LANDMARK CENTER BOSTON CIVIC DESIGN COMMISSION OCTOBER 1, 2013

Similar documents
Residential Commons at Barry s Corner. Boston civic design commission February 5, 2013

AMENDED AND RESTATED DEVELOPMENT PLAN FOR THE SPORTS FACILITY PROJECT WITHIN PLANNED DEVELOPMENT AREA NO. 87 BOSTON LANDING

1617TREMONT.COM REDEVELOPMENT OPPORTUNITY LONGWOOD MEDICAL AREA // MISSION HILL BOSTON, MASSACHUSETTS DOWNTOWN BOSTON SEAPORT BACK BAY SOUTH END

Community Task Force Meeting June 19, Planned Development 500 Huntington WENTWORTH INSTITUTE OF TECHNOLOGY

November 2018 THE DISTRICT AT CLIFTON HEIGHTS

The West College Avenue Corridor Redevelopment Plan

The. Copley Group. Fenway Neighborhood Guide

2.0 PROJECT DESCRIPTION

Institutional Master Plan Notification Form. WHEELOCK COLLEGE Resource Center Project Renovation and Addition

The. Copley Group. Fenway Neighborhood Guide

PRIMARILY RESIDENTIAL DEVELOPMENT PROJECT VISION TOWER 4 TOWER 2 TOWER 1 TOWER 5

Allston Brighton Boston College Task Force Meeting. Brighton Marine Health Center March 27, 2013

Forest Hills Improvement Initiative A Partnership for Building a Better Community. Use & Design Guidelines September 23, 2008

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

St. Kevin s Area Planning Collaborative

ANC 2A Presentation. November 9, 2006

Proposed Major Institution Master Plan Street Vacation. March 19, 2009

Manhattanville Development Proposal: Project Description

Institutional Master Plan The Arnold Arboretum of Harvard University

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP

Transportation. Strategies for Action

Stuart Street Planning Study Development Review Guidelines to supplement Back Bay Downtown IPOD (1987) October 15, Preface

Planning Districts INTRODUCTION

12600 S Existing Conditions

AMENDED AND RESTATED DEVELOPMENT PLAN For PLANNED DEVELOPMENT AREA NO. 78. SEAPORT SQUARE PROJECT South Boston. Dated: November 16, 2017

South Norfolk Municipal Facilities Study

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

150 Seaport Boulevard BCDC Project Summary Booklet

PROPOSED DEVELOPMENT CONCEPTS

PLAN ELEMENTS WORKSHOP. April 5, 2016

Historic Preservation Preserve, restore or adaptively re-use historic structures and landscapes.

South Station Expansion Project. Appendix 4 (Part 2) - Land Use and Zoning Technical Report

burlington mobility hubs study Downtown Burlington Mobility Hub

Cities are dynamic and ever changing places with buildings, infrastructure and outdoor spaces constantly being improved and buildings replaced.

17.11 Establishment of Land Use Districts

Subject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park

Town Center. Block 5 Existing multifamily residential units are expected to remain.

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW

FOR IMMEDIATE RELEASE Contact: Dyana Koelsch

City of San Juan Capistrano Agenda Report

A Context-Based Design Code for Pedestrian & Transit-Oriented Development RAIL~VOLUTION NOVEMBER 2006

BRYN MAWR. Tier 2 Characteristics: Location: Lancaster Avenue from Old Lancaster Road on the east to Norwood Avenue on the west

The underlying goals of the study and resultant zoning recommendations are to:

Sketch Plan. MNCPPC Plan No: A

3.0 URBAN DESIGN. December 6, OVERVIEW

GREEN WEDGE MANAGEMENT PLAN

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015

New Partners for Smart Growth Conference February 5, 2010

A. INTRODUCTION B. METHODOLOGY

Description of Preferred Alternative

Hudson Group North America LLC

New Town Mixed Use District

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

design & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

Taming the Bus: Strategies for Urbanizing Suburban Transit. Seth Riseman, Utile, Inc. Architecture + Planning

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Bringing the Community Together. TOWN SQUARE UPDATE November 1, 2017

DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO BOYLSTON STREET PROJECT BOSTON, MASSACHUSETTS TABLE OF CONTENTS

John Callaway, for Rees 514 LLC & Brent Brunswick LLC Name of Project

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

John Callaway, for Rees 514 LLC & Brent Brunswick LLC Name of Project

Site 2 Development Brief

Corridor Investment Projects (FY FY2012)

UNIVERSITY OF WASHINGTON Mercer Hall Project, Terry/Lander Hall Project, and Development Capacity Re-allocation from Central to West Campus

public review draft Key objectives for this chapter are:

Policies and Code Intent Sections Related to Town Center

The principal elements of the NTC Strategic Vision plan are as follows.

