TECHNICAL SUPPLEMENT 1: LAND USE AND ZONING

Similar documents
Federal Transit Administration-Region 6

East Central Area Plan

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

Carlsbad Village Redevelopment Concept Summary of Features

4.8 LAND USE AND PLANNING

appendix and street interface guidelines

CITY OF PUYALLUP. Background. Development Services

DRAFT. October Wheaton. Design Guidelines

ARLINGTON COUNTY, VIRGINIA

The transportation system in a community is an

4 C OMMUNITY D ISTRICTS

International Blvd. TOD Plan Public Workshop #1

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016

Staff Report and Recommendation

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

5.2 LAND USE AND ZONING

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

The Ritz-Carlton, Paradise Valley

Strategic Growth Area #1 Northampton Boulevard Corridor Area

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

FUTURE LAND USE ELEMENT

Hockessin Community Redevelopment Plan

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

, C-MS I June 3, 2016 $1500 pd chk #216918

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

CHAPTER 4 COMMUNITY DEVELOPMENT AND DESIGN

Land Use. Hardware Street Vendor Mixed-Use

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

141 GEORGE STREET PLANNING RATIONALE

Policies and Code Intent Sections Related to Town Center

hermitage town center

Chapter 2, Section C: Urban Design and Visual Resources A. INTRODUCTION

Town Center. Block 5 Existing multifamily residential units are expected to remain.

ATTACHMENT A. Definition of Activity Centers

SECTION UNIFIED DEVELOPMENT ORDINANCE SECTION Part 1 Ordinance. ARTICLE 1 Zoning Districts

12600 S Existing Conditions

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

Blue Line LRT Extension

5.1 Site Plan Guidelines

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

4.1.3 LAND USE CATEGORIES

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

POCKET COMMUNITY PLAN

Planning & Zoning Commission Staff Report

Town Center (part of the Comprehensive Plan)

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

Executive Summary. NY 7 / NY 2 Corridor

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Clairtrell Area Context Plan

ATTACHMENT A 09/12/2011. Attachment A - 1. A. Preliminary Future Transit Station Sub-area

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

Citizen Advisory Group Meeting 5: Land Use April 14, 2011

Appendix D. Zoning Report. Bridge Boulevard Corridor Redevelopment Plan

Sub Area 2: Downtown Overland Park

A. WHAT IS A GENERAL PLAN?

4.1 LAND USE AND PLANNING EXISTING CONDITIONS REGULATORY BACKGROUND LAND USES IN THE PLAN AREA SURROUNDING LAND USES

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

3.0 LAND USE PLAN. 3.1 Regional Location. 3.2 Existing Conditions Existing Uses. Exhibit Regional Location Map

CHAPTER 2: FUTURE LAND USE CONCEPTS

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Zoning Code Issues Prioritization

Planning Districts INTRODUCTION

Urban Planning and Land Use

Staff Report to the North Ogden City Planning Commission

Environmental Assessment. Appendix E Visual And Aesthetic Conditions Technical Report

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

NEC of Central Avenue and Indian School Road

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Venice Pumping Plant Dual Force Main Project Draft EIR

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Appendix D North Road/N. Leroy Street Subarea Plan

Be it enacted by the Town Board of the Town of Guilderland that the following new A (Transit Oriented Development (TOD) District) is adopted:

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

RESIDENTIAL DISTRICTS

Pedestrian and Bike Bridge LOGO

CENTERS CORRIDORS WEDGES GLOSSARY

A P P E N D I X B - O P P O R T U N I T Y S I T E S

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

Urban Development Areas Bedford County

THE 355/270 CORRIDOR:

City of Tacoma Planning and Development Services

SOUTH FLORIDA TOD GRANT UPDATE

City of Long Beach. creating vibrant and exciting places

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

DRAFT ETC Master Plan. Appendix D Land Uses and Demographics

Transcription:

TECHNICAL SUPPLEMENT 1: Albuquerque Rapid Transit Project Prepared for: Prepared by: Parsons Brinckerhoff, Inc. August 2015

