December 13, 2005 Meeting Status of NPDES Post Fire BMPs

Similar documents
EROSION & SEDIMENT CONTROL

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

Structural Storm Water Best Management Practices (BMPs)

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

IMPROVED STORMWATER MANAGEMENT BMPS AND FLOOD PREPAREDNESS FOR 2016 EL NIÑO STORMS

MW7H. 4 v. and OUtfall Location s / 1. i d, DRAINAGE TO M[ILR CAN ON DRAINAGE TO ARRO'OSI\II. 1 ~a,a Iz irrlrr v DRAINAGE TO BELL CANYO N //I~~ ~^7~

NPDES Permit limits, daily maximum benchmark limits, and receiving water limits in the First Quarter 2017.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

Butte Creek Canyon. The New Road Built in April of 2015 by Signalized Intersection West, LLC. Presentation slides from December 2015 through June 2016

Piles, Trenching, Inverters, Cables, Material Deliveries

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

Guidance on Preparation of Construction and Maintenance Costs

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

EROSION PREVENTION BMP SUGGESTED USES MATRIX

2.1.4 Roof Downspout Rain Gardens

Preventing Storm Water Pollution: What We Can Do

Town of Essex Small Site Erosion Control Guide

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Severn River Sub-Watershed: BMP 09-Retrofit

BIORETENTION FACILITY

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Storm Water Basics for Construction Sites Presented by Representatives from the City of Grass Valley and Nevada County

Wisconsin Contractors Institute Continuing Education

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

2008 SWMM, 2010 Revision City of Tacoma

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Erosion Control for Home Builders in the. City of Jacksonville


5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

SOIL EROSION AND SEDIMENT CONTROL

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

Information for File # JTF

Operations and Maintenance Plan

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

The Low Risk Site Handbook

Why a new Food & Farm Ordinance?

Use of Best Management Practices

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Tips for Maintaining and Enhancing Stormwater Management Areas

Eric Konzelmann, CPESC, CPSWQ Assistant District Manager. Montgomery County Conservation District

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

6.1 Bioretention Areas

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

4. CONCEPT PLAN DEVELOPMENT

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

APPENDIX H BMP SITE RANKING ANALYSIS

Illinois Urban Manual

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

APPENDIX C: STORMWATER CONTROL PLAN

The proper use of erosion and sediment controls will allow the following objectives to be met:

The following general requirements will be met for all planter box installations:

Chapter 14. Stormwater Quality Introduction

2018 Annual Landfill Inspection Report

Post Construction BMPs

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

Lesson 2: Stormwater Best Management Practices (BMPs)

Piles, inverters, trenching, cabling, assembly.

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

2016 Annual Inspection Report

Rainwater Harvesting: Soil Storage and Infiltration Systems

Integrating Innovative Stormwater Management Technology Into A Mixed Use Community

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Analyzing the Bioretention Construction Sequence

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

A DIVISION OF L & M SUPPLY EROSION CONTROL BLANKETS, WATTLES AND LOGS

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Table 4.7.1: Swales Potential Application and Storm Water Regulation

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

POST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

POLE BRIDGE ROAD NEAR FIVE LOT FARM

Transcription:

December 13, 2005 Meeting Status of NPDES Post Fire BMPs Agenda Overview of Current Operations At SSFL Impacts of Fire At SSFL Rebuilding & Improvement of BMPs Future Activities Site Tour Close-out 1

Santa Susana Field Laboratory Regional Map 2

SSFL Operations Generating Discharges Current & Future Operations Rocket Engine Testing 2005 Approximately 17 engine tests 2006 Possibly one more Sewage Treatment Plant Operations 2005 - Two days of operation due to high volume of flow from rain. 2006 - None expected due to sewer line repairs and capping of old sewer lines. Groundwater Treatment Systems 2005 Treatment occurred using some systems. 2006 Resumption of treatment to be coordinated with DTSC. 3

Impact To SSFL as a Result of September 2005 Fire 4

2005 Fire Boundary 5

October 4 th NASA IR-Image 6

Fires Not Uncommon in Area 7

Impact of September 2005 at SSFL Brush burned on over 2,000 acres of the site. 10 of the 200 structures were damaged by fire with 7 destroyed. Over 300 telephone and power poles were destroyed. High Density Polyethylene (HDPE) pipelines from the groundwater remediation systems were destroyed. DTSC, DOE, DHS, VCEHD, RWQCB and various fire departments have been on site to inspect and assess the fire damage. 8

September 2005 Fire At SSFL 9

A Few Days After 10

Post Fire Re-building Efforts Debris from destroyed buildings removed. Electricity restored to the site, phone & internet connections still being restored. Telephone poles being removed. BMPs re-built & improved. 11

