Western Michigan University Facilities Management Engineering Division

Similar documents
DIVISION 21 FIRE SUPPRESSION

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

Design & Construction Standards, Revised January

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

McMAHON FP200 OUTAGAMIE COUNTY ADMINISTRATION CENTER S. WALNUT & W. 8TH, APPLETON, WI ALTERATION / ADDITION

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

WEST VIRGINIA UNIVERSITY

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

September 30, Dear Fire Suppression System Contractor/Designer:

SECTION : FIRE PROTECTION SYSTEMS

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS

Port of St Helens SIA Aircraft Hanger Scappoose, OR

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

New Construction Fire Inspection Process

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

APPENDIX H (DESIGN SUBMISSION CRITERIA)

APPLICATION FOR INSTALLATION OF SPRINKLER SYSTEM.,. :" ROCHESTER, NH FIRE DEPARTMENT FIRE PREVENTION DIVISION

FIRE SUPPRESSION SPRINKLER SYSTEM

SECTION WET-PIPE SPRINKLER SYSTEMS

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

Environmental Health & Safety

SECTION Fire Pumps

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Fire Sprinkler Submittal Requirements and Acceptance Testing

5.07 Air Replenishment Systems

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors)

Narrative Reports As Regulated by 780 CMR, Section 903.0

Module 9: Ontario Building Code Fire Fighting Provisions

May 1, Dear Fire Suppression System Contractor/Designer:

SECTION FIRE-SUPPRESSION STANDPIPES

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour.

A. This section includes design and performance information for fire protection and suppression systems.

PRIVATE FIRE SERVICE INSTALLATION PACKET

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

DIVISION 21 - FIRE SUPPRESSION

FIRE PROTECTION BASIC MATERIALS AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

B. Special Documentation Requirements. C. Materials and methods of Construction

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

CONTENTS. B. System Design and Performance Requirements

I. INTRODUCTION Codes, Rules, Laws, & Requirements

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

Construction and Development Guide

Expectations (continued)

SECTION SPRINKLER SYSTEMS

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

The Owner will provide the QEI inspection and certification services.

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Kidde Nitrogen Inert Gas Clean Agent Fire Suppression System

B. Section Identification for Fire Suppression Piping and Equipment.

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

2. Welding Materials and Procedures shall conform to the ASME Code.

Florida Building Code 2010

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

HIGH-RISE RETROFIT ORDINANCES - NO and NO

Fire Protection System Impairment Procedure

Rocky Mountain Fire Protection District 4390 Eldorado Springs Drive Boulder, CO

DESIGN & CONSTRUCTION GUIDELINES

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Fire Suppression Introduction Contact Information

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

Gas Station & C Store SECTION CWM Job No

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

ICC CODE CORNER 2015 International Fire Code

SECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM

PLAN REVIEW CHECKLIST

Date Issued: December 14, 2017 Revision: 2.1

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL UL 300

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

DIVISION 21 FIRE SUPPRESSION

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

Transcription:

Western Michigan University Facilities Management Engineering Division Design Guidelines for Facilities Construction: DESIGN GUIDELINE DG21-1 Fire Suppression Systems & Equipment I. GENERAL... 1 A. General Design Criteria... 1 B. Standards to follow... 2 C. Codes to use... 2 D. Document Review Process... 2 E. Areas of Coverage & Systems To Use... 2 II. EQUIPMENT/SYSTEM DESIGN... 2 A. Sprinkler Systems... 2 1. Wet Pipe Sprinkler Systems... 2 2. Pre-action Sprinkler System... 3 3. Dry Pipe Sprinkler Systems... 3 B. Standpipe & Fire Hose... 3 C. Fire Hydrants... 3 D. Fire Pumps... 4 E. Gas Systems... 4 III. INSTALLATION... 4 IV. CLEANLINESS... 4 V. COMPLETION... 4 VI. TESTING... 4 I. GENERAL A. General Design Criteria The Professionals design and specifications shall include the following guidelines and recommendations. All spaces within new University buildings or major renovations of University facilities should be covered by at least one automatic suppression system suitable to the hazard classification, as determined by Professional Service Contractor (Professional) representatives in conjunction with the appropriate building codes, the University and the Authority Having Jurisdiction requirements. The University shall identify the Authority Having Jurisdiction at the beginning of the project to the Professional. Incorporate into the design of any facility other appropriate fire suppression systems to suit the functional areas within the building, pre-action dry pipe systems, standpipes (no hoses), gas systems, chemical systems, and special systems such as kitchen systems. Fire alarm guidelines are covered in the Fire Alarm Systems guideline DG28-2. DG21-1 Fire Suppression Systems 1 revised: 12/2/2013