TABLE OF CONTENTS 1.0 Project Description... 1 1.1 General Description of Existing Land Use and Zoning... 3 Beginning of Project at 98 th Street to Coors Boulevard... 3 Coors Boulevard to Atrisco Drive SW... 5 Atrisco Drive SW to 10 th Street SW... 6 10 th Street SW to Interstate-25... 8 Interstate-25 to Girard Boulevard... 10 Girard Boulevard to San Mateo Boulevard... 11 San Mateo Boulevard to Wyoming Boulevard... 13 Wyoming Boulevard to Tramway Boulevard... 15 2.0 Conclusion... 16 Land Use Summary... 16 3.0 References... 17 PAGE i

1.0 PROJECT DESCRIPTION The Albuquerque Transit Department (ABQ RIDE), in cooperation with the Federal Transit Administration (FTA), is proposing to implement the Albuquerque Rapid Transit (ART) project a rapid transit system on Central Avenue within the City of Albuquerque (see Figure 1). This paper discusses the land use and zoning aspects of the proposed project. The general design and operational features of the project are summarized below. A more detailed description of the project is included in the categorical exclusion document. The proposed rapid vehicle route extends from the Unser Transit Center (northwest corner of Central Avenue and Unser Boulevard) on the west side of Albuquerque to Tramway Boulevard on the east side an overall length of approximately 9.5 miles. Within this area, exclusive lanes for rapid vehicles will be constructed from Coors Boulevard to Louisiana Boulevard a distance of approximately 8.75 miles. Enhanced transit service will be provided at the west and east ends of the construction area. Rapid vehicles will operate in mixed flow traffic between Unser Boulevard and Coors Boulevard (a distance of approximately one mile) and between Louisiana Boulevard and Tramway Boulevard (a distance of 4 miles). Rapid vehicles will also operate on Louisiana Boulevard between Central Avenue and Indian School Road to connect with the Uptown Transit Center (a distance of approximately 1.8 miles). Rapid vehicles will use existing Rapid Ride stations within the enhanced service areas. The construction area Coors Boulevard to Louisiana Boulevard on Central Avenue will include a two lane center running busway, except: o o o through the Downtown area where rapid vehicles will operate in mixed flow traffic; from San Pasquale to 10th Street in west Downtown where a single, reversible rapid vehicle lane is proposed; and, from Broadway Boulevard to Interstate 25 and from University Boulevard to Girard Boulevard where a bi-directional rapid vehicle lane is proposed. A total of 20 passenger stations will be constructed including 15 median stations and five curbside platforms. Stations will be spaced at approximate ½ to 1 mile intervals. In general, all stations will include level/elevated boarding platforms (approximate dimensions of 10 feet to 14 feet wide by 65 feet long), an overhead canopy, seating, ticketing equipment, security lighting and equipment, and other similar equipment consistent with BRT service. To avoid an adverse effect to historic districts, overhead canopies will not be installed at the Walter Street station, the 15th Street station, and the Rio Grande Boulevard station. The proposed service will operate at approximate 7.5 to 10 minute headways depending on time of day. The weekday span of service will be from 5:45 AM to 9:30 PM. The traffic signal system for Central Avenue within the project limits will be modified to provide traffic signal priority for ART vehicles. Land use and zoning issues as they relate to the proposed project are discussed in the remainder of this paper. The analysis and impacts identified in this paper assume a specific project footprint regarding rapid vehicle lanes, station dimensions, and operating schedule. As the project advances to final design and more detail is known, the footprint may be smaller and the operating schedule may be reduced. If this occurs, project impacts may be less than those described in this document. The discussion below includes the project construction area and the areas where enhanced transit service will be provided. PAGE 1

Figure 1 Project Vicinity PAGE 2

1.1 General Description of Existing Land Use and Zoning Given Central Avenue s long established position as the original key commercial route for the City of Albuquerque and the broad span of the project limits, land uses along the corridor are varied, but highly dominated by commercial uses. The parcels near the most western portion of the project consist of large vacant plots, however as the project travels east, properties become primarily commercial with few exceptions as discussed in the following sections. The Zoning Code is a portion of the City s Code of Ordinances, and as such, is a regulatory instrument for controlling future land use activities. It is guided by the Albuquerque/Bernalillo County Comprehensive Plan, which is the long-range city policy for the development and conservation of the metropolitan area, containing a broad array of policies to guide growth and redevelopment. The Zoning Code is one of several legal and administrative tools within the city s land use planning system. In general, the commercial, recreation, and public/institutional zoning along Central Avenue is consistent with BRT. Flexibility for future projects and the incorporation of mixed-use projects especially near the stations increases the potentiality for transit oriented development. Sector Development Plans further define zoning regulations within their boundaries. Since the area within the project limits is primarily comprised of the most established neighborhoods in the city, almost the entire corridor is covered by a Sector Development Plan which will be discussed below. 98 th Street to Coors Boulevard Land Use / Existing Conditions PAGE 3