Santa Susana Field Laboratory Surface Water NPDES Outfall Locations N 006 005 SIMI VALLEY 007 003 004 010 009 016 012 013 015 014 Black Canyon Woolsey Canyon 017 008 018 011 Undeveloped Land 002 001 BELL CANYON 970xxxxc.ppt aw/jhs 12

Outfall 001 (Southeast) Before 2005 Fire BMPs In Place Upstream settling pond (Perimeter Pond). Dense natural vegetation along entire length of drainage. 13

Outfall 001 (Southeast) After 2005 Fire BMPs Damaged Vegetation along streambed either completely destroyed or heavily damaged. Hillsides along drainage covered in ash that is known to contain elevated levels of naturally occurring metals and dioxins. 14

Outfall 001 (Southeast) 2 Months after 2005 Fire BMPs Implemented Straw wattles installed along burned areas of drainage. Straw bales placed in 001 streambed. Straw bales placed in tributary streambeds. Straw wattles and bales placed upstream. 15

Outfall 002 (Southwest) Before 2005 Fire BMPs In Place Upstream settling ponds (R-2 Pond). Dense natural vegetation along entire length of drainage. 16

Outfall 002 (Southwest) After 2005 Fire BMPs Damaged All vegetation along streambed either completely destroyed or heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. 17

Outfall 002 (Southwest) 2 Months after 2005 Fire BMPs Implemented Straw wattles installed along burned areas of drainage. Straw bales placed in 002 streambed. Straw bales placed in tributary streambeds. Straw wattles and bales placed upstream. 18

Outfall 003 (RMHF) Before 2005 Fire BMPs in place Dense natural vegetation along entire length of drainage and hillsides. Silt fencing in place. Filter bags including vermiculite and activated carbon. 19

Outfall 003 (RMHF) After 2005 Fire BMPs Damaged All vegetation along northern side of drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs completely destroyed. 20

Outfall 003 (RMHF) 2 Months after 2005 Fire BMPs Implemented Straw wattles installed along burned areas of drainage and hillside. Straw bales placed at toe of hill. Loose gravel to diffuse flow Silt fence. Activated carbon filter bags. 21

Outfall 004 (SRE) Before 2005 Fire BMPs in place Dense natural vegetation along entire length of drainage and hillsides. Plastic sheeting covering potentially impacted areas. Silt fencing in place. Filter bags including vermiculite and activated carbon. 22

Outfall 004 (SRE) After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs completely destroyed. 23

Outfall 004 (SRE) 2 Months after 2005 Fire BMPs Implemented Straw wattles and silt fence installed along burned areas of drainage and hillside. Plastic sheeting replaced. Sand filter with underdrain. Activated carbon filter bags. 24

Outfall 005 (FSDF 1) Before 2005 Fire BMPs in place Dense seeded vegetation above drainage Plastic sheeting. Silt fencing in place. Filter bags including vermiculite and activated carbon. 25

Outfall 005 (FSDF 1) After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs completely destroyed. 26

Outfall 005 (FSDF 1) 2 Months after 2005 Fire BMPs Implemented Straw wattles installed along burned areas of hillside. Sand filter trenches with underdrain. Straw wattles installed upstream and downstream of the trenches to protect system until vegetation can take root. Activated carbon filter bags. 27

Outfall 006 (FSDF 2) Before 2005 Fire BMPs in place Rip rap swale Plastic sheeting. Multiple silt fences in place. Filter bags including vermiculite and activated carbon. 28

Outfall 006 (FSDF 2) After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs completely destroyed. 29

Outfall 006 (FSDF 2) 2 Months after 2005 Fire BMPs Implemented Rip rap installed upstream. Sand filter with underdrain. Activated carbon filter bags. Straw wattles installed around entire system until vegetation can take root. 30

Outfall 007 (B/100) Before 2005 Fire BMPs in place Dense seeded vegetation above drainage. Silt fencing in place. Filter bags including vermiculite and activated carbon. 31

Outfall 007 (B/100) After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs completely destroyed. 32

Outfall 007 (B/100) 2 Months after 2005 Fire BMPs Implemented Straw wattles installed upstream Staw wattles and Silt fence around drainage. Activated carbon filter bags. 33

Outfall 008 (Happy Valley) Before 2005 Fire BMPs in place Extensive Interim measure perchlorate clean up. Rip rap beds. Straw hay bales installed. Tributary to Outfall 34

Outfall 008 (Happy Valley) After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs completely destroyed. Tributary to Outfall 35

Outfall 008 (Happy Valley) 2 Months after 2005 Fire BMPs Implemented Rip rap installed upstream Straw wattles and straw bales lining drainage and former source area. Multiple silt fences installed. Straw wattles lining drainage and tributaries until vegetation can take root. Drainage vacuumed to removed accumulated ash Tributary to Outfall 36

