Application for Abandonment

Similar documents
Policies and Code Intent Sections Related to Town Center

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

EXISTING COMPREHENSIVE PLAN

November 2, 2015 at 5:15pm City Council Chambers, 3rd Floor, City Hall, 1737 Main Street Columbia, South Carolina 29201

ORDINANCE AN ORDINANCE TO ADD A NEW SECTION 4.N. IN THE ZONING CODE FOR THE TOWN OF MIDDLETOWN, RELATING TO MIXED-USE DEVELOPMENT

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

KEIZER STATION PLAN INTRODUCTION

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

Johnson County I-69. Corridor Plan DRAFT DRAFT

Planning Districts INTRODUCTION

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

B. Blocks, Buildings and Street Networks

K. SMART ASSOCIATES LIMITED

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

Building & Site Design Standards Application

VIRGINIA DRIVE SPECIAL PLAN

I. Introduction. Prior Approvals

ORDINANCE NO.:

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval

Figure Example of out door dining in the public right-of-way.

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Highland Village Green Design Guidelines

STAFF REPORT DEVELOPMENT COMMISSION ZONING MEETING CITY OF COLUMBUS, OHIO JANUARY 10, 2019

Town Center (part of the Comprehensive Plan)

Rezoning Petition Pre-Hearing Staff Analysis September 17, 2018

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

Be it enacted by the Town Board of the Town of Guilderland that the following new A (Transit Oriented Development (TOD) District) is adopted:

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

The transportation system in a community is an

CHAPTER 3. Design Standards for Business, Commercial, Industrial, Recreational and Institutional Uses

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

OPPORTUNITY SITES. A. Introduction. Chapter 5

CITY OF RENO APRIL Progressive Urban Management Associates (P.U.M.A.) in association with. Economic and Planning Systems (EPS)

TEMPLE MEDICAL & EDUCATION DISTRICT

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

The University District envisions, in its neighborhood

PLANNING STAFF REVIEW

17.11 Establishment of Land Use Districts

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

PRELIMINARY DEVELOPMENT PLAN REVIEW - CITY OF MARYLAND HEIGHTS

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Olde Towne Vision Plan

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

Lehigh Acres Land Development Regulations Community Planning Project

DRAFT Civic Center Station Area Plan. Executive Summary

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update

Urban Design Brief Fanshawe Park Road. Competition Toyota

Midtown Greenway Land Use and Development Plan Executive Summary

appendix and street interface guidelines

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

ARTICLE 6: Special and Planned Development Districts

Urban Design 9Identity

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018

CHAPTER 21 NC-PUD NEIGHBORHOOD COMMERCIAL PUD DISTRICT

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

SPECIFIC PLAN Requirements

URBAN DESIGN BRIEF REPORT

DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT

Guiding Principles, Objectives, Strategies and Policies

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay

FUTURE LAND USE ELEMENT

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

.404 acres (approximately 17,600 square feet) Existing Zoning

M E M O R A N D U M. Consider a recommendation of a site plan for Sherwin Williams, a proposed approximately 4,500 square-foot paint store.

WATERFRONT DISTRICT DESIGN STANDARDS

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

PLAN ELEMENTS WORKSHOP. April 5, 2016

Appendix D North Road/N. Leroy Street Subarea Plan

U.S. Highway 377 North Overlay District. 1. General Purpose and Description

REZONING APPLICATION MPD SUPPLEMENT

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

City of Hermosa Beach Administrative Policy #

Procedures IV. V. Rural Road Design Option

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

DEVELOPMENT CONTROLS MEDICAL DISTRICT

PORT WHITBY COMMUNITY

ARTICLE 13 STREETS General

Small Area Plan. South Gateway

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

4.1.3 LAND USE CATEGORIES

Transcription:

Application for Abandonment Of 6 th Street Alley Abandonment Prepared For: University Housing Group, Inc. 2770 Electric Road SW, Suite C Roanoke, VA 24018 Prepared By: KRATER CONSULTING Group A Nevada professional corporation 901 Dartmouth Drive Reno, Nevada 89509 (775) 815-9561 July 10, 2017

Table of Contents I. Supporting Information A. Discussion of UNR Regional Plan B. Project Summary C. Abandonment Findings D. Neighborhood Advisory Board Information E. Conclusion II. Location Map III. Zoning/Vicinity Map IV. Site Plan V. Abandonment Application Checklist VI. Abandonment Application A. Petitions for Abandonment B. Owner Affidavits Assessor Maps C. Applicant Affidavits D. Exhibits Showing Location of Public Utilities VII. Title Reports A. Schneider B. NNUD VIII. Legal Description IX. Tract Map #24 Evans Addition