This section of the project corridor has a large amount of vacant land except near the major intersections. The region from Coors Boulevard west is characterized by larger lots, many of which are undeveloped or underutilized. Some industrial/manufacturing properties and some wholesale/warehousing uses exist in large box structures. Given that this was once part of Historic Route 66, there are some older structures such as motels that are situated close to the roadway. Zoning A large portion of the parcels in this section of the BRT project are zoned residential/agricultural, which is considered a placeholder for future consideration and suggests future flexibility. Parcels near the west end of Central Avenue are zoned commercial as well as parcels near 98 th Street and Coors Boulevard, showing that these intersections are expected to become future activity centers. Some parcels are still zoned industrial/wholesale/manufacturing. West Route 66 SDP - Central Avenue between the BOP and Coors Blvd The West Route 66 Sector Development Plan establishes Special Neighborhood zoning from the BOP to Coors Boulevard on Central Avenue where established zoning did not address the special need for a transition to more mixed land use opportunities. The Special Neighborhood Zone (SU-2) allows a mixture of uses for new development and redevelopment appropriate to the special needs of the neighborhood. The West Route 66 Sector Development Plan also establishes a Design Overlay Zone to achieve cohesive positive development, a positive streetscape, landscape design, and quality site design to be implemented on site-specific new construction. It applies to all properties within the plan area boundaries and takes precedence over other City or County regulations if there is conflict. PAGE 4

Coors Boulevard to Atrisco Drive SW Land Use / Existing Conditions This portion of the project corridor begins with a gateway feature at Coors Boulevard and expansive views into the valley. It is characterized by mostly small, older commercial establishments fronting the streetscape. There are still many vacant parcels but these are decreasing in frequency when heading east. There are some residential uses in the form of mobile home parks and apartments, and some motels representing remnants of the motor court style from the Historic 66 heyday. There is a strip mall and a large big-box retailer southwest of Atrisco Drive. Zoning PAGE 5

Within this portion of the project area, the parcels are zoned almost exclusively commercial with one large parcel zoned Institutional/Government and occupied by a fire station. The West Mesa Sector Development Plan governs the north side of Central Avenue within this portion of the project, but does not give specific guidance on zoning or development. Atrisco Drive SW to 10 th Street SW Land Use / Existing Conditions Land Use Segment A - Atrisco Dr to San Pasquale Ave This section of the project corridor includes the Rio Grande River bridge crossing and public institutions such as the Albuquerque Biopark (which includes the Albuquerque Aquarium, Botanic Garden, and Tingley Beach), and the Historic Old Town. Signage for these institutions and landmarks are located on Central Avenue however only parking lots servicing them are immediately visible from the street. The Beach Apartments, a multi-family development is located at Tingley Drive. Land Use Segment B - San Pasquale Ave to 10 th St This area of Central Avenue is significant as it provides a seam between two important historic neighborhoods as discussed below. Along with the small commercial structures, there are multi-family developments. Manzano Day School, a private elementary school, lies on the north side of Central Avenue near the Old Town Plaza, and the public Washington Middle School lies on the south side of Central Avenue behind some small commercial properties. PAGE 6

