Standard Procedure s for Tenant Fire Sprinkler Work

Similar documents
FIRE PROTECTION DESIGN REQUIREMENTS FOR TENANTS (Revised 1/15/2019)

Tempra / DHC-E. The Finest Tankless Electric Water Heaters Available! Simply the Best Featuring Advanced Microprocessor Control

Limestone Cements. Why are we doing this? What are they? What s in it for you? Limestone Cements, Holcim (US) Inc.

BULK PURCHASE DISCOUNTS Valid for purchases any time of year

Simply the Best WHOLE HOUSE COMFORT SAVE WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS

Simply the Best WHOLE HOUSE COMFORT SAVE WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS

Tempra Series WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS Whole House Comfort

Advanced Microprocessor Control The Finest Tankless Electric Water Heaters Available! DHC-E / Tempra

Standards and Safety Update

Bosch Tankless Water Heater Troubleshooting Guide

ADVANTAGE SERIES. Popular Technologies for Outdoor Living

Featured Fish-Week ofmay 29th

- Residential Fire Sprinkler -

Griddle Stands REFRIGERATORS & FREEZERS. Call us toll free at (800) INNOVATIVE DESIGNS FOR YOUR FOODSERVICE NEEDS

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

Inventory Management Guide

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

FIRE SUPPRESSION SPRINKLER SYSTEM

Presentation to NC Home Inspectors Licensure Board April 7, Opportunities and Partnerships

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

ADDRESS (NO PO BOX) COMMUNICATIONS GENERAL INFORMATION. First Name*: John. Last Name*: Smith. Job Title*: President Company Name*: Custom Homes

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

2018 PRICING. alderonind.com STANDARD PRODUCTS

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

USE OF A LOWER RATE WHEN APPLIED ON CEREALS AT THE HERBICIDE TIMING (FEEKES 4-6) - AL, AR, AZ ETC.

Gas Station & C Store SECTION CWM Job No

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

Hello. What can I do for you? QUALITY CUSTOMER SERVICE. Joseph Griffith Regional Sales Manager. Cooling Tower Depot is Global, I am Local

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

Continuing Education Units (CEU)

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

This presentation is posted for public use. ACEEE does not endorse any product or service.

INFINITI K APPLICATIONS MANUAL. Indoor Residential and Tankless Water Heaters. Warning: Follow each appliance's instructions precisely.

FIRE ALARM SYSTEM INSPECTION

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

SECTION DRY-PIPE SPRINKLER SYSTEMS

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

NOW I 50% OFF. CALL TODAY! H.L. Flake McDonald Dash ORDER ONLINE! HLFLAKE.COM BUY AT LIST PRICE

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

DOWNLOAD OR READ : KITCHEN AND BATH SOLUTIONS CLARKSVILLE TN PDF EBOOK EPUB MOBI

DESIGN & CONSTRUCTION GUIDELINES

Pennsylvania State Hazardous Materials & Pipeline Safety Meeting. Paul Metro Chief, Gas Safety Division Pennsylvania PUC

Arc Flash and Selective Coordination

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

Bar Equipment BOTTLE, KEG & BACK BAR COOLERS INNOVATIVE DESIGNS FOR YOUR FOODSERVICE NEEDS

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

DIVISION 21 - FIRE SUPPRESSION

E x t E N d e d Co v e r ag e S p r i n k l e r s. Office Buildings Hotels Hospitals Libraries. High-Piled Storage Big-Box Retailing

FIRE SPRINKLER SYSTEMS POLICY

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE FIRE-SUPPRESSION SPRINKLERS

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

EC/QREC ORDINARY HAZARD PENDENT SPRINKLER VK572 (K14.0) TECHNICAL DATA

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

SECTION : FIRE PROTECTION SYSTEMS

STORAGE FIRE PROTECTION SPRINKLERS

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

Overview of Biosolids Composting Science, Production and Use Albert Cox Kuldip Kumar

SPRINKLERS TABLE OF CONTENTS

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

FIRE SPRINKLER SYSTEMS POLICY

Environmental Health & Safety

Submittal Packages Detailed with Items and Reviewers

Port of St Helens SIA Aircraft Hanger Scappoose, OR

SECTION WET-PIPE SPRINKLER SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

Series EC-11 and EC-14 Sprinklers, 11.2 K and 14.0 K Upright and Pendent Extended Coverage Light and Ordinary Hazard General Description