WELCOME and introduction

Sub Area 2: Downtown Overland Park

PERFECT HOMES FOR EVERYONE

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

APPLICATION FOR ARTICLE 80E SMALL PROJECT REVIEW

AN ORDINANCE THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

U T D N o r t h C a m p u s T O D and D o w n t o w n D e n t o n T O D

Downtown / Ballough Road Redevelopment Board

FUTURE LAND USE ELEMENT

West Ocala Vision & Community Plan City Council Work Session. Presented by West Ocala Community Plan Steering Committee

PROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes).

Sewanee Village + Request for Builder/Developer Proposals

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Palm Jebel Ali - Dubai, United Arab Emirates

Project Overview. Washington s Most Exciting New Destination for Office and Retail PROPERTY GROUP PARTNERS

Enhanced Planning Process

Advisory Group Meeting 16 November 2010

ARLINGTON COUNTY, VIRGINIA

Section4 Design Vision & Implementation Plan

3.0 LAND USE PLAN. 3.1 Regional Location. 3.2 Existing Conditions Existing Uses. Exhibit Regional Location Map

BRYN MAWR. Tier 2 Characteristics: Location: Lancaster Avenue from Old Lancaster Road on the east to Norwood Avenue on the west

of ZONING OVERHAUL

Ville de. Côte Gelée

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW


Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

2017 Downtown Waterfront District Municipal Harbor Plan & Public Realm Activation Plan Supplement - February 16, 2018

Land Use, Zoning, and Public Policy

Planning Board Hearing October 20th, 2016

Five Points of a Sustainable Urbanism. Daniel Kaplan, FAIA, LEED AP, Senior Partner, FXFOWLE

Transcription:

BOSTON CIVIC DESIGN COMMISSION OCTOBER 1, 2013

CONTENTS 01 PROJECT SUMMARY 03 PROGRAMMING & URBAN DESIGN 02 PROJECT SITE 04 AERIAL VIEW 05 EMERALD NECKLACE 06 SITE PLAN 07 EXISTING PHOTOS 03 FLOOR PLANS 08 GROUND 09 PARKING 10 SECOND 11 THIRD 12 TWELFTH 13 ROOF 04 SECTION & ELEVATIONS 14 SECTION EAST-WEST 15 ELEVATION PARK DRIVE 16 ELEVATION FULLERTON STREET 17 ELEVATION MULTI-USE PATH 18 ELEVATION BROOKLINE AVENUE 05 RENDERINGS 19 FENWAY MARKET 20 FROM THE RIVERWAY

3 PROJECT SUMMARY The proposal at Landmark Center in the Fenway entails the re planning and redevelopment of the existing Landmark Center located at the corner of Park Drive and Brookline Avenue adjacent to the Sear s Rotary in Boston s Fenway neighborhood, proposed by Fenway Enterprises LLC, a Samuels & Associates entity, on behalf of Landmark Center Ventures LLC. 75,000 gsf grocery store. An additional 15,000 gsf of office to the existing 675,000 gsf of office. A new public plaza along Brookline Avenue and Fullerton Street. MASSING & DESIGN Building massing has been shaped in response to the height and use of the surrounding context and the desire to preserve daylight and views both on- and off-site. The removal of almost 380,000 square feet of existing above-grade garage offsets the impact of new massing on the Project Site. The 01 PROJECT SUMMARY The entire site is being re planned to make the historic Sears building and the surrounding block more permeable. The strategies are dramatic and include the demolition of all above grade parking, creation of new public space on Brookline Avenue and the relocation of the office lobbies to the street level. Redevelopment of the Project Site will bring new ground and second floor retail uses, including a major supermarket. The interior of the Landmark Center will be reconfigured to provide weather protected travel from the Fenway MBTA station to the commercial district of the Fenway neighborhood, through a destination food market anchored on the Fullerton side of the building by the new supermarket. Above the retail, new residential buildings will be constructed. The Project also includes reconfiguration of a portion of existing office and cinema space, mechanical space, residential amenity space and other accessory uses and facilities. THE PROPOSED PROJECT CONSISTS OF : Increase in useable open space by 97 percent site wide to 2.2 acres. Preservation of the landmark status of the existing historic building. ZONING The Project Site is located in the Brookline Avenue Community Commercial Subdistrict of the Fenway Neighborhood District pursuant to Article 66 of the Boston Zoning Code. The Project Site is within the Restricted Parking Overlay District (RPOD) and the Groundwater Conservation Overlay District (GCOD). A portion of the Project Site along Park Drive is located in the Fenway/ Park Drive Greenbelt Protection Overlay District (GPOD). The existing improvements on the Project Site were approved by the BRA as a Chapter 121A project on December 15, 1996 by a Report and Decision (the Existing 121A Approval ) that included zoning deviations. The Proponent intends two-story base of the development is made up of a mix of small, intermediate and anchor scale retail designed to draw pedestrians to and through the Project Site from the MBTA, Park Drive, Brookline Avenue and Fullerton Street. Building masses above the retail base are oriented perpendicular to Brookline Avenue and Park Drive to maximize light and air around the proposed development. Building height decreases from south to north, stepping down toward the Audubon Circle neighborhood. The roof space between new and existing buildings above the retail base creates a unique opportunity for multi-level open space that is activated by both the commercial and residential uses. Materials and architectural expression carried down from the building mass to the street level accentuate the massing composition. A modern architectural expression is proposed and responds to the existing context and to the orientation of new buildings. The proposed buildings will stand alongside recent and new Removal of 380,000 sf of existing above-grade to seek 121A in connection with the Project. Because the development at Trilogy, 1330 Boylston Street, The Van Ness parking garage. proposed building exceeds 50,000 square feet, the Project and The Point, and will express their own unique identity Approximately 1,500 new parking spaces below grade. is subject to the requirements of Large Project Review pursuant to Article 80 of the Code. Since the proposed amid the continued positive growth of this neighborhood. Up to 550 new residential units. building also exceeds 100,000 square feet, the Project is An additional 110,000 gsf of retail to the existing 276,00 gsf retail. subject to schematic design review by the Boston Civic Design Commission (BCDC) under Article 28 of the Code.