Outfall 009 (WS 13) Before 2005 Fire BMPs in place Rip rap at upstream Area 2 landfill. Straw wattles and straw bales at Area 2 landfill. Silt fences in place below Area 2 landfill. Area 2 Landfill 37

Outfall 009 (WS 13) After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. Most BMPs completely destroyed. Outfall 009 Area 2 Landfill 38

Outfall 009 (WS 13) 2 Months After 2005 Fire BMPs Implemented Straw bales, Straw wattles and silt fences replaced at Area 2 landfill. Land based hydro-seeding at Area 2 landfill and Outfall 009. Outfall 009 Area 2 Landfill 39

Outfall 010 (B/203) Before 2005 Fire BMPs in place Extensive Interim measure to remove mercury impacted soil. Gunite retaining wall and water retention basin. Coco mat reseeding. Straw bales around retention basin. Vermiculite filter bags in S.S. box. 40

BMPs Damaged Outfall 010 (B203) After 2005 Fire All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. All BMPs damaged. 41

Outfall 010 (B203) 2 Months After 2005 Fire BMPs Implemented Added Rip rap below gunite. Added rocks to dissipate flow. Installed straw wattles. Installed silt fence around retention basin. Installed carbon filter bags. 42

Outfall 011 (Perimeter) Before 2005 Fire BMPs in place Dense natural vegetation along entire length of drainage and hillsides. Settling pond to aid sediment retention. 43

Outfall 011 After 2005 Fire BMPs Damaged All vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. 44

Outfall 011, 2 Months After 2005 Fire BMPs Implemented Silt fence installed at discharge to Perimeter Pond. Installed gravel on road to prevent muddy conditions. Installed stainless steel gravity filter structure. Straw wattles, straw bales and hydromulching. 45

Outfall 018 Before 2005 Fire BMPs in place Dense natural vegetation along entire length of drainage and hillsides. Settling pond to aid in sedimentation retention. Pilot sand/carbon duel media filter system being tested. 46

Outfall 018 After 2005 Fire BMPs Damaged Vegetation around drainage heavily damaged. Hillsides along drainage covered in ash known to contain elevated levels of naturally occurring metals and dioxins. 47

Outfall 018, 2 Months After 2005 Fire BMPs Implemented Repaired Pilot filter piping and electrical. Upstream placement of straw wattles, straw hay bales and hydromulching. Need picture 48

Additional Activities Vacuumed drainage areas. Nearly 7 miles of straw wattles installed. Over 430 straw bales placed. 6 acres of hydromulch applied around SWMUs. 610 acres of hydromulching to be aerially applied by late December/early January Carbon filter bags being used for additional solids removals. 49

Recent Cleanup Projects: Soil Removal Near Outfall 008 (Happy Valley Area) Perchlorate Interim Measure (Boeing Area 1) Total soil excavated: ~8,000 cubic yards Backfilling, re-vegetation and installation of erosion control measures completed Surface water monitoring (Outfall 008) confirm success of perchlorate driven Interim Measure 50

Recent Cleanup Projects: Soil Removal near Outfall 010. (Building 203) Mercury Interim Measure (NASA Area 2) 2004 soil removal action 3,000 cubic yards of soil removed M5554#.ppt ml 51

Recent Cleanup Projects: Soil Removal Near Outfalls 005 & 006 (Former Sodium Completion of DOE (Area 4) FSDF Interim Measure Disposal Facility) 2000 soil removal action 14,900 tons of soil/sediment removed Helicopter lift Onsite soil borrow area FSDF M5554#.ppt ml 52

Compliance History SSFL has experienced and reported storm water violations for: - TCDD - Lead - Mercury - Manganese - Copper - Sulfate -ph -TDS - Iron - Surfactants Exceedances are generally sporadic, and reveal no clear patterns. 53

Boeing s Source Testing Program Testing has been expanded to include: On-site soils, ash, and rainfall Off-site soils, ash, and storm water runoff From Topanga fire area, but off-site From Burbank fire area Preliminary (unvalidated) results indicate similar concentrations on and off-site. Literature review from other post-fire data collection programs. Testing not required, but Boeing is undertaking proactively 54

Boeing s Source Testing Program Goal is to understand sources and variability of constituent concentrations in storm water, and to use this information to improve BMP effectiveness. 55

Boeing s BMP Testing Program Concentrations of key constituents in runoff through various BMP materials has been measured in lab tests: Aggregate and sand Hay Runoff from plastic tarps Hydromulch materials Testing not required, but Boeing is undertaking proactively 56

Boeing s BMP Testing Program Goal is to select cleanest BMP materials and to understand the potential contribution of BMP materials to storm water runoff 57