Categorical Exclusion (CE) Determination Project Narrative

Similar documents
WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

CENTERTON ROAD BRIDGE REPLACEMENT

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

Appendix E Section 4(f) Evaluation

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Right-of-Way Acquisitions and Relocations Technical Memorandum

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

SECTION 4(f) DE MINIMIS DOCUMENTATION

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

S SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

7.0 DRAFT SECTION 4(f) EVALUATION

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Table of Contents Programmatic 4(f) Evaluation. Programmatic 4(f) Evaluation 77

Town of Weston Guardrail Overview Report

7.0 SECTION 4(F) EVALUATION

DRAFT MAP AMENDMENT FLU 04-4

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Pennsy Greenway Trail

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Northern Branch Corridor SDEIS March 2017

Commonwealth ofmassachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

ITS Concept Development Activity Descriptions

Public Information Centre. Welcome

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Asbury Chapel Subdivision Sketch Plan

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY)

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Creating Complete Roadway Corridors:

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Florida Department of Transportation 1000 NW 111th Avenue Miami, FL

LOCATION AND DESIGN DIVISION

Clay Street Bridge Replacement Project

Northern Branch Corridor SDEIS March 2017

MONTGOMERY COUNTY PLANNING DEPARTMENT

Staff Report CONDITIONAL USE

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Project Overview. Get Involved. Public Information Meeting. Contact Information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Rezoning Transportation Analysis Petition Number: General Location Identifier:

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

FDOT D4 Complete Streets

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Southern Gateway Project and Public Green

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

WELCOME TO OPEN HOUSE TWO November 28, 2018

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary

Berkshire Regional Planning Commission Clearinghouse Review Report

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Northern Branch Corridor SDEIS March Table of Contents

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

4.1 Build Alternative 1 Construction Phasing

4.13 Security and System Safety

Title 11 Streets and Sidewalks

Mississippi Skyway Preliminary Engineering Report

Project Purpose. Project Need

7.5 Impacts on the Section 4(f) Properties

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Decision Notice. Proposed Action

Concord, BRF-X-5099 (021), Draft Alternative Analysis

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PARKLET PROPOSAL PACKAGE & PROCESS

Appendix E Preliminary Location Hydraulic Study

Transcription:

Categorical Exclusion (CE) Determination Project Narrative Project Information Project Name: SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET Route or Road Name: Atlantic Avenue MassDOT Project Number: 607345 City/Town: Cohasset MassDOT District: 5 Project Cost/Programming: $4,336,600.00 Boston Region MPO FFY 2016 TIP, STP/BROFF Project Manager or Preparer: Stephen Soma Project Description The Massachusetts Department of Transportation (MassDOT) proposes to replace the superstructure and substructure of the Atlantic Avenue Bridge (Bridge C-17-002) over Little Harbor Inlet in Cohasset, Massachusetts. The project will also require the reconstruction of approximately 300 feet of roadway at either side of the bridge (See attached project locus). The existing bridge is a single-span steel stringer bridge, built in 1890 and reconstructed (superstructure) in 1962, with a 1 degree skew. The substructure consists of concrete abutment caps founded on the original stone abutments. The superstructure is comprised of six 36-inch WF230 steel beams spaced at 6 feet, 2 inches on center, supporting 7.5-foot concrete deck and 2.5 feet of bituminous wearing surface. The overall bridge span is approximately 86.5 feet. Atlantic Avenue runs along the bridge with one lane in each direction at a width of approximately 27 feet, 2 inches. A 5-foot sidewalk runs along the western side of the roadway and a 1.5-foot safety curb runs along the eastern edge. The total deck width, out-to-out, is 36 feet. The proposed bridge replacement will consist of a single span structure supporting a widened roadway and sidewalk over the Little Harbor Inlet. The superstructure will consist of prestressed concrete New England Bulb Tee beams with a concrete deck and a bituminous wearing surface. The proposed abutments will be installed in the same location as the existing abutments. The roadway across the bridge will be widened to 30 feet curb-to-curb (two 12 to 14-foot shared lanes) with a 5.5-6.5 sidewalk on the west side of the bridge. A. Purpose and Need This project is intended to replace a structurally deficient bridge in Cohasset located on Atlantic Avenue over Little Harbor Inlet. The proposed project is necessary to maintain access to the surrounding areas. Page 1 of 11 7/11/2016

