RENEWAL OF BUILT HERITAGE: A CASE OF GOPI- TALAO, SURAT

Similar documents
Sabarmati Riverfront Development Integrated Environmental Improvement and Urban Revitalization

COMPREHENSION OF NMT IN DELHI MASTER PLAN 2021

Vishwakarma Yojna: An approach towards Rurbanisation

CENTURY CITY URBAN DESIGN FRAMEWORK

Integrated Multi Modal Public Transit Hub

SECTION ONE: INTRODUCTION. introduction

CHAPTER 4.1 COMMUNITY HERITAGE AND HISTORIC PRESERVATION ELEMENT

General Manager, Planning and Development; General Manager, Parks, Recreation and Culture. Proposed Mini-Park and Plaza Designations

TRANSIT ORIENTED DEVELOPMENT

CHAPTER 2 URBAN PLANNING AND DEVELOPMENT IN INDIA AND THE CASE CITY OF CHENNAI

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Orcasur Market. Madrid Plaza del Pueblo-Avenida de Orcasur

Social Screening and Impact Assessment for Sub Projects

Recommended Heritage Designation

Public Participation in Urban Planning Case of Lilongwe, Malawi

Chapter 03 Planning framework

Annexure 1. STRATEGY for better Urban Form

City Center Neighborhood Plan

South th E ast Communit ity Centre (SECC)

Outline of Presentation

From Concept to Creation: Building Amaravati, the People s capital of Andhra Pradesh

LEADERS IN URBAN TRANSPORT PLANNING. Ahmedabad Urban Development Authority

HAROONABAD OPEN SPACES AND PARKS PROGRAMME (HOSPP) (Revised)

The Big Hole Precinct

South Norfolk Municipal Facilities Study

Appendix C: Interim Mixed-Use Evaluation Criteria

Northern Territory Compact Urban Growth Policy

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Master in architecture. (Urban Landscape Design)

Appendix H: Easement cross sections

The Charter of European Planning BARCELONA 2013

Felicitation Programme of Vishwakarma Yojana: Phase-II

GUJARAT TECHNOLOGICAL UNIVERSITY. A progress Report. Vishwakarma Yojna. THE Nodel Office,Bhuj.

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

MAGALIESBURG DEVELOPMENT INITIATIVE (MDI)

THE OPEN SPACE CONTRIBUTING TO NEIGHBORHOOD SUSTAINABILITY THROUGH PUBLIC EVENTS: A CASE FROM AKARA, TURKEY. Bahar Gedikli Charleston, October 2010

. URBAN MANAGEMENT : ISSUES & STRATEGIES (PP-236)

Performance Optimization of the Evaporative Condenser Design

Purpose of the Master Plan

ACCESS QATAR S MULTI-BILLION DOLLAR INTERIORS MARKET +5,000 ATTENDEES +250 EXHIBITORS SQM. index-qatar.com

10.0 Open Space and Public Realm

Creating the Enabling Environment in. The Walled City of Lahore

Purpose of the Master Plan

MALL REVITALIZATION CASE STUDIES

Amar City of Joy : Kolkata

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness

HERITAGE COUNTS 2017 East of England

1120 Haist Street - Pelham Arena Community Co-Design Recommendation Report Haist Street - Pelham Arena Community Co-Design Recommendation Report

Commercial, Industrial & Institutional

CHAPTER 1 Introduction

RIGA LATVIA. KEY FEATURES OF THE CITY Demographic Facts. Urban Figures. Heritage. EXISTING GOVERNANCE MECHANISMS Development and Management Plans

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

City of Lake Mary, Florida. Evolution of a Historic Downtown with Transit Oriented Development Strategies

Norwich (United Kingdom), 9-10 September 2004

1. Introduction to Linköping

1Planning. Approach. Part I Chapter 1: Planning Approach

Name of Action: Arrangement of beach locations on the River Vikhra

CASE STUDY: MCGREGOR COXALL SYDNEY, AUSTRALIA. McGregor Coxall

One Bangkok, Thailand s largest integrated development, set to transform Bangkok city-centre and become a new global landmark destination

Trunk Infrastructure and Urban Growth Managing Rapid Urbanization in Poverty in Dar es Salaam, Tanzania

Excellencies, Dear colleagues from other agencies and organizations, Ladies and Gentlemen,

Further input invited as Colchester Growth Strategy nears final phase

Draft Western District Plan

6 PORT SYDNEY SETTLEMENT AREA

The Sustainability of Urban Heritage Preservation. The Case of Aleppo. Inter-American Development Bank. Meinolf Spiekermann

DESIGN AND FABRICATION OF OMNI MULTI AXIS CEILING FAN

E O L A F I V E. Location Map SUMMARY G M P Z O N I T E M S # 1 A. & B.

