Bus Rapid Transit Backgrounder. December 2016

Similar documents
The University District envisions, in its neighborhood

CAL POLY MASTER PLAN UPDATE, March 2015

Shift Rapid Transit Public Participation Meeting May 3, 2017

CAMPUS MASTER PLAN UPDATE Transportation Element Focus Group Meeting #3

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

Port Credit Local Advisory Panel October 20 th Meeting

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

Silverdale Regional Center

Green Line North Centre City Alignment

iii. Visioning framework

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

CITY COUNCIL AGENDA REPORT

TRANSIT-ORIENTED DEVELOPMENT POLICY DRAFT. City Planning and Development Department Kansas City, Missouri

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

2010 Campus Master Plan Update - USF TAMPA Campus Master Plan Update USF TAMPA

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

WELCOME and introduction

Seattle Transit Master Plan

Community Open House #2 June 12 th, 2018, 5:30 7:00 PM

Eglinton West LRT Update

Transportation. Strategies for Action

Appendix E: Evaluation of Network Alternatives - July 2017

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Economy Vision Statements: Social Wellbeing Vision Statements: Natural Environment Vision Statements:

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

Route 110 Alternatives Analysis

THE 355/270 CORRIDOR:

Subcampus Recommendations

Plano Tomorrow Vision and Policies

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Rapid Transit Implementation Working Group Transit Oriented Development and Transit Villages January 12, 2017

1 Welcome! UBC Okanagan Master Plan Update - Open House

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

THE GREEN VISION WORKSHOP Friday, November 6, 2009

University of Minnesota. MINNEAPOLIS CAMPUS DEVELOPMENT FRAMEWORK February 11, 2016

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Executive Summary. NY 7 / NY 2 Corridor

implementation r expression in landscape

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms.

2013 CAMPUS MASTER PLAN UPDATE

The role of urban mobility in (re)shaping cities


Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

The West Vaughan Employment Area Secondary Plan Policies

Rapid Transit Implementation Working Group

The Proposed Auckland Unitary Plan (notified 30 September 2013)

Planning for TOD Implementation at a Corridor Scale

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

4.1.3 LAND USE CATEGORIES

ELK GROVE GENERAL PLAN VISION

History: a Grand Urban Boulevard

City of Long Beach. creating vibrant and exciting places

City of Hermosa Beach Administrative Policy #

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Northwest commuter rail station US 36 BRT. Westminster Station

Welcome to the Oakridge Centre Open House

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

SUMMARY. An Attractive, Competitive and Sustainable GREATER MONTREAL. Draft Metropolitan Land Use and Development Plan. April 2011

REVIEW AND EVALUATION OF REGIONAL LAND USE

Portage Parkway Environmental Assessment Public Information Centre No. 1

Chapter 1: Introduction

Evaluation Criteria. Detailed Evaluation Criteria

Update on University Avenue Study. September 21, 2015

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION

Hillsborough County MPO Transit Study. Citizens Team Workshop Wednesday, February 28 th, 2006 Hillsborough Community College - Brandon

178 Carruthers Properties Inc.

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

SECTION TWO: Urban Design Concepts

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

The GATEWAYS Sub Area Master Plan. City of Walker

Rapid Transit Implementation Working Group September 14, 2017

1.0 INTRODUCTION & BACKGROUND

The Master Plan Framework

CHAPTER 7: Transportation, Mobility and Circulation

ROCHESTER INSTITUTE OF TECHNOLOGY Active Transportation Improvements 2010

PLAN ELEMENTS WORKSHOP. April 5, 2016

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

There are five comprehensive goals that inform the Urban Design element at FIU. They are:

Developer s Program. The Station at East 54

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Transcription:

Bus Rapid Transit Backgrounder December 2016

Background The City of London is completing the second stage of Shift, its public transit planning exercise. Shift, focuses on rapid transit, along with vehicular and active transportation, as part of a system that will help London grow and prosper. This stage will develop a detailed design for the preferred rapid transit routes and provide a plan to build the rapid transit network including how it will be funded. In May 2016, the City updated its plan to move away from Light Rail Transit (LRT) to a Bus Rapid Transit (BRT) model. In June 2016, following consultations with the campus community, Western s Board of Governors unanimously expressed its support for both improved transit in the city and the introduction of rapid transit running to campus. However, the Board did not support LRT routes traversing through campus, or BRT routes traversing through campus if it is conditional to being convertible to LRT in the future. The Board also stated that the university would complete an open-space-and-landscapeplanning exercise intended, in part, to make the campus a more pedestrian-focused space with limits on vehicular traffic. This exercise, which is underway, will include an assessment of where transit routes should go, as well as the possible construction of transit hubs

Bus Rapid Transit The City and the university have continued to work towards finding a solution to ensure that existing bus transit and the proposed BRT provide convenient service to campus while maximizing ridership and service efficiency, and minimizing environmental and social impacts at Western. Five route alternatives have been identified for consideration and the City plans to have final routing no later than January 2017. In order to choose the best option, it will be important to understand the potential implications to all activities on campus, including academia, research and leisure The university is working with the City on a technical assessment of BRT route alternatives. These will be evaluated against objectives of Western s Strategic Plan, Campus Master Plan and emerging Open Space Plan.

