Design Review Benjamin Franklin Hotel 44 East Third Avenue San Mateo, California...

Similar documents
Standards Compliance Review 303 Baldwin Avenue, San Mateo, California

M E M O R A N D U M CITY PLANNING DIVISION PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA

Storefront. Cornice. Frieze. Awning. Transom. Recessed entrance. Pier. Display window. Base panel or bulkhead

DOWNTOWN FACADE GUIDELINES COMMUNITY DEVELOPMENT DEPARTMENT

CHAPTER 6 DESIGN GUIDELINES FOR INDIVIDUAL BUILDING ELEMENTS. Commercial Facades

BACKGROUND PROJECT DESCRIPTION. Memo

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Fourth Street Spenger s

13. New Construction. Context & Character

HISTORIC LANDMARK COMMISSION STAFF REPORT. Front Yard Terracing PLNHLC South 1200 East Meeting Date: August 7, 2014

Hendersonville Historic Preservation Commission Main Street Local Historic District Design Guidelines

FAÇADE DESIGN GUIDE. A Placemaking Initiative of the City of Richmond Department of Planning & Development Review

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

Town Center Design Guidelines

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

Secretary of the Interior s Standards for Rehabilitation

1. Avoid extensive blank walls that would detract from the experience and appearance of an active streetscape.

The Secretary of the Interior s Standards for Rehabilitation

GUIDELINES TORONTO GENERAL HOSPITAL LOCATION. INTRODUCTION Existing College Wing Buildings and Site Plan - Figure 1A and Figure 1B.

HISTORIC LANDMARK COMMISSION STAFF REPORT

211 Turner St. before rehabilitation

Policies and Code Intent Sections Related to Town Center

Historic Preservation Commission Motion No. 0171

2.6 City Centre District Site Specific Design Recommendations

Design Guidelines for

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

2.1 Decision Making Matrix

Resolution : Exhibit A. Downtown District Design Guidelines March 2003

Site Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23

Cha p t e r 2: Ge n e r a l De s i g n Gu i d e l i n e s

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

Building and Site Design Standards

CHAPTER 11 DESIGN GUIDELINES FOR SIGNS. Also consult Chapters and of the Truckee Municipal Code.

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Historic Resources. San Mateo has a Historic Building Survey that identified roughly 200 historically significant

Figure Example of out door dining in the public right-of-way.

CITY HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION

City of Redlands Architectural Guidelines for Non-Residential Development

SECTION TWO: Overall Design Guidelines

BYLAW TOWN OF BLACK DIAMOND

Highland Village Green Design Guidelines

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

Certificate of Appropriateness Case Report HEARING DATE: MARCH 20, 2019

History of the American Preservation Movement Part Two

ILLUSTRATIVE DESIGN GUIDELINES FOR OFFICE DEVELOPMENT

Los Angeles Department of City Planning RECOMMENDATION REPORT

HISTORIC DOWNTOWN MONROE DESIGN GUIDELINES

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

WEST LOOP DESIGN GUIDELINES CHECKLIST

Ardmore Storefront Design Guidelines The Township of Lower Merion December 2006

Motor City Re-Store Design Guidelines

1. Topeka Cemetery, 1601 SE 10 th Ave. 2. Crawford House, SW 17 th St. I. Roll Call. Approval of Minutes July 13, 2017 Minutes II.

1755 Le Roy Avenue (Tellefson Hall)

September 30, 2014 Ms. Lorraine Weiss Department of Community Development City of San Mateo 330 West 20th Avenue San Mateo, CA

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

Bayshore Boulevard Home Improvement District Design Guidelines

(DC1) Direct Development Control Provision DC1 Area 4

WATERFRONT DISTRICT DESIGN STANDARDS

Historical Evaluation Congregational Church, 225 Tilton Avenue City of San Mateo November 15, 2011

Urban Planning and Land Use

DESIGN REVIEW COMMITTEE AGENDA ITEM

ARLINGTON COUNTY, VIRGINIA

CARTERSVILLE HISTORIC PRESERVATION COMMISSION DOWNTOWN BUSINESS DISTRICT. General Guidelines Effective Date: April 1, 2004

CENTERS AND CORRIDORS

Historic District Commission Staff Report May 3 rd, 2017

Heritage Capital Projects Fund: PRESERVATION STANDARDS HCPF Biennium Application Workshops Olympia Spokane Mount Vernon Yakima