KRATER CONSULTING GROUP A Nevada professional corporation Krater Consulting Group Phone (775) 815-9561 901 Dartmouth Drive Fax (775) 786-2702 Reno, Nevada 89509 E-mail: Ken@KraterConsultingGroup.Com July 10, 2017 Claudia Hanson, Planning Manager Community Development Department City of Reno P.O. Box 1900 Reno NV 89505 Dear Claudia: SUBJECT: ABANDONMENT APPLICATION UNIVERSITY HOUSING GROUP, STUDENT APARTMENTS Project Summary Supporting Information The proposed student apartment project has been planned to be fully compatible with the University of Nevada Regional Center Plan and to be an asset for both the University and Downtown Reno. Plans call for redevelopment of 3/4ths of an entire city block with lighting, landscaping, and sidewalk improvements being considered that will provide a uniform look and enhance safety and security for the entire city block. Following are excerpts from the University of Nevada Regional Center Plan pertinent to the proposed project and a description of the project that describes how the plan goals and policies will be met. Abandonment Findings are also stated and addressed. UNIVERSITY OF NEVADA REGIONAL CENTER PLAN Development Concept - University of Nevada Regional Center Plan There are three subareas within the UNRC Plan, including: 2. University District (area of proposed project) consisting of several blocks north of I-80 and land south of I- 80 within the UNRC Plan boundary. This district is intended to leverage the University s influence to catalyze residential, retail, commercial and light industrial development. The University District Should contain a mix of uses to create a vibrant university oriented neighborhood and support:

North Virginia Street and Evans Avenue corridors linking the campus to the downtown through enhanced streetscapes and land uses encouraging active ground floor retail and commercial uses along the North Virginia Main Street Corridor and active innovation and research uses along the Evans Innovation Corridor. Zoning should support a variety of housing and commercial uses, university innovation and research partnership opportunities, office, maker/light industrial, startup/incubator space, and community service uses. University of Nevada Regional Center Plan Maps, Goals, and Policies (following pages) Page 2

MAP 2: DEVELOPMENT CONCEPT PHASE 2 LAND USE University of Nevada Regional Center Plan Page 3 City of Reno Master Plan April 27, 2016

MAP 5: TRANSIT CONCEPT Source: UNR Campus Master Plan 2015-2024 University of Nevada Regional Center Plan Page 9 City of Reno Master Plan April 27, 2016

MAP 6: PEDESTRIAN FACILITIES Source: UNR Campus Master Plan 2015-2024 University of Nevada Regional Center Plan Page 10 City of Reno Master Plan April 27, 2016

MAP 7: BICYCLE NETWORK Source: UNR Campus Master Plan 2015-2024 University of Nevada Regional Center Plan Page 11 City of Reno Master Plan April 27, 2016

Land Use, Streetscape and Urban Design Medical marijuana establishments and non-restricted gaming should be prohibited within the UNRC Plan area. The appropriateness of bar uses and restricted/accessory gaming for properties in the University District south of Interstate 80 should be further evaluated. Zoning overlay standards should be evaluated within the Gateway Precinct to consider specific building design standards, such as brick facades, to ensure continuation of the university campus aesthetic as it interfaces with University District development. The portions of North Virginia Street and Evans Avenue adjacent to the University Campus should include generous sidewalks on both sides of the street. As redevelopment occurs, sidewalks should be widened to at least ten feet and be shaded by trees. An urban-scaled minimum build-to line of twelve feet from face of curb for at least 75% of street frontage for sidewalks, including: trees, street furniture, lighting and other urban amenities should be established in the University Districts. A unified design standard for North Virginia Street and Evans Avenue should be developed. Landscaping should create a comfortable low water use environment and attractive tree canopy that encourages preservation of mature trees. Circulation and Public Rights-of-Way The City should consider supporting the permanent/managed closing or abandonment of public streets, alleys and easements within the Gateway Precinct in order to facilitate the objectives of the UNRC Plan and Gateway concept, subject to thorough review of traffic impacts, including without limitation impacts on historic resources. In order to promote a pedestrian-friendly environment, the City should evaluate necessary street improvements to facilitate intensification of the University District and Gateway Precinct, including the feasibility of returning the one way couplets south of Interstate 80 to two-way traffic flows. In order to enhance bicycle access, bike facility improvements should be made on Virginia Street and Evans Avenue. The City should collaborate with the Regional Transportation Commission to widen the public right-of-way on North Virginia Street adjacent to the Gateway University of Nevada Regional Center Plan Page 13 City of Reno Master Plan April 27, 2016

