DRAFT. Urban Development Areas Fairfax County. UDA Needs Profile: Tysons Corner 13% Location Characteristics. Socio-Economic Characteristics

Similar documents
Urban Development Areas Bedford County

Urban Development Areas Frederick County

Urban Development Areas Albemarle County

Urban Development Areas James City County

Urban Development Area (UDA) Process in Virginia: History & Requirements

VOLUME II DISTRICT DESIGN GUIDELINES BAILEYS CROSSROADS SEVEN CORNERS

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

ARLINGTON COUNTY, VIRGINIA

ARTICLE 6: Special and Planned Development Districts

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

Three Decades of Smart Growth: Arlington s Urban Village

4.1.3 LAND USE CATEGORIES

PLANNING IN ARLINGTON. Briefing to Katie Cristol

CHAPTER 7: Transportation, Mobility and Circulation

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Status Report: MD 355 Project

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

LAND USE ELEMENT. Purpose. General Goals & Policies

The Village of Shirlington

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Arlington, Virginia is a worldclass

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

EXISTING COMPREHENSIVE PLAN

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Human Dominant & Mixed Use

ARLINGTON COUNTY, VIRGINIA

General Land Use Plan

EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

Staff Report and Recommendation

Living in Albemarle County s Urban Places

Creating Quality Places: Successful Communities by Design

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011

Corridors. Re-vitalize our Corridors and Gateways

Arlington County Retail Plan

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

1.0 VISION STATEMENT. December 6, PRINCIPLES

Implementation Guide Comprehensive Plan City of Allen

Rosslyn Sector Plan Implementation

DRAFT Subject to Modifications

SPRINGHILL LAKE TRANSIT VILLAGE

A P P E N D I X B - O P P O R T U N I T Y S I T E S

Mobility Districts and Traffic Studies

TRANSIT SUPPORTIVE DEVELOPMENT ANALYSIS

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

The Baileys Planning District portion of the Comprehensive Plan contains site design recommendations for both the Baileys Crossroads Community

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton

Transit / Housing Oriented Redevelopment

Floyds Fork Area Study Project Overview, Suitability Analysis, & Form Districts July 29, title

Hockessin Community Redevelopment Plan

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

AMENDMENT TO THE COMPREHENSIVE PLAN (2007 EDITION) The following changes to the Comprehensive Plan have been adopted by the Board of Supervisors.

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

4. Shape Transitions. 4. Shape Transitions

NEW CASTLE COUNTY S ZONING DISTRICTS

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Draft Memorandum #1: Goals and Vision for Revitalization

Strategic Growth Area #1 Northampton Boulevard Corridor Area

General Land Use Plan (GLUP) Amendments 2001 Present*

TO: FROM: SUBJECT: Background

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

SECTION ONE: INTRODUCTION. introduction

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Outer Congress Street Land Use

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

Chapter 4. Linking Land Use with Transportation. Chapter 4

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Making Transit Oriented Development Work For Boonton, NJ

APPENDIX D: BACKGROUND AND VISION

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

CITY OF PUYALLUP. Background. Development Services

Town Center (part of the Comprehensive Plan)

Plano Tomorrow Vision and Policies

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Linking Land Use and Transportation

Prepared for the Citizens of Forsyth County by the City-County Planning Board

Olde Towne Vision Plan

Land Use & Transportation Primer

LONG-RANGE LAND USE. Intent

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

PORT WHITBY COMMUNITY

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

CITY OF TARPON SPRINGS DCA#11-1AR

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

The Five Components of the McLoughlin Area Plan

Future Land Use SAMPLE RECOMMENDATIONS

Stakeholder Recommendations Voting Results

THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES. Community Technical Assistance Program Building Active Communities Institute March 2016

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

CITY OF SACRAMENTO GENERAL PLAN. UC Davis ESP 171 Urban and Regional Planning April 21, 2011

ARLINGTON COUNTY, VIRGINIA

NEIGHBORHOOD DESIGN ELEMENT

The transportation system in a community is an

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

NORTH LAKE SPECIFIC PLAN AREA

Transcription:

14 Urban Development Areas Fairfax County UDA Needs Profile: Tysons Corner Tysons Corner is located in Fairfax County, surrounded by the town of McLean to the east and Vienna on the west along I-495, the Dulles Toll Road, Route 7, and Route 123. Location Characteristics PDC Northern Virginia Regional Commission UDA Size 3.4 square miles Year Designated 2013 Comprehensive Plan Detail - Tysons Corner is the Urban Development Area (UDA) for Fairfax County. The Tysons Corner land use plan is consistent with the UDA requirements for minimum densities and intensities for development, the appropriate planning horizon for Fairfax County, inclusion of principles of traditional neighborhood design, and incentives for development. The vision for Tysons is grounded in a set of guiding planning principles that includes transforming Tysons from a suburban office park and activity center into a 24/7 urban center marked by the diversity of residents and workers, as well as attracting mixed use transit-oriented development and private investment to Metrorail station areas and transit connection locations throughout Tysons. Geographic Location Socio-Economic Characteristics UDA Characteristics: (Source: LEHD, 2010) Total Population 19,184 persons Total Primary Jobs 93,484 jobs 80% 60% 40% 20% 0% 53% 8% <= $15,000 per year Jobs by Industry 47% 15% Jobs Within a 45 Minute Drive 985,444 Working Age Population Within a 45 Minute Drive 691,272 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Professional, Scientific, and Technical Other Total Jobs by Earnings $15,000-$39,996 per year 76% > $39,996 per year Population Growth (Source: Weldon Cooper Center) 2010 13% 2025 1,081,699 1,224,054

14 Urban Development Areas Fairfax County Current Place Type - Urban Core Planned Place Type - Urban Core Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. Future Transportation Needs Internal UDA Needs External UDA Needs Roadway Capacity/Infrastructure Signage/Wayfinding Traffic Calming Roadway Capacity/ Infrastructure Transit Capacity/Access Street Grid Safety Features Intersection Design Signage/Wayfinding Improvements to the Natural Environment Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) GAP 100 90 80 70 60 50 40 30 20 10 0 Access to transportation networks beyond the UDA Friendly pedestrian and bicycle environment

23 Urban Development Areas Herndon Town UDA Needs Profile: Herndon UDA The Town of Herndon, located in Fairfax County, designated its entire town as an Urban Development Area (UDA) in 2016. In 2008, the Regional Corridor Mixed Use area was also designated as a UDA, which is part of Dulles Corridor Metrorail Phase Two Transportation Improvement District. Location Characteristics PDC Northern Virginia Regional Commission UDA Size 4.29 square miles Year Designated 2008 and 2016, respectively. Comprehensive Plan Detail - Herndon's 2012 Amended Comprehensive Plan designates land within town's Regional Corridor Mixed Use area as the Metrorail Urban Development Area (UDA). The UDA is part of the land included in the Dulles Corridor Metrorail Phase Two Transportation Improvement District for the Herndon Metrorail station, which will connect the area with both Washington, DC and Dulles Airport. The Metrorail Station UDA conforms to Virginia Code requirements concerning areas for growth with new urbanist development. The UDA identifies where higher density, transit oriented development is appropriate. Socio-Economic Characteristics UDA Characteristics: (Source: Town of Herndon Metrorail Station Area Study) Total Population 24,446 persons Total Primary Jobs 15,889 jobs 80.0% 60.0% 40.0% 20.0% 0.0% 54% 12.7% Jobs by Industry 27% 9% 10% Professional, Scientific, and Technical Services Wholesale Trade Information Other Jobs Total Jobs by Earnings 20.9% <= $15,000 per year $15,000-$39,996 per year 66.4% > $39,996 per year Geographic Location Jobs Within a 45 Minute Drive 419,415 Working Age Population Within a 45 Minute Drive 232,361 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Population Growth (Source: Weldon Cooper Center) 2010 2025 13% 1,081,699 1,224,054

