GE Total Lighting Control

Similar documents
GE TLC Softwired Contactor TM Guideform Specification

SECTION LOW VOLTAGE LIGHTING CONTROLS

GE LightSweep Lighting Control System Guideform Specification

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

Model Gas Alarm Panel APPLICABILITY & EFFECTIVITY. This manual provides instructions for the following Sierra Monitor products:

Public Safety DAS Annunciator Panel

ANNUNCIATOR FIXED MODULE

Installation Instructions

Installation Instructions

Installation Guide. Tracer ZN523 Zone Controller BAS-SVN003-E4

THERMAL BUILDING SOLUTIONS EN-TraceTekTTSIM1A-IM-H /16

EMS510 Electrical Wiring Guide Volume 2, Rev 1.4

Solid Core and Split Core Fixed Current Status Switches CSS-O,C; CSP-O,C -F (FIXED) SERIES

Security & Control Cables

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

Cautions and Warnings. Introduction 4009 NAC POWER EXTENDER

S5JB Quick Setup Guide. Refer to the instructions on the following pages for complete details on the steps outlined below.

NGC-40 Advanced Heat-Tracing Control System

C-Bus Four Channel Analogue Output Unit Installation Instructions

Solid Core and Split Core 4-20 ma Output Current Sensors CTS-20; CTP-20

TTSIM-2 TRACETEK SENSOR INTERFACE MODULE WITH LCD AND RELAY INSTALLATION/OPERATION INSTRUCTIONS

C-Bus Four Channel General Input Unit Installation Instructions

ACSI MODEL 1410 POWER SUPPLY INSTALLATION INSTRUCTIONS

General Installation Instructions Maintenance Guide

TTSIM-1A. TraceTek Sensor Interface Module with Relay. Installation/Operation Instructions. Installation Items (not supplied) Tools Required.

Analog Input Module IC670ALG630

2 PREPARE THE OPENING

LDM Series Lamp Driver Modules For Graphic Annunciation and Control

Advantium TM. Built-In. Speedcook Ovens. Installation. Instructions

MEGA. cal electronic gas alarm. Installation, Operation, and Maintenance Instructions. Part No Rev. D Pg.

Stellar Panelboard Dimming Systems

Installation and Operation. Tracer ZN521 Zone Controller CNT-SVX07C-EN

Two-Channel Gas Controller

Unison Echo Room Controller

INSTALLATION INSTRUCTIONS

IMPORTANT SAFETY INFORMATION:

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Frequently asked questions: Intelligent Transmitter Series

Viking Installation Guide

Installation Instructions 30 French Door Built-in Wall Ovens

Beacon 410A Gas Monitor Operator s Manual

Home Theater Cables. Your complete solution for high-end audio transmission, stereo, professional audio systems and home theater systems.

Dual Technology Wall Switch Occupancy Sensor. Manual & Specification

21-light Remote Annunciator. Owner s Manual

Operating & Maintenance Manual. Alert-4 Ethernet LCD Master Alarm

DIVISION 26 ELECTRICAL SECTION LIGHTING CONTROL SYSTEM

GPF Dimming Panels. GRAFIK Systems SPECIFICATION SUBMITTAL

Gunite & Fiberglass Pools

MODEL B2 INSTALLATION MANUAL

T6984F,G Electronic Floating Control Thermostats

Integrated Process Solutions. Series 48 Heaters. heater jackets sizes 1 1/2'' to 4'' (nw 40 to nw 100)

Index Arc Guard Systems. Arc Guard Systems. Arc Guard Systems Industrial Automation Supply - Tel:

PART GENERAL 1.01 SECTION INCLUDES

Installation Instructions

CENTERLINE 2100 Motor Control Center (MCC) Doors and Units with Vertical Operating Handles

I/O ZONE 560/583 USERS GUIDE

MODEL 8144-RD CLOCK SELECTOR/DISTRIBUTION AMPLIFIER INSTRUCTION MANUAL. SPECTRACOM CORPORATION 95 Methodist Hill Drive, Suite 500 Rochester, NY 14623

Installation Instructions

SP-1000X. Panic Device Power Controller Installation Guide. Rev

Pre-March 2016 Design - Click to be redirected to newer SBS-H2 design SBS-H2. Hydrogen Gas Detector Kit

Power Supply Display Module PSDM. Installation and Operation Manual

Installation, Operation & Service Manual

SERIES 500. Installation & Maintenance Instructions. Ceiling Mounted Fan Forced Heater WARNING SAVE THESE INSTRUCTIONS. Recessed Mount.