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

DOWNTOWN TRANSCONA URBAN DESIGN GUIDELINES

Waterville Main Street Design Guidelines

Historic Preservation DESIGN GUIDELINES

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC)

BYLAW NUMBER 6M2017 NOW, THEREFORE, THE COUNCIL OF THE CITY OF CALGARY ENACTS AS FOLLOWS:

Design Guidelines. Roosevelt. Mike Podowski DPD Design Guidelines Ordinance ATT 13 August 13, 2012 Version #1

Downtown Design Guidelines FINAL. Johnstown. January Town of

Downtown Overlay District Design Guidelines (Approved by City Council August 2, 2011)

Address: 302 West Main Street PIN: Plan: Rectangular Stories: 2 Original Owner: Roof Type: Flat

City of San Juan Capistrano Agenda Report

ZONING. 300 Attachment 1. City of Oneonta. Design Guidelines ( )

TOWN CENTER DESIGN STANDARDS FOR THE CITY OF. August, MOUNTLAKE TERRACE TOWN CENTER DESIGN STANDARDS August,

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

general corridor design guidelines gen-0.0

PLANNING BOARD REPORT PORTLAND, MAINE

Public Frontage Regulations Map

Chapter II: Building Placement, Massing and Access

MINUTES. Date: November 13, 2013 Location: 747 Market Street, Tacoma Municipal Building, Room 248

ELK GROVE TOWN CENTER DESIGN GUIDELINES

Agenda Report Meeting Date 08/01/18

CHAPTER 3 DOWNTOWN COMMERCIAL DISTRICT CHARACTER AREA

CITY HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION

STAFF BRIEF. Project: 2016-COA-356 Meeting: September 8, th Street Oxford Hotel

Draft for Public Review. The Market and Octavia Neighborhood Plan

Asbury Park Urban Enterprise Zone Design Guidelines

STAFF BRIEF. Design Guidelines for Lower Downtown Historic District, Appendix A: Standards and Guidelines for Signs (2014), pg.

OAKLAND SMALL PROJECT DESIGN GUIDELINES

CHAPTER 20 THE RAILROAD CHARACTER AREA. The Railroad Character Area contains the railroad tracks and those lands flanking them.

ARCHITECTURAL DESIGN REVIEW ORDINANCE DESIGN GUIDELINES DECEMBER 2000 PREPARED FOR THE MEREDITH PLANNING BOARD BY CHRISTOPHER P. WILLIAMS, ARCHITECTS

showroom façades Cladding of showroom façades Entrance signage Handling of special cases Renault Brand Stores - September 2016

FINAL DRAFT. Building 77

CHAPTER 13 DESIGN GUIDELINES

Architectural Review Board Report

Transcription:

Benjamin Franklin Hotel 44 East Third Avenue San Mateo, California... prepared for the City of San Mateo Department of Planning and Community Development prepared by Architectural Resources Group Architects, Planners & Conservators San Francisco, California... 28 January 2013* *This report is an update of the 25 September 2012 report and is based on a reduction in the project scope as reflected in the 19 November 2012 plans and the colored elevations for the Benjamin Franklin building as presented at the 8 January 2013 Planning Commission public hearing.

Benjamin Franklin, San Mateo, California 28 January 2013 I. Introduction In response to a request from the City of San Mateo, Architectural Resources Group (ARG) has assessed the proposed project at the Benjamin Franklin Hotel, in order to evaluate its compliance with The Secretary of the Interior s Standards for the Treatment of Historic Properties (The Standards) and the City of San Mateo Downtown Retail Core & Downtown Historic District Design Guidelines. The Benjamin Franklin Hotel is located at 44 E. Third Avenue, San Mateo, California, assessor s parcel numbers 034-143-280 and 034-143-290. The Benjamin Franklin Hotel was surveyed as part of San Mateo s Historic Resources Survey in 1989. The property was assigned a Nation Register of Historic Places (National Register) Status Code of 3/3D indicating the property appears individually eligible for the National Register and as part of a historic district. The hotel is also a contributor to the San Mateo Downtown Historic District, a locally designated district. Consequently, the building is considered a historic resource for the purposes of the California Environmental Quality Act (CEQA). 1 Under CEQA, a project that may cause a substantial adverse change in the significance of a historic resource is a project that may have a significant effect on the environment. 2 Substantial adverse change in the significance of a historic resource means physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of a historical resource would be materially impaired. 3 The proposed rehabilitation project for the Benjamin Franklin Hotel could potentially cause a substantial adverse change in the significance of the building. However, any proposed project that follows The Secretary of the Interior s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring & Reconstructing Historic Buildings (The Standards) is considered to have mitigated any potential impacts to a less-than-significant level. 4 In addition, the Downtown Specific Plan Historic Preservation Policies require that all exterior renovations of individually eligible buildings are consistent with The Standards.