B. Alternatives Categorical Exclusion Determination Project Narrative and Checklist Alternatives for the project included the No-Build Alternative. The project involves the replacement of structurally deficient bridge; therefore the No-Build Alternative would result in continued deterioration of the structure and would ultimately lead to its closure. The No-Build alternative does not meet the purpose and need requirements of the project and therefore were not selected as the preferred alternative. Additionally, various alternatives were considered regarding the cross-section of the roadway on the bridge and its approaches. In order to meet MassDOT s Healthy Transportation Policy Directive, the cross-section would need two sidewalks and two 5 shoulders for bicycle accommodation. However, in order to design a structure which is context sensitive the surrounding environmental resources and in light of public feedback, the cross-section is proposed with a narrower width. The proposed cross-section minimizes environmental impacts while addressing community concerns (described in Section D). C. Existing Conditions, Environmental Impacts, and Mitigation Measures 1. Wetlands and Waterways The project is located across the Little Harbor Inlet. The project will result in temporary and/or permanent impacts to waters of the United States (including salt marsh) subject to jurisdiction under Sections 401 & 404 of the Federal Clean Water Act. Salt marsh replication and relocation areas are proposed for mitigation measures adjacent to the site of work. The project will require a Water Quality Certification (WQC) in accordance with Section 401 of the Federal Clean Water Act because this project is located within an area designated as an Outstanding Resource Water and the project involves work in water. Additionally, a Pre-Construction Notification (PCN) will be submitted to the U.S. Army Corps of Engineers (USACE) pursuant to requirements of Section 404 of the Federal Clean Water Act. The Corps will review the PCN along with State and Federal resource agencies, as applicable. Little Harbor Inlet is classified as a navigable waterway by the US Coast Guard, subject to jurisdiction under Section 9 of the Rivers and Harbors Act. However, the proposed replacement and rehabilitation of Bridge C-17-002 will provide similar opening for flow and clearances as the existing bridge. On 12/1/2015, the Federal Highway Administration (FHWA) concurred that the bridge project qualifies for a STURRA Approval in accordance with the 23 CFR Chapter 1, Subpart H, Section 650.805 (See Attached). 2. Threatened and Endangered Species According to the U.S. Fish and Wildlife Service s Information for Planning and Conservation (IPaC) online mapping tool, three federally listed species occur within the project limits, the northern longeared bat (Myotis septentrionalis), the roseate tern (Sterna dougallii dougallii) and the red knot (Calidris canutus rufa). A NLEB Streamlined 4(d) submittal form was sent to the USFWS on 5/5/16 to satisfy informal programmatic consultation under Section 7 of the Endangered Species Act (see attached). No response from USFWS was received after the passage of 30 days; therefore the project has satisfied programmatic informal consultation requirements under Section 7. Because the project Page 2 of 12 7/11/2016

is confined to the existing bridge footprint, approaching roadways and the immediate vicinity, no impacts to the roseate tern or red knot are anticipated. 3. Section 4(f) Properties The project will require temporary easements for various construction activities including slope grading, installation of erosion and sedimentation controls and placement of loam and seed on a parcel that is eligible for listing in the National Historic Register and therefore subject to Section 4(f) protection. The SHPO, the official with jurisdiction, concurred with MassDOT s determination that the temporary easements do not constitute a use, only a temporary occupancy of a Section 4(f) property. The project does require easements within the waterway (Little Harbor Inlet) which is owned by the Commonwealth of Massachusetts. However, upon consulting with MassGIS Open Space data layer, it was determined that the property is not designated as a significant recreational facility or parkland or wildlife refuge. While the Inlet functions primarily as a natural feature, the area of easements in question do not abut another publicly owned recreational area and any recreational activities that occur there are incidental, secondary, occasional or dispersed. Therefore, it has been determined that Section 4(f) does not apply the Little Harbor Inlet waterway. 4. Historic Properties MassDOT Cultural Resources Unit (CRU) has reviewed the proposed project under the Massachusetts Statewide Programmatic Agreement for Section 106 of the National Historic Preservation Act of 1966, as amended [36 CFR 800], and has determined that this bridge replacement and roadway improvement project will have No Adverse Effect on properties that are listed or eligible for listing in the National Register of Historic Places. The project received a concurrence of a Section 106 finding of No-Adverse-Effect from the Massachusetts Historic Commission (MHC) on April 12, 2016. 5. Noise The project is not a Type I action requiring a noise assessment. It does not involve the construction of a highway on a new location; alteration of an existing highway where there is either a substantial horizontal alteration or a substantial vertical alteration; the addition of a through traffic lane(s); the addition of an auxiliary lane, except for when the auxiliary lane is a turn lane; the addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial interchange; restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane; or, the addition of a new or substantial alteration of a weigh station, rest stop, rideshare lot or toll plaza. 6. Right-of-Way Requirements The project will require one permanent easement and six temporary easements. All right-of-way will be acquired in accordance with the Uniform Act. MassDOT s Right of Way Bureau is responsible for certifying that the ROW will be acquired in accordance with all applicable state and federal regulations. Page 3 of 12 7/11/2016

