITMENT BROCHURE OWN A HOMETOWN STORE IN YOUR HOME TOWN

4 RESIDENTIAL ZONE. 4.1 Background

The Professional Choice

Timber Doorsets For Every Application. ASSA ABLOY, the global leader in door opening solutions

Your perfect PVC-U partner WINDOWS DOORS. spectus n. look, appearance, aspect

Iso Solutions. Enabling wellbeing

K. SMART ASSOCIATES LIMITED

SITE ANALYSIS CALVARY HOSPITAL NORTH ADELAIDE LARGE INSTITUTIONS AND COLLEGES DPA CALVARY HOSPITAL

THERMOPYLES SOCIAL HOUSING & TRANSITION HOUSE

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation

BSI the UK National Standards Body: The Role of Standards

Transcription:

Arras / 2008 Arras General Hospital Press Release

PRESS CONTACT Ante Prima Consultants T + 33 (0)1 40 49 04 04 21 rue Cassette 75006 Paris m.guesnet@ante-prima.com Communication Groupe-6 T + 33 (0)1 53 17 96 00 94 avenue Ledru-Rollin 75011 Paris communication@groupe-6.com Having won a public commission in 2002, Groupe-6 renovated and extended Arras General Hospital (CHA), completing the work in 2008. The first new generation institution to open as part of the French government s 2007 hospital modernisation plan, the CHA is emblematic of a new generation of healthcare facilities combining modernity and humanity. A hospital in the city Located near the cities of Lille, Douai and Lens, Arras General Hospital is at the heart of an urban community comprising 21 towns and 80,000 residents, and provides health services to an area home to some 230,000 people. With nearly 2,000 care staff, Arras is the headquarters of the Pas de Calais department ambulance service, which is the fifth-largest service in France due to the density of its activities, its management of emergency services for the cross-border Eurostar connection and its heliport. Redevelopment of the site began with the rebuilding of the psychiatric facility and the nursing school, but the project managed by Groupe-6 was the flagship project on the site. It involved the renovation of facilities totalling some 14,000 m² and the creation of 60,000 m² of new surface area, including 560 hospital beds. At the time of the competition, the CHA project included keeping and renovating the existing lowrise building as a home for administrative activities. The two new buildings are simple, compact structures home to the accommodation blocks and the theatre and clinical support block. Their architectural styles stand out from and engage with the existing buildings, which are now the smallest element on the site. They rebalance the whole complex: by playing on the effects created by differences in thickness and reflections, the dual skin of the accommodation building «dematerialises» it ; in contrast, the smaller theatre and clinical support block, oriented north, is clad in black resin. The lobby, a hub in the very heart of the complex, provides a link to the existing elements. The entrance to the hospital, moved to the south, reorients the whole of the site in the direction of the historic city. In order to limit phasing for this complex construction project on the existing site, the new buildings were inserted in the spaces between the existing buildings, without hindering the hospital s activities. All medical activity was transferred in February 2007 once the new buildings had been completed and delivered, thereby freeing up the existing buildings for renovation and demolition, completed in 2008. A connected hospital, a light and airy hospital, a sustainable hospital The «Connected hospital» concepts, embedded in large modular, upgradeable blocks, were arranged so as to meet the requirement to let natural light penetrate into the heart of the buildings. Large, fully-glazed arcades link directly with the gardens and serve as general thoroughfares. From the inside, views alternate between the gardens, patios and lakes. As a result, the complex of buildings forms a whole which is integrated into the green spaces by the interplay of structures, transparencies and reflections.