23 Urban Development Areas Herndon Town Current Place Type - Medium Town or Suburban Center Planned Place Type - Urban Core Future Transportation Needs Internal UDA Needs External UDA Needs Roadway Capacity/Infrastructure Improvements /Capacity/Access /Amenities Street Grid/Intersection Design Bicycle/Pedestrian Infrastructure /Traffic Calming Safety Features/Signage/Wayfinding Off-Street Parking Capacity Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. On-Street Parking Capacity Roadway Capacity/Infrastructure Improvements /Capacity/Access /Amenities Street Grid/Intersection Design Bicycle/Pedestrian Infrastructure /Traffic Calming Safety Features/Signage/Wayfinding Off-Street Parking Capacity Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) GAP 100 90 80 70 60 50 40 30 20 10 0 est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) Safety for all users Circulation and access within the UDA Access to transportation networks beyond the UDA Friendly pedestrian and bicycle environment

41 Urban Development Areas City of Manassas UDA Needs Profile The City of Manassas designated its entire City limits as a UDA in 2013. Manassas is located adjacent to Prince William County and is served by I-66, U.S. 29, VA State Route 234 and 28. Location Characteristics PDC Northern Virginia Regional Commission UDA Size 9.9 square miles Year Designated 2013 Comprehensive Plan Detail - The Manassas 2013 Comprehensive Plan notes that it meets the requirements for Urban Development Areas (UDAs) including, but not limited to, the plans and policies set forth in the City s adopted Sector Plans. The plan's land use goal states that Manassas will maintain its existing pattern of residential, commercial, and open space land uses, emphasize improved design principles, promote mixed uses compatible with existing neighborhoods, accommodate high quality infill and redevelopment where appropriate, and reinforce the unique and positive qualities of diverse neighborhoods. Geographic Location - Socio-Economic Characteristics UDA Characteristics: (Source: LEHD, 2010) Total Population 37,821 persons Total Primary Jobs 12,032 jobs 60% 50% 40% 30% 20% 10% 0% 64% 18% Jobs by Industry 13% 12% 11% 33% Jobs Within a 45 Minute Drive 98,834 Working Age Population Within a 45 Minute Drive 145,854 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Retail Trade Professional, Scientific, and Technical Services Educational Services Other Total Jobs by Earnings <= $15,000 per year $15,000-$39,996 per year 48.0% > $39,996 per year Population Growth (Source: Weldon Cooper Center) 2010 17% 2025 37,821 44,230

41 Urban Development Areas City of Manassas Current Place Type - Medium Town or Suburban Center Planned Place Type - Large Town or Suburban Center Future Transportation Needs Internal UDA Needs External UDA Needs Roadway Capacity/Infrastructure Off-Street Parking Capacity Intersection Design Signage/Wayfinding Improvements to Natural Environment Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. Safety Features Transit Capacity Signage/Wayfinding Improvements to Natural Environment Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) GAP 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) Safety for all users Friendly pedestrian and bicycle environment

71 Urban Development Areas Loudoun County UDA Needs Profile: Suburban Policy Area Loundoun County has one UDA, the Suburban Policy Area, located in the eastern part of the County. The area is defined on the north by the Potomac River and on the South by Braddock Road. Location Characteristics PDC- Northern Virginia Regional Commission UDA Size 93.3 square miles Year Designated 2011 Comprehensive Plan Detail - As the primary location for suburban-scale residential and nonresidential development, the manner of growth and redevelopment in the Suburban Policy Area is of vital importance. The Plan anticipates that there will be four distinct communities within the Suburban Policy Area, separated from one another by associated Green Infrastructure components and major roads. The Plan introduces the concept of Community Plans that will guide the remaining build-out of Ashburn, Dulles, Potomac, and Sterling. The County s goal is that the principles of Smart Growth and revitalization will guide the build-out and revitalization of the Suburban Policy Area. Geographic Location Socio-Economic Characteristics UDA Characteristics: (Source: LEHD, 2010) Total Population 212,832 persons Total Primary Jobs 91,439 jobs 60% 50% 40% 30% 20% 10% 0% 62% 14.20% 15% Jobs by Industry 13% 10% Total Jobs by Earnings 30.63% <= $15,000 per year $15,000-$39,996 per year Jobs Within a 45 Minute Drive 75,422 Working Age Population Within a 45 Minute Drive 117,518 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Professional, Scientific, Technical Services Construction Retail Trade Other Jobs 55.17% > $39,996 per year Population Growth (Source: Weldon Cooper Center) 2010 40.4% 2025 312,311 438,589