Zoning The parcels in this section of the project corridor are primarily zoned commercial with the exception of the Open Space/Recreation/Agricultural designation at the Albuquerque Biopark. Generally, the zoning along this portion of Central Avenue is commercial with exceptions for open space/ recreation/ agricultural for Tingly Beach near the Rio Grande River. Huning Castle SDP - South side of Central Ave between the Rio Grande River and 10th Street The Huning Castle SDP establishes the Special Neighborhood Zone (SU-2) for the Raynolds Addition between 14 th Street and 10 th Street on Central Avenue which was previously zoned as Office/Institutional. This is to ensure that new development on Central Avenue will be consistent with existing development and have a minimum impact on the adjacent neighborhood with regard to traffic, noise, and litter. Downtown Neighborhood Area SDP - North side of Central Ave between All properties will maintain a Special Neighborhood Zone (SU-2) designation to ensure that infill development is responsive and complementary to existing neighborhood patterns. Central Avenue is the only area within the plan boundaries where multi-family, commercial, or office uses are encouraged. Any property that falls within one of the two Historic Overlay Zones shall also comply with those design guidelines. PAGE 7

10 th Street SW to Interstate-25 Land Use Maps / Existing Conditions Land Use Segment A - 10 th St to Broadway Blvd This portion of the project corridor begins with a neighborhood park and a roundabout as Central Avenue straightens into the Downtown Core, the densest portion of the corridor. Multi-story buildings bordering the sidewalk with little to no extra space characterize the area. Active commercial exists along the street level such as retail, restaurants, and an older theatre. Less active commercial uses or residential uses operate in the upper levels. The Albuquerque Alvarado Transportation Center is located on a large parcel just west of Broadway Blvd. There are still a couple of surface parking lots bordering Central Avenue in this area. Land Use Segment B - Broadway Blvd to I-25 The development in this portion of the project corridor consists of multi-story structures with historic integrity. This part of the roadway has less density than the Downtown Core with buildings limited to 4 stories or less and some surface parking areas. The historic Albuquerque High School at Broadway Blvd (shown right) was converted into condominiums as a redevelopment project. There are many commercial service motels and hotels near the intersection with I-25, including the historic Hotel Parq Central. PAGE 8

Zoning Downtown 2025 SDP - Central Avenue between 10 th St and Broadway Blvd The Downtown 2025 SDP defines the Downtown Core to be the SU-3 Special Center Zone and designates Central Avenue (within the plan boundaries) as the Arts and Entertainment District, one of five districts created by this plan to regulate permitted uses, building types, and building standards. The SU-3 Special Center Zone allows a variety of uses controlled by this plan and tailors the development of the Urban Center to create a clear and defined boundary between the Downtown Core and the surrounding neighborhoods. Huning Highland SDP - Central Avenue between Broadway Blvd and I-25 Originally, much of this area was zoned for office use because city planners considered it an extension of downtown; however growth in other parts of the city prevented downtown from expanding into this neighborhood. The Huning Highland Area was re-zoned to be the Special Neighborhood Zone (SU-2), which allows a mixture of uses controlled by this SDP. SU-2 zoning is appropriate for areas where other available zones do not promote conservation of special neighborhood characteristics and a mixture of uses with careful control and coordination. Within the overall SU-2 zone, separate zoning categories are established. The SU-2 zone is comprised of sub-zones with the zone along Central Avenue designated Neighborhood Commercial/ Residential (NCR) which has a zero front yard setback requirement for all properties. PAGE 9

Interstate-25 to Girard Boulevard Land Use Maps / Existing Conditions Land Use Segment A - I-25 to University Blvd This portion of the corridor has a similar density to just west of I-25 with some large multi-story structures and some vacant parcels or parking lots. However the land uses in this area are primarily large public institutions such as Presbyterian Hospital located immediately southeast of I-25 (shown right) Land Use Segment B - University Blvd to Girard Blvd This section of the corridor is dominated by the University of New Mexico (UNM) on the north side of Central Avenue. Several structures of varying size and density occupy the streetscape here with some buildings forming a wall against the street with short setbacks and some open parking. The south side of Central Avenue consists of almost exclusively commercial uses that service UNM such as a multitude of restaurants. PAGE 10

Zoning University Neighborhoods SDP - Central Avenue between I- 25 and Girard Blvd Zoning along Central Avenue includes some institutional/government parcels along with commercial in order to accommodate University uses. Zoning for the University Neighborhoods behind Central seeks to improve the existing mixed use characteristics of the area by encouraging compatible relationships between related uses and buffering incompatible uses. This SDP calls for no further expansion of institutional ownership or activities into the areas zoned residential and requires a buffer between parking lots and residential areas. Girard Boulevard to San Mateo Boulevard Land Use Maps / Existing Conditions PAGE 11

