Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems

Similar documents
(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN

Fixed Fire Extinguishing Equipment and Systems

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

AMENDMENTS NO. 3/2012 to

Fire. IMO fire control signs - according to IMO Resolution A.654 (16) (mm) 150x x200

RESOLUTION MSC.98(73) (adopted on 5 December 2000) ADOPTION OF THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS

Explosion Protection Engineering Principles

Enclosure 4- RISK ASSESSMENT

Additional Fire Protection (F-AMC)

Fire protection on chemical manufacturing sites

OFFSHORE SUPPORT VESSELS 2014

ADDITIONAL FIRE PROTECTION (F-AMC)

Rules and Regulations for the Classification of a Floating Offshore Installation at a Fixed Location

Notice on the implementation of the amendments to the FSS Code in resolution MSC.339(91)

STANDARDS FOR VAPOUR EMISSION CONTROL SYSTEMS ( MARPOL reg VI/15 )

MSC Guidelines for Foam Fire Suppression Systems

ENHANCED FIRE PROTECTION ARRANGEMENTS

RESOLUTION MSC.339(91) (adopted on 30 November 2012) AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

Crosswalk: Weight-Based Rating versus Performance-Based Rating

3. Low location lighting system. 4. Illuminated emergency units. 5. Cabin escape route plans

Notice No. 7. Rules and Regulations for the Classification of Ships, July Issue date: March Working together for a safer world

Fire protection solutions for ships and offshore facilities BRANCH SOLUTION

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER

MAINTENANCE AND INPSECTION OF FIRE PROTECTION SYSTEMS AND APPLIANCES

Fire Safety. Presenter, Kevin V Coleman September 14 th 2016

INTERIOR FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

Exploration and extraction can be on land or on offshore platforms. Once extracted, ground transportation is done by means of oil or gas pipelines,

IMO. Resolution A.952(23) Adopted on 5 December 2003 (Agenda item 17) GRAPHICAL SYMBOLS FOR SHIPBOARD FIRE CONTROL PLANS

A safe journey with Dräger CRUISE CATALOGUE

Dual Agent Unit w / Atmospheric Tank 200 Litres DAHR 01

Requirements for ships carrying hydrogen and compressed natural gas vehicles

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE

Fire protection solutions for ships and offshore facilities

Fire fighting Questions


MOBILE OFFSHORE DRILLING UNITS 2014

ADVANCED EXTERIOR FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

Basic Fire Safety Awareness Training.

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

MOBILE OFFSHORE DRILLING UNITS 2012

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea

Foam Products ENGLISH

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

Boiler Mountings. Engr. Omar Sadath, Maritme Lecturer & Trainer, Bangladesh

Technical Information

ClassNK Technical Information No. TEC-0453 Attachment (1) to ClassNK Technical Information No. TEC-0453 Guidance on SOLAS Chapter II-2 as amended in 2

GENERAL SPECIFICATION SAFETY

APPENDIX D Inspection Check List for Chartering Non-UNOLS Vessels

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

Ship Name: DORIS T Ship Type: General Dry Cargo Ship. Organization

highline SVCS-1 INSTALLATION & USER MANUAL SMOKE VENT CONTROL SYSTEM * enclosure design may vary software version: SVCS1r6 SVCS1r7 SVCS1r10

SAFETY AND FIRE PROTECTION

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

DRY BULK HANDLING SYSTEM

Engine Fire Protection System

CRU-S Series Stainless Steel Condensate Recovery Unit

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

Cadet Entry Level Award(ELA) Part Four. Fire Safety

Element C3.4 Fire Fighting Equipment

Packaged Marine Design Thermal Fluid (Hot Oil) Heaters

HANDLING FLAMMABLE AND COMBUSTIBLE LIQUIDS ON DOCKS, PIERS AND WHARVES

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS

Caresaver Universal Refrigerant Recovery Unit

FIRE SAFETY. This easy-to-use Leaders Guide is provided to assist in conducting a successful presentation. Featured are:

Airport Firefighter Recertification Core Competency Task Book

Following are the systems proposed as per NBC & Local Fire Authority:

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

Types of Detection. Fusible Link Detection - Most Common

Contents. xiii. 4. PHYSICAL PROPERTIES OF HYDROCARBONS General Alkene Series... 28

Marine Solutions. Honeywell s Solution for LNG Vessels

FIRE SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS MACHINERY AND SYSTEMS MAIN CLASS PART 4 CHAPTER 10 JULY 2006

UNIFIED INTERPRETATIONS OF SOLAS CHAPTER II-2, THE FSS CODE, THE FTP CODE AND RELATED FIRE TEST PROCEDURES ***

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Charlotte Building, 17 Gresse Street, London W1T 1QL

Global Marine Solutions and Services From Ship to Shore Single Source Providers for Fire, Security, Life Safety

ENGINEERING STANDARD FOR FIRE STATIONS ORIGINAL EDITION NOV. 1993

Amerex Fire Suppression Systems. Because Operators and the Environment are NOT Disposable Quality is Behind the Diamond.

