Citizen Concerns I-16/I-75 Interchange Design

Similar documents
This image shows a conceptual green space connection(s) throughout the project area. Linear green space elements are shown along the entire length of

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Moving The Metro. A special construction update for the metro Omaha area.

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

New Stanton Project Update July 3, 2012

4.1 Build Alternative 1 Construction Phasing

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Southern Gateway Project and Public Green

Public input has been an important part of the plan development process.

Reclaiming Old West Broad Street: I-16 Ramp Removal Study

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Whitehurst Freeway Deconstruction Feasibility Study

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

TRANSPORTATION & STREET DESIGN

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

PROPOSED IMPROVEMENTS

2040 Long Range Transportation Plan

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Fairfax County Parkway (Route 286) Widening Project

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Asheville Design Center March 2010

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Access Management: An Overview

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING

Introduction to the Project

WHAT MAKES A GREAT PLACE?

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Capital Projects impacting Odenton Town Center

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

Corridor Enhancements

DRAFT. Draft Addendum 1 to Visual Impact Assessment Technical Report

POLICIES & REGULATIONS

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

TRANSPORTATION COMMITTEE

Chapter V-Transportation

Public Meeting May 20, 2014

FREEWAY MAINLINE FAIR SHARE WEEKDAY PM PEAK HOUR

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

Transportation Improvements

Highway 417 Expansion East

MARGARITA ROAD. Harveston Community 1,900 homes centered around Harveston Lake DATE STREET ±180,000 CPD. Future French Valley Overpass On/Off Ramp

V. Gateways GATEWAYS / V-1

Project Purpose. Project Need

ALTERNATIVES WHAT ELSE IS POSSIBLE?

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

2 Transportation Improvement Alternatives

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278

STREET DESIGNATIONS AND STANDARD ROADWAY DIMENSIONS

Various segments of the project could be defined in terms of natural water features that embody physical characteristics relevant to each area.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015

Revised Long Range Transportation Plan

COASTAL REGION METROPOLITAN PLANNING ORGANIZATION APRIL 2012 MPO MEETINGS

Planning Districts INTRODUCTION

RESOLUTION NO R

Mavis Road Class Environmental Assessment

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Places29: List of Implementation Projects

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Mississippi Skyway Preliminary Engineering Report

Capital Projects in and near Odenton Town Center

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

AGENDA ACTION ITEMS INFORMATION ITEMS

The Lower SaLuda Greenway

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

Granada Hills-Knollwood New Community Plan Program Focus Group Land use Related Issues Summary*

RZC Public View Corridors and Gateways

I-70 Corridor Enhancement Plan

Existing Transportation System 5-1

5.8 Visual Resources and Aesthetic Qualities

PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

16E. 24 th Street Corridor. A. Background

Memorandum CITY OF DALLAS

I-84 Karcher Interchange to Franklin Blvd Interchange Summary of Community Workshop #1 December 13, 2017

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

How can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015

I-90 Mississippi River Bridge & Interchange Project

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

Mendota Heights 2040 Comprehensive Plan Draft Vers

Context Sensitive Solutions A Process to Achieve Better Results

Appendix SPAIN Madrid M30-Río-TUNNEL

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

SR 483 Clyde Morris Boulevard FDOT District 5

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Transcription:

Citizen Concerns I-16/I-75 Interchange Design Project # NH-IM-16-1(92), NH-IM-16-1(131), NH-IM-75-2(177), & NM-16-1(104) P.I. # 311000, 311005, 311400, & 311410 Shirley Hills & North Highlands Neighborhood Associations February 2003

Concerns Project Scale Audible and Visual Impact on Historic Areas Environmental, Audible, and Visual Impact on Greenway Barrier to East Macon Development Alternatives

Project Scale Existing Roadway: I-16 has 4-12 foot lanes with 40 foot grassed median I-75 has 4-12 foot lanes with 40 foot median I-16/I-75 Interchange at Walnut Street overpass has 8-12 foot lanes with median I-16/I-75 Interchange has 1, 2, & 3 lane connecting ramps

Project Scale Proposed Roadway: I-75 Mainline - 8-12 foot lanes with 12 foot shoulders (144 feet) I-16 Mainline - 6-12 foot lanes with 12 foot shoulders (84 feet) I-16 Mainline at Split - 8-12 foot lanes with 12 foot shoulders (144 feet) Collector-Distributor Roads at Spring St. - 3-12 foot lanes with 8 and 10 foot shoulders (to I-75) & 2-12 foot lanes with 8 and 10 foot shoulders (from I-75) (240 feet)

Project Scale Widest spot between Spring Street and Ocmulgee River - 13 lanes for a total width of 240 feet (80 yards) with shoulders Comparable Scale Roadways: Downtown Connector through Atlanta is 14 lanes at North Avenue/Georgia Tech or 208 feet with shoulders I-85 at the Tom Moreland Interchange (Spaghetti Junction) is 16 lanes or 232 feet with shoulders at its widest point

Project Scale Football Field Football Field Current Width - 144 feet Proposed Width - 240 feet

Project Scale Fly-over Bridges Looking from Riverside Drive Current View Projected View

Project Scale Fly-over Bridges Looking from Rose Hill Cemetery Current View Projected View

Project Scale Fly-over Bridges Looking from River s Edge Current View Projected View

Project Scale Traffic Counts ADT - Average Daily Traffic Estimated ADT Counts for the Interchange presented by Moreland/Altobelli and GDOT do not appear to coincide with actual collected GDOT Data The ADT counts from I-75 at Pierce Avenue and Hardeman Avenue combined with the ADT counts on I-16 at Spring Street in a single direction, into or out of the split, is the actual amount of traffic through the Interchange Estimated future Traffic (2025) by Moreland/Altobelli and GDOT appear to have used increased current traffic number to achieve a higher increase in vehicles

