City of Bristol Route 6 Corridor Implementation Program

Similar documents
The transportation system in a community is an

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

Implementation Guide Comprehensive Plan City of Allen

Town Center (part of the Comprehensive Plan)

EXISTING COMPREHENSIVE PLAN

Citizen Advisory Group Meeting 5: Land Use April 14, 2011

Draft Memorandum #1: Goals and Vision for Revitalization

4.1.3 LAND USE CATEGORIES

ARLINGTON COUNTY, VIRGINIA

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Potential Green Infrastructure Strategies May 6, 2015 Workshop

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

UNIVERSITY CITY AREA PLAN. Volume Two: Implementation Plan

CHAPTER 7: Transportation, Mobility and Circulation

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

A. WHAT IS A GENERAL PLAN?

Hockessin Community Redevelopment Plan

Executive Summary. NY 7 / NY 2 Corridor

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Route 1 Corridor Study

International Blvd. TOD Plan Public Workshop #1

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Lehigh Acres Land Development Regulations Community Planning Project

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

Transportation. Strategies for Action

NEC of Central Avenue and Indian School Road

FUTURE LAND USE ELEMENT

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

, C-MS I June 3, 2016 $1500 pd chk #216918

The University District envisions, in its neighborhood

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Volume 2: Implementation Plan

Good Neighbor Plan Dallas Love Field Airport Transportation and Environment Committee

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

8implementation. strategies

appendix and street interface guidelines

This page left intentionally blank.

A larger version of this map is located on the last page of this PDF.

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

2030 Comprehensive Plan VISION STATEMENT

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Town of Oakville Streetscape Strategy

FDOT D4 Complete Streets

Executive Summary. The goals of the Plan are to:

Olde Towne Vision Plan

CITY OF PUYALLUP. Background. Development Services

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update

6. DOWNTOWN. The Downtown Element focuses on supporting and expanding the vitality and enhancement of Downtown Chico as the City s central core.

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

SOUTH UNIVERSITY Street Design Alternatives in Progress

Downtown River District

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

EAST COLFAX EAST OF I-225 CORRIDOR PLAN

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

CHAPTER 12 IMPLEMENTATION

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Sahuarita District & Phase 1 Master Plan. Town Council December 11, 2017

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Policies and Code Intent Sections Related to Town Center

East Bayshore Road Neighbourhood

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Danvers High Street I-1 District Study

The Five Components of the McLoughlin Area Plan

THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES. Community Technical Assistance Program Building Active Communities Institute March 2016

TRANSIT ORIENTED DEVELOPMENT PINELLAS COUNTY MPO LIVABLE COMMUNITIES INITIATIVE PINELLAS COUNTY COMPREHENSIVE PLAN AMENDMENTS

Chapter 7: Streetscape & Design Elements

Chapter 1: Introduction

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

CHAPTER 2: FUTURE LAND USE CONCEPTS

DRAFT. October Wheaton. Design Guidelines

Introduction. Intent of the Plan. Urban Design and Land Use Approach

TRANSPORTATION ELEMENT

2040 Long Range Transportation Plan

The Lincoln Neighborhood Corridor Plan. The LiNC

Making Transit Oriented Development Work For Boonton, NJ

Tonight s Agenda. 7:45 p.m. Next Steps 8:00 p.m. Close

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

38 Queen s University Campus Master Plan Part 1

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Issues Requiring Future Study

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

The Baileys Planning District portion of the Comprehensive Plan contains site design recommendations for both the Baileys Crossroads Community

Highland Village Green Design Guidelines

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

COMPLETE GREEN STREET CHECKLIST

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Planning Board Briefing

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Appendix A COMMUNITY IMPROVEMENT PLAN DESIGN GUIDELINES

Transcription:

City of Bristol Route 6 Corridor Implementation Program FITZGERALD & HALLIDAY, INC. Innovative Planning, Better Communities June 2017