SECTION SPRINKLER SYSTEMS

B. Section Identification for Fire Suppression Piping and Equipment.

D. Reference Standards (Utilize latest editions available):

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS

TECHNICAL DATA OBSOLETE

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

Design & Construction Standards, Revised January

SECTION SPRINKLER SYSTEMS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ec/qrec ordinary hazard upright and pendent sprinklers vk570 and vk572 (k14.0)

ATTIC UPRIGHT SPECIFIC APPLICATION SPRINKLER VK696 TECHNICAL DATA

STANDARD RESPONSE DRY PENDENT STANDARD ORIFICE SPRINKLERS TECHNICAL DATA

Cellular Conversion Installation Manual

APPENDIX H (DESIGN SUBMISSION CRITERIA)

standard response elo upright and pendent sprinklers (storage-density/area)

quick response Sprinkler 105a October 25, 2010

freedom residential horizontal sidewall lead free sprinkler VK4840 (k4.2)

TECHNICAL DATA. The Viking Corporation s Web site at Frame Casting: Brass UNS-C84400

2. Welding Materials and Procedures shall conform to the ASME Code.

SECTION WET-PIPE SPRINKLER SYSTEMS

NFPA Edition Update

TECHNICAL DATA. Refer to the Approval Chart and Design Criteria for UL and FM Listing/Approval requirements that must be followed.

Transcription:

Standard Procedure s for Tenant Fire Sprinkler Work 1. Provide tenant a copy of Simon Property Group Standards for Fire Protection Systems, Section 15400, requesting they in turn would give the standards to their sprinkler contractor who would adhere to the same. The standards are available through Brian Cotter in the Architecture and Engineering Department. 2. For existing tenants, the tenants sprinkler contractor shall obtain original fire sprinkler shop drawings from the local mall manager. 3. In addition to complying with the local authority requirements for submission of sprinkler shop drawing, the sprinkler contractors shall submit a minimum of (5) sets of sprinkler shop drawings and hydraulic calculations (if applicable) to Global Risk Consultant s for approval. Contact is: Mr. Bill Cary (480) 926-8858 4. Any changes to the existing sprinkler system shall require shop drawing submittals. 5. Global Risk Consultant s shall return the shop drawings as follows: (1) set to the Sprinkler Contractor (2) sets to the local Mall Manager (1) set to SPG Tenant Coordination Dept. 6. A copy of the shop drawing review letter will be submitted to SPG Risk Management Department (Gene Thomas). Risk Management (Gene Thomas) will in turn review the letter and if there is any further action required from the sprinkler contractor, Risk Management (Gene Thomas) will forward the letter to the local mall manager and ask them to contact the tenant and have his sprinkler contractor respond accordingly. Sprinkler contractor should respond and resubmit shop drawings no longer than (1) week after notification from the mall manager.

Simon Property Group 10/21/05 Tenant Plan Review Global Risk Consultants Offices: Peter Rullo Simon Tenant Plan Review Manager c/o Global Risk Consultants 100 Walnut Avenue 5 th Floor Clark, NJ 07066 Locations State: CT, IN, KY, MA, MD, ME, NH, NJ, NY, OH, PA, VA Phone: 732.827.4454 Cell: 201.618.3447 Email: peter.rullo@globalriskconsultants.com Attn: Amanda Norris 4950 San Diego Court Sparks, NV 89436 775-750-9853 AK, AZ, CA, NV, UT, WA amanda.norris@globalriskconsultants.com Attn: Kim Newton 2590 Woodside Drive Highland Village, TX 75077 AR, CO, KS, LA, MO, NE, NM, OK, TX 972-317-0312 kim.newton@globalriskconsultants.com Attn: Michelle Czarnecki 6122 King s Way Saugatuck, MI 49453 IA, IL, MN, WI 269-857-8198 michelle.czarnecki@globalriskconsultants.com Attn: Lori Meyers 1003 Regency Manor Drive Ballwin, MO 63011 FL, GA, NC, SC, TN 636-891-9052 Lori.Meyers@globalriskconsultants.com

November 16, 2006 SECTION 15400 -TENANT FIRE PROTECTION SYSTEMS SECTION DESCRIPTION 15401 GENERAL REQUIREMENTS 15402 FIRE PROTECTION DESIGN CRITERIA 15403 SPRINKLER EQUIPMENT 15404 SYSTEM ACTIVATION, TESTING AND CERTIFICATION