MOBILE OFFSHORE DRILLING UNITS 2018

VANUATU GENERAL CONDITION SURVEY REPORT

1 PERSONAL SURVIVAL TECHNIQUES 1.1 INTRODUCTION, SAFETY AND SURVIVAL (0.50 HR) Safety guidance.1 state the safety rules laid down by the chief i

Rules for Classification and Construction Ship Technology

WOC HSE Standards Manual

POSITION PAPER ON WATER MIST FOR FIRE FIGHTING APPLICATIONS

GENERAL PROCEDURES TO FOLLOW IN CASE OF EMERGENCY SAFETY RULES TO PREVENT FIRES

FIRE AND FIRE FITTING By Mr. Prashant Sansare

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview

Emergency shutdown systems. Procedures for bypassing ESD s

FIRE AND EVACUATION PLAN

VANUATU GENERAL CONDITION SURVEY REPORT

I. It shall be the responsibility of the department officers to implement this operating guideline.

Manager Other (Specify) Gross Tonnage: Main Propulsion (kw): Generating Power (kw):

Vehicle Level Heating and Air Conditioning Description and Operation A/C System - Manual. A/C System - Manual

CO2 COCO GAS FLOODING SYSTEM

Transcription:

Kelsow Work Instruction Buffalo Venture FPSO Fire Protection Systems

Table of Contents Abbreviations and Definitions....................................................... 2 Overview............................................................................ 3 Fire Water Supply Diagram......................................................... 4 Deluge System Electric Deluge Fire Pumps..................................... 5 Deluge System Diesel Deluge Fire Pump....................................... 6 Deluge System Process Module Deluge......................................... 8 Fire Pumps and Fire Main..........................................................10 Fire Water Cross-Over............................................................12 Low Expansion Foam System.....................................................13 High Expansion Foam System....................................................14 Deck Monitors......................................................................17 Deck Hydrants.....................................................................18 Turret Monitor System..............................................................19 Heli-Deck Fire System.............................................................21 Gas Detection System.............................................................23 Smoke and Heat Detection........................................................24 Carbon Dioxide Extinguishing System............................................25 Engine Room Fire Protection......................................................26 Accommodation Fire Protection....................................................29 Kelsow Work Instruction 2008

Abbreviations and Definitions BLEVE....... Boiling Liquid Expanding Vapour Explosion. CCR.......... Central Control Room. CCTV.........Closed Circuit Television. CO2.......... Carbon Dioxide. ESD-1........ Emergency Shut Down #1 Total facility shutdown; total Well Head Platform shutdown including sub-surface safety valves, process modules shutdown and blowdown, engine room shutdown. ESD-2........ Emergency Shut Down #2 Well Head Platform surface shutdown, process module shutdown and blowdown, engine room boilers change to MDO firing. ESD-3........ Emergency Shut Down #3 Process module shutdown, not blown down. Boilers change to MDO firing. ESD-4........ Individual process unit shutdown. FPSO.........Floating Production, Storage, and Offtake vessel. HLO.......... Helicopter Landing Officer. kpa...........kilo Pascal. LED...........Light Emitting Diode. LEL...........Lower Explosive Limit. MAC.......... Manually Activated Call point. MDO.........Marine Diesel Oil. Offtake........ The pumping of crude cargo from FPSO to berthed shuttle tanker, via floating hose. Skid A.........Aft process unit on raised platform on FPSO, supporting crude oil separation vessels and water treatment plant. Skid B........ Forward process unit on raised platform on FPSO, supporting gas compression and gas treatment plant. Skid C........ Forward flare unit on raised platform on FPSO, supporting liquid knock-out vessels. Kelsow Work Instruction 2008 2

