Hochhaus am Park Conception

Similar documents
Grundschule Gronau (D)

Hampton by Hilton Frankfurt/M. (D)

Fire Safety Concept Hotel Jumeirah

PARIS LA DEFENSE SEINE ARCHE BUSINESS DISTRICT A KEY PLAYER IN GREATER PARIS

Guide to a Perfect Climate. W a r m l i k e t h e s u n

Offices - Bruno Donjon de Saint Martin, Managing Director 2016 INVESTOR DAYS

URBAN GREEN ALL OVER EUROPE

Paris Hospitality Guide

SUN CLOCK In structions Manual

CONCRETE CORE COOLING CONCRETCOOL

CHARM The Dawn of a New Era in Checking the Tightness of Natural Gas Pipelines

niu by Novum: Art in Design

PARIS LA DÉFENSE The new tourist and entertainment destination in Greater Paris

Urban Development Management in Munich, Germany. Integrated strategy, impacts, learning from external evaluation

Prix de L Arc de Triomphe

Towards a national indicator for urban green space provision and environmental inequalities in Germany: Method and findings

Reiner Nagel - Head of Division for Urban Planning and Open Spaces. Sustainable Urban Development Policy in Berlin

People ignore design that ignores people. Frank Chimero

2. Urban history and climate

Integrated protection for IT rooms and computer centres STULZ the air conditioning specialist for the complete EDP room

A G R E A L E S TAT E I BOTANIC BUILDING Brussels

AQUATIC FACILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING. True Expertise + Working Ingenuity

BD DES MARÉCHAUX BD PÉRIPHÉRIQUE BORDER PARIS PTE DE CLIGNANCOURT PTE SAINT OUEN PTE DE CLICHY PTE D ASNIÈRES PTE DE LA CHAPELLE PTE D AUBERVILLIERS

Conference Facilities

Day 3. Here we are on Champs Elysees, looking towards Grand Palais, which is a big exhibition hall from the world exhibition in Paris in 1900.

Sustainable Urban Metabolism for Europe SUME

FROM ARC DE TRIOMPHE TO CHAMP-DE-MARS

Program Summary: A ,000 SF Program Statement: $46.41 $11,000,000 August 2013

CONGRATULATIONS ON YOUR NEW CONTRACT MANAGER OF A VERY COMPLEX BUILDING

D-Day Netherlands and France March 7, March 16, 2019

ZINC & METAL ROOFING CONTRACTORS.

Paris Bike Tours Fact Sheet. Inclusions: Bike Helmet (provided but optional) Stop for lunch at charming café (cost not included)

Optimizing the use of Chilled Beams for health and comfort GUNNAR SVENSSON

HIGH PRESSURE WATER MIST SYSTEM Application: High Rise Building Bindreiter Michael London,

The urban dimension in European Cohesion Policy

McGeown Estate Agents for themselves and/or the vendors of this property whose Agents they are, give notice that (i)these particulars are set out as

An Overview of Greenroofs at Airports: Greening Rooftops as Sustainable Design

We recommend you cite the published version. The publisher s URL is:

75+ Plenary Conference Secretariat

13 BARROW ROAD, CAMBRIDGE

URBAN DESIGN PEER REVIEW PANEL MINUTES

PORCELAIN TILE ALLURE

POLYCENTROPOLIS In Search of the European Holy Grail

A PRIME DEVELOPMENT OPPORTUNITY AND ATTRACTIVE COTTAGE IN THE CENTRE OF THIS HIGHLY REGARDED NATIONAL PARK VILLAGE

Programme Shared Mobility / Shared Spaces June 2012

Nags Head Lane 940,000 Great Missenden Buckinghamshire

A CHARMING HOUSE IN A BEAUTIFUL ELEVATED SETTING WITH BREATH-TAKING VIEWS

Dominique Perrault Architecte LIGHTWALK

Fire Safety in the Channel Tunnel

CUSTOMISED LIGHTING SCULPTURES

G4 / Randstad Prof Greg Clark

2 Clos Galliotte Icart Road, St Martin s

Transport & Mobility and Citizen Engagement Carolina Zabas Roelandt

Fire resistance design in Europe

This document is a preview generated by EVS

THE MOORINGS, THRIFTS WALK, CHESTERTON

Supporting and Enhancing Research on Cultural Heritage in France: the PATRIMA Project

sun 3 - wed 6 nov 2019 Brussels Expo

Delivering on Education. Spotlight on Sir Isaac Newton

Oasia Concept HOTEL FURNITURE MANUFACTURER

100 % Serenity Business Relax & Fun. Creator of atmospheres * *LED lighting for hotel complexes