Vision & Objectives Strategic Plan Goals (2013) Campus Master Plan (2015) Emerging Open Space Plan Principles (2016) Raise Expectations: Create a world-class research and scholarship culture Lead in Learning: Provide Canada s best education for tomorrow s global leaders. (international attraction, diversity, sustainability ethos) Reach Beyond Campus: Engage alumni, community, institutional and international partners. Take Charge of Destiny: Generate and invest in new resources in support of excellence. Core Principles Support academic mission Provide the best student experience Guide growth and change Enhance quality of campus environment Support interdisciplinary study and interaction Ensure safety, health, access and mobility Incorporate sustainability Key Initiatives Intensify the Core Campus Improve pedestrian environment of Western Road Promote parking management and alternatives Improve campus connectivity (particularly within campus) Create high quality public spaces Identify/define campus gateways Human Place: People are the priority on campus. It must be safe and inviting, encouraging interaction of the diverse campus community. Access: University should be connected to the larger London community by a diversity of modes. Equity: All people are valued. Access, use, enjoyment and learning on the campus should be available to all irrespective of culture, income or physical ability. Mobility: The campus is a connected place where people move easily between buildings and through spaces via a variety of modes. Physical activity is valued to promote health of body and mind. Resilience: The campus has and will endure change. Redundancies and flexibility ensure durability. Pedagogy: The campus is a place of learning. Spaces and systems must support the educational mission and promote learning.

Technical Assessment Criteria There are several technical assessment criteria that will be considered, including: The number of proposed rapid transit stations servicing the campus and the attractiveness of particular station sites. The length of the route from Richmond Street at Huron Street to Western Road at Windermere Road. The approximate transit travel time along the assessed route assuming a top operating speed of 35 km/hour on internal campus roads. A sum of all the existing peak transit boardings within 400 m of the stations along the route. The walk time between the geographic centre of campus (McIntosh Gallery) as identified by the City of London and the closest rapid transit station on the route.

Evaluation Metrics Plan Principle/Objective Attract top talent: strengthen the ability of the University to compete in attracting leading faculty and top scholarship students from across Canada and the globe. Qualitative Evaluation Measure(s) Efficiency of connection to the Downtown and other key regional destinations. Legibility of route and access to destinations. Lead in Learning: Support leading research and teaching Potential impacts on sensitive research and other activities Promote sustainability: Reduce environmental impacts with regard to transportation-related emissions and stormwater from surface runoff. Promote a pedestrian-oriented campus: Support and enable the reduction or elimination of private vehicle traffic in the core of the campus Enable sustainable growth: Support planned campus growth by providing access, especially by non-auto means Campus connectivity: Strengthen the connection and accessibility between campus precincts. Quality of place: Facility design compliments visual character of the campus and campus landscape Ability to support a mode shift among the university community to reduce vehicle kilometers traveled (VKT). Potential to enable reduction in impervious surface area dedicated to vehicle demand such as travel way widths and surface parking Potential to negatively impact pedestrian safety Potential to provide a non-auto alternative to access campus destinations Potential to reduce vehicle trip generation rates at planned campus expansion sites Potential to reduce parking demand Viability to use the proposed alignment to meet intra-campus connection demands Potential to negatively impact or degrade elements that contribute to campus identity and pride Potential to lead to improvement of Western Road

1. Middlesex Drive Alternative Potential Benefits High level of service to major campus trip generators Convenient stop location to service students, faculty and staff Maintains existing transit hub location Partially serves planned campus expansion areas Relatively short segment of Western Road impacted. If autos are prohibited in core campus area, provides best connectivity and service to highest density of uses. If autos are prohibited in core campus area, proposed route and stop location have strong potential for place-making as unique, high quality and identifiable transit plaza and corridor. Potential Impacts Proximity to sensitive research and arts facilities could impact these activities, although with substantially less impact than LRT Stop location could further exacerbate already significant modal conflicts (bicycle, pedestrian, transit and vehicle) at Oxford/Middlesex/Elgin intersection. Initial concepts from the city may require reconstruction or potential widening of University Drive bridge, reconstruction of Richmond Street gates and potential widening of other campus streets. Mitigations are available that could eliminate the need for major widening and avoid impact to the gate. Requires operational changes to provide two way transit service on Middlesex Drive and Elgin Road. Could result in conflicts between transit and bicycle facility on Middlesex Drive. Potential widening of Western Road.