Route 6 Corridor Plan IMPLEMENTATION PROGRAM The following Implementation Program is a companion document to the Route 6 Corridor Plan (June 2017). Implementation is the essential next-step for the Route 6 planning process, to be undertaken with a series of complementary actions that would enable the vision and goals for the Route 6 Corridor to be achieved. This Implementation Program is intended as a working document; one that facilitates a dynamic process where the Route 6 Corridor recommendations are periodically reviewed and the supporting tasks are updated as needed to respond to changing conditions. This program has three elements, organized by the recommended lead City entity that should champion and drive the implementation efforts. The three initiatives are; Zoning Initiative Development Collaboration Initiative Transportation System Initiative It is not intended that the Champion for each initiative work alone, and bear sole responsibility for those tasks. Rather it is intended that the Champion work to sustain momentum of a collaboration of departments, boards, commissions, and agencies who would contribute to making progress on each of the recommendations. It is understood that implementation of the Route 6 Corridor Plan will be a gradual and continual process. While some recommendations can be carried out in a relatively short time period, others would be longer-term in nature. Implementation time-frames for the purposes of this plan would be as follows: -term: within the next one to three years -term: within the next 4 to 7 years -term: within the next 10 years Ongoing: within the next year and continuing beyond as necessary The forms on the following pages are intended to be used for tracking implementation progress. While a time-frame is suggested, the actual target completion dates remain for each champion to identify. Refer to the full corridor plan for more detail on each of the recommendations. The Implementation program should be regularly updated by: Setting the timeline for completion of each task, Periodically assessing how implementation is proceeding, Adding new tasks or actions that are identified which will help accomplish the goals of the plan, Refining tasks or actions already under way in order to enhance their implementation or improve their effectiveness. 1

2

Zoning Initiative CHAMPION: The Bristol Zoning Commission PARTNERS: Bristol Planning Commission; Bristol Land Use Office; Bristol Town Engineer; Bristol Economic Development Authority TIME FRAME: -term Recommendations Corridor-Wide Address consolidation of non-residential parcels; add language. Distinguish between Major and Minor developments. Develop and adopt design guidelines for each of the Route 6 segments for Major and Minor developments; provide separate site design guidance for each including graphic examples/illustrations Create a Mixed-Use Transition Zone (TMU) and apply to all relevant areas of the corridor as indicated on the Corridor Land Use Scenario. Provide minimum density requirements for the TMU zone. Establish design standards for the TMU zone for Minor Developments that are favorable to stand-alone smallscale business. Adjust parking requirements; adjust minimums and add maximums for Major Developments/high traffic generators. Allow more flexibility in parking arrangements; i.e. shared parking, off-site parking, joint parking development. Allow accessory dwelling units in all mixed-use zones where residential uses are allowed. As commercial redevelopment occurs, encourage developers to provide site plans with narrative and plan sets that show how they contribute to, creating/strengthening a defined activity center. Target Completion Date Date/Status 3

Recommendations Enhance landscaping requirements to provide both effective buffers and connectivity between residential neighborhoods and commercial nodes; provide sample graphic/illustrations. Add selective relief from the zoning regulations for small businesses/minor Developments. Supplement requirements related to adaptive reuse in the TMU and BG zones. Offer expedited application processes and other zoning incentives for commercial plaza redevelopment that meets or exceeds City objectives for site reuse to create commercial destinations. Permit Live/Work units in the Mixed-Residential Zone as-of-right. Review and refine signage standards; As redevelopment occurs, ensure that new signage meets design goals for the corridor. Adopt an Access Management Overlay for the corridor using the Route 72 Access Management provisions as a model. Terryville Segment Refine boundaries of Neighborhood Business (BN) Zone consistent with the land use scenario for this segment of the corridor. Consider any development in the BN Zone along Terryville Ave. to be a Minor Development. Establish a TMU zone at the rail overpass area as shown on the Terryville Avenue land use scenario. Downtown Gateway Segment Adopt the Downtown Gateway concept plan as the design guidance for future developments. Create a single Downtown Gateway District as shown in the Downtown Gateway Land Use Scenario and adjust the zoning text and map accordingly. Replace the Downtown Neighborhood Transition Zone with the comparable TMU zone established as an overlay for Route 6. Target Completion Date Date/Status 4