28 January 2013 Page 2 II. Building and Site Description Figure 1: view of the Benjamin Franklin Hotel looking southwest (ARG June 2007). The Benjamin Franklin Hotel is an eight-story plus penthouse, two-part commercial building fronting Third Avenue between South El Camino Real and San Mateo Drive in the City of San Mateo. At the rear, there is a double-height, one-story, full-width wing, and a second smaller, projecting east wing. At the southwest corner of the lot, there is a fan-shaped pool. For the most part, the elevations are symmetrical. Typical of the Spanish Colonial Revival style, the walls are planar stucco surfaces with elaborate Churrigueresque ornament at the eighth-floor windows, parapet, and penthouse at all elevations, and the second floor of the front elevation. Overall, the building has a high degree of integrity, with the exception of the storefronts on the north (principal) façade, which have been heavily altered. In addition, in the 1960s or 1970s, an addition was built at the west end of the penthouse. The character-defining features of this building are identified as follows: General Exterior Eight-story block with penthouse Stucco finish Churrigueresque-style plaster ornament: spandrel panels, elaborate ornament at parapet, and medallions Overall vertical emphasis through fenestration, massing, and ornament Flat roof with parapet Silhouetted plaster ornament projecting above the parapet Molded sill course at eighth floor windows Molded plaster spandrel panels immediate below eighth floor sill course

28 January 2013 Page 3 Regularly spaced bays of windows Three-over-three, double-hung wood windows (some arched at the seventh floor) Beveled building corners that contribute to the overall vertical emphasis of the building Front (North) Elevation Overall symmetrical fenestration (with exception of penthouse addition) Stepped cornice line created by original penthouse Churrigueresque ornament at penthouse level including central window and flanking blind arches Center flag pole on roof Horizontally striated plaster at first floor Beltcourse, panels, and Churrigueresque ornament around second floor windows Second and seventh bays, which project slightly and are emphasized by spandrel panels and elaborate Churrigueresqe ornamentation at the eighth floor parapet Central placement of main entrance opening (glazed doors, transoms, sidelights, and wing walls are from a 1950s remodel and are not characterdefining features) Rear (South) Elevation Symmetrical fenestration Stepped cornice line created by penthouse Octagonal turret at southwest corner Six-light windows on rear wing Three sets of glazed doors flanked by multi-light sidelights and transoms Figure 2: view of the Benjamin Franklin Hotel looking north (ARG June 2007).

28 January 2013 Page 4 East and West (Side) Elevations Symmetrical fenestration (including blind and small windows on east and west elevations) BENJAMIN FRANKLIN painted in block letters immediately below cornice (west elevation). BENJAMIN FRANKLIN painted in block letters immediately below cornice with neon letters (east elevation) Open metal fire stair Interior Features and finishes of the Fireside Room including: o o o o o o o Overall open massing Arched ceiling form Exposed corbelled woodtrusses, rafters and purlins Clerestory windows on south side and corresponding vents on north side Carved lintels above doorways between lobby and Fireside Room and between Fireside Room and the pool area Stuccoed conical fireplace at west wall with molding Octagonal light fixtures III. Building History The B. Getz syndicate built the Benjamin Franklin Hotel in 1927 for $250,000. The building was designed by W.H. Weeks, a Bay Area architect noted for his school buildings, hotels, public buildings, and residences. The anticipated market for the hotel was San Francisco residents seeking a holiday in the countryside but unable to afford, or not desirous of, a country house. The Peninsula had traditionally served as the location of San Francisco elite s country houses, a rural retreat from city life and cold San Francisco summers. However, by the 1920s, San Mateo had already begun its transformation into a bedroom suburb of San Francisco. Initially, the hotel was also intended to serve local residents as a place for social events and for a few, with long-term residential arrangements. 5