Index 1-SETTLEMENT 2-RURAL SETTLEMENTS: (VILLAGES) 3-URBAN AREAS: (TOWNS) 3.1-TOWN FUNCTIONS 3.2-TOWN'S HIERARCHY 3.3-STRUCTURE OF TOWNS

The Paris Of Henry IV: Architecture And Urbanism By Hilary Ballon

INNOvAtION CORPORATE CENTER. Strategize your workplace

Uniclass L7535 EPIC L13. CI/SfB (57) X. secontrols.com. Smoke Ventilation, Natural Ventilation and Window Automation

Rose Cottage, Lavender Hall Lane, Berkswell, CV7 7BL

Nuur. Designer. Awards. Applications

Furniture Makers Hall. An Oasis in the City MEETINGS WORKSHOPS DINING

Paris & London: Architecture & Urbanism Program. Paris Activity Guide Summer 2018

Nordic cities. The Nordic way for future urban development. 8 new projects. Nordic City Network Henrik Poulsen Per Riisom Marianne Dock

B RTC Mobility Training Center AIA Nevada Excellence In Design Awards Built Architecture November 10, 2016

QUALITY MANAGEMENT SYSTEM - ISO 9001:2000

Hospitality. Carpet/Flooring/ Tile/Stone. Outdoor Furniture + Fabrics. Mixed Market. Kitchen + Bath

Temporary uses in unused spaces. City.making: connecting supply and demand.

Alma Avenue, Hornchurch, RM12 6BP. Asking Price: 595,000

Date: August / September In order to register or for further information please contact aubiko e.v.:

Sean. Designer. Applications. Jean-Marie Massaud, Home Library Break-out area Lounge Waiting room

CONTINUITY AND CHANGE: THE NATURE OF URBAN CHARACTER AND ITS IMPLICATIONS FOR URBAN DESIGN

Air distribution systems. Air distribution systems for assembly rooms

Laptop Computer (OLPC)

Drawing meshes. Segmental linings. Reinforced steel cages. Coils and rods.

TREASURE HUNT THE ART PROJECT

International Plant Exchange Network (IPEN) An exchange system for botanic gardens for non-commercial purposes according to the CBD

THE LETTING MARKET PARIS REGION 1 ST QUARTER 2017

CLIMATE CHANGE. DIALOGUE ON CITIES AND CLIMATE CHANGE World Bank Washington, September 21-23, 2009

The attractiveness of world-class business districts

plot Redefining how we sit: Modular loungescapes for contract use. Design: osko+deichmann

City of Poughkeepsie Waterfront Redevelopment Strategy. Poughkeepsie Waterfront Redevelopment Strategy

Alan Hennessy Architecture, Urbanism and Urban design

Future challenges for society and the financial industry: spatial disparities. Prof. Henry Overman (LSE, SERC, WWC)

English translation prepared by DIBt - Original version in German language. Nails

MUSEUM OF LONDON DOCKLANDS CONFERENCES

Steeve. Applications. Designer

SILVERTOWN WAY COMMUNITY FORUM 16 JUNE 2015

This document is a preview generated by EVS

Past, Present and Future

CEILINGS. ELEVATED IDEAS.

Incremental light rail planning

FlipFlow. Exit Lane Breach Control. Creating Secure Environments. record your global partner for entrance solutions

MOBILE CIVIC CENTER SITE MASTER PLAN PRELIMINARY PROGRAM WORKSHOPS NOVEMBER 13-14, 2017

Transcription:

Hochhaus am Park Conception Period: 06/2017 to 10/2017 Contract value: - Support of design studies for renovation 1

U-Aréna Paris Period: 07/2017 to 10/2017 Contract value: - Support of project management and design (roof) 2

Uniklinikum Düsseldorf 2. BA Period: 09/2017 to 11/2017 Contract value: - Shop drawings for cladding company - renovation 3