Downtown Whitby Action Plan

EVALUATION CRITERIA ECAD East China Architecture Design & Research Institute Co. Ltd

UNIVERSITY OF MUMBAI

Walk plan will lead to future

12.2 CONCEPT DEVELOPMENT

Delhi May 6-7, Paper to be published in Urban Update during South Asian Cities Summit organized by AIILSG and UCLG, New

Welcome to the Oakridge Centre Open House

MUNICIPAL CORPORATION UDAIPUR

We are the UAE s premier real estate developer. We have reshaped Dubai s skyline with our iconic buildings,

Partnering with Consultants to overcome Urban Renewal Challenges

Case Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development)

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Jury Report for the European Green Capital Award 2015

#SmartCitiesChallenge Phase 2

Wasatch CHOICE for 2040

Tools for Implementing your Comprehensive Plan. Josh Campbell City of Suwanee Planning and Inspections

4.11 Town Centre Secondary Plan (Former City of Cumberland)

~~-~ ASSESSMENT OF CULTURAL SIGNIFICANCE OBSERVATORY HILL SYDNEY I I I I I. February For Edaw. Prepared by Wendy Thorp

7-1. Chapter 7: Historic Preservation. 7.0 Accomplishments since Introduction. New Castle County 2012 Comprehensive Plan

Authorization to Study the Distillery District as a potential Heritage Conservation District

Moody Centre Station TOD Area Today

37 Interlaken A Vision To The Future

KANPUR 5 LAND USE Final Report: Kanpur City Development Plan Under JNNURM

Global Report on Culture and Sustainable Urban Development

Strategy to Adjust Musi Riverfront Development at Palembang

Analysis of Surface resistivity behavior of Conductive Woven fabrics made from Copper Jari & S.S./Polyester yarns for ESD control

RE: Report CDS (Municipal Heritage Committee Minutes May 8, 2018) Randwood Estate

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

INTRODUCTION TO TOWN PLANNING

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Soil Stabilization by Using Fly Ash

CHAPTER I: INTRODUCTION

Transcription:

RENEWAL OF BUILT HERITAGE: A CASE OF GOPI- TALAO, SURAT Sapana Jayeshkumar Shah 1, Prof. Himanshu J. Padhya 2, Prof. Bhasker V. Bhatt 3 M.E, Civil Engg., Sarvajanik College of Engg. and Tech., Surat, Gujarat, India 1 Associate Prof., Civil Engg., Sarvajanik College of Engg. and Tech., Surat, Gujarat, India 2 Associate Prof., Civil Engg., Sarvajanik College of Engg. and Tech., Surat, Gujarat, India 3 Abstract: Real challenge for urban local body through developers, architects, and professionals is to protect and preserve the built heritage. Most difficult task ahead is to conserve the local traditional and cultural values of communities for future generations to appreciate. This paper discusses a case for the renewal & restoration of historical Gopitalao, Surat that is accomplished by Surat Municipal Corporation and on the verge of completion. This study comprehends on the past, and present conditions and development undertook for restoration and redevelopment. Further, the administrators of the city have planned for a grade separated road along the partial periphery of Gopi-talav that will add to beautification feature of the lake. Keywords: Gopi-talav, Heritage, Restoration, Surat, Urbanisation, Urban Renewal, Walled city. INTRODUCTION India population has grown two and half times while urban population increased five times in the last 50 years. (Cochin, 2013) Urbanisation in the country with the level of 31% where more than 40% of urban population living in 53 metro cities (Census of India, 2011). Country is trending towards metropolitan development. Most of the major cities are centuries old, and about 2.8 percent of total geographical area of the country is under urban settlements. So, urban renewal is needed to revitalise the city or a part which has been plagued by the ills of urbanisation. In Surat, Gopi-talao is a built heritage water body. It was constructed by Malek Gopi a prosperous merchant in 16th century A.D. Its main purpose was to provide water supply to Surat city, but the pond has dried out & is filled only during rainy days. In the other duration, the bed is used as a playground. Gopi-talav has the only step-well in this area having steps to go down from all four sides availing ground water. The step-well is with 25 footsteps, within the 35 square metres structure, and 15 metres deep compared to water body depth of 12 metres. (India, n.d.) History suggests that centuries ago, Gopi-talao was among renowned objects having worldwide attention. The lake s exquisiteness evoked elaborate chapters penned to pronounce its glory, not only by Indian intellectuals, but also by European travellers in travelogues about their trip to India. All rights reserved by www.ijaresm.net ISSN : 2394-1766 1

