Terrace View Park. Master Plan

Similar documents
Long Branch-Wayne Local Park Renovation Project

A cknovvledgements. Table of Contents. Project Introduction...1

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

Charles P. Johnson and Associates. Annapolis Landscape Architects

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

Burrus Old Mill Park

100 Dix Drive Conceptual Master Plan. Wyatt Thompson, PLA, ASLA, Assistant Director Lindsay Stucki, Intern Park Planner

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project

REPORT TO COUNCIL City of Sacramento

Draft Master Plan for Franklin Park

Design Considerations

How to Plan and Implement Outdoor Learning Environments

VEHICULAR AND PEDESTRIAN CIRCULATION

REPORT TO COUNCIL City of Sacramento

Hidden Pointe Landscape Master Plan. June, archi terra

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

Rosslyn Highlands Park + Coordinated Open Spaces Plan (Plan Adoption) County Board Meeting September 24, 2016

Park Types and Attributes

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

CARMODY PARK MASTER PLAN

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Catholic School Master Plan & Playground: Tulsa, Oklahoma

ACADEMY AREA CONCEPT PLAN

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Coffey Neighborhood Park Master Plan/Design/Rebuild Workshop. August 4, :00pm 4:00pm

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2

Littleton Fields Master Plan

What is happening? OPENING. Goals for Today WE ARE HERE. STEP 1 Online Questionnaire. STEP 2 Preliminary Design. STEP 3 Public.

Eastcreek Farm. Planned Development Standards September, 2014

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

More than 30 adults and 19 children were involved in these community workshops.

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES

Exhibit A: Project Scope

Greater East Wenatchee Urban Growth Area. Design Standards & Guidelines

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

Barrie Park Site Master Plan

Montana Rail Link Park

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

South th E ast Communit ity Centre (SECC)

University at Albany MRP Fall Studio. May 26, 2009

Eastcreek Farm. Planned Development Standards July, 2015

CHAPTER 7 I NDUSTRIAL

LELAND & VISITACION PARK COMMUNITY MEETING

MER BLEUE URBAN EXPANSION AREA

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

L-1 LEGEND HOMES AT DEER HILL LAFAYETTE, CALIFORNIA

Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services

MADISON MANOR PARK RENOVATIONS

AIRPORT BUSINESS PARK

The 17th Avenue Pocket Plaza

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

russell+mills studios

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

4 Semi-Private & Private Open Spaces

Chapter 5: Mixed Use Neighborhood Character District

Rotary Park / Railroad Lake

Campus Master Plan Description Section 6 Storm water management and people places at campus buildings. Section 6 Campus MP Description

LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

The leader in physical activity for young children!

MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

City of Sheridan Landscape Plan Checklist

Master Plan Presentation August 12, 2015

Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

WARM SPRINGS PARK MASTER PLAN

TA B L E O F C ON T EN T S

Las Colonias Park Master Plan

3.13. Development Guidelines

Bullhead City Rotary Park Plan Update

New Library Building Proposal

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

boyd park draft concept plan CITY ROAD BALSTON STREET KINGS WAY KAVANAGH STREET CITY OF MELBOURNE BOYD COMMUNITY HUB MULTIPURPOSE COURT NORTH LAWN

REQUEST FOR COUNCIL ACTION

REPORT TO COUNCIL City of Sacramento

Preliminary Sketch Plan for Fort Hunter Park

Throughout. square. (Crystal City Vision Plan 2050)

DESIGN GUIDELINES. Seattle Children s Major Institution Master Plan. Approved May 7, 2010

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

Chapter 4: Jordan Road Character District

Georgeson Botanical Garden Master Plan

Appendix C Park Design Guidelines

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

Revitalization of Durand Park. Durand Park Proposal June 2008

Report or technical documentations of the target areas in Siauliai

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

Marshview Park. Concept Briefing and Feedback Session. Aquarium/Owls Creek Plan Steering Committee March 20, 2012

AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE

I-70 Highway Cover Study MARCH 4, 2015 COMMUNITY WORKSHOP SUMMARY

City of Talent Capital Improvements Plan

Transcription:

Terrace View Park Master Plan

Table of Contents Terrace View Park Master Plan Page Executive Summary 1 Project Background 3 Master Planning Process Existing Conditions Master Plan 9 Park Zones and Amenities Upper Terrace Middle Terrace Lower Terrace Accessibility Maintenance and Emergency Access Plantings Lighting Park Management Issues Implementation 14 Phasing Conceptual Grading Costs Recommended Next Steps 17 Policy Discussion of ADA Compliance in Hillside Parks Park Renovation Phase 1A Appendices Appendix 1 - Workshop #1 Presentation Materials Summary from Workshop #1 Appendix 2 - Workshop #2 Presentation Materials Summary from Workshop #2 Appendix 3 - Workshop #3 Presentation Materials Summary from Workshop #3 Terrace View Park Master Plan

Executive Summary Terrace View Park is a 1-acre neighborhood park located between Fairlawn Drive and Queens Road in the Berkeley Hills. The park is situated on a steep site, with many mature trees and developed with three terraced areas with various play structures in sand areas, a small lawn area and an asphalt paved area that includes basketball courts. Many of the park features are in poor condition, not useable or do not meet current codes and safety requirements. The master plan was developed through a series of three community workshops. Participants discussed the various features of the plan, identified their priorities for improvements, potential phasing and construction costs. Presentation materials and workshop summaries were posted on the City website throughout the design process. Park Features: The Master Plan recommends that each of the three terraces be focused on specific activities. Design guidelines that incorporated community input were developed for each of the features of the plan. Upper Terrace: The upper terrace will continue to be focused on children s play. The existing old equipment will be replaced with new play equipment. The equipment should create separate play activities for pre-school (2-5 years old) and school age (6-12 years old) children. Middle Terrace: The middle terrace will continue to be focused on community activities and be adult oriented. A new structure (to replace the removed deck ) is proposed to built around an existing redwood tree and extended out to provide a visual connection with the lower terrace. Lower Terrace: The lower terrace will continue to be focused on active play. A mix of lawn and paved areas will accommodate a broader range of games. Additional planting is required for screening on both the north and south perimeters of this terrace. The Master Plan addresses a variety of issues including access, planting, lighting and management. Several key issues were raised during the development of the plan: Accessibility: The 1991 American with Disabilities Act (ADA) requires that as each area of the park is improved, access for disabled persons is to be provided. The cost of the four ramps is approximately 55% of the estimated construction cost and cover approximately 12% of the park area. Lighting: Lighting of the park was perhaps the most controversial issue with the community. Some adjacent residents did not want any lights in the park. Others Terrace View Park Master Plan Page 1

recognized the need for safety and security given that the park hours are 6 am to 10 PM. The plan recommends including minimal lighting that illuminates the accessible pathway for safety. Park Management Issues: Policy or park management issues raised during the development of the plan included noise, especially after park hours; fire hazards and the restriction of overnight parking. Implementation: The renovation of the park would be phased due to the overall cost and complexity. The community placed the highest priority on development of the lower terrace, second priority was the upper terrace and final priority was the middle terrace. A conceptual grading plan was prepared in order to provide a relative cost estimate and better understand the impact of providing ADA access throughout the park. The total cost for the park renovation is estimated at $1.972 million. Phase 1 $720,000 Phase 2 $542,000 Phase 3 $710,000 Recommended Next Steps The Master Plan process brought out the difficulty of compliance with the American with Disabilities Act for hillside parks due to construction costs and the amount of space required. It is recommended that a policy discussion be opened with the disabled community for potential options for compliance. The Plan also recommends that due to the level of Phase 1 construction costs an interim phase be looked at as a first step. This Phase 1A would include work to renovate the lower terrace with a basketball court and small lawn area. This work would also complete the demolition of the community deck and its foundations. The estimated construction cost is $165,000. Terrace View Park Master Plan Page 2