7. Other Environmental Impacts The project does not have a disproportionately high and adverse impact on minority or low-income populations. There are no minority or low-income populated areas within or adjacent to the project area limits. The project is located within the coastal zone of Massachusetts and in Coastal Zone Management (CZM) jurisdiction in accordance with 301 CMR 21.99. It is anticipated that it will be consistent with the Massachusetts Coastal Zone Management Plan and formal consultation will occur during the Army Corps of Engineers joint processing procedure pursuant to authorization of the action under Section 404 of the Clean Water Act. D. Public Outreach Design public hearings were held for Thursday, February 25, 2016 and Wednesday May 25, 2016 at the Cohasset Senior Center. At the February 25 th hearing, members of the public raised concerns about potential impacts to boat traffic due to possible change in bridge elevation, increased travel speed due to proposed widening of the bridge, general change in the bridge s appearance and detrimental impacts to views of Little Harbor Inlet. On May 25 th, key issues raised at the hearing included: Bridge Rail Bridge Width Shortened Construction Limits Impacts to Trees Wall Construction Roadway Curvature As it pertains to the bridge rail being proposed, at the meeting it was decided by popular vote to switch from the steel S3-TL4 rail to the concrete CT-TL2 Texas Style rail. MassDOT now proposes a 28 roadway, down from the 30 previously proposed. This brings the total width increase to 1 from the existing bridge width. In consideration of the impacts to trees, MassDOT proposes to shorten the limits of the sidewalk north of the bridge by approximately 100 to STA 15+50. In conjunction with the revision to the roadway width, this revision will reduce the number of impacted trees from 24 to 9. It was decided by popular vote at the meeting that although the abutments will be constructed as concrete walls with a granite veneer, the wing walls would transition to cemented fieldstone walls that would be built using stones salvaged from the existing walls. MassDOT did reconsider the proposed changes to the alignment of the curve immediately north of the bridge; however, subsequently it was decided that in the interests of public safety that no changes would be made to proposed alignment. The existing curve has a very tight radius that, according to MassDOT and AASHTO guidelines, is only appropriate for a maximum design speed of 15 mph. Page 4 of 12 7/11/2016

E. Permitting and Regulatory Review Permit/Review Agency Status Comments Section 401/404 Clean Water Act USACE 401- Work in ORW, requires Water Quality Certificate (WQC) 404- Pre-Construction Notification to be submitted to USACE See Section C.1. 4(d) Consultation USFWS Cleared (Submitted 5/5/16) See Section C.2. STURRA US Coast Guard STURRA Approval Concurrence from FHWA See Section C.1. Section 106 Clearance Massachusetts Historic Preservation Officer Concurrence of No Adverse Effect (4/12/16) See Section C.4. Appendix A Supporting Documentation Attached: Project Locus Map ROW Parcel Summary Sheet Section 106 Finding- No Adverse Effect Concurrence and Section 4(f) Temporary Occupancy Concurrence from MHC (Concurrence on 4/12/16) USFWS 4(d) NLEB Consultation Form (Dated 5/5/16) Notice of Design Public Hearing STURAA Exemption Concurrence letter from FHWA Page 5 of 12 7/11/2016