Precinct to accommodate bus-only lanes, a northbound bus turnout, wider sidewalks, bicycle parking and placement of street trees. The City should encourage pedestrian safety and traffic calming improvements at Evans Avenue and 9 th Street. The City should collaborate with RTC and prioritize traffic calming strategies, increased lighting, additional marked crossings with flashing beacons, and sidewalk widening. The City should revisit its on-street parking permit program in the University area to ensure effectiveness and adequate enforcement. The City should ensure that residents of developments within the plan area north of Interstate 80 granted parking reductions are ineligible to receive on-street parking permits. IMPLEMENTATION Amended land use designations and zoning districts, as well as modified Reno Municipal Code provisions, are necessary to implement the development and circulation concepts in this plan. Land Use The University of Nevada Regional Center is designated as Special Planning Area in the Reno Land Use Plan. This designation recognizes that customized land use and zoning provisions are appropriate and provisions of this regional center plan govern land use and development within the plan area. Zoning The majority of the Plan area was rezoned to the Mixed Use (MU) base zoning district and University Regional Center Planning Area (UNRC) Overlay at the time this Plan was first adopted in 2005. Mixed use development (i.e. combinations of uses) is allowed in this zone with specific modifications to land uses, development standards and processing requirements identified in the University Regional Center Planning Area Overlay in Reno Municipal Code. University of Nevada Regional Center Plan Page 14 City of Reno Master Plan April 27, 2016

PROJECT SUMMARY The proposed student apartment project will consist of approximately 200 apartment units on 56,000 sq. ft. of property for a floor area ratio of over 150 units per acre; far exceeding code requirements. We plan to have approximately 560 bedrooms within the 200 +/- units or 2.8 bedrooms per apartment. Over fifty percent of the street frontage along Virginia Street, 6 th Street, Center Street, and 7 th Street will be dedicated to a mix of pedestrian friendly uses including a pet care station and an enclosed bicycle center with storage for 170 +/- bicycles (Note that the University of Nevada Regional center depicts Center Street as an important bicycle entrance into campus). Additional pedestrian related uses include a package concierge service, a fitness center, a two-story lounge and café, a leasing office and a business center. We are also dedicating space for student artwork along 7 th Street to allow residents to work together to display their personal, class, and university artwork. Although the Showboat motel and Travel Lodge located on the corner of Virginia and 7 th Street will remain for the time being, we are investigating the potential for continuation of new sidewalk, street trees, and street lighting around the two public streets (Virginia and 7 th ) to enhance safety and security and improve the visual appearance of the area for residents of the student apartment complex. The leasing center, business center, and lounge/café are located on 7 th Street closest to the main entrance to campus. An area will be dedicated to the display of artwork along 7 th Street to enhance the entrance into the complex and create pride among residents. Plans call for abandonment of the southern one-half of the alley that runs from 6 th Street to 7 th Street between Virginia Street and Center Street. The southern portion of the alley is in very poor shape. Upon demolition of the few remaining homes that are in extremely poor condition with little or no maintenance or upkeep over the last few decades, there is no reason to have a public alley for the proposed project. The north half of the alley will remain allowing access to parking spaces and trash dumpsters in the adjoining Showboat motel and Travel Lodge. (See below looking from 7 th Street). Note that there are several openings in the motel buildings that allow vehicle access to the alley so access to the motel will be negligibly affected with the alley abandonment. View of Alley looking South from 7 th Street. Page 9