Project Background Terrace View Park is a 1-acre neighborhood park located between Fairlawn Drive and Queens Road in the Berkeley Hills. The park is situated on a steep site, with many mature trees and developed with three terraced areas with various play structures in sand areas, a small lawn area and an asphalt paved area that includes basketball courts. Many of the park features are in poor condition, not useable or do not meet current codes and safety requirements. Master Planning Process The master plan was developed through a series of three community workshops. Prior to the first workshop the neighboring community had been Terrace View Park is located between Fairlawn Drive & Queens Road in the Berkeley Hills. actively involved with City Staff in the development of the project scope and selection of the consultant team. The community had communicated initial concerns and desires. The consultant team reviewed these background materials and developed preliminary alternatives to facilitate a discussion regarding the development of the master plan. At the first workshop, held on December 17, 2008 the consultant team presented an overview of existing conditions and a proposed program of improvements. The team described the different approaches offered by the three master plan alternatives. Participants were then divided into small groups to discuss the alternatives. Each group used these plans as a starting point to recommend a preferred approach to improving the park. Each small group presented their ideas to the entire workshop. The consultant team identified areas of consensus and differences that served as the foundation for a preferred alternative plan. (See Appendix 1 for summary of comments). The presentation materials and summary of the community input were posted on the City website with a two week additional comment period. Following the first workshop the consultant team reviewed with City Staff the ideas, preferences and comments from the workshop and those that were received by e-mail and telephone. Using this input the team developed a preliminary draft master plan. The second workshop, held on January 28, 2009 utilized a similar format to the first workshop with presentation, small group discussion and reporting back to the entire workshop. The consultant team provided an overview of the first workshop and areas of group consensus and differences. Next they presented the preliminary draft master plan and potential phasing constraints. Participants were then divided into small groups to Terrace View Park Master Plan Page 3

discuss the plan, identify their priorities for improvements and potential phasing. Each small group presented their ideas to the entire workshop. (See Appendix 2 for summary of comments). The presentation materials and summary of the community input were posted on the City website with a two and one-half week additional comment period. The third workshop held on March 18, 2009 provided a final opportunity for the community to work on refinement of the Draft Master Plan. The consultant team provided an overview of the first two workshops and areas of group consensus and differences. Then they presented the draft master plan, potential phasing and construction costs. The group offered final refinements to the plan and the phasing recommendations. Participants also continued their discussion regarding park operation hours and the potential for light and noise levels that are objectionable to the neighbors. The presentation materials and summary of the community input were posted on the City website with a two week additional comment period. The Draft Master Plan was presented to the Park and Recreation Commission on May 11, 2009. Park Commissioners expressed concerned regarding the cost and space required for ramps to make the park accessible. Discussion included alternative approaches to renovation, such as phasing, or repair of existing park components. Concern was also expressed regarding the momentum of inflation of construction cost and the neighborhood expectation for park renovations. Residents feel the park is an important part of the community. On October 26, 2009, the Park and Recreation Commission approved the Master Plan. Terrace View Park Master Plan Page 4