Categorical Exclusion (CE) Determination Checklist Starting with Section 1, answer the questions by checking Yes or No. After each of the following sections, there will be instructions that direct the preparer to continue to the next appropriate section of the checklist. The source(s) of the information used should be listed at the bottom of the response to each question and supporting documentation should be attached to the checklist. The preparer should refer to MassDOT s Categorical Exclusion Project Narrative and Checklist Detailed Instructions for further information and guidance on completing this checklist. SECTION 1-CATEGORICAL EXCLUSIONS YES NO 1. Is the project on the list of CEs? If Yes, the preparer should check the CE that is being considered and then complete Section 2 below. If No, the preparer should complete Section 2 below. List of Categorical Exclusions Categorical Exclusions in 23 CFR 771.117(c) (The C List) 1. Activities that do not involve or lead directly to construction, such as planning and research activities; grants for training; engineering to define the elements of a proposed action or alternatives so that social, economic, and environmental effects can be assessed; and Federal-Aid system revisions that establish classes of highways on the Federal Aid highway system. A feasibility study would be an example of this CE. 2. Approval of utility installations along or across a transportation facility. 3. Construction of bicycle and pedestrian lanes, paths, and facilities. Examples include walkways, sidewalks, shared-use paths and facilities, and small passenger shelters provided no new disturbance will occur. 4. Activities included in MassDOT s highway safety plan under 23 USC 402. 5. Transfer of Federal lands pursuant to 23 U.S.C. 107(d) and/or 23 U.S.C. 317 when the land transfer is in support of an action that is not otherwise subject to FHWA review under NEPA. 6. Installation of noise barriers or alterations to existing publicly-owned buildings to provide noise reduction. Examples include maintenance and/or replacement of existing noise wall panels and/or posts. 7. Landscaping. Examples include herbicidal spraying; mowing or brush removal/trimming projects; and beautification or facility improvement projects (e.g., landscaping, curb and gutter replacement, installation of park benches, or decorative lighting). 8. Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning devices where no substantial land acquisition or traffic disruption will occur. Page 6 of 12 7/11/2016

Examples include the installation or maintenance of signs, pavement markings/raised pavement markers/sensors, traffic calming activities, new or replacement right-of-way fencing, and general pavement marking or "line painting" projects. 9. The following actions for transportation facilities damaged by an incident resulting in an emergency declared by the Governor of Massachusetts and concurred by the Secretary of the United States Department of Transportation (the Secretary), or a disaster or emergency declared by the President pursuant to the Robert T. Stafford Act (42 U.S.C. 5121): (a) Emergency repairs under the FHWA Emergency Relief Program (23 U.S.C. 125); and (b) The repair, reconstruction, restoration, retrofitting, or replacement of any road, highway, bridge, tunnel, or transit facility, including ancillary transportation facilities (such as pedestrian/bicycle paths and bike lanes), that is in operation or under construction when damaged and the action: (i) Occurs within the existing right-of-way and in a manner that substantially conforms to the preexisting design, function, and location as the original (which may include upgrades to meet existing codes and standards as well as upgrades warranted to address conditions that have changed since the original construction); and (ii) Is commenced within a two-year period beginning on the date of the declaration. 10. Acquisition of scenic easements. Examples include conservation easements and mitigation easements. 11. Determination of payback under 23 USC 156 for property previously acquired with Federal Aid participation. 12. Improvements to existing rest areas and truck weigh stations. Examples include resurfacing of existing parking areas, truck stop electrification, and construction/installation of alternative energy facilities at existing facilities. 13. Ridesharing activities. Examples include transportation corridor fringe parking facilities and park and-ride lots. 14. Bus and rail car rehabilitation. 15. Alterations to facilities or vehicles in order to make them accessible for elderly and handicapped persons. 16. Program administration, technical assistance activities, and operating assistance to transit authorities to continue existing service or increase service to meet routine changes in demand. 17. The purchase of vehicles whose use can be accommodated by existing facilities or by new facilities which themselves are categorically excluded. An example would be the purchase or conversion of vehicles to alternative fuel uses. 18. Track and rail bed maintenance and improvements when carried out within the existing right-ofway. 19. Purchase and installation of operating or maintenance equipment to be located within the Page 7 of 12 7/11/2016