Overview The System The Buffalo Venture FPSO is protected by a variety of fire fighting devices, to cover a range of applications. These consist of: Fire pumps, hydrants, and hose reels; Electric driven deluge pumps; Diesel driven standby deluge pump; Carbon dioxide release system; Gas, smoke, and heat detection; Low and high expansion foam systems; Automatic process module deluge system; Main deck and heli-deck fire monitors; FPSO swivel fire monitor. Fire fighting water is provided by two distinct systems, taking suction from the sea. The existing ship s fire pumps and fire mains, supply the facility s hydrants for hose reel use. The deluge pumps, both electric and diesel driven, fitted during the ship s conversion to a FPSO, supply fire fighting water to the process module deluge, turret monitor, and foam systems. These systems will be explained further in more detail. Kelsow Work Instruction 2008 3

Fire Water Supply Diagram Kelsow Work Instruction 2008 4

Deluge System Electric Deluge Fire Pumps The electric driven Deluge Pumps on the Buffalo Venture are located in the Engine Room. The pumps are normally lined up to supply deluge water at all times, taking suction from the sea, via the sea chests. The electric deluge pumps can be started in a variety of ways. The normal position for the control cabinet is in remote. The pumps can therefore be started from the CCR panel; by initiation of the process module deluge system, or by a reduction in jockey water pressure to the deluge system. Jockey water pressure is supplied by the Process Cooling Sea Water pumps, which maintain a pressure of 500 kpa in the system. When this pressure reduces to 400 kpa, by the opening of a deck monitor for example, a cut-in switch activates and #1 and #2 deluge pumps will start automatically. The pumps can also be started from the CCR control panel, when in the remote position locally. The pumps can be started from the local pump control panel in the Engine Room, however any remote operation will be disabled. After any remote activation of the pumps, and the deluge system is no longer required, the pumps can only be stopped at the local control panel. The pumps must be switched to local, and then switched off. When the jockey water pressure of the deluge system recovers, the local control panel can then be switched over to remote, ready for stand-by operation. Otherwise, pumps will start again immediately if jockey pressure has not recovered, prior to switching to remote. #1 & #2 Electric deluge pumps Engine room bottom plates #1 & #2 Electric deluge pumps Remote start from CCR Not in Auto Warning Light If pumps not switched to Remote locally Stop/Start Buttons Local/Remote Switches Local Electric Deluge Pump Control Cabinets Kelsow Work Instruction 2008 5

Deluge System Diesel Deluge Fire Pump The diesel driven stand-by deluge pump on the Buffalo Venture is located in the Forward Machinery Space. The diesel deluge pump can be controlled in the field via the local control panel, or the local emergency start button. The Diesel Deluge Pump can also be started remotely from the CCR push-button control. This pump is a critical device in the fire protection of the vessel, as it acts as the last line of defence in any fire emergency. The deluge system is configured so that if the main electric driven deluge pumps operation fails, due to power failure, and the deluge jockey water pressure remains in low state for more than 30 seconds, the diesel pump will start and supply deluge water. Or in the case of a facility ESD-1, the diesel deluge pump will start automatically after 30 minutes of Emergency Shutdown and/or loss of power to the shutdown control panel. As with the electric deluge pumps, operation can be switched from remote to local at the local control panel. This is normally only done to test run the pump for maintenance, and must not be left in the local position unattended. Local emergency start button Diesel Deluge Fire Pump Kelsow Work Instruction 2008 6

If the pump has started automatically and is no longer required, the pump must also be switched to local position on the local control cabinet and then stopped. When the jockey pressure has recovered to above 400 kpa, the pump can be switched back to remote for normal operation and starting. Due to the location of the diesel deluge pump being above sea level, a primary pump is positioned in the Forward Pump Room, to take suction from the sea at the forward sea chest, and supply sea water to the diesel fire pump. The operation of this system is tested regularly. Local/Remote Switch Local Position Confirmation Start & Stop Buttons Local Control Panel Diesel Deluge Pump Remote start from CCR Not in Remote Warning Light Kelsow Work Instruction 2008 7