71 Urban Development Areas Loudoun County Current Place Type - Medium Town or Suburban Center Planned Place Type - Large Town or Suburban Center Future Transportation Needs Internal UDA Needs External UDA Needs Roadway Capacity/Infrastructure Roadway Capacity Street Grid Signage/Wayfinding Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. Street Grid Safety Features Transit Capacity Intersection Design Traffic Calming Safety Features Intersection Design Traffic Calming Signage/Wayfinding Improvements to environment Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) GAP 100 90 80 70 60 50 40 30 20 10 0 Safety for all users Access to transportation networks beyond the UDA

82 Urban Development Areas Fairfax City UDA Needs Profile: All UDAs The City of Fairfax designated areas shown as mixed use on the Comprehensive Plan Future Land Use Map as Designated Growth Areas. These areas include Old Town Fairfax and its immediate surroundings, and the centers along Fairfax Boulevard (Kamp Washington, Northfax, and Fairfax Circle). Location Characteristics PDC- Northern Virginia Regional Commission UDA Size 0.35 square miles Year Designated 2015 Comprehensive Plan Detail - Areas of the City designated as mixed use on the Future Land Use map are found to meet the intent of the Code of Virginia, 15.2-2223. The mixed use category supports a combination of commercial, residential, and institutional development to be tailored to specific site conditions and transition needs. The capacity and functionality of the City s infrastructure are of critical importance to future land use. This infrastructure includes the vehicle and pedestrian networks as well as elements such as lighting, parks, public signage and storm water management facilities. Socio-Economic Characteristics UDA Characteristics: (Source: LEHD, 2010) Total Population 3,161 persons Total Primary Jobs 1,276 jobs 60% 40% 20% 31% 8% 49% 25% Jobs by Industry 36% Total Jobs by Earnings 36% Retail Trade Accomodation and Food Services Administration and Support Other Jobs 16% Geographic Location 0% <= $15,000 per year $15,000-$39,996 per year > $39,996 per year Jobs Within a 45 Minute Drive 898,543 Working Age Population Within a 45 Minute Drive 1,202,876 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Population Growth (Source: Weldon Cooper Center) 2010 2025 9.6% 22,565 24,730

82 Urban Development Areas Fairfax City Current Place Type - Small Town or Suburban Center Planned Place Type - Urban Center Future Transportation Needs Internal UDA Needs Street Grid Traffic Calming Safety Features Roadway Capacity Transit Capacity Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. On-Street Parking Off-Street Parking Intersection Design Signage/Wayfinding Improvements to the Natural Environment External UDA Needs Street Grid Traffic Calming Safety Features Roadway Capacity Transit Capacity On-Street Parking Off-Street Parking Intersection Design Signage/Wayfinding Improvements to the Natural Environment Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) GAP 100 90 80 70 60 50 40 30 20 10 0 est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) Safety for all users Circulation and access within the UDA Friendly pedestrian and bicycle environment

92 Urban Development Areas Arlington County UDA Needs Profile: All UDAs Arlington County designated a total of seven UDAs in 2015, including Rosslyn-Ballston, Jefferson Davis corridor, Columbia Pike corridor, Lee way/cherrydale Revitalization District, Shirlington Planned Development Site Plan, Nauck Village Center, and the East Falls Church Neighborhood Center District. Location Characteristics PDC- Northern Virginia Regional Commission UDA Size 8 square miles Year Designated 2011 Comprehensive Plan Detail The following areas in Arlington County s General Land Use Plan comply with Virginia Code 15.2-2223.1: Rosslyn-Ballston, Jefferson Davis and Columbia Pike corridors, Lee way/cherrydale Revitalization District, Shirlington Planned Development Site Plan, Nauck Village Center, and Urban Development Areas PLA-6078 East Falls Church Neighborhood Center District. Geographic Location Socio-Economic Characteristics UDA Characteristics: (Source: LEHD, 2010) Total Population 160,683 persons Total Primary Jobs 14,858 jobs 60% 50% 40% 30% 20% 10% 0% 48% 13% 14% Jobs by Industry 25% 14% Total Jobs by Earnings 31% <= $15,000 per year $15,000-$39,996 per year Jobs Within a 45 Minute Drive 338,860 Working Age Population Within a 45 Minute Drive 582,837 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Population Growth (Source: Weldon Cooper Center) 2010 2025-1.9% Health Care and Social Assistance Transportation and Warehousing Professional, Scientific, and Technical Services Other Jobs 55% > $39,996 per year 207,627 203,757 *Current Weldon Cooper Center, Arlington County, and U.S. Census Bureau 2014 population estimates show continued growth in Arlington County. Local data projections, adopted as part of MWCOG Cooperative Forecast, show that Arlington County will have a population of 258,700 in 2025.