Existing Conditions The City of Berkeley acquired seven parcels of land for the park in 1950-1951 in the area known as Terrace View. The park was dedicated on October 30, 1951. In 1956, the City purchased an additional parcel of land to expand the playground. The Friends of Terrace View Park used a City mini-grant to add a play structure to the upper terrace in 1995. The steep sloping park is divided into three terraces. The upper terrace consists of a play area with tot swings, a tot oriented play structure installed in 1995 with slide and climbing activities, concrete tunnel, concrete enclosed sand area and benches. The area is surfaced in sand and surrounded by a 4-foot chain link fence. The upper terrace is a fenced tot play area. The middle terrace includes a small lawn, bar-bcue grills, picnic tables, as well as a swing set and horizontal chinning bars in a sand surfaced area. The middle terrace is used for movie nights, pumpkin carving and other neighborhood events. A wooden deck that extended over the lower terrace was removed in late 2008 due to its unsafe condition. Adjacent to the lawn area is a ground-level concrete slide that starts from the park entrance at Fairlawn Drive and ends in a sand area on the middle terrace. At the south end of the middle terrace is a drinking fountain and stepped path that leads to the lower terrace. The middle terrace includes a small lawn and is used for neighborhood events. The lower terrace is paved with asphalt and includes two basketball courts with backstops. The asphalt has heaved and cracked in many locations. The western edge of the area is enclosed with a 10 foot tall chainlink fence to stop errant balls. A steep asphalt road provides authorized vehicle access through the park and serves as the main pedestrian entry. This road exceeds A concrete slide connects the middle terrace from the entrance on Fairlawn. Terrace View Park Master Plan Page 5

Terrace View Park Master Plan Page 6

accessibility standards of 1:12 (vertical:horizontal) or 8.33% slopes. The park also includes three sets of stairs built into the steep slopes that link Fairlawn to each of the terraces. None of these steps meet current Codes for handrails, riser or tread configurations. The park has several features to protect during future renovations. Mature evergreen trees establish the natural feeling of the park and include redwood, giant redwood and Douglas fir. The majority of the large trees are in good health. Some of the smaller ornamental trees on the slope below Fairlawn Drive are in poor condition and should be replaced over time. Underground utilities, such as water, irrigation lines and the sanitary sewer and storm drain lines are located throughout the park and will need to be protected during any major renovation work. Parking is provided on Queens Street. A steep asphalt service access runs through the park. Terrace View Park Master Plan Page 7

LEGEND BENCH WITH ARM RESTS EXISTING TREE GAME TABLE WITH CHAIRS FLOWERING TREE TRASH / RECYLCLING CONTAINER CONIFEROUS TREE DRINKING FOUNTAIN GROUNDCOVER AREA NEIGHBORHOOD INFORMATION KIOSK TURF AREA DP VAN PARKING SERVICE ACCESS 10' 20' UPPER ACCESS TABLE WITH CHAIRS 47 0' RAMP B PICNIC AREA PLANTING AREA MULTIPURPOSE TURF AREA MIDDLE TERRACE COMMUNITY AREA BASKETBALL COURT SAND RAMP A PARKING AREA SERVICE ACCESS 38 SWINGS DP VAN PARKING LOWER ACCESS EXISTING STORM DRAIN INLET LOWER TERRACE RAMP D EXISTING REDWOOD GROVE CHILDREN'S PLAY EQUIPMENT MULTIPURPOSE TURF AREA RAMP C SAND BOX UPPER TERRACE EXISTING STORM DRAIN INLET (E) STAGE SWINGS Parks Recreation & Waterfront Terrace View Park Berkeley, California MASTER PLAN 72 Amphion Professional Design Services 1404 Franklin St., Suite 300 Oakland, CA 94612 (510) 893-9888 amphion@value.net Urban Design Planning Landscape Design Management 22 April, 2009

Master Plan Park Zones and Amenities The Master Plan recommends that the park continues to be divided into three terraces and that each of the terraces be focused on specific activities. Upper Terrace The upper terrace will continue to be focused on children s play. The existing old equipment will be replaced with new play equipment. The equipment should create separate play activities for pre-school (2-5 years old) and school age (6-12 years old) children. The final selection of the play experiences/ equipment will be determined prior to implementation. Design guidelines include: Maintain a natural feeling to the play area. Select play equipment in wood or metal and not plastic. Provide poured-in-place safety surfacing for child safety, longevity and ease of maintenance. (Engineered wood fibers, while desirable from aesthetic considerations, raised concerns over small children ingesting them and the need for on-going replenishment to maintain required depths and distribution). Choose colors that blend with the natural environment. Provide separate groupings of activities for each age group including a range of active play such as sliding, climbing, rocking/balancing, spinning, as well as social and inclusive play for all ages. Terrace View Park Master Plan Page 9