4 02 PROJECT SITE AERIAL VIEW

5 COMMONWEALTH AVENUE PRUDENTIAL CENTER 02 PROJECT SITE SYMPHONY HALL MUSEUM OF FINE ARTS KENMORE SQUARE FENWAY PARK BOYLSTON STREET BROOKLINE AVENUE BOSTON UNIVERSITY ISABELLA STEWART GARDNER MUSEUM LANDMARK CENTER ON THE EMERALD NECKLACE

BEACON STREET 6 KENMORE EXISTING TO REMAIN RETAIL 02 PROJECT SITE CINEMA/ENTERTAINMENT OFFICE RESIDENTIAL SERVICE/PARKING HOTEL NE HEALTH CARE WB UR VE EA IN KL OO TAIL R B RE 20 YS TR E ET 1 ED OS OP IL PR RETA ED OS OP IL PR RETA N IN CE T EN IO ID ARR S RE Y M B ED OS OP IL PR RETA BR O OK N LI E A VE LA E NU ED OS OP IL PR RETA D AR RV ARD HA GU N A V ND SD OW NE STR EET FENWAY PARK E LIN OK IL RO TA 0 B RE 12 AVE E DR TL IPO K PA R IL NA PS LON SA M EL ST WE K& AC S EM LIO BO CVS SUBWAY PILLIPO CITIBANK TASTY BURGER GUITAR CENTER JERRY REMY S RITE AID FEDEX KINKOS BERRY LINE SWEET CHEEKS THE POINT RETAIL HOWARD JOHNSON HOTEL SW H S ET IPSWICH STREET IVE E LIN OK IL RO TA 6 B RE 12 AVE E LIN OK L RO TAI 2 B RE 13 AVE CH IP VAN NESS STREET IC E TR BOYLSTON STREET DOMINO S CHICKEN BONE BASEBALL TAVERN CITIZEN UPPER CRUST BASHO L AN D MARK CENTER BURGER KING SHAW S LOCATION & PRESENCE S A M U E L S & A S S O C I AT E S E L K U S M A N FR E D I A R C H I T EC T S

7 02 PROJECT SITE LANDMARK PHOTOS

8 MINER STREET 02 PROJECT SITE RIVERWAY RIVERWAY CONNECTOR PARK DRIVE FULLERTON STREET HARVARD VANGUARD BURLINGTON STREET EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING BROOKLINE AVENUE GROUND FLOOR PLAN

9 03 FLOOR PLANS EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING PARKING PLAN

10 03 FLOOR PLANS EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING SECOND FLOOR PLAN

11 03 FLOOR PLANS EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING THIRD FLOOR PLAN

12 03 FLOOR PLANS EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING TWELFTH FLOOR PLAN

13 MINER STREET 03 FLOOR PLANS RIVERWAY RIVERWAY CONNECTOR PARK DRIVE FULLERTON STREET HARVARD VANGUARD BURLINGTON STREET EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING BROOKLINE AVENUE ROOF PLAN

14 EXISTING TO REMAIN RETAIL CINEMA OFFICE RESIDENTIAL SERVICE/PARKING 04 SECTION & ELEVATIONS 197 0 180 0 156 0 50 0 32 0 MARKET ARCADE PARK DRIVE PLAZA EXISTING FULLERTON STREET PROPOSED EAST-WEST SECTION

15 04 SECTION & ELEVATIONS ELEVATION PARK AVENUE

16 04 SECTION & ELEVATIONS ELEVATION FULLERTON STREET

17 04 SECTION & ELEVATIONS ELEVATION MULTI-USE PATH

18 04 SECTION & ELEVATIONS ELEVATION BROOKLINE AVENUE

19 05 RENDERINGS FENWAY MARKET

20 05 RENDERINGS FROM THE RIVERWAY