Solid Core and Split Core 0-5, 0-10 Vdc Output Current Sensors CTS-05,10; CTP-05,-10

GasScanner 4C. Four Channel Monitor. Operator s Manual. MINT-0280-XX Rev. A 02/25/08

Installation and Programming Instructions for the Federal Signal Serial Interface Module

R A D I O N I C S. READYKEY K2015A Alarm Event Manager. Installation Data Sheet. Description

ROOM VALET. Installation And Wiring Guide PARTS I, II, and III. Room Valet Revision Complete Install Guide

Pump Station Appliance

Job Name th Street-Controls Denver CO. Bid Date Feb 22, Submittal Date Feb 26, 2008

NGC-UIT-ORD User interface terminal for Raychem NGC systems Installation Instructions

ACSI AO ELECTRIC LATCH RETRACTION CONTROLLER INSTALLATION INSTRUCTIONS I.D. 1089, REV. F

Electrical cable Water supply tube Fittings for tube Coupler Teflon tape. Hole saw min. 2½" bit

/9308 External Battery Chargers Installation Instructions

A. This Section includes the following lighting control devices:

LightSweep. Lighting Control System

- Data Brochure Mixing Control 360

Product Specifications Dialog Room Controller* (*patent pending)

MBCE-110/230FR Flame Sensor Module

Connecting and Routing the Cables

Installation Instructions

Installation, operating and servicing instructions

Installation, Service, and Troubleshooting Instructions

MBCE-110/230UV Flame Sensor Module

PAIRED UNJACKETED. Insulation Nominal Anixter. Paired Conductors Thickness O.D. Number AWG Strand No. IN IN

Dual Column Dehydrating Breather Manual

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

PARAGON Commercial Refrigeration Controls

sirens speakers and programmable controls

SECTION 26 NX DISTRIBUTED INTELLIGENCE LIGHTING CONTROL SYSTEM HUBBELL CONTROL SOLUTIONS

SLATE. UV Ampli-Check Flame Amplifier INSTALLATION INSTRUCTIONS R8001S1071

INSTALLATION INSTRUCTIONS

SC-6 Six Supervised Control Module

RMS/RPX Reader. User Manual

BATH FAN / LED LIGHT READ AND SAVE THESE INSTRUCTIONS MODEL GBR100LED-DECOR TABLE OF CONTENTS. Package Contents 2. General Safety Information 3

DOOR MONITORING/DURESS SYSTEM

General Routing Interface

1 UL 864 Compliance. 2 Product Overview. Network Communications Module NCM-W/F Product Installation Document. 1.1 Products Subject to AHJ Approval

Transcription:

GE Total Lighting Control ProSys Lighting Control System Catalog Number RINTERxxxPS(P) ProSys Lighting Control System Relay Panels RINTER2424PSP 24-Relay Interior shown with RTUB24 DESCRIPTION The ProSys Lighting Control System is a small network of relay panels and occupant control switches linked by a 4-wire dataline. Together, these devices form a reconfigurable switching platform one that uses softwiring instead of hardwiring to link occupant switches to relays. Scheduling capability can be readily added by simply mounting an RCLK8PS Softwired Clock to the DIN rail in any relay panel. The RINTERxxxxPS(P) 1 is the interior for a ProSys Lighting Control System Relay Panel. The complete relay panel assembly will include the following: 1. Tub (RTUBxx) 2. Interior (RINTERxxxxPS or RINTERxxxxPSP) 3. Power Supply (RPWRxxx) 4. Cover (RCOVxxxx) This instruction sheet will show you how to: 1. Install the Relay Panel(s) 2. Install and Test the Dataline 3. Document the Relay Panels Full descriptions of the installation and operation of Softwired Switches and the Softwired Clock and other optional automation devices are located in other sections of this manual and are provided with each hardware unit. Before starting, read the following installation instructions. If you have questions, call GE Total Lighting Control Service at: 1-877-584-2685 (LTG-CNTL) in the USA and Canada. These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that may be met in connection with installation, operation or maintenance. Should further information be desired or should particular problems arise that are not covered for the purchaser's purposes, the matter should be referred to the GE Company. 1