2. Lambton Drive Alternative Potential Benefits Good service to major campus trip generators Generally removed from sensitive research activities Convenient stop location to service students, faculty and staff Maintains existing transit hub location Good connectivity to planned campus expansion areas If autos are prohibited in core campus area, provides good connectivity and service to highest density of uses. Has strong potential to maintain excellent access if autos are prohibited in core campus area. Strong potential to support/enable removal of autos from core campus and thus greatly reduce pedestrian/vehicle conflict/risk Corridor and Alumni Circle have strong potential as unique and high quality transit plaza space; could remove substantial impervious surface around the Circle. Potential Impacts Longer segment of Western Road is impacted Conflicts would remain between pedestrians, bicycles and transit particularly at Alumni Circle May require reconstruction/potential widening of University Drive bridge and potential widening of other campus streets (if vehicles are not prohibited). Stop location is further from campus core. Slightly longer transit travel time.

3. Richmond/ Windermere Alternative Potential Benefits Little to no impact on university street or campus Fast travel time to the Downtown No change required in University Drive bridge Little impact on Western Road Generally removed from sensitive research activities Few additional conflicts between pedestrians and vehicles Potential Impacts Stop locations are generally inconvenient for students, faculty and staff Does not well serve planned campus expansion areas Does not serve areas with highest density of uses. Does little to support removal of cars from core campus or replace lost connectivity if cars are prohibited from campus Stop locations are less obvious and intuitive. Lower projected transit ridership

Potential Benefits Limited impact on streets within the main campus Fast travel time to the Downtown Little to no impact on Western Road Generally removed from sensitive research activities Few additional conflicts between pedestrians and vehicles 4. Perth Drive Alternative Potential Impacts Stop locations are generally inconvenient for students, faculty and non-hospital affiliated staff Numerous curb cuts on corridor could make station siting difficult Does not well serve planned campus expansion areas Potential for a high level of pedestrian conflict at the intersection of University, Perth, and Middlesex Drives. Does little to support removal of cars from core campus or replace lost connectivity if cars are prohibited from campus. Could harm concepts to restrict auto access only to periphery streets if BRT operations constrain the street. Stop locations are less obvious and intuitive.

5. Philip Aziz Alternative Potential Benefits Excellent connectivity to student housing Good connectivity to athletic facilities Good potential access to planned university expansion areas Generally removed from sensitive research activities Potential Impacts Stop locations are less convenient to academic centre Could exacerbate pedestrian movement and safety at intersection of Philip Aziz and Western University traffic. Does little to support removal of cars from core campus or replace lost connectivity if cars are prohibited from campus. Could harm concepts to restrict auto access only to periphery streets if BRT operations constrain the street. Long travel time to the Downtown.

Summary Evaluation University Objectives Metrics Middlesex Lambton Windermere Perth Philip Aziz Efficient connection to Downtown Good Good Moderate Poor Poor Legibility of route Excellent Excellent Poor Poor Moderate Impact on research and other labs Poor Moderate Good Moderate Good Potential for mode shift (reduced parking demand) Good Good Poor Poor Moderate Potential to reduce impervious surface Moderate Good Poor Poor Poor Impact on pedestrian safety Poor Moderate Good Good Moderate Access to campus destinations Excellent Good Poor Moderate Moderate Reduced trip generation for new development Poor Good Poor Poor Moderate Intra-campus connectivity potential Good Good Poor Poor Poor Potential visual impact Poor Poor Good Poor Poor Impact on Western Road Moderate Poor Excellent Excellent Poor

Preferred Alternative The Lambton Drive alternative is Western s preferred route as it: Provides the highest level of connectivity to existing and future trip generators Minimizes impacts to sensitive activities (academia, research, leisure) Supports the objectives of a largely vehicle-free core campus while retaining critical access to and through the campus Provides a strong opportunity for the creation of a signature transit mall through campus from the iconic gateway on Western Road Could lead to much needed improvements along the southern portion of Western Road

Preliminary University Conditions Western has indicated four conditions be met for the BRT to be routed through campus: Transit vehicles must share travel lanes through campus to minimize any necessary widening of streets or bridge or affect historic gates. Transit streets, stops and other facilities must demonstrate excellence in design and respect the pedestrian-centric priorities of the campus. The selection of transit vehicle should eliminate, to the extent possible, noise, vibration or electromagnetic impacts. The addition of BRT on campus must support the objective to reduce overall vehicle traffic on campus.

Next Steps Additional technical assessment Precedent Studies Further development of conditions for approval Consultation with the campus community through December and January Recommendations will be considered by Western s Board of Governors on January 26, 2017