Deluge System Process Module Deluge The process modules on the Buffalo Venture have an automatic deluge protection system. Fusible plugs on a pressurised air circuit, and a deluge water spray system, combine to make up this system. The spray nozzles are situated so as to not necessarily extinguish any fire, but to provide vital cooling to the pressure vessels, and avoid the possibility of a BLEVE. The helicopter refuelling pods are stationed at the starboard side of the process modules, and are also protected by deluge water. The deluge spray system will activate automatically with the release of air pressure from the fusible loop via a fusible plug release. The deluge can also be activated by turning the red handle three-way valve 180 0 on the local panel, simulating a fusible loop air release, or from the CCR push button. All activation methods will create an ESD-2 situation; and also sound the General Alarm, start the deluge pumps, and open deluge valve XV-1611A. In addition to any fusible loop activation, any gas detection on the gas compression module (Skid B) will also initiate the process deluge. The local deluge panel in the field and threeway valve arrangement is located on the main deck of the facility, aft of the main deck paint locker. Fusible Loop and Fusible Plugs Deluge Spray Nozzles Deluge Activation Indicator Lights CCR Deluge Activation Local Deluge Activation in Field Kelsow Work Instruction 2008 8

The correct placement of both fusible plugs and deluge nozzles is vital, in providing effective fire fighting and cooling capabilities. As can be seen in these illustrations, the fusible plugs are positioned where there is a risk of loss of containment, combined with areas of hydrocarbons in their most volatile state. For example, crude oil that is heated above its flash point in the stabilisation process, or hydrocarbons in their gaseous state, pose a potential danger if released and ignited. Skid C Flare module however, does not have deluge water nozzles in place, only fusible plugs. Flare vessels V109 and V110 operate at atmospheric pressure, and therefore do not require the cooling deluge water. The means to combat potential fire risks, such as the process deluge system, are engineered into the design of hydrocarbon processing units, as on the Buffalo Venture FPSO. Deluge Nozzles Fusible Plug at Block Valve Crude Line Crude Heater Deluge Protection XV-1611A Bypass Valve Tie-In Point from Diesel Deluge Pump Process Deluge Valve XV-1611A Kelsow Work Instruction 2008 9

Body Fire Pumps Heading & Fire Main The fire pumps and fire main system on the Buffalo Venture, is as it was prior to conversion to a FPSO. The deluge pumps and deluge system were added to the vessel as part of the conversion. The fire pumps system consists of the Fire & General Service Pump, and the Fire & Bilge Pump. These pumps are situated in the Engine Room, taking suction from the sea. The pumps supply what was the original ship s fire main, which in service on the FPSO, supply sea water to all fire hydrants in all parts of the facility. Most hydrants have a numbered fire box in close proximity to the hydrant outlet, containing a fire hose and nozzle. The Fire & G.S. pump, and the Fire & Bilge pump, can be started either locally in the engine room, at the local stop/start stations, or remotely from the CCR, via the Utilities Mimic Panel. Fire & G.S. Pump & Fire & Bilge Pump Engine Room Bottom Plates Remote Fire Pump Start CCR Utilities Mimic Panel Kelsow Work Instruction 2008 10

The Fire & G.S. pump can be lined-up to provide cooling water to the engine room plant if required. Before starting either pump from the CCR, conformation is required from the Utilities Technician as to which fire pump is lined-up for fire pump service. It is also good practice to open a fire hydrant, prior to starting a fire pump. This will reduce the risk of water hammer and damaging the pump or fire main piping. Fire & Bilge Pump and Local Start/Stop Panel Local Start/Stop Panel Engine Room Fire Main, Hydrant, Nozzle and Hose Reel Fire & General Service Pump Kelsow Work Instruction 2008 11

Body Fire Water Heading Cross-Over Located in Foam Room A, a crossover arrangement exists, to provide redundancy for the Fire Main and Deluge systems. Cross-over valve FMV-1 provides this, by acting as the main isolation point between both fire water systems. Opening this valve can provide back up if one system s operation should fail. For example, if the deluge pump s operation failed, and foam required in an emergency, the crossover valve FMV-1 could be opened to supply water from the Fire & G.S. pump or Fire & Bilge pump, and supply water to the deluge system. The cross-over valve FMV-1 can be found in the port aft corner of Foam Room A. The fire water systems manifold together in Foam Room A, to allow for a variety of flow-paths. The cross-over valve remains in the Normally Closed position, until commoning of the fire water systems is required. Cross-Over Valve FMV-1 Foam Room A Fire Water Manifold Cross-over Valve FMV-1 Kelsow Work Instruction 2008 12