92 Urban Development Areas Arlington County Current Place Type - Urban Core Planned Place Type - Urban Core Future Transportation Needs Internal UDA Needs Transit Capacity Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. Street Grid Safety features Traffic Calming External UDA Needs Transit Capacity Safety Features Off-Street Parking Signage/Wayfinding Street Grid Traffic Calming Features Improvements to the Natural Environment GAP Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) 100 90 80 70 60 50 40 30 20 10 0 est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) Transit enhancements Circulation and access within the UDA Friendly pedestrian and bicycle environment

125 Urban Development Areas Falls Church UDA Needs Profile The City of Falls Church, located in the northern part of the Commonwealth, designated its entire city boundaries as an Urban Development Area (UDA) in 2016. The city is bounded by the I-66 to the north, the I-495 to the west and U.S. Route 29 to the south. State Route 7 bisects the entirety of the city. Location Characteristics PDC Northern Virginia Regional Commission UDA Size 2.05 square miles Year Designated 2016 Comprehensive Plan Detail - The entirety of the City of Falls Church is designated as an Urban Development Area (UDA) in accordance with Code of Virginia 15.2-223.1 which allows project prioritization by the Commonwealth Transportation Board in accordance with Code of Virginia 33.2-214.1. The City meets the criteria for incorporating traditional neighborhood design. This includes recommendations for pedestrian-friendly road design, interconnection of new local streets with existing local streets and roads, connectivity of road and pedestrian networks, preservation of natural areas, mixed-use neighborhoods with affordable housing, reduction of front and side yard building setbacks, and reduction of subdivision street widths and turning radii at subdivision street intersections. Geographic Location Socio-Economic Characteristics UDA Characteristics: (Source: LEHD, 2010) Total Population 12,332 persons Total Primary Jobs 8,198 jobs Jobs by Industry 60% 50% 40% 30% 20% 10% 0% 57% 18.5% 21% <= $15,000 per year 11% 11.2% Total Jobs by Earnings 32.0% $15,000-$39,996 per year Jobs Within a 45 Minute Drive 2,530,842 Working Age Population Within a 45 Minute Drive 3,243,295 Source: EPA Smart Location Database (U.S. Census tract data) Jurisdiction Characteristics: Health Care and Social Assistance Professional, Scientific, and Technical Services Waste Management and Remediation 49.5% > $39,996 per year Population Growth (Source: Weldon Cooper Center) 2010 2025 14.9% 12,332 14,168

125 Urban Development Areas Falls Church Current Place Type - Medium Town Planned Place Type Medium Town Future Transportation Needs Internal UDA Needs Transit frequency Transit facilities Street grid Refer to the DRPT Multimodal System Design Guidelines, Chapter 3, for more details. Bicycle infrastructure Pedestrian infrastructure Complete streets Intersection design Roadway operations Transit operations Safety features On-street parking Traffic calming features Off-street parking Signage/wayfinding Improvements to the natural environment External UDA Needs Transit frequency Transit operations Transit facilities Street grid Complete streets Transit frequency Pedestrian infrastructure Roadway capacity Safety features Roadway operations On-street parking Transit capacity Off-street parking Bicycle infrastructure Intersection design Signage/wayfinding Traffic calming features Existing Internal Needs Gap (% shortfall) Transportation system gap by need category (represents the gap to fully promote UDA) est Rated Overall Needs within UDA Localities ranked transportation needs within their UDAs (1 being the highest need, to 4 the lowest) GAP 100 90 80 70 60 50 40 30 20 10 0 Safety for all users Circulation and access within the UDA Friendly pedestrian and bicycle environment Access to transportation networks beyond the UDA Transit enhancements