Provide a small sand play area Include swings that accommodate the range of ages and abilities (2 12 years of age). Locate benches to make it easy to supervise the play area. Include game/ picnic tables that are scaled to kids. Consider a kiosk at the entrance of the play area that can be used to announce community events and park rules. Add fencing around the play area to exclude dogs and allow for controlled supervision. Create views into the lower terrace from the west edge of the terraces below. Middle Terrace The middle terrace will continue to be focused on community activities and be adult oriented. A new structure (to replace the removed deck ) is proposed to built around an existing redwood tree and extended out to provide a visual connection with the lower terrace. Design guidelines include: Maintain a lawn with a retaining wall along the east side that can also serve as informal seating. Provide a swing set to accommodate a range of ages, (6 years adult). Relocate the drinking fountain to a more central location. Terrace View Park Master Plan Page 10

Create a paved path along the west edge of the terrace to connect to ramps and stairs at the north and south. Maintain views into the lower terrace. Allow for flexibility in the master plan to either extend the size of the community deck or create a planting area between the Middle and Lower Terraces that could be considered for use as a community garden. This is the sunniest portion of the park. Note: Interested neighbors will need to participate in the City s formal community garden program to facilitate the development of this area if a community garden is desired. Lower Terrace The lower terrace will continue to be focused on active play. A mix of lawn and paved areas will accommodate a broader range of games. Additional planting is required for screening on both the north and south perimeters of this terrace. Design guidelines include: Provide a lawn in southern portion of the terrace. Provide full basketball court with new backboards. Select backboards and paved surfacing to reduce noise from play. The court may be less than regulation in size. Provide a ball wall. Do not use a rebounder type net; but select wall materials/ design for noise attenuation. Consider striping for other games such as four-square or hopscotch. Locate benches and seatwall outside of area of play but nearby for viewing. Locate games/ picnic tables and seats at the perimeter of the area. Replace the fencing on the west side of the terrace to contain errant balls. Fencing should be located behind a seatwall. Terrace View Park Master Plan Page 11

Accessibility The 1991 American with Disabilities Act requires that as each area of the park is improved, access for disabled persons is to be provided. This requires the introduction of van parking areas at both Queens Road and Fairlawn Drive, as well as a series of ramps that provide access throughout the park. The timing of the construction of these ramps will be negotiated as each phase is implemented dependant upon the availability of similar play features and experiences that are accessible nearby and the overall cost of renovation. Compliance with the 1991 Act is not clear-cut as law suits continue to redefine the law. The community workshop participants expressed strong concern regarding the amount of space these ramps require, as well as concern for the aesthetics, potential trash, vagrant and security issues. They understood that the ramps were required. The following guidelines reflect their preferences: When possible use natural or natural looking materials; for example stone or wood pattern concrete. Take advantage of ramp landings that provide natural overlooks. Make them an aesthetically inspiring feature, such as a ship s prow, climbing wall, etc. Consider providing planters at the base of larger ramp walls so vines can be planted to soften these walls. Minimize open areas below ramps, where possible, that can trap trash or serve as hiding places. Allow the accessible ramps to serve as the primary circulation through the park. A conceptual grading plan was developed to show preliminary ramps and grading required for access through the park. If fully implemented, the ramps would total approximately 4,730 square feet which would cover 12% of the roughly 40,200 square foot park. Reduction of the number of ramps is more fully explored on page 17. City staff will work with the ADA compliance officer to develop an agreement and final recommendation. An effort was made to reduce the impact to the existing trees. Three trees are required to be removed for the construction of the ramps. However, prior to final design of the ramps all adjacent trees should have an arboricultural evaluation for further recommendations, such as pruning or crown thinning, to reduce the impact of construction. Maintenance and Emergency Access Vehicle access is to be provided through the park. Where turf occurs within the emergency access route for fire trucks or ambulances, use reinforced grass paving system, such as Grasspave2 manufactured by Invisible Structures Inc., to provide an appropriate surface. Terrace View Park Master Plan Page 12