Low Expansion Foam System The Low Expansion Foam System on the Buffalo Venture supplies fire fighting foam to the main deck and heli-deck areas, delivered via fixed monitors. The foam tank and manifold are located in Foam Room A, on the upper deck level of the accommodation. The facility exists to common the deluge system water supply, to the existing fire main system, to provide redundancy if required. The cross-over valve to perform this, is located in Foam Room A, and is normally closed The deluge and foam system manifold in Foam Room A is normally lined up for automatic activation, to supply foam to the main deck and heli-deck monitors, as per the plan on display in Foam Room A. If foam is required on deck, the deluge pumps are activated via the opening of a monitor, or from the CCR push buttons. Once deluge water flow is established, foam is initiated from the CCR foam control panel. This automatically opens the sea water inlet valve to the foam eductor, and the foam outlet valve to the deluge system. If these valves fail to operate automatically, they can both be opened manually with a spanner, on location at the foam valves as back-up. If foam is no longer required, the system is stopped by pushing the stop button on the CCR foam control panel. The deluge pumps can then be stopped as previously described. Deluge System, Fire Main, and Deck Foam Plan On Display in Foam Room A Spanner for Manual Valve Opening Sea Water Inlet and Foam Outlet Control Valves Deck Foam Control Cabinet CCR Sea Water Inlet and Foam Outlet Valve Position Indicator Lights Sea Water Inlet and Foam Outlet Open/Shut Buttons Kelsow Work Instruction 2008 13

High Expansion Foam System The High Expansion Foam System on the Buffalo Venture provides fire protection for the Engine Room, and Cargo Pump Room. Positioned in both areas are a series of foam diffusers, which are injected with high expansion foam via three nozzles to each diffuser. This arrangement spreads foam over the entire area to smother and extinguish any fire. All ventilation fans are stopped in these areas to assist with this. The high expansion foam tank and distribution system is located in Foam Room B, in the port aft area of the accommodation, upper deck level. As with the use of Carbon Dioxide to extinguish fire, high expansion foam also poses a risk to life when activated, due to the dense nature of the foam. If personnel remain in the engine room or cargo pump room upon activation, breathing could be impaired, as with identification of escape routes. A warning horn is sounded prior to foam release, to alert personnel to evacuate these areas. The engine room and cargo pump room are extremely hazardous areas for personnel to remain in, if an emergency situation occurs. It must be confirmed prior to high expansion foam release that no personnel are present in the area. The release of the high expansion foam is only at the discretion of the OIM, due to the hazard the foam itself poses to life, and the damaging properties of the foam to plant. Combined with the presence of fire and smoke, an extremely hazardous situation will escalate, and personnel must be evacuated if a fire emergency develops. The high expansion foam system is activated via the control panel located in the CCR. Displayed on the control panel are instructions in its use. Foam standby and discharge buttons Foam Spray Nozzles High Expansion Foam Diffuser Confirmation and indication lights High Expansion Foam Control Cabinet CCR Kelsow Work Instruction 2008 14

Initially, the manual block valve MV1, located in Foam Room B, must be opened prior to automatic activation of the foam. This is kept shut to ensure no release of the foam occurs, for the hazardous reasons discussed. If the foam system will not activate automatically, it can be manually carried out in Foam Room B. Foam Room B consists of a foam tank, a foam pump, local pump operation panel, control valves, and deluge water/foam distribution manifold. The control valves and foam pump can be manually operated if required. For an engine room fire, the Diesel Deluge Pump is started manually from the CCR, as the integrity of the Electric Deluge Pumps will be compromised by the release of the high expansion foam in that area. Either electric or diesel deluge pumps can be used for a Cargo Pump Room fire. Auto Use Instructions CCR Control Cabinet Foam Room B Distribution Manifold Foam to Deluge Water Venturi AV3 and AV4 control valves MV1 Isolation Valve Open Prior to Use Kelsow Work Instruction 2008 15

Instructions to manually operate the high expansion foam system, is displayed on the port side bulkhead of Foam Room B. Two of the control valves, AV1 and AV2, require the cap to be removed from the bonnet of the valve, and the valve screwed open with a spanner. The correct sized tools for this task are in position on site. The distribution valves AV3 and AV4 are manually operated by turning the red handle on the valve body. Pressure gauges exist on the flow path of deluge water supply and foam supply, to ensure adequate pressure is reached prior to release of the foam. As when operating the system automatically, valve MV1 must be opened prior to activation. The system can be stopped at either local or CCR control panels. Manual Use Instructions Foam Room B Foam Pump and AV1 Valve Tools for Manual Valve Operation Kelsow Work Instruction 2008 16