transit facility and with no significant impacts off the site. 20. [Not Applicable] 21. Deployment of intelligent transportation systems. 22. Projects, as defined in 23 U.S.C. 101, that would take place entirely within the existing operational right-of-way. Examples include: Tower lighting. Guardrail installation and replacement (including median cable barriers) where roadway ditches and backslopes will not be relocated. Improvements to existing MassDOT maintenance facilities. Construction of new MassDOT maintenance facilities within an existing operational right-of-way. Work on pedestrian and vehicle transfer structures and associated utilities, buildings, and terminals. (For CE C-22, see Categorical Exclusion Determination Project Narrative and Checklist Detailed Instructions). 23. Federally-funded projects: (a) That receive less than $5 million of Federal funds (as adjusted annually by the Secretary to reflect any increases in the Consumer Price Index prepared by the Department of Labor); or (b) With a total estimated cost of not more than $30 million (as adjusted annually by the Secretary to reflect any increases in the Consumer Price Index prepared by the Department of Labor) and Federal funds comprising less than 15 percent of the total estimated project cost. (For CE C-23, see Categorical Exclusion Determination Project Narrative and Checklist Detailed Instructions). 24. Localized geotechnical and other investigation to provide information for preliminary design and for environmental analyses and permitting purposes, such as drilling test bores for soil sampling; archaeological investigations for archaeology resources assessment or similar survey; and wetland surveys. (This CE only applies to stand alone projects, not for environmental surveys being conducted as part of a project with an environmental document). 25. Environmental restoration and pollution abatement actions to minimize or mitigate the impacts of any existing transportation facility carried out to address water pollution or environmental degradation. These actions include retrofitting and construction of stormwater treatment systems to meet Federal and State requirements under Sections 401 and 402 of the Federal Water Pollution Control Act (33 USC 1341; 1342). 26. Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes or parking lanes. Examples include: Construction of highway safety and truck escape ramps. Construction of bicycle lanes and pedestrian walkways, sidewalks, shared-use paths, or facilities and trailhead parking that do not otherwise qualify for a CE C-1 designation. Page 8 of 12 7/11/2016

Beautification or facility improvement projects (e.g., landscaping, curb and gutter installation and replacement, ADA ramps/curb ramps, installation of park benches, or decorative lighting). Implementation of Complete Street elements to improve safety and/or pedestrian, bicycle, transit, vehicular, or freight mobility. 27. Highway safety or traffic operations improvement projects, including the installation of ramp metering control devices and lighting. Examples include lane reduction changes, provided that traffic analyses are completed. 28. Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at-grade railroad crossings. 29. Purchase, construction, replacement, or rehabilitation of ferry vessels (including improvements to ferry vessel safety, navigation, and security systems) that would not require a change in the function of the ferry terminals and can be accommodated by existing facilities or by new facilities which themselves are within a CE. 30. Rehabilitation or reconstruction of existing ferry facilities that occupy substantially the same geographic footprint, do not result in a change in their functional use, and do not result in a substantial increase in the existing facility's capacity. Example actions include work on pedestrian and vehicle transfer structures and associated utilities, buildings, and terminals. Categorical Exclusions in 23 CFR 771.117(d) (The D List) 1. to 3. [Reserved] 4. Transportation corridor fringe parking facilities. 5. Construction of new truck weigh stations or rest areas. 6. Approvals for disposal of excess right-of-way or for joint or limited use of right-of-way, where the proposed use does not have significant adverse impacts. 7. Approvals for changes in access control. 8. Construction of new bus storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and is located on or near a street with adequate capacity to handle anticipated and support vehicle traffic. 9. Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users. 10. Construction of bus transfer facilities when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic. 11. Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and Page 9 of 12 7/11/2016