To improve care, CHA offers patients high-quality accommodation services : An «inverted» bedroom layout: with a new shower room layout, set in the façade, the bedroom door is large enough for medical trolleys, which can also be prepared in the room with the door closed for greater privacy and a better patient/carer relationship, Spacious reception areas, «patient-family» meeting points and thoroughfares in public spaces, with a marked enlargement of corridors and accesses. The main lobby is lit with thin strips of light, the intensity of which varies according to the time of day. The colours of the furniture in reception and the signage regularly reflect the palette of materials: these splashes of colour enhance the feeling of space in the interiors, areas of transition and interaction. «Sustainable hospital»: the hospital s south-facing accommodation block benefits from passive solar energy thanks to its dual skin. In winter, the sun heats the red concrete/brick modules of the shower rooms adjoining the bedrooms, located behind the glass. The energy stored up during the day is then distributed during the night. In summer, the air intake vents in the wall open. The building changes skins to breathe more easily. Site plan Innovative features The objective for the redevelopment of the hospital was to improve the patient/caregiver relationship by rationalising logistics and using high-tech information and communication solutions, including: Arranging departments into hubs: construction of a single theatre and clinical support block concentrating a variety of surgical services in a single space; limiting transfers for staff and patients; facilitating access to accommodation; bringing treatment units and admissions closer together. Centralising and automating logistical functions: grouped together in a shared catering, pharmacy, linen and waste processing basement hub. Products are transported to the hubs using AGV (Automated Guided Vehicle)-aided logistics, considerably reducing the distances travelled by care staff. Spacious, comprehensible thoroughfares, facilitating the flows of patients, care staff and visitors. The creation of a smart network meshing the architecture with information and communication technologies (ICT). Communication is becoming essential to the continuity of care and the traceability of all medical interventions, administrative tasks and any other intervention linked to patient well-being. An IP address, a powerful WiFi network (500 routers, 1,500 PCs) and multimedia terminals in each bedroom guarantee the flow of information. Adaptation of treatment units to meet therapeutic needs: the geometry of the treatment units can vary thanks to the continuous design of the layout and «full IP» support. The units can thus be «reprogrammed» to integrate nurse call systems, contact with administrative staff, etc. South elevation This full system earned CHA the 2008 Grand Prix in the Information Companies and Society Awards. Second floor : Accomodation

The dual skin of the accommodation block is brought to life by reflections from the trees in the gardens. Thermal, climatic, but also architectural: it speaks a language which engages with the existing buildings and reshapes the whole site.

Spacious, contemporary interior spaces to improve reception conditions for patients and visitors.

Groupe-6, a team of architects covering a range of disciplines France s 3rd leading architectural agency, with some 180 employees from 15 different nationalities, Groupe-6 is a multi-disciplinary structure made up of architects, urban planners, interior designers, landscape designers and economists. For 30 years now, Groupe-6 has been designing complex, large-scale projects that fall in line with their flawless aesthetic approach and optimal functionality, keeping within the budget and deadlines given. Groupe-6 is a flexible, multi-disciplinary architectural agency, which can adapt to the wide range of requests it receives from its clients and contractors. It has expertise in sectors of activity ranging from business-related urban planning, hospital design, new technologies, research and education, sport and leisure, culture, and finally, urban planning. In the interests of its client and the end project, Groupe-6 ensures it works with the world s best specialists and opens its teams up to expertise from outside the agency, in the areas of engineering, landscaping, stage design, lighting, acoustics, and more. The agency s teams are run by experienced project leaders able to tackle complex and demanding programs. Groupe-6 is committed to designing projects that respond to the issues of sustainable development and eco-responsibility. The agency pays particular attention to the quality and sustainability of its architecture and, with respect to its constructions, takes a preventive approach to the ecological and energy-related issues. For over 10 years, Groupe-6 has been working overseas, accompanying its clients in their real estates ventures and exporting its savoir-faire. Already involved in projects in Europe, the Ukraine, the Middle-East and the Magreb, Groupe-6 competes in the most dynamic geographical areas. Informations Project : Hospital: redevelopment of the site including construction of a new hospital and refurbishment of existing facilities. Site : Arras Client : Centre Hospitalier d Arras Team : Groupe-6 architectes, lead consultant (Denis Bouvier) Engineering TCE : Jacobs France Quantity surveyor : Groupe-6 Landscaping : Pierre-Yves Jorcin Net surface area : 75,000 sq m net floor area, of which 61,000 sq m new build, 14,000 sq m renovation Number of beds : 560 Construction costs : 98,000 M (December 2003 value) Schedule: June 2002: wins public commission End 2003: start of works January 2007: delivery of new buildings December 2008: delivery of renovated buildings Photos : pages 8-9, 11-12-13, 14 Renaud Araud; cover + pages 6-7, 10 Meffre et Marchand Certified ISO 9001 in 2009, Groupe-6 aims for excellence in what it does, focusing in particular on four key values : Consider its clients as real partners, offering permanent, trusting and constructive dialogue about their projects.respect, attentiveness and dedication are all highly valued by the agency. Invest in bold projects that push the agency to be creative, thorough and practical. Groupe-6 values its clients projects, giving them a privileged place among its concerns. Ensure a collective mode of operating, striking the right balance between innovation, consultation, methodology, and decision-making priorities. Provide clients with architectural solutions that offer the best compromise between functional requirements, flexibility and sustainability: essential conditions for the quality and durability of its projects. Paris 94 avenue Ledru-Rollin 75011 Paris France T +33 (0)1 53 17 96 00 paris@groupe-6.com Grenoble 12 rue des Arts et Métiers CS 70069-38026 Grenoble Cedex 1 France T +33 (0)4 76 96 45 90 grenoble@groupe-6.com

www.groupe-6.com