10 South Wacker Drive Chicago (USA) UNDER CONSTRUCTION Period: 07/2017 to 03/2018 Contract value: - Design for cladding company 4

Grundschule Gronau (D) UNDER CONSTRUCTION Period: 05/2017 to 06/2017 Contract value: - Design support for cladding company 5

Rindermarkt 13/14 München (D) UNDER CONSTRUCTION Period: 05/2017 to 10/2017 Contract value: - Design for cladding company 6

Passerelle Haguenau (F) Period: 04/2017 to 07/2017 Contract value: - Design support for cladding company 7

Cour de Justice Européene Luxembourg UNDER CONSTRUCTION Period: 04/2017 to 08/2018 Contract value: - Cladding consultancy for Main Contractor 8

Unter Sachsenhausen Köln (D) UNDER CONSTRUCTION Period: 02/2017 to 07/2017 Contract value: - Design for cladding company (renovation) 9

Hampton by Hilton Frankfurt/M. (D) UNDER CONSTRUCTION Period: 01/2017 to 06/2017 Contract value: - Design for cladding company 10

Laboratoire Belval Esch-s/Alzette (Lux) UNDER CONSTRUCTION Period: 12/2016 to 03/2017 Contract value: - Design for cladding company 11

FCA & Universum Frankfurt/M.(D) UNDER CONSTRUCTION Period: 12/2016 to 02/2017 Contract value: - Shop drawings for cladding company 12

GHU Köln (D) Period: 12/2016 to 03/2017 Contract value: - Partial design & Shop drawings for cladding company 13

Morgan Stanley - Paris Period: 07/2016 to 12/2016 Contract value: - Design for cladding company (Renovation) 14

UKM - Münster(D) UNDER CONSTRUCTION Period: 07/2016 to 04/2017 Contract value: 20 Mio. Design for cladding company (Renovation) 15

Neustädtische Kirchstraße - Berlin(D) UNDER CONSTRUCTION Period: 05/2016 to 07/2016 Contract value: - Shop and Installation drawings stair cases 16

Amadeus Fire Frankfurt/M. (D) Period: 04/2016 to 09/2016 Contract value: 1,8 Mio. Design for cladding company 17

Futur Palais de Justice Paris (F) Period: 12/2015 to 07/2016 Contract value: 7,5 Mio. Project manager of dedicated zones 18

Avenue Malakoff Paris Period: 12/2015 to 05/2016 Contract value: 4 Mio. Shop and Installation drawings (Renovation) 19

Townhouses Amsterdam (NL) Period: 12/2015 to 05/2016 Contract value: - Design for cladding company 20

CC3F Cergy-Pontoise (F) Period: 11/2015 to 02/2016 Contract value: - Shop and Installation drawings for mock-ups 21

Duo Towers Paris Period: 10/2015 to 02/2016 Contract value: - Support of design studies (for investor) 22

Landesmuseum Schwerin (D) UNDER CONSTRUCTION Period: 06/2015 to 10/2015 Contract value: - Shop and Installation drawings 23

Projects in English HQ1, London Canary Wharf Mincing Lane, London Metropolis House, London BP1, London Grosvenor, London Swiss Re tower, London ( internal Lobby) Angel Building, London UCLH, London Period: 2000 to 2015 of design office Shop and Installation drawings Contract value: - 24

Pensionskasse Münster (D) Period: 07/2015 to 10/2015 Contract value: - Design for cladding company 25

Uni Parkhaus Münster (D) Period: 08/2015 to 11/2015 Contract value: - Design and shop drawings for main contractor 26

Marquardt & Bahls Hamburg (D) UNDER CONSTRUCTION Period: 03/2015 to 10/2015 Contract value: - Shop and Installation drawings 27

Parkhaus 2 Neckarsulm (D) Period: 03/2015 to 10/2015 Contract value: - Shop and Installation drawings 28

Appartement Tower Frankfurt (D) Period: 03/2015 to 05/2015 Contract value: - Support of design studies (for investor) 29

Firmensitz Darmstadt (D) Period: 02/2015 to 09/2015 Contract value: - Support of design studies (for investor) 30

La Poste du Louvre Paris Period: 03/2015 Contract value: - Support of design studies (for investor) 31