Figure 1 Location of site I. WALLED CITY & GOPI-TALAO Gopi-talao, situated in the walled area of Surat having various features like, Strategic location: It is a place in which will give the better indicator for development because it is in the central area of commercial activity. Sources of water storage: It was the prime source of water storage & storm water management point in ancient time. Topographical condition: It is low lying area that leads to water logging problems in that field. Significant Recreational Activity: It has recreational activity like boating & places of attraction like gardens, mango orchards. Socio-cultural importance: The main reason for the construction of Gopi-talao was economic to cultural development. Figure 2 Location of Gopi Talao (Ancient map) & Development around Gopi Talao Situation around Gopi-talao Whole area around Gopi-talao decay due to various parameter & having present situation like central open land, slum encroachment, poor linkages, and surrounding graveyards shows in the above figure. Existing situation demanded the renewal of Gopi-talao. Renewal of Gopi-talao Surat Municipal Corporation (SMC) decided to renewal the Gopi-talao & initiated a mega demolition to remove 1,400 houses and 140 shops around Gopi-talao. Apart from opposition shown by a few people, the drive remained peaceful as all home owners have been allotted flats for economically weaker section (EWS) at Bhestan. The civic body aims at redeveloping Gopi-talao that once existed at the spot and developed it through inspiration by Kankaria Lake, Ahmedabad. Re-development of 13,934.88 Sq. Mt. of land outside Gopi-talao will give the historic 16th-century lake site a magnificent view. This SMC property is in front of DKM Hospital and stretch is to the front portion of Navsari bazar. (India-Bilkulonline, 2014) All rights reserved by www.ijaresm.net ISSN : 2394-1766 2

PRESENT DEVELOPMENT The development of Gopi-talao area has reached up to a stage where the realisation of the project has triggered many positive changes in the development scenario of the old city of Surat. Main four features of Redevelopment: Redevelopment of Gopi-talao as a lake Restoration of the heritage vav, development of play area & fountains Development of a snowpark, IMAX & other allied entertainment activities as a part of Gopi-talao area redevelopment Development of newly acquired land parcel on kotsafil road A. Gopi-talao Special Development Zone (GTSDZ) For practical implementation of the project, it is proposed to divide the entire SDZ into parcels. Parcel 1: Commercial Development Parcel 2: Slum Rehabilitation Site & service scheme Parcel 3: Graveyard development Parcel 4: Informal & Formal market redevelopment with parking Total area of Gopi-talao is approximately ten hectares with several zone in below table with its area. Location Area (sq.mt) Water body 34254 History zone 4220 Environment Zone 5310 Diamond Zone 5215 Surat nu Jaman 5880 Textile zone 5290 Commercial harmony 6161 zone Future Zone 9480 Table 1 Zone in New Development Figure 3 Divided Parcel of land SMC is carrying out the redevelopment in 3 phases: Phase-1: Work completed in this stage is 3 Nos. of platform, two no. of Ghats, open amphitheatre, viewing jetty with approximately amount of 6 crore. Phase-2: Work completed in this stage is inner, outer & D. P. Roadside compound wall, C.C road development cost of about 3.40 Crore. Phase-3: Development of different types of zone (approximately cost of 10 crore). History Zone: Having 300 years old existing vav is restored in this area with an office building Environment Zone: Mass plantation work with Nirmit & the Sunshine fountain around open Amphitheatre. Diamond Zone: development of walkways & other area look like diamond shape, in a centre Kohinoor shape fountain will be placed. Surat nu Jaman: Total 17 nos. of food stall & landscape work. All rights reserved by www.ijaresm.net ISSN : 2394-1766 3