The student apartment project will only have access from 6 th and 7 th Streets, consistent with the historical theme of alleys where vehicle and service access to homes was from the alley. Trash facilities will be located along 6 th Street where curb parking is available for Waste Management trucks to pull out of the through travel lane for curb-side service. Trash compactors will be used to minimize the need for trash pickup (twice weekly trash pickup is planned) and recycle facilities will be located adjacent to the package concierge area to encourage recycling and minimize the amount of trash going to the local landfill. Existing utility facilities will be abandoned or relocated as needed including a short storm drain line just north of 6 th street, two sanitary sewer lines and an overhead electric line that provide service to homes and businesses along the alley and the Bank of America building located north of 7 th Street PERTINENT SECTIONS OF THE RENO MUNICPAL CODE Section 18.08.301. - Nonresidential and Mixed-Use Base Zoning Districts. (a) MU Mixed Use District. The following standards shall apply to all development in a MU District: (9) Architecture and Site Layout. e. At least 50 percent of the width of a new or reconstructed first story building wall facing a street shall be devoted to pedestrian entrances, display windows, or windows affording views to retail, office, restaurant, or lobby space. FINDINGS ARTICLE VI: - ABANDONMENT Section 18.06.603. - Review Process (c) Findings. In approving any abandonment, the city council shall find the following: (1) The public will not be materially injured by the proposed abandonment. NEIGHBORHOOD ADVISORY BOARD The project lies in Ward 5, Councilwoman Neoma Jardon s ward. We look forward to presenting the project and abandonment request to the next available Ward 5 meeting. CONCLUSION This project has been designed to fully comply with the University of Nevada Regional Center Plan and Reno city code. In fact, the proposed project will exceed code requirements in many aspects and finally begin the process of linking downtown Reno with the University in a significant fashion. The close proximity to the original campus entrance on Center Street, transit facilities, bicycle facilities Page 10

and corridors, downtown restaurants, and special events will create a unique and desirable living environment for students and enhance their University experience. The proposed abandonment of the south one-half of the north-south alley that runs between 6 th and 7 th Streets between Virginia Street and Center street will fully comply with the finding that must be made in order for the city council to approve the abandonment The public will not be materially injured by the proposed abandonment. With development of the project, not only will the alley not be needed, the entire block will be far more attractive without an alley running the length of the block. The City of Reno does not have the financial resources to maintain this alley and adequate access will be provided for the Showboat motel and Travel Lodge. Calls for service will be reduced upon redevelopment of this block and this entire quadrant of the downtown Reno are will be greatly enhanced. We greatly appreciate your consideration of this matter. Please do not hesitate to contact me with any questions. Sincerely, Kenneth Krater, P.E. Page 11

6th Street Alley Abandonment July 7, 2017 1:2,430 0 0.02 0.04 0.08 mi 0 0.0225 0.045 0.09 km City of Reno GIS Esri, HERE, DeLorme, MapmyIndia, OpenStreetMap contributors, and the GIS user community Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

SITE PLAN

6th and Virginia SD City of Reno FacilitiesMap // 5/24/2017 2:32 PM // thomasj

6th and Virginia SS City of Reno FacilitiesMap // 5/24/2017 2:24 PM // thomasj

TITLE REPORT Schneider Trust

TITLE REPORT NNUD

LEGAL DESCRIPTION ALLEY ABANDONMENT

EXHIBIT A ABANDONMENT DESCRIPTIONS Portions of that alley lying within Block 8 of Evans North Addition to Reno, as shown on the plat thereof, recorded on December 16, 1879 as Tract Map 24 in the office of the County Recorder of Washoe County, Nevada, and situate within the north one-half of Section 11, T19N, R19E, MDM, Reno, Nevada, more particularly described as follows: Area to be merged with Lot 1 (APN 007-217-09): All that portion of the west one-half of said alley lying north of the northerly line of East 6th Street and south of the extension of the northerly line of Lot 1 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. Area to be merged with Lot 2 (portion APN 007-217-10): All that portion of the west one-half of said alley lying north of the extension of the southerly line and south of the extension of the northerly line of Lot 2 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. Area to be merged with Lot 3 (portion APN 007-217-10): All that portion of the west one-half of said alley lying north of the extension of the southerly line and south of the extension of the northerly line of Lot 3 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. Area to be merged with Lot 4 (APN 007-217-11): All that portion of the west one-half of said alley lying north of the extension of the southerly line and south of the extension of the northerly line of Lot 4 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. Area to be merged with Lot 13 (APN 007-217-05): All that portion of the east one-half of said alley lying south of the extension of the northerly line and north of the extension of the southerly line of Lot 13 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. Area to be merged with Lot 14 (APN 007-217-06): All that portion of the east one-half of said alley lying south of the extension of the northerly line and north of the extension of the southerly line of Lot 14 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less.

Area to be merged with Lot 15 (APN 007-217-07): All that portion of the east one-half of said alley lying south of the extension of the northerly line and north of the extension of the southerly line of Lot 15 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. Area to be merged with Lot 16 (APN 007-217-08): All that portion of the east one-half of said alley lying north of the northerly line of East 6th Street and south of the extension of the northerly line of Lot 16 of said Block 8; being approximately 10 feet in width by 50 feet in length. Containing 500 square feet, more or less. C and M Engineering 5488 Reno Corporate Drive, Suite 200B Reno, NV 89511