Land Use Segment A Girard Blvd to Washington St This area is known as the Nob Hill District which is well known for its neighborhood-commercial atmosphere. Land use is almost exclusively commercial, but with a variety of commercial types varying from retail to restaurants to motels to office, etc. The density of the structures is moderate and many of the buildings line the sidewalk with short setbacks even though they are single story and there are a few gaps for parking. New developments are starting to infill with multi-story and multi-use structures. Land Use Segment B Washington St to San Mateo Blvd This section of the corridor is known as the Highland District where the density decreases and land uses include more parking and vacant parcels along with the commercial buildings. The Highland area is known to be less pedestrian and more automobile focused than the Nob Hill area. The old Hiland Theatre (shown right) is on the parcel designated as public/institutional as it is currently used as a school of dance. Zoning Nob Hill Highland SDP - Central Avenue between Girard Blvd and San Mateo Blvd Zoning designations for this section facing Central Avenue are exclusively commercial. This section of the roadway is part of the Nob Hill District and has a potential for more intensive multi-use transit oriented development. The Nob Hill Hiland Sector Development Plan establishes Community Commercial/ Residential or CCR zones instead of the standard Commercial zones allowing for the mix of residential and commercial activity that is a major community goal for Central Avenue. The properties fronting Central Avenue will have a specific set of requirements that will be focused on enhancing their PAGE 12

role as an active pedestrian-oriented urban street. Regulated items include location of buildings and parking relative to the street, and conformance to architectural form and design requirements. The CCR zone eliminates some uses such as drive-up windows and adds high-density residential. Zoning along Central Avenue as established by this plan has slight variations in requirements for the following sections of the roadway: 1) the Route 66 Historic Core (between Girard Blvd and Carlisle Blvd) is designated CCR-1; 2) the Emerging Nob Hill (between Carlisle Blvd and Washington St) is designated CCR-2; and 3) the Highland District (between Washington St and San Mateo Blvd) is designated CCR-3. A key element differentiating these sections is the Allowable Building Heights with 3-stories allowed in CCR-1, 4-stories in CCR-2, and 5-stories in CCR-3. These regulations will assist in guiding transit oriented development associated with the BRT project. San Mateo Boulevard to Wyoming Boulevard Land Use Maps / Existing Conditions Segment 1 San Mateo Blvd to Louisiana Blvd This section of the corridor is varied with a large amount of commercial parcels, public/institutional, transportation/utilities, and many parking lots. This section begins with one of the tallest multi-story buildings in the corridor the Bank of the West building which was constructed when zoning foresaw the neighborhood becoming a much higher density than has been realized (see picture). The large parcel designated as parks/recreation is Expo New Mexico (state fair grounds) and the Downs Race Track and Casino, owned and operated by the state, which leaves a large expanse of the corridor bordered by a parking lot visibly blocked by a solid wall in some sections and by a fence in others. Segment 2 Louisiana Blvd to Wyoming Blvd This section of the Central Avenue corridor is characterized by large vacant parcels, used car lots, restaurants, gas stations, offices, mobile parks and a multi-family structure. PAGE 13

Zoning Zoning in this section of the project corridor consists of almost all commercial. The large parcel designated Institutional/Government is the Fairgrounds/Downs Racetrack/Casino/Tingley Coliseum which may pose some obstacles to transit oriented development in the area. La Mesa SDP - North side of Central Avenue between Louisiana Blvd and Wyoming Blvd The Central Avenue corridor is primarily zoned commercial with the large Fairgrounds/Casino parcel zoned institutional/government. The interior of this plan area was previously zoned for single-family residential use, but in 1957 at the request of property owners, and subsequent to Planning Department studies, it was changed to multi-family residential zoning. Trumbull SDP - South side of Central Avenue between Louisiana Blvd and Wyoming Blvd Parcels along Central Avenue are zoned commercial, and behind Central Avenue, the majority of the area is zoned and developed with high-density residential, which has created overcrowding and parking issues that BRT could alleviate. The Trumbull SDP states that this area is not currently eligible for SU-2 zoning, however this plan recommends it for future consideration so that an updated sector development plan can guide uses as appropriate. PAGE 14