28 January 2013 Page 5 IV. Proposed Project The proposed project involves three buildings: the Benjamin Franklin Hotel, 37 E. 4 th Avenue, and The Collective. No exterior work is proposed at 37 E. 4 th Avenue or The Collective, and, as a result, the review of changes to these two buildings is not part of this evaluation. The following summarizes the project as presented in a drawing set prepared by TMDA dated 9 November 2012 and four color renderings dated 9 November 2012. Benjamin Franklin Hotel (44 E. Third Avenue) Exterior Alterations replacement of the ground floor storefronts and hotel entrance new exterior paint scheme on all elevations installation of exterior lighting installation of exterior signage alterations to the deck of the rear one-story wing including installation of generator construction of two exterior stairways at the one-story rear wing replacement of glazed doors and transoms between the Fireside Room and pool area 37 E. 4 th Avenue no exterior changes proposed The Collective (51-65 E. Third Avenue) no exterior changes proposed V. The Secretary of the Interior s Standards for Rehabilitation According to The Secretary of the Interior s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (The Guidelines), If the building requires more extensive repair and replacement, or if alterations or additions are necessary for a new use, then Rehabilitation is probably the most appropriate treatment. Because much of the original fabric of the first floor storefronts and the entrance of the Benjamin Franklin Hotel were previously altered significantly, Rehabilitation is the most applicable Standard.

28 January 2013 Page 6 The ten Standards for Rehabilitation are noted below, each followed by ARG s findings regarding the proposed project. 1. A property will be used as it was historically or be given a new use that requires minimal change to its distinctive materials, features, spaces, and spatial relationships. As part of the proposed project, the Benjamin Franklin Hotel would be converted to a private university including dormitory and classroom space. The hotel s first floor rooms originally housed commercial spaces, a lobby, and a lounge (the Fireside Room). Under the proposed project, the existing restaurant (commercial) space would remain a restaurant. The commercial space to the west of the Lobby would function as a lounge for students. The Lobby would continue to function as a reception area for the university. The Fireside Room would become a classroom, and the original guest rooms would serve as student dormitory rooms. Although somewhat reconfigured, the proposed project would retain the commercial, lobby, and lounge/gathering space uses at the first floor. The former hotel rooms would also retain their residential use. It is ARG s opinion that the proposed project is consistent with Standard 1. 2. The historic character of a property will be retained and preserved. The removal of distinctive materials or alteration of features, spaces, and spatial relationships that characterize a property will be avoided. The proposed project would remove three sets of historic doors, sidelights, and transoms between the Fireside Lounge and the pool area. Paired doors with transoms (no sidelights) would be installed in their place. Because this change is on a secondary elevation, and The Guidelines recommend Designing and installing additional windows on rear or other non-character-defining elevations if required for the new use, the installation of new doors is not inconsistent with The Standards. In addition, the size of the historic openings would be maintained. It is ARG s opinion that the proposed project is consistent with Standard 2. 3. Each property will be recognized as a physical record of its time, place, and use. Changes that create a false sense of historical development, such as adding conjectural features or elements from other historic properties will not be undertaken. The proposed project uses modern materials and detailing that are clearly distinct from the building s historic fabric. Conjectural features or elements from other historic properties are not part of the proposed project. It is ARG s opinion that the proposed property is consistent with Standard 3.

28 January 2013 Page 7 Figure 3: view of the Benjamin Franklin Hotel sign from El Camino Real (ARG, August 2012). 4. Changes to a property that have acquired historic significance in their own right will be retained and preserved. Exterior changes to the Benjamin Franklin have occurred primarily at the building s storefronts, the Banquet Room, and the ninth-floor penthouse. The storefront alterations appear to have occurred piecemeal over the last fifty years. The hotel s banquet room was remodeled in 1954. As part of this project, brick columns, an awning, and paired hollowcore doors were added to the first floor of the south façade. The penthouse addition appears to have been built in the 1960s or 1970s. The project proposes alterations to the storefronts, banquet room entrance, and the penthouse addition. None of these past alterations are architecturally significant or represent important themes, events, or people in the hotel s history; therefore these changes are not significant in their own right.