CAUTION: Make sure all power is OFF before wiring. Do not energize wiring until the unit is fully assembled. Conform to all applicable codes. RELAY PANEL INSTALLATION Figure 1 Dimensions (A x B) RINTER1212PS(P) 16.0" (406mm) x 16.5" (419mm) RINTER2424PS(P) 22.5" (572mm) x 24.0" (610mm) RINTER4848PS(P) 36.0" (914mm) x 24.0" (610mm) Relay Capacities (C) RINTER1212PS 12 RR7 relays RINTER1212PSP 12 RR9 relays RINTER2424PS 24 RR7 relays RINTER2424PSP 24 RR9 relays RINTER4848PS 48 RR7 relays RINTER4848PSP 48 RR9 relays DIN Rail Capacities RINTER1212PS(P) RINTER2424PS(P) RINTER4848PS(P) Two modules If you have purchased the ProSys II Lighting Control System (the stand-alone system), the devices (panels, switches and clock) will be in self-install mode, which means that as soon as they are connected to the network, they are operational and can communicate with each other. If you have purchased the ProSys LM Lighting Control System along with the ProSys LM software, the devices will be in software-install mode. This means that in order for them to function on the network you must: assign network addresses to the devices and bind network variables and message tags using your network management tool. Addresses and binding are necessary for the devices to function on the network. ProSys LM users please refer to the ProSys LM Software User Guide for instructions on installing devices. Rough-In Tub One module Two modules SWITCED LIGTING CIRCUITS 2" TYP. Environment 32 to 131 o F (0 to 50 o C), 0 to 95% relative humidity, stationary applications Mounting The tub should be level, plumb and rigidly installed with hardware sufficient to hold 100 lbs. (48kg). For flush-mount panels, the front flange should be flush with the final finished surface. For multiple panels, allow 1 4 minimum between panels for showbox cover clearance. Pulling Wires Route line-voltage wiring through the 2 1 2 knockouts in either the top or bottom of the tub. Route Class 2 lowvoltage dataline from the remote switches or other controls through the 3 4 knockouts in either end. A 4.5" D RELAYS C CLASS 2 LOW-VOLTAGE WIRING SECTION DIN RAIL LINE-VOLTAGE WIRING SECTIONS 5" WIDE B 1.5" x 1.5" CROSSOVER WIRING CANNEL (TOP AND BOTTOM) RELAYS C 115 VAC NEU GRD GE Lighting Controls CIRCUIT BREAKER PANEL ILLUSTRATION NOT TO SCALE Install Interior Power Supply Attach the power supply to the frame (bottom of 12-relay interior and left side of 24- or 48-relay interiors) and plug the low-voltage connector to the terminal marked POWER as shown in Figure 1 above. Interior Mount the interior in the tub and secure it to the studs with the hardware provided. Make sure that all line- and lowvoltage wiring is confined to the appropriate areas. Wire Line Voltage Before making any connections to the relays, make sure that none of the load circuits are shorted. Wire from the circuit breaker through each relay s SPST output terminals, and from there to the loads. Confirm that each circuit is wired to the relay specified in the drawings. Wire the power supply. Figure 2 J2 RINTER2424PS shown 2

POWER UP AND TEST RELAYS 1. Apply power to the power supply only. As shown in Figure 3, to the right, press the Relay Control Button next to each relay s yellow plug-in termination to toggle it ON/ OFF. The relay should click and the LED status indicator should change state. Confirm the operation by measuring the continuity at the line-voltage terminations of each relay. 2. Apply power to the relays. Being careful not to touch any line-voltage wiring, toggle each relay ON/OFF again and confirm that each relay controls the appropriate load. Figure 3 TO RELAY RR7P RELAY SOWN LED INDICATOR RELAY CONTROL BUTTON DOCUMENT RELAY WIRING Record the circuit controlled by each relay on the RELAY SCEDULE which was shipped with the interior. The relays associated with automation channels A- are recorded later. Figure 4 PROSYS RELAY SCEDULE PANEL # 01 RELAY # SUPPLY LOAD DESCRIPTION -01 LP1-1 OPEN OFFICE - FIRST FLOOR NW -02 LP1-2 " -03 LP1-3 OPEN OFFICE - FIRST FLOOR NE -04 LP1-4 " -05 LP1-5 OPEN OFFICE - FIRST FLOOR SW SOFTWIRING A RELAY GROUP TO A CANNEL 2 3 Figure 5 Softwiring a Relay Group PRESS AND OLD CANNEL PUS BUTTON FLASING RED LED FLASING LED 1 Press and hold the Channel Push Button for several seconds. 2 Select the relays to be controlled. 3 Press the Channel Push Button again. Test. Press the Channel Push Button to toggle the group ON/OFF/ON. Each ProSys panel includes eight channels (A-) which may be softwired to relays within the panel. Channels are used to group relays for common control. When a ProSys system includes an automation module (RCLK8PS Softwired Clock), we strongly recommend you turn to the installation instructions for that automation module and complete the documentation before softwiring any relays to channels. owever, if automation is to be provided by an interface to another system, or by using manual switches only, the channels may be used simply for grouping relays. Follow the instructions in Figure 5 to the left. 3