Deck Monitors The main deck of the Buffalo Venture has a number of fire fighting monitors installed, supplied with sea water from the deluge system. The monitors are operated by opening both isolation valves, and directing the nozzle to the required area. Opening the isolation valves, creates a reduction in the jockey water pressure of the deluge system, and automatically starts the deluge pumps. Low expansion foam can be supplied to the deck monitors, for any deck fires where a foam blanket is the best means of extinguishment. Otherwise, deluge water can be utilised to provide additional cooling to process vessels in the proximity of the monitor, if required. Isolation Valves Main Deck Monitor Isolation Valves Main Deck Monitor At Process Module Kelsow Work Instruction 2008 17

Deck Hydrants All areas of the Buffalo Venture are fitted with hydrants and fire boxes, including the main deck, engine room, accommodation, and machinery spaces. The hydrants are supplied with sea water, via the Fire & General Service pump, or the Fire & Bilge pump. If required to use a fire hydrant for fire fighting, the fire box fitted near all hydrants contains a fire hose and nozzle. When the hose and nozzle are assembled and fitted to the hydrant, open the hydrant valve and hose nozzle, and contact the CCR by radio or via the Incident Controller for a fire pump to be started. Ensure the hydrant and hose nozzle are open, to expel air from the fire main and hose. Otherwise water hammer will occur, and controlling the fire hose will become difficult. Also ensure if in the vicinity of a fire emergency, that the situation is communicated correctly to the CCR, as the use of a fire hose alone may be inadequate, and the user may be in more danger, if the situation escalates. Main Deck Fire Main & Hydrants Fire Hose & Nozzle Main Deck Firebox & Hydrant Accommodation Area Hydrant Main Deck Main Deck Hydrants Kelsow Work Instruction 2008 18

Turret Monitor System The fire protection system for the turret structure and swivel of the Buffalo Venture, consists of one fire water monitor and a fusible loop. Gas detectors are also fitted, however their action is to shutdown and blowdown the process modules. Any fusible loop heat detection will activate an ESD-2; indicate on the ESD Panel in the CCR the Turret Water Monitor Activation light, also light up Zone 23 on the Fire & Gas Panel, and sound the General Alarm. The turret fire monitor is a similar system to the process module deluge, however separate. Any release of air pressure from the fusible loop, via a fusible plug, will automatically start the deluge pumps and open the control valve FW-616V, to send water to the turret monitor. The turret monitor can also be activated from the local control panel, located at the base of the turret rigid arm, starboard outboard side. This is the only means of manually operating the turret deluge monitor. FPSO Swivel Turret Monitor Turret Monitor Deluge Layout Kelsow Work Instruction 2008 19

Local activation is done by turning the red handle three-way valve 180 0, to exhaust the air pressure from the fusible loop, to simulate a fusible plug air release. Unlike the process modules, the turret monitor deluge cannot be activated from the CCR. A light exists on the CCR ESD Panel, to warn of any activation, along with an ESD-2 and sounding of the General Alarm. Local Turret Activation Base of Starboard Rigid Arm Turret Deluge Water Inlet Control Base of Starboard Rigid Arm Control Valve FW-616V Turret Monitor Deluge Activation CCR Indication Light Kelsow Work Instruction 2008 20

Heli-Deck Fire System The Heli-deck of the Buffalo Venture has fixed fire fighting equipment, to contend with any helicopter emergency on deck. This equipment consists of two fixed monitors, fire hydrants and hose reels, two large dry powder extinguishers, and fire fighting suits and breathing apparatus ready for use. For the duration of a helicopter operation, a member of the helicopter crew is dedicated to man the fire monitor. If a fire emergency develops during refueling, the person on fire duty will open a monitor, at the HLO s call, and place the foam spear into an open foam drum on deck. #1 and #2 deluge pumps will start, and supply deluge water and foam to the deck fire. The foam drum contains approximately one and a half minutes of foam for immediate coverage, as the main low expansion foam supply in Foam Room A will take approximately one and a half minutes to reach the heli-deck. The main supply of foam is activated at the Foam Panel by the CCR Technician, who is constantly monitoring the helicopter operation via CCTV. Foam Drum and Spear Helicopter Operations on Buffalo Venture Heli-Deck Deluge/Foam Monitor Dry Chemical Powder Extinguishers Kelsow Work Instruction 2008 21