Project Scale GDOT/Moreland Altobelli Traffic Counts: I-75 two-way ADT 72,200 * (2005) 96,100 * (2025) I-16 two-way ADT 71,900 * (2005) 101,800 * (2025) Total Interchange - 130,000+ * * 200,000+ (2025) * * *Moreland Altobelli, I-16/I-75 Widening and Interchange Modifications Fact Sheet ** GDOT, The Interchange Vol 1, No 2, Fall 2000 352 349 363 367 365 2000 Traffic Counts 2001 Traffic Counts TC Number State Road Street Name/Position North South East West Total North South East West Total 352 401 I-75 @ Pierce 26482 29203 55685 56311 349 401 I-75 @ Hardeman 38333 35651 73984 76636 363 404 I-16 @ Split 15476 18084 33560 33640 365 404 I-16 @ Spring St. 34911 37558 72469 73002 367 404 I-16 @ Second St. 20728 20353 41081 42382 369 404 I-16 @ MLK 46271 47520 372 404 I-16 after Mounds 15685 15891 31576 32417 369 Estimated ADT (Average Daily Traffic) Totals: 105,094 into the Interchange * * GDOT 2000 Coverage Counts for Bibb County Below 372

Project Scale 215000 I-16/I-75 Traffic Count Data GDOT/MA Average Daily Traffic 195000 175000 155000 135000 115000 95000 75000 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 ADT Into Interchange Projected Traffic @ 1.8% Growth Projected Traffic @ 1.5% Growth Projected Traffic @ 1.2% Growth P=C(1+r)^n P=Projected Traffic C=Current Traffic r=rate of Growth n=years 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Project Scale Growth Rate * Macon Metro Area Bibb County 1970 15.2% 1.5% 1980 12.4% 4.8% 1990 6.6% -0.2% 2000 10.9% 2.6% Ten Year Average Rate Average Annual Rate 11.28% 2.18% 1.13% 0.22% * US Census 1960, 1970, 1980, 1990, 2000 for Bibb County and Metro Macon

Audible and Visual Impact Historic Areas Rose Hill Cemetery Riverside Cemetery Shirley Hills Historic District North Highlands Historic District Pleasant Hill Historic District East Macon Historic District Macon Historic District Vineville Historic District Fort Hill Historic District Central City Park Macon Railroad Industrial District Ocmulgee National Monument

Audible and Visual Impact 1- Macon Historic District 2 - East Macon Historic District 3 - Fort Hill Historic District 4 - Vineville Historic District 5 - Ocmulgee National Monument 6 - Macon Railroad Industrial District 7 - North Highlands Historic District 8 - Pleasant Hill Historic District 9 - Shirley Hills Historic District 10 - Central City Park 11 - Riverside Cemetery 12 - Rose Hill Cemetery * GDOT Web Site www.i16/i75.com

Audible and Visual Impact Noise Barriers Only useful within a small area from roadway (200 to 300 feet) and a small reduction in sound (less than 20 db) Unsightly walls will bounce sound into Rose Hill Cemetery, Riverside Cemetery, Macon Historic District, and Pleasant Hill Historic District 20 foot wall on Bridges will limit sight of the Ocmulgee River from Roadway as well as extend overall height of Bridge Structure to 90 feet above the River s edge (Tom Moreland Interchange Bridges are approximately 90 feet)

Impact on Greenway Environmental Impact Damage to Greenway Trail during Construction Elimination of the Tree Canopy along Ocmulgee River s edge

Impact on Greenway Audible Impact Increased Tractor-Trailer noise due to multiple fly-over bridges and steep downgrades (5-6%)

Impact on Greenway Visual Impact Fly-over Bridges will be over 70 feet tall towering over the Ocmulgee River s edge Second Street and MLK collector-distributor road will cover most of Greenway Trail along river in Macon Removal of Tree Canopy for roadway construction

Impact on Greenway Visual Impact Fly-over Bridges Looking from River s Edge Current View Projected View

Impact on Greenway Visual Impact Fly-over Bridges Looking North from Greenway Current View Projected View

Barrier to East Macon Barrier to East Macon Development East Macon lags behind the rest of the Metro Area in Development Current I-16 and Gray Highway roadways act as a wall to the rest of Macon Added Roadway will completely Wall Off East Macon, further depressing the area.

Alternatives Scale Down of Project Joseph Passonneau & Associates Design McCullough Concept

Alternatives Joseph Passonneau & Associates Design Raising of Spring Street over I-16 Removal of I-75 Southbound Spring Street Entrance Removal of Spring Street exit from I-16 Eastbound and Southbound I-75 * Moving of Railroad is shown in computer picture

Alternatives McCullough Concept Elimination of Spring Street Interchange with I-16 Second Street and MLK will be main entrances to Macon from Interstate Better utilization of Second Street Freeway into Macon Lengthens weaving area to exits (added safety) Parts of Spring Street can be Pedestrian walkway to Greenway, Downtown Macon, and proposed RiverWalk Improved access to East Macon

Conclusion Project Scale Too large for the middle of Macon Audible and Visual Impact on Historic Areas Excessive roadway will add noise and visual pollution to Historic Areas Impact on Greenway Beauty of the Ocmulgee River will be damaged Barrier to East Macon Development Large roadway will wall off East Macon Alternatives Changes to Spring Street exits