Textile zone: Development of walkways, benches & look like any textile print. Children play area in this Zone with rubber flooring. Commercial harmony zone: Meditation & gathering platform for senior citizens with landscaping. Figure 4 Redevelopment Proposals in parts of Gopi-talao II. RESTORATION OF VAV AT HISTORY ZONE The step-well built at Gopi-talao in Gopipura area of Surat city in the 18th century is a significant heritage structure. Mir Alamsha Binkhan built this Gopipuravav in 1718. (India, n.d.) He was a friend of Haider Kaun Khan, in charge as Surat governor during 1715 to 1718. Haider initiated building of the fort across Surat city known as Alamanah Fort. Alamsha acquired some of the stones meant for the fort & had the step-well built outside Navsari Bazar at Gopipura lake. It is the only step-well in this area having steps to go down from all four sides. Hence, it is called as Chatusmukhi Vav. Before After OTHER DEVELOPMENTS Development of Snow Park, I-max, laser show & other entertainment activities in Gopitalao area as PPP arrangement with following vision: Taking project of Gopi-talao lake Figure development 5 Chatusmukhi to Vav the next level so as to make it the ultimate tourist destination for the locals & the visitors to Surat. Initiating latest activities for entertainment so as to have the world class experience of recreational in the city. Giving guidelines to develop PPP model to suit the vision Providing such types of entertainment activities so that all age-group & income group people can get involved. All rights reserved by www.ijaresm.net ISSN : 2394-1766 4

Generating a financially viable model for SMC to generate revenue to maintain other facilities at Gopi-talao. Other activities planned at Gopi-talao are Speed & Paddle Boating, Balloon Riding, Water Zorbing, Trampoline, Trumping, Mechanical Bull and Indoor Play Zone. Figure 6: 3-D image for proposed development PROPOSED FLYOVER ON KOTSAFIL ROAD As the redevelopment of Gopi-talao project is in the last stage of development, for quickly reach Gopi-talao from Ring road, there is a proposal of approximately 1.5-2 Km long flyover. It will be the 3 rd largest flyover if Surat city. Due to this flyover the average travel time from Gopi-talao to ring the road will decrease to 2 minutes from 10-12 minutes. It will also give the aerial view of whole Gopi-talao. CONCLUDING REMARK This project develops a unique activity plaza for the people of immediate surrounding & the city at large. It creates an identity & opportunity for the city & will trigger the regeneration of the surrounding & subsequently the entire old town. This project will also motivate other cities to restore their built heritage & to maintain their cultural values. ACKNOWLEDGMENT Behind any major work undertaken by an individual, there lies the contribution of the people who helped him to cross all the hurdles and achieve his goal. Authors express deep sense of gratitude towards our institute, Sarvajanik College of Engineering and Technology, Dr. Vaishali Mungurwadi, Principal and the P. G. Section of Town and Country Planning for availing the facilities for the present work. Sincere note of thanks is due to Mr Vishal Shah, Asst. Professor, Faculty of Architecture, SCET, Surat for providing details on Gopi-talao development. All rights reserved by www.ijaresm.net ISSN : 2394-1766 5

REFERENCES [01] Cochin,C.o.(2013,August). http://www.corporationofcochin.net/urban_kb/homepage.html. Retrieved from http://www.corporationofcochin.net/. [02] Corporation, S. M. (2014, November). Retrieved from www.suratmunicipal.org. [03] India, T. o. (2014.). Timesofindia.indiatimes.com/city/surat/504-year-old-Surats-lostlake-Gopi-Talav-set-to-regain-glory/articleshow/31186286.cms. Retrieved from http://timesofindia.indiatimes.com/. [04] India-Bilkulonline, E.-N. p. (2014, April). http://www.bilkulonline.com/gujaratnews/civic-authorities/2526-smc-shifts-hundreds-from-gopi-talav_.retrievedfrom http://www.bilkulonline.com/. [05] Shah, V. (2014). Redevelopment of Gopi-talao as a lake & public activity plaza as the face of Gopi-talao precinct. Surat: Urban Initiative. [06] www.skyscrapercity.com.(2014.). http://www.skyscrapercity.com/showthread.php?t=817894&page=89. All rights reserved by www.ijaresm.net ISSN : 2394-1766 6