where there is no significant noise impact on the surrounding community. 12. Acquisition of a particular parcel or a limited number of parcels for hardship or protective purposes where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed. An example is right-of-way acquisition only for a bikeway/pedestrian facility (no construction). SECTION 2-CE AND UNUSUAL CIRCUMSTANCES QUESTIONS YES NO 2. Does the project induce significant impacts to planned growth or land use for the area? 3. Does the project require the relocation of significant numbers of people? 4. Does the project have a significant impact on any natural, cultural, recreational, historic, or other resource? 5. Does the project involve significant air, noise, or water quality impacts? 6. Does the project have a significant impact on travel patterns? 7. Does the project involve substantial controversy on environmental grounds? 8. Does the project have a significant impact on Section 4(f) properties or on historic properties? 9. Is the project inconsistent with any Federal or state requirement or administrative determination relating to the environmental aspects of the action? If the answer for any of the questions within Section 2 is Yes, then the project does not qualify as a CE and an EA or EIS is required. If the answer for all the questions within Section 2 is No, the preparer should complete Section 3 below. SECTION 3-SEGMENTATION QUESTIONS YES NO 10. Is the action a linear project? If the answer is Yes, the preparer should complete Questions 11 through 13. If the answer is No, the preparer should not respond to Questions 11 through 13 and advance to Section 4 below. 11. Does the project have independent utility? 12. Does the project connect logical termini? 13. Does the project allow further consideration of alternatives for other reasonably foreseeable transportation improvements? If any of the answers for Questions 11, 12, and 13 is No, then the project does not qualify as a CE and Page 10 of 12 7/11/2016

consultation between MassDOT and FHWA is required. If the answers for Questions 11, 12, and 13 are Yes, the preparer should complete Section 4 below. SECTION 4-PROGRAMMATIC CE CONDITION QUESTIONS YES NO 14. Does the project involve the permanent acquisition of more than minor amounts of right-of-way or involve non-residential or residential displacements? 15. Does the project have a substantial environmental impact from the intended future use of land involved in the sale, transfer, or lease of state-owned property? 16. Does the project have a finding of adverse effect on historic properties? 17. Does the project have a disproportionately high and adverse impact on minority or low income populations? 18. Is the project a Type I project requiring a noise analysis? 19. Does the project require the use of Section 4(f) properties necessitating the preparation of an Individual Section 4(f) Evaluation? 20. Does the project require the use of Section 6(f) properties? 21. Does the project require an Army Corps of Engineers Section 10 permit or Individual Section 404 permit? 22. Does the project require a U.S. Coast Guard bridge permit? 23. Does the project adversely affect Federally-listed threatened or endangered species or critical habitat? 24. Does the project involve a floodplain encroachment other than for functionally dependent uses or actions that facilitate open space use? 25. Does the project involve construction in, across, or adjacent to a river component designated or proposed for inclusion in the National System of Wild and Scenic Rivers? 26. Does the project convert prime or unique agricultural land to nonagricultural uses? 27. Does the project affect a known Superfund site? 28. Does the action involve any changes in access control? 29. Does the project involve the construction of temporary access or closure of existing road, bridge, or ramps? Page 11 of 12 7/11/2016

If the answers to Question 14 through 29 are No then the project qualifies as a Programmatic CE. If any of the answers to Questions 14 through 28 are Yes then the project cannot be classified as a Programmatic CE and an Individual CE approval from FHWA is required. If the answer to Question 29 is Yes, the preparer should complete Question 30 below. 30. Does the project meet the following conditions for construction of temporary access or closure of existing road, bridge, or ramps? Provisions have been made for access by local traffic and are posted; There will be no adverse effects on through-traffic dependent business; The temporary access or closure of existing road, bridge, or ramps will not interfere with a local special event or festival; The temporary access or closure of existing road, bridge, or ramps will not substantially change the environmental consequences of the project; or There is no substantial controversy associated with the temporary access or closure of existing road, bridge, or ramps. YES NO If the answer to Question 30 is Yes, then the project qualifies as a Programmatic CE. The checklist and all supporting information should be submitted to the MassDOT Project Manager. If the answer to Question 30 is No, then the project cannot be classified as a Programmatic CE and an Individual CE approval from FHWA is required. The preparer should attach to this checklist all supporting information to clearly establish that there is little or no potential for significant impact. The Individual CE and supporting information will be submitted to the FHWA Massachusetts Division for approval. I concur with this categorical exclusion determination: 7/1/2016 Director of Environmental Services (or designee) Date Page 12 of 12 7/11/2016