The heli-deck of the Buffalo Venture has a main thoroughfare and stairs down to the helicopter muster room, one level below. This is located at the forward end of the heli-deck, indicated by the yellow pathway. An emergency exit is at the aft end of the heli-deck, with stairs leading down to the next level. A fire hydrant is also positioned at the aft emergency exit. If escaping via the aft exit, the person must keep in mind the likelihood of the aircraft s tail rotor being in the vicinity. A crash box is in place on the heli-deck, to recover passengers if a crash on deck occurs. The crash box contains a variety of tools, a fire blanket, and life-lines for this purpose. The crash box is located forward of the refueling station. If a helicopter engine fire occurs whilst on deck, the initial response is at the pilots discretion, in communication with the Helicopter Landing Officer (HLO). The Supa-Puma helicopter has its own engine fire extinguishing system, activated in the cockpit by the pilots. Two large dry chemical extinguishers with snorkels to reach the engine in-takes, are positioned on the heli-deck as back-up, if required. Emergency Exit Aft End of Heli-Deck Heli-Deck Aft Fire Hydrant Heli-Deck Crash Box Fire Fighters Outfit Boxes Breathing Apparatus at Main Heli-Deck Exit Kelsow Work Instruction 2008 22

Gas Detection System The gas detection system is an automated system, where detectors are strategically place around process, compressor, and flare modules. The cargo pump room, engine room, and accommodation ventilation system are also protected from any influx of hydrocarbon gas. High Pressure Gas Cooler These send an indication to the Central Control Room (CCR) if any gas is present, and perform various functions depending on the amount of gas and location detected. Gas Detector Head Example of a gas detector head on process module. This high pressure gas cooler will have any gas released from a leaking flange or pipe rupture detected. The gas detector panel in the CCR. Any recorded gas reading is relayed in LEL format, from any of the 48 gas detector heads on the facility. A light will indicate which head is reading LEL, with the percentage amount shown on the LED screen. LED % Read-out Functions A 10% LEL gas reading will give an alarm in the CCR, indicating to the Technician that gas has been detected, and from which head. A >40% LEL gas reading will shutdown the facility and ventilation fans if on the process module, and initiate the process deluge if on the compressor module. Gas Detector Location Descriptor A >40% gas reading from the cargo pump room will stop the pumps if an offtake is underway, and if in the engine room area, shutdown necessary equipment such as ventilation fans, to maintain a safe facility. In-Alarm Indication Lights Kelsow Work Instruction 2008 23

Smoke and Heat Detection The Buffalo Venture FPSO has thermal and smoke detection devices, located at various locations around the facility. The Accommodation and Engine Room are protected by smoke and heat detectors; the Cargo Pump Room, Forward Machinery Space and Forward Pump Room by smoke detectors; the Flare, Gas Compressor and Process modules by fusible plugs. Zone Indication Lights Reset Button For testing and after smoke/ heat source cleared Any detection is relayed to the Fire Alarm Panel located in the CCR, indicated by the affected zone light, and the fire and general alarm activation. Action is then taken to extinguish fire by appropriate means, if not already activated automatically. Output Override for testing purposes only Example of Heat Detector Example of Smoke Detector Kelsow Work Instruction 2008 24

Carbon Dioxide Extinguishing System Certain spaces on the Buffalo Venture FPSO are protected by CO 2 release systems. These areas are #1 and #2 Boiler hoods, boiler crude fuel ducting, galley, main deck paint locker, and the Forward Machinery Space. These are designated high fire risk areas, where the most effective way to control any likelihood of fire, is to enclose the area and release CO 2 to extinguish. Using CO 2 to extinguish any fire, although highly effective, is a hazard to life itself. Therefore the use of CO 2 is strictly controlled, whereby any entry to a CO 2 protected space under normal operations is logged in the CCR. Under emergency situations, it is imperative to ensure no person remains in the void space prior to release of CO 2, as it is an asphyxiant. If fire is detected in the void space, the severity of the situation is determined by the Incident Controller. Only under the instruction of the Offshore Installation Manager will CO 2 be released. All CO 2 systems, at all locations on the facility, have instructions clearly posted in the event of a fire, to activate effectively if instructed to do so by the OIM. #1 Boiler hood internals fuel supply and firing front potential fire hazards #1 Boiler Hood Door Instructions for use clearly labelled #1 Boiler CO 2 activation point Warning Sign CO 2 System Kelsow Work Instruction 2008 25