Plantings The natural character of the park was highly valued by the community. However, some members felt the park was too shaded. It was recommended that in the future when the evergreen trees decline and are removed that they should be replaced with deciduous trees with more open canopies to allow for more sunlight into the park. Screening at the edges adjacent to residences was also important to the community. The steep terrain surrounding the park places a premium upon usable space. However planting buffers of shrubs and small scale trees should be located on the north and south edges of the park. These plantings will provide some privacy to the houses immediately adjacent to the park. Consider neighbor preferences for visibility and security. Lighting Lighting of the park was perhaps the most controversial issue with the community. Some adjacent residents did not want any lights in the park. Others recognized the need for safety and security given that the park hours are 6 am to 10 PM. There was discussion regarding shortening the park hours to dawn to dusk to eliminate the need for lighting. However, a majority of the community supported maintaining the park hours and providing minimal lighting that illuminates the accessible pathway for safety. These low level lights should be shaded downward, with wall lights or bollards preferred. The lights should not illuminate any of the play areas or the basketball court. Park Management Issues The community also raised several policy or park management issues. Noise was a big concern for some adjacent residents. The use of the basketball court in the late hours was especially a concern. There was a desire to restrict the placement of lights so that no activities would occur on the basketball court or play area after hours. There was also concern over the patrol and enforcement of after hours illegal use of the courts. Most of the participants felt that this could be monitored by the community. Wildland fire hazard was also a concern as the Berkeley hills are designated a high fire hazard area. The lower limbs of trees should be trimmed up and fuel ladders removed from under the mature trees. New plant species should be selected with firewise characteristics that are easy to maintain with low fuel loads. Do not use plants with high volatile oils or fuel loads such as eucalyptus, pine or juniper. Barbecue areas should be placed in lawn or non-flammable materials and surrounding trees be pruned back to prevent ignitions. Disposal of hot charcoal briquettes should also be provided for. Concerns were expressed regarding restriction of overnight parking. Consider posting a sign of no overnight parking in the small lot on Queens Road. Terrace View Park Master Plan Page 13

Implementation Phasing The renovation of the park will likely be phased due to the overall costs and complexity of construction. The community discussed priorities and recommended three phases. However, should funding for a specific area become available that areas could be developed out of sequence, provided ADA access requirements can also be fulfilled. The following graphic depicts the community s preferred sequence of implementation: The final components that are included in a construction phase will respond to funding sources with the following community guidelines: The community placed the highest priority on development of the lower terrace due to the poor condition of the asphalt. Development of this terrace will require access improvements including the parking area on Queens Road with a van accessible space and the ramp from the parking up to the lower terrace. This phase should also address the area of the demolition of the former community deck concrete foundations and retaining walls. Terrace View Park Master Plan Page 14

The second priority was placed on the upper terrace to enrich the play experiences for all ages children. Development of this terrace will require implementation of an accessible ramp and van parking on Fairlawn Drive. Third priority was placed on the middle terrace to replace the community gathering area. Included in the implementation of this phase are the final two ramps that connect to the upper and lower terraces. Conceptual Grading A conceptual grading plan was prepared to better understand the potential accessible ramp configurations and their impact on the site topography and existing trees. This plan shows where removal of earth (cut) or bringing in addition fill material are required. The conceptual grading plan shows that the addition of fill allows many of the ramps to be built at or near grade. The placement of this fill will require geotechnical engineering. Each of the ramps A-D has been designed to conform to ADA with the maximum allowable slope of 8.33% and landings at changes of direction or at a maximum of 30 inches of rise. The service access road between Queen s Road and the lower terrace is regraded to 25%. The service access between the lower and middle terrace is regraded to 16%. The access to Fairlawn remains unchanged. Terrace View Park Master Plan Page 15