SECTION 15400 - FIRE PROTECTION SYSTEMS 15401 - GENERAL REQUIREMENTS A GENERAL REQUIREMENTS 1. The fire protection system shall be designed, fabricated, and installed by a Licensed or NICET Fire Protection System Contractor. The engineer shall provide specifications and diagrams to allow letting of a contract for the fire protection portion of the project. The entire system design, material use and installation shall comply with FM Global engineering guidelines as a minimum. 2. Simon Property Group s Property Insurance plan review group contact is Global Risk Consultants Corp. Bill Cary: (480) 926-8858: 2551 E. Saratoga Street; Gilbert, AZ 85296. 3. Regional plan submissions shall be made to the following Global Risk Consultants (GRC) offices: States: CT, DE, MA, MD, ME, NH, NJ, NY, PA, RI, VT Attn: Peter Rullo / Simon Tenant Plan Review 100 Walnut Avenue, 5 th Floor Clark, NJ 07066 (732) 827-4454 States: AR, CO, KS, LA, MO, NE, NM, OK, TX, Puerto Rico Attn: Paul Helweg / Simon Tenant Plan Review 86 Berry Hill Lane Kingston, RI 02881 (401) 789-2554 States: IA, IL, IN, MI, MN, ND, OH, SD, WI, Canada Attn: Michelle Czarnecki / Simon Tenant Plan Review 6122 King s Way Saugatuck, MI 49453 (269) 857-8198 States: AL, DC, FL, GA, KY, MS, NC, OR, SC, TN, VA Attn: Lori Meyer / Simon Tenant Plan Review 1003 Regency Manor Drive Ballwin, MO 63011 (636) 891-9052

States: AK, AZ, CA, HI, ID, MT, NV, UT, WA, WY Attn: Amanda Norris, P.E. / Simon Tenant Plan Review 4950 San Diego Court Sparks, NV 89436 (775) 750-9853 4. The sprinkler system shall be a wet pipe system serving all areas of the retail space. Portions of the space that are unheated or exposed to freezing temperatures shall be provided with an automatic dry pipe type system complying with FM Global engineering guidelines and NFPA-13. 5. Piping shall be fastened to the structural system of the building and concealed in areas having a suspended ceiling. Install and/or upgrade seismic sway bracing on existing systems where required for earthquake zones per local codes and FM Global engineering guidelines. Seismic bracing for fire systems must be designed and installed following FM Global Data Sheet 2-8. 6. Drain piping is required at low points of piping systems. Drain down locations shall be extended to locations that are accessible. C. FIRE PROTECTION FOR EXISTING TENANT SPRINKLER SYSTEMS 1. Whenever an existing sprinkler system is being renovated, the integrity and reliability of the existing system must be maintained. Original sprinkler shop drawings shall be acquired through the Mall Manager/Project Manager. If these drawings are not available, field verification will be required. If the sprinkler contractor discovers a discrepancy from the original sprinkler shop drawings and actual field conditions, he shall note the discrepancy on his renovated shop drawings. 2. The hydraulic design criteria as a minimum shall match the hydraulic criteria originally intended for the facility. At no time shall the hydraulic criteria be less than Ordinary Hazard Group 2 occupancy as defined by NFPA-13. The latest site water flow data to be used for hydraulic calculations shall be obtained from Global Risk Consultants or Mall Management. 3. Existing pipe schedule sprinkler systems are required to be calculated at the FM Global density of 0.15 gpm per sq. ft. over the most hydraulically remote 2500 sq. ft. 4. FM Approved materials for Ordinary Hazard Group 2 occupancy must be used, including but not limited to sprinkler piping, hangers, sprinkler heads, etc. Seismic bracing may be UL Listed. 5. Sprinkler head spacing requirements for Ordinary Hazard Group 2 occupancy shall be in strict compliance with the sprinkler head listings and approval. 6. NFPA-13 and FM Global Data Sheets 2-8N latest editions shall be the minimum design requirements along with any state and local requirements.