Recommendations Farmington Avenue Segment Update the General Business (BG) Zone to incorporate new language that distinguishes between Major and Minor developments. Require BG Zone development clusters to be walkable; emphasize this element of site design for any infill, redevelopment, or adaptive reuse proposals. Establish design guidance within the TMU targeted to this segment that complements and is sensitive to adjacent residential uses. Apply the TMU Zone as an overlay to all relevant areas of Farmington Avenue as indicated on the Corridor Land Use Scenario. Rezone areas of Farmington Avenue targeted for a mix of residential densities as Mixed-Use Residential; refine requirements for that zone. Assess compliance of existing signage with zoning standards and work to eliminate incremental changes in intensity inconsistent with the intent of the regulations; update signage design guidance. As redevelopment occurs, ensure that site signage is updated to meet the design goals for the corridor. Target Completion Date Date/Status 5

Development Collaboration Initiative LEAD CHAMPION: The Bristol Economic Development Authority PARTNERS: The Bristol Planning Commission; Bristol Land Use Office; Bristol Public Works Department, Business Community TIME FRAME: -term, and/or Ongoing Recommendations Develop a Commercial Plaza Redevelopment guide. Seek public-private partnerships for support in sustaining small local and independent businesses. Explore establishment of Business Improvement Districts in each corridor segment. Offer financial incentives for commercial plaza redevelopment that meets or exceeds City objectives for site reuse to create commercial destinations. Explore options for municipal/private parking partnerships. Develop a Downtown branding program and apply this to future infrastructure improvements. Adopt a façade Improvement program. Develop gateway signage for each corridor segment. Target Completion Date Date/Status 6

Transportation System Initiative LEAD CHAMPION: Bristol Public Works Department PARTNERS: The Bristol Planning Commission; Bristol Land Use Office; CTDOT TIME FRAME: Varied Recommendations Corridor-Wide Evaluate intersections of Route 6 with Minor Collector and residential streets to address hazardous turning movements. Require public sidewalk construction as a condition of new development with frontage on local streets intersecting with Route 6 to connect with the existing network. Time frame Target Completion Date Date/Status Consolidate multiple driveways that are on single parcels. Reduce the width of driveway curb cuts. Provide side road access to properties and remove driveways on Route 6. Provide targeted sidewalk network improvements along Route 6. Enhance transit accommodations Provide bicycle accommodations on or in proximity of Route 6. Terryville Avenue Segment Develop connectivity plan for bicyclist and pedestrians. Encourage access management for non-commercial parcels as part of building permit process. Provide sidewalk connection to West Bristol School via Rosemont Street. Provide crosswalk and refuge island across Terryville Avenue at Rosemont Street. Conduct preliminary engineering study for 10-footwide sidepath on the south side of Terryville Avenue 7

Downtown Gateway Segment Carry the design for North Main Streetscape project into the Downtown Gateway area; seek streetscape funding to extend the sidewalk system as shown on the Downtown Gateway concept plan. Install curb ramp on north side of Route 6 at Sherman Street and the rail overpass; eliminate crosswalk on the west side of the road. Continue sidepath on west side of Pound Street; Extend to Race Street. Provide shared road (Sharrow) pavement markings on Race Street. Install new curb ramps at crosswalk on north side of Route 6 at North Main Street. Install Gateway signage. Install sidewalks, crosswalks, and on-street parking as indicated on the Downtown Gateway Concept Plan. Construct roadway reconfiguration for Federal Street as shown on the Downtown Gateway Concept Plan. Farmington Avenue Segment Work with CTDOT to complete sidewalk network by filling in gaps as indicated on the Route 6 Corridor Plan transportation strategies graphic. Complete sidewalk connections on Minor Collector and residential streets that connect with Route 6. Install crosswalks at intersections as indicated on the Route 6 Corridor Plan transportation strategies graphic. Provide bus shelters, benches, and waiting areas along the western end of Farmington Avenue as indicated on the Route 6 Corridor Plan transportation strategies graphic. Install curb ramps; pedestrian refuge island, and pedestrian actuated signs at Collier Avenue. 8