DATALINE INSTALLATION GLOBAL (PANEL-TO-PANEL) DATALINE PANEL 01 PANEL 02 PANEL XX The dataline connects the relay panels, switches and optional control modules. Within the 4-wire dataline are two twisted pairs: the red and black wires, carrying data; and the blue and white wires, providing power to the dataline switches and control modules. For simplicity, we refer to a 4-wire dataline running between a relay panel and the dataline switches as a Local Dataline. The relay panel provides the low-voltage power to all of the intelligent devices on that section of the dataline. 4 The dataline running between relay panels is known as the Global Dataline, and it uses only the red and black data wires. The blue and white wires are not connected and should be trimmed. Panel Addressing The two rotary switches on each relay panel set its address, allowing the differentiation between relays in different panels. NOTE: The first panel address must be set at 01 and the others numbered sequentially 02, 03, and so on, between 02 and 30 as shown to the right. If the panel address is set higher than 30, the channel LEDs in the panel will flash. Setting the panel address to 30 or below will return the panel to normal operation. If a panel is set to the same address as another panel, then the two panels will not operate properly. The ProSys LM panels can be setup in groups of 30 where the panels in a group can be numbered from 00 to 30. Note: To ensure good communications between panels, the installer must comply with the dataline specification. GE will not warrant a system using a dataline that does not meet our specification. To avoid questions, use GE RLONWIRE-4P (plenum rated). Do not run the dataline in conduit or wiring trays with power wires. Do not connect the local datalines from two different panels. GE RLONWIREP-S4 Dataline Wire Specifications #18 AWG (7 strands x 26 AWG) 2 independent twisted pairs black/red, blue/white Unshielded copper conductors 2 inch twist lay on pairs, 6 inch twist lay on cable Plenum-rated copolymer jacket, 0.230" O.D. FEP 0.010" insulation, 0.060" O.D. 30 pf/foot maximum capacitance -20 C to 150 C operating temperature range 17 lbs. per 500 foot reel UL rated

ARDWIRE LOW-VOLTAGE SWITCES (OPTIONAL) Each of the ProSys panel s eight channels has a single switch input which will accept any of the dry-contact configurations shown in Figures 6 and 7, and also provides status feedback for that channel. Figure 7 ardwired Switch Configurations RED/BLACK JUMPER ProSys panels whose catalog numbers end in P also include inputs for each relay. Like the channel inputs, these support all of the dry-contact configurations shown. MAINTAINED ISOLATED CONTACT BLACK/WITE JUMPER Figure 6 ardwired Switch Inputs 2-WIRE MOMENTARY PUS BUTTON ARDWIRED CANNEL SWITCES ARDWIRED RELAY SWITCES* * The ability to hardwire a 2- or 3-wire switch directly to a relay is an option in ProSys system panels. For panels with relay inputs, order interiors with catalog numbers ending in P. STANDARD 3-WIRE MOMENTARY STANDARD 3-WIRE MAINTAINED PANEL TESTING AND TROUBLESOOTING Panel Testing The panel-to-panel dataline should be tested for continuity and isolation from ground. To test for continuity, remove the red and black dataline wires at panel 01 and wire nut together (short the wires together). Go to the last panel in the series and measure the resistance between the red and black terminals. It should be less than 3 ohms. Return to panel 01 and restore the red and black wires to their associated terminals. For shorts, test from red to white and black to white anywhere in the low-voltage section of the panel. You should see an open circuit. 5

6 DE40212 BL 0700 R02 GE Total Lighting Control 41 Woodford Avenue, Plainville, CT 06062 2000 General Electric Company GE Total Lighting Control