Cité musicale, Île Séguin Paris Period: 10/2014 to 04/2015 Contract value: 10 Mio. Project manager for concert hall cladding 32

Hippodrôme Longchamp Paris Period: 01/2015 to 02/2015 Contract value: - Support of design studies (for investor) - Renovation 33

Palais de Justice, Pointe-à-Pitre Guadeloupe (F) UNDER CONSTRUCTION Period: 12/2014 Contract value: - Feasibility studies for main contractor 34

Eisenbahnbundesamt Köln (D) Period: 01/ to 02/2015 Contract value: - Design of dedicated zones 35

Fassadensanierung Herne (D) Period: 09/ to 11/2014 Contract value: 350.000,- Shop and Installation drawings 36

Fassadensanierung Iserlohn (D) Period: 09/2014 Contract value: 350.000,- Shop and Installation drawings 37

Tech Center Hamburg (D) Period: 08/2014 to 02/2015 Contract value: 350.000,- Shop and Installation drawings 38

Ferienanlage- Houffalize (B) Period: 2014 / 2015 Contract value: 350.000,- Design metal sheetings (Renovation) 39

Many small cubes, FIAC Paris (F) Period: 08/ to 10/2014 Contract value: 250.000,- Shop and Installation drawings 40

DCNS Toulon (F) Period: 05/ to 08/2014 Design of bow windows Contract value: 100.000,- 41

KAUFLAND - Neckarsulm (D) Period: 2013 to 2014 Contract value: 400.000,- Shop and Installation drawings ground floor 42

Verteidigungsministerium - Paris Period: 12/2013 to 03/2014 Contract value: 900.000,- Design of glazed roof with certification 43

SPOT - Oberhausen (D) Period: 2013 to 2014 Contract value: 450.000,- Shop and Installation drawings 44

CHALLENGER St. Quentin-en-Yvelines (F) Period: 2011 to 2014 Contract value: Project management and Design (partial) 20 Mio. (Renovation) 45

LAENNEC Paris (F) Period: 2012 to 2014 Project management and Design Contract value: 1,8 Mio. 46

University College London Hospitals, London Period: 2010/2011 Project manager Contract value: 12 Mio. 47

One Hyde Park, London Period: 2009/2010 Contract value: 65 Mio. Site manager on dedicated zones 48

Tour FIRST (CB 31, AXA), Paris 220 m Period: 2008/2009 Contract value: Project manager 35 Mio. (Renovation) 49

Hôpital Central, Charleroi (B) Period: 2007/2008 Project manager for main contractor Contract value: 3,5 Mio. 50

Musée d Art Moderne, Luxembourg Period: 2005 to 2010 Claim-Management / Project manager for reception Contract value: 13 Mio. 51

Formel-1 Start-Ziel Gebäude, Spa-Francorchamps (B) Period: 2007 Support of Project manager Contract value: 0,5 Mio. 52

Tour T1, Paris 180 m Period: 2005 to 2007 Project manager Contract value: 28 Mio. 53

DEXIA-BIL, Esch s/alzette, (Lux) Period: 2004/2005 Contract value: 15 Mio. temporary site manager 54

LE PARTITIO, Paris Period: 2004 Project manager Contract value: 3,5 Mio. 55

Landesvertretung NDS/SH, Berlin Period: 2001 Contract value: Site management for main contractor 3,5 Mio. DM 56

Medienzentrum am Alexanderplatz, Berlin Period: 2000 Contract value: Project manager for cladding 5 Mio. DM 57

Israelische Botschaft, Berlin Period: 2000 Contract value: Site manager 5 Mio. DM 58

Japanische Botschaft, Berlin Period: 2000 Contract value: Site manager 4 Mio. DM 59

EHZ Hallen am Borsigturm, Berlin Period: 1998/1999 Contract value: Site manager 28 Mio. DM 60

Calenberger Esplanade, Hannover (D) Period: 1998 Contract value: Site manager 5 Mio. DM 61

Europa-Congresshotel, Suhl (D) Period: 1997/1998 Contract value: Site manager 10 Mio. DM 62

GWG Stadt Cottbus (D) Period: 1996/1997 Contract value: Site manager 3 Mio. DM 63

Lange Straße, Berlin Period: 1994 to 1996 Contract value: Junior Project manager 10 Mio. DM 64