Costs A preliminary opinion of probable construction costs was prepared for the implementation of the park in the priority of the phasing identified with the community. In summary the estimated construction costs are as follows: Phase 1 Phase 2 Demolition $95,000 Asphalt paving @ basketball-court and $45,000 parking Stamped concrete paving $75,000 Ramp A (including grading & lighting) $375,000 Amenities benches, basketball $55,000 backstop, ball wall, fencing Planting and Irrigation $75,000 Total Phase 1 $720,000 Demolition $35,000 Paving (access road + entry) $20,000 Play equipment, play surface and fencing $182,000 Ramp D (including grading & lighting) $260,000 Amenities benches, tables + chairs, $30,000 trash receptacles Planting and Irrigation $15,000 Total Phase 2 $542,000 Phase 3 Demolition $30,000 Paving (access road + walkways) $95,000 Overlook Terrace $75,000 Ramp B (including grading & lighting) $250,000 Ramp C (including grading & lighting) $190,000 Amenities benches, swings $50,000 Planting and Irrigation $20,000 Total Phase 3 $710,000 Total Terrace View Park Renovation $1,972,000 Terrace View Park Master Plan Page 16

Recommended Next Steps Policy Discussion of ADA Compliance in Hillside Parks The master planning process brought out the difficulty of compliance with the American with Disabilities Act for hillside parks. The estimated construction cost of three phases of the project is approximately $2 million. Approximately 55% of this cost is related to the ramps required for disabled access through the steep terrain. The consultant team felt that this level of expense was not fundable and that alternative compliance should be explored. Potential options that could be negotiated with the ADA compliance representatives include: Removal of either Ramp A or Ramp D. This option would still provide access to all improved features within the park. However the costs are still proportionately extremely expensive. Removal of all ramps and instead provide for access by special vehicle that can access the park, possibly along the lines of a dial-a-ride service. This option could be enhanced by further re-grading of the existing service road from Queen s Road to reduce the grade to 16% from the existing 25%. Renovation of portions of the parks in a way that would not trigger ADA improvements. This is recommended as a potential for the first phase where the basketball court would be repaved, turf installed, and some minimal cost improvements to make the former deck area safe. The total improvement would be limited to less than $125,000 per the City s ADA coordinator. Development of a comprehensive policy for ADA improvements within the city parks located in the hill where either due to terrain or geology (rocks) the cost of full access presents an inequitable burden. This policy should be developed in conjunction with the disabled community. Improvements in hill parks could be tied to enhanced ADA improvements in alternative parks where the construction conditions would result in a more effective use of available funds and better serve the disabled community. Key to this discussion will be several concepts including o o o Program access to the whole range of city services and program, versus access to a single site. Undue financial burden based on all resources available for use in a program (20% is threshold often used in private renovation beyond which is a financial burden). Alternatives to structural changes to achieve program accessibility as a specific park, such as access via a vehicle. Terrace View Park Master Plan Page 17

Park Renovation Phase 1A It is recommended that due to the level of Phase 1 construction costs an interim phase be looked at as a first step. The estimated construction cost is $165,000. This Phase 1A would include the following work on the lower terrace: Grinding of existing asphalt (to remove the top level and create a firm base), and replacement of asphalt Demolition of former community deck concrete foundations and retaining walls and grading to allow for temporary planted slope until Phase 3. Removal of asphalt and base and install proposed turf area with supporting irrigation. Removal of existing basketball backstops and replacement with new backstops and striping as shown on the proposed plan. This Phase 1A would require that ADA compliance is negotiated so that access is not required. An accessible basketball court is located at Codornices Park, approximately 1.6 miles west from Terrace View Park. Terrace View Park Master Plan Page 18