Fire suppression systems required for a new facility shall be designed under the direction of a person qualified and registered in Michigan to design systems of the type required. The University tests and maintains all fire protection systems in accordance with the requirements of the NFPA. B. Standards to follow Fire protection system materials and components shall be Underwriter s Laboratories listed and labeled, and Factory Mutual approved for the application anticipated. The fire suppression system installer should be required to submit proof that the items furnished conform to the requirements of these agencies. C. Codes to use All fire suppression systems shall be designed to and conform to the appropriate current NFPA Codes and Authority Having Jurisdiction recommendations. The International Building Code shall be utilized in determining system applications. D. Document Review Process Sprinkler drawings, specifications and hydraulic calculations shall be submitted to the Professional for review for conformance to the specifications and then shall be submitted to the University for approval by the University s Insurance carrier. E. Areas of Coverage & Systems To Use All areas of new facilities shall be sprinkled except in the following cases: 1. Electrical substation rooms shall meet the exception criteria of NFPA 13 and 70 and shall have no sprinklers or piping installed within the room. 2. Sprinkler s in elevator machine rooms, shall meet the requirements of the Michigan Elevator Code, and shall be installed with shut-off valves with tamper switches in the piping. Outdoor loading dock areas and other unheated areas that are part of a facility shall be protected utilizing a dry pipe sprinkler system with non-galvanized pipe. II. EQUIPMENT/SYSTEM DESIGN A. Sprinkler Systems Sprinkler systems shall be fully calculated to the nearest outside fire hydrant. A flow test shall be performed at the fire hydrant referenced, with in two (2) years of the date of the calculations. 1. Wet Pipe Sprinkler Systems Test connections shall discharge to the building exterior. DG21-1 Fire Suppression Systems 2 revised: 12/2/2013

The control valve for the Inspector s Test Connection shall be located not more that 4 above finished floor. Water flow alarms shall be connected to the building fire alarm Test flow connections shall be routed outside. 2. Pre-action Sprinkler System Where these systems are employed, the system should be stand-alone and should not rely on the building fire alarm system for operation. The control panel should be connected to the building fire alarm control panel as an annunciated zone, along with the trouble indication from the Provide air pressure monitoring device alarm connected to the fire alarm 3. Dry Pipe Sprinkler Systems Provide air pressure monitoring device and alarm connected to fire alarm Where these systems are employed, the system should be stand-alone and should not rely on the building fire alarm system for operation. A local control panel, with separate detection should be used. The control panel should be connected to the building fire alarm control panel as an annunciated zone, along with the all trouble indications from the Provide air pressure monitoring device and alarm connected to the fire alarm B. Standpipe & Fire Hose Fire hoses are not desired and should not be installed. The University has no onsite fire fighting personnel. Wet stand pipes are preferred, for use by the fire department. These need to be coordinated with the local Fire Marshal, by way of review with University Project Manager. All buildings requiring fire hose cabinets per code shall he equipped with dry standpipe cabinets having national standard threaded fittings. All standpipe cabinets shall be located in approved enclosures and have 1-1/2 outlets for fire department hoses. All buildings with standpipes or sprinklers shall have fire department Siamese hose connections on the side of the building nearest the service drive or street and shall have 2-1/2 national standard thread C. Fire Hydrants Underground fire protection water and service piping to within 5 feet of the building, or the water meter; is provided by the City of Kalamazoo at the University s expense. The Professional should provide a suggested design, water capacity requirement and plan for the City s approval. Piping between the DG21-1 Fire Suppression Systems 3 revised: 12/2/2013

pit or meter is the Professional s responsibility. The city does not use post indicator valves on building feeds. Valves and Valve boxes are acceptable. D. Fire Pumps Fire pumps when necessary by building design shall be designed and installed per NFPA. Pumps shall be of the horizontal split case design. See Division 21-10 Preferred Manufacturers List for pumps and controls. E. Gas Systems Gas fire suppression systems shall only be used when approved by the Campus Facility Engineer. III. INSTALLATION The Professionals specifications for the work shall include the following. Additions or modifications to existing University fire systems, shall follow the same design and submission document procedures and criteria as new systems. University Health & Safety personnel shall be present during any shut down or activation of sprinkler or alarm systems. Installation and alterations of fire protection piping, equipment, specialties, and accessories, and repair and servicing of equipment shall be performed only by a qualified installer. Fire sprinkler modification work shall be accomplished as specified in NFPA Standard 13 in all respects and meet or exceed the most stringent applicable codes. Any fire sprinkler system shall not be left inoperative overnight. At the end of each work day, the work, should be completed in such a way, utilizing caps and plugs, to allow the contractor to re-activate the system before leaving the premises. IV. CLEANLINESS Upon completion of any fire suppression system the system and site shall be cleaned to the University s satisfaction. The Professional shall write the specifications to require piping end caps, etc. to maintain cleanliness of system materials in the field and as installed. This is to minimize the flushing necessary in the new This also applies to stored materials both before reaching the site and on site storage. V. COMPLETION When the contractors complete their work, they shall notify the University who will notify the Authority Having Jurisdiction. VI. TESTING Upon completion of the system and prior to acceptance of the installation, the contractor shall complete the tests required by NFPA Standards, in the presence DG21-1 Fire Suppression Systems 4 revised: 12/2/2013

of the State Fire Marshal and University representatives, and should furnish the Professional with a certificate as required. The following requirements shall be included in the specifications unless specific circumstances require variances. Such variances should be acknowledged in writing by University representatives. Inspections and Tests shall be witnessed by the Campus Facility Engineer. A Contractor s Material and Test Certificate for Aboveground Piping shall be completed and submitted, by the Contractor, to the University s Facility Development Project Manager. Initial fire pump flow tests shall be conducted in the presence of Campus Facility Engineer and Health and Safety personnel. END OF FILE DG21-1 Fire Suppression Systems 5 revised: 12/2/2013