Wyoming Boulevard to Tramway Boulevard Land Use Maps / Existing Conditions This part of the project area is characterized by large lots of commercial uses mostly strip mall in appearance with parking lots bordering the street and deep setbacks. Land development has been primarily auto-oriented and dominated by large regional commercial activities. Due to the area s historic position as an entrance point to the city from the east, there are many motels, some dating from the Historic Route 66 motor-court era. There are also several fast-food and sit-down restaurants. There are many lots with large item sales such as mobile homes, recreational vehicles, and boats, along with auto repair. The terminus of the project at Tramway Boulevard has a gateway feature/park and a large shopping center with a grocery store, restaurants, and a motel. There are some vacant older buildings and some vacant lots. Zoning PAGE 15

East Gateway SDP - Central Avenue between Wyoming Blvd and Tramway Boulevard The general zoning designation is exclusively commercial as shown in the figure above. The East Gateway Sector Development Plan which regulates the area of Central Avenue between Wyoming Boulevard and Tramway Boulevard establishes Special Neighborhood (SU-2) commercial zoning in order to clearly indicate that they are subject to special controls as set forth in this plan. This plan applies zoning districts to the major activity centers in the area and to properties abutting transit corridors to encourage a mixture of uses that enable people to live, work, shop, use local services, and take public transit. Three of the four special SU-2 zones created for East Gateway exist along Central Boulevard - the Community Activity Center Zone near Tramway, the Neighborhood Activity Center Zone near Wyoming and Juan Tabo, and the rest is part of the Corridor Zone. This allows a wide variety of uses for properties abutting Central Boulevard, and a more limited list of uses for community commercial properties inside residential neighborhoods near Central Avenue. 2.0 Conclusion Land uses along the Central Avenue corridor are mostly commercial; and yet, the center of the project area has many intuitional uses, such as museums, government offices, and a school. The use and design of rapid vehicle stations will be consistent with existing land uses and will be sensitive to historic context. The expected conflict with commercial properties such as motels, restaurants, and gas stations, is primarily through the potential blocking of median access, which will most likely occur throughout the corridor, and will be determined as designs are further developed. Most of the project area is developed and zoned according to existing land use patterns. The majority of the project area is governed by Sector Development Plans, which generally encourage transit oriented development and projects like the BRT onto Central Avenue with the intent of keeping major commercial development to the interior of the neighborhoods. Thus, this project is not expected to conflict with City zoning. Land Use Summary Given Central Avenue s long established position as the original key commercial route for the City of Albuquerque and the broad span of the project limits, land uses along the corridor are varied, but highly dominated by commercial uses. The parcels near the most western portion of the project consist of large vacant plots, however as the project travels east, properties become primarily commercial with few exceptions. Although this creates exciting opportunities by offering transit services and transit oriented development to established and relatively dense populations, there could be some potential conflict with access to commercial properties. Median access will decrease throughout the corridor. Access accommodations for businesses and area residents will include protected left-turns and U-turns, and in high pedestrian activity areas, by including protected pedestrian crossings. PAGE 16

3.0 References Downtown 2025 Sector Development Plan, City of Albuquerque Planning Department, Updated June 2014. Downtown Neighborhood Area Sector Development Plan Update, City of Albuquerque Planning Department, Enacted June 2012. East Gateway Sector Development Plan, City of Albuquerque Planning Department, Amended December 2013. Huning Castle Sector Development Plan, City of Albuquerque Planning Department, Amended December 1993. Huning Highland Sector Development Plan, City of Albuquerque Planning Department, Amended March 2005. La Mesa Sector Development Plan, City of Albuquerque Planning Department, Adopted November 1976. Nob Hill Highland Sector Development Plan, City of Albuquerque Planning Department, Amended June 2014. Trumbull Sector Development Plan, City of Albuquerque Planning Department, Amended January 2003. University Neighborhoods Sector Development Plan, City of Albuquerque Planning Department, Amended June 1991. West Mesa Sector Development Plan, City of Albuquerque Planning Department, Amended May 1978. West Route 66 Sector Development Plan, City of Albuquerque Planning Department, Amended March 2009. PAGE 17