7. A minimum of (4) sets of shop drawings along with hydraulic calculations (if applicable) shall be submitted to Global Risk Consultants for approval. Hydraulic calculations shall be submitted for all tenant sprinkler system work irregardless of the scope of work involved. Plans shall be submitted to the local authorities having jurisdiction for approval. Installation/renovation of sprinkler system shall not begin until all approvals have been received. 8. 4 sets of material brochures shall also be submitted to GRC for review. Brochures shall be limited to new sprinklers heads, flexible drops and valves. Plans shall indicate the type of piping being utilized with the gauge indicated. 15402 - FIRE PROTECTION DESIGN CRITERIA A. GENERAL 1. Sprinkler head arrangement shall be in conjunction with architectural finishes and provide allowance for partitions, columns, light fixtures, air diffusers, etc. 2. Sprinkler Shop Drawings shall not be considered final until all requirements of GRC, SPG, and all Local and State Building Codes having authority have been met, and the approval of each has been tendered. 3. Minimum and maximum sprinkler head operating pressures shall be consistent with their UL Listing/FM Approval. 4. Design calculations for inside pipe should use C=100 for dry and pre-action systems, and C=120 for wet or deluge systems. 5. Minimum and maximum sprinkler spacing shall be in accordance with their UL Listing/FM Approval. 6. FM Global required minimum density for Sales/Retail/Storage spaces will be 0.15 gpm per sq. ft. over the most hydraulically remote 2500 sq. ft., using ½ or 17/32 orifice, 165 degree F. rated heads. If the local AHJ requires an NFPA-13 design density, 0.18 gpm per sq.ft. over the most hydraulically remote 2500 sq. ft. shall be used unless specific approval is given otherwise for special occupancies. The most remote area should have the dimensions parallel to the branch line of at least 1.4 times the square-root of the area per FM Global Data Sheet 2-8N. Quick-response (QR) sprinklers do not qualify for a design area reduction per FM Global Data Sheet 3-26. The density design should conform to the most stringent of either FM Global Data Sheet 3-26 or NFPA-13, Ordinary Group 2 occupancy.

7. Stockroom/storage areas over 200 sq. ft. must be protected for the maximum storage height and configuration (bin-box/gondola/shelf or rack) per FM Global Data Sheet 8-9. When storage exceeds 10 feet in height, the Regional GRC plan reviewer shall be consulted for appropriate design densities. Classify the commodities in tenant spaces as Cartoned Expanded & Unexpanded Plastics for sprinkler design purposes. Sprinkler head spacing shall not exceed 100 sq. ft. in storage areas unless approved for extended coverage (i.e., EC-25). 8. Big Box Stores require unique sprinkler system designs to meet the requirements of FM Global Data Sheet 8-9 and NFPA-13, Chapter 12. Contact Bill Cary with Global Risk Consultants for specific design requirements based upon the proposed display / storage configuration and roof deck height. 15403 - SPRINKLER EQUIPMENT A. GENERAL 1. Only sprinkler equipment bearing the FM Global Approval mark shall be installed. Provide equipment as manufactured by: Automatic Sprinkler, Tyco, Reliable, Viking Gem or equal. B. SPRINKLER HEADS 1. Sprinkler heads shall be glass bulb type of a configuration as required for each particular location. All heads on concealed piping shall be chrome plated with chrome plated escutcheon plates. Operating temperature shall be as required for the type of occupancy. 2. Sprinkler heads in janitor s closets, mechanical rooms, electrical rooms and those mounted less than 8 feet above finished floor shall be protected with a wire cage type guard. C. SPRINKLER PIPING 1. Aboveground piping shall be FM Approved Schedule 10 or 40 black steel. Schedule 10 piping shall be joined with FM Approved roll-grooved fittings, not threaded or plain-end. Fittings shall be cast iron or steel approved for a minimum of 175 psi working pressure. Dry systems shall have FM Approved galvanized piping and fittings for corrosion resistance. 2. Threadable lightwall (XL) and thinwall pipe may not be utilized under any circumstances.

3. Hangers shall be FM Approved, and adaptable to various types of construction. Hangers shall be supported from building structure and structural steel headers shall be installed for supporting crossmain hangers where main is not directly below structural member. Roof deck hangers are prohibited. All hangers shall comply with FM Global engineering guidelines. 4. Wall plates shall be provided on exposed piping where pipe passes through walls, partitions, ceilings, etc. and secured by setscrews. D. VALVES 1. All valves and fittings shall be FM Approved and rated 175 lb. minimum. 15404 - SYSTEM ACTIVATION, TESTING AND CERTIFICATION 1. Sprinkler contractor shall install and activate the entire sprinkler system prior to the Certificate of Occupancy. 2. Existing sprinkler systems shall be shut down and red tagged in strict accordance with Simon Property Group Impairment Procedures. Under no circumstances should a sprinkler system be left out of operation overnight without an appropriate fire watch in place. 3. All fire protection systems shall be tested as required by local authorities and Global Risk Consultants before any systems are concealed. 4. Contractor shall conduct hydrostatic tests in compliance with FM Global Data Sheet 2-8N and NFPA-13 (two hours at 200 psi or 50 psi over normal system pressure minimum). Piping subject to freezing during test period shall be tested with compressed air. 5. Certificates of approval of installation shall be obtained from the Authority having Jurisdiction and forwarded to SPG. 6. After tests are conducted and any repairs completed; completely flush the piping systems with water until discharge shows no discoloration. *** END OF SECTION ***