Body Engine Heading Room Fire Protection The engine room on the Buffalo Venture is an enclosed, ventilated space. Fire protection systems include the High Expansion Foam system as previously discussed; gas detection on ventilation ducting, an enclosed extraction and gas detection system on the boiler hoods, smoke and heat detectors, hydrant and hose reels for water and foam application, and a variety of fire extinguishers. The boiler s firing fronts have hoods fitted and an air extraction system, to contain any gas that may be released. If gas is detected within the boiler hood, the boiler fuel supply will change immediately over to Marine Diesel Oil. The MDO system is supplied from tanks in the engine room, and will therefore prevent any propagation of potential fire to the fuel ducting and the crude and fuel gas supply. Once gas is detected and investigated, CO 2 may be activated at the OIM s discretion. Fuel Supply Lines and Valves #2 Boiler Hood Internals Boiler Hood Extraction Fans Kelsow Work Instruction 2008 26

Gas detection is also in place at the feed filter tank vent. The feed filter tank receives steam condensate returns from the process unit and other utilities, to be re-used as boiler feed water. If hydrocarbons have communicated with the heating steam within a heat exchanger on the process module, and returns to the engine room with the steam condensate, any gas released will be detected and initiate an ESD-2. Any smoke or heat detection within the engine room is relayed back to the Fire Alarm Panel in the CCR, and will sound the General Alarm. The source of the detection will then be investigated and acted upon accordingly. The engine room workshop has a 30 minute timer override, to allow for hotwork, without inadvertently setting off the Fire Panel alarm and General Alarm. Feed Filter Tank in Engine Room Feed Filter Tank Vent Feed Filter Vent Gas Detector Smoke Detector in Engine Room Kelsow Work Instruction 2008 27

The engine room area ventilation inlet ducts have gas detectors installed. Any detection will have the same executive action as the process module gas detection, by activating an ESD-2. However, engine room equipment and power supplies will also be shutdown, and stop all ventilation fans automatically. Six fire hydrants and hose reels are in place at various deck levels in the engine room. Foam drums and nozzles are also at hand, for fire fighting using a branch line. The foam drums are in place due to the hydrant system being supplied from the Fire & G.S or Fire & Bilge pump, and no direct low expansion foam supply from the deluge system. Fire extinguishers are in various locations also, including foam on large capacity trolleys, dry chemical and CO 2, dependant on the area. Engine Room Ventilation Inlets Gas Detectors High Capacity Foam Extinguisher Foam Nozzle Fire Hydrant in Engine Room Foam Drums Kelsow Work Instruction 2008 28

Accommodation Fire Protection The accommodation area of the Buffalo Venture has a wide range of fire systems, to protect this area of the facility where personnel on board are located. The accommodation ventilation and air conditioning system provide positive pressure within the accommodation space, to resist any ingress of harmful gases. Any smoke or heat detection within the accommodation is relayed back to the Fire Alarm Panel in the CCR, and will sound the General Alarm. The source of the detection will then be investigated and acted upon. Located around the accommodation passageways are a number of fire boxes, containing a hose reel and nozzle for connection to a hydrant fitted inside the box. On all levels of the accommodation, fire extinguishers of varying types are located, depending on the application required. Foam, CO 2, and Dry Chemical types are used, and are typically found in passageways and near stairwells on all deck levels. Foam Extinguisher at Stairwell Accommodation Upper Deck Level Fire Box Internals Dry Powder Extinguishers Upper Deck Passageway Kelsow Work Instruction 2008 29

The accommodation area ventilation and air-conditioning inlet ducts have gas detectors and dampers installed. Any gas detection will have the same executive actions as a process module gas detection, by activating an ESD-2 shutdown. In addition, some engine room equipment and power supplies will also be shutdown. All exhaust ventilation and air conditioning dampers will also close automatically, and all vent and air conditioning fans will stop. Doors within the accommodation will automatically close, and if fire and smoke is present in the air-conditioning ducting, dampers can be shut manually around the passageways to prevent propagation. Automatic Damper Accommodation Air Conditioning Inlet Gas Detectors Gas Detector Automatic Damper Galley Air Exhaust Kelsow Work Instruction 2008 30

On any fire emergency within the accommodation, it is imperative to proceed to the muster point as the general alarm is sounded, and wait for instructions from the Incident Controller. If witnessing the incident and in the vicinity, clear concise instructions must be relayed to the Central Control Room, so the situation can be evaluated. This applies to all areas of the facility. Manually Operated Fire Damper Magnetic Door Release Mechanism Fire Alarm Manual Call Point (MAC) Kelsow Work Instruction 2008 31

PO Box 5596 Manly QLD 4179 AUSTRALIA Tel: +61 (0)7 3396 1913 Mob: +61 (0)408 275 535 Email: info@kelsowconsulting.com Web: www.kelsowconsulting.com