28 January 2013 Page 8 Figure 4: view of the Benjamin Franklin Hotel sign from E. Third Avenue and S. San Mateo Drive c. 1947 (Downtown San Mateo http://dsma.org/history ). The proposed project would encase the Benjamin Franklin painted and neon signs at the east and west facades. The signs were installed c. 1947 and have been important character-defining features of the building. The signs have been in place 65 years and are strongly associated with the historic building and its historic use: the Benjamin Franklin Hotel. In addition, because the building is significantly taller than the surrounding structures, the signs are highly visible from the downtown and surrounding streets and neighborhoods. As a result, although they are located on what would usually be considered secondary facades, the signs are an important part of the public s view of the building and its identity. The proposed project would retain the signs in place but encase them in a fascia to allow the project sponsor to mount new signage over them. Because the signs will be retained, and the fascia is easily reversible, this approach is consistent with The Standards. It is ARG s opinion that the proposed property is consistent with Standard 4. 5. Distinctive materials, features, finishes, and construction techniques or examples of craftsmanship that characterize a property will be preserved. The proposed project does not appear to remove distinctive materials, features, finishes construction techniques or examples of craftsmanship that characterize the property. It is ARG s opinion that the proposed property is consistent with Standard 5.

28 January 2013 Page 9 6. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in design, color, texture, and where possible, materials. Replacement of missing features will be substantiated by documentary and physical evidence. The proposed project does not include the repair or replacement of historic features. It is ARG s opinion that the proposed project is consistent with this Standard 6. 7. Chemicals or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. Chemical or physical treatments are not proposed. If, as the project develops, it is determined that such treatments are necessary, these should be evaluated by a preservation professional or city staff to determine if they meet The Standards. It is ARG s opinion that the proposed property is consistent with Standard 7. 8. Archaeological resources will be protected and preserved in place. If such resources must be disturbed, mitigation measures will be undertaken. ARG s scope of work does not include the analysis of archeological resources. 9. New additions, exterior alterations, or related new construction will not destroy historic materials, features, and spatial relationships that characterize the property. The new work shall be differentiated from the old and will be compatible with the historic materials, features, size, scale and proportion, and massing to protect the integrity of the property and its environment. At the exterior, the proposed project is focused on changes to the storefronts, the rear one-story wing roof deck, addition of stairways at the one-story wing, exterior doors on the south façade, and a new paint scheme. The storefronts have very little original fabric left intact. The possible exception is a divided-light clerestory above the western storefront, which may be original. Removal of the clerestory, the last piece of historic fabric at the storefront, would not be problematic since it is only a portion of the clerestory and does not represent enough of the feature to understand its relationship to the other missing elements of the storefront system. The installation of a generator above the Peninsula Banquet Room would not destroy historic fabric and would be easily reversible in the future. The proposed project would remove an exterior stairways at the west façade of the one-story rear wing and add stairways at the south and east facades of the one-story wing. The new stairways do not cover, or require the removal of, any characterdefining features. In addition, the stairways are at side and rear (secondary) facades. The proposed project would replace the three sets of exterior doors between the

28 January 2013 Page 10 Fireside Lounge and the pool area. Currently, the openings have single glazed doors, sidelights, and multilight transoms. The project would install pairs of taller glazed doors with a smaller transom. Their replacement is consistent with The Standards because the doorways are on a secondary façade, and the openings would be retained in their current dimensions. The exterior walls of the hotel are currently painted; however, neither the paint itself nor its application represents a distinctive material, finish, or example of craftsmanship. The original paint scheme has not been investigated. The proposed project would paint the west elevations in a tan and warm gray scheme. In addition, the second through eighth floors of the north, south, and east elevations would receive the same color scheme. These colors are compatible with the Spanish Colonial Revival style of the building and are consistent with Standard 9. At the north (primary) façade, the proposed project would paint the first floor in a warm gray and bright orange-yellow and green scheme. The orange-yellow color wraps to the east elevation. At the south elevation, the first floor would be painted in a yellow, blue, and green color scheme. The Secretary of the Interior s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, & Reconstructing Historic Buildings (The Guidelines) do not recommend, Radically changing the type of paint or coating or its color. The Guidelines recommend Repainting with colors that are historically appropriate to the building and district. The bright colors proposed at the first floors of the north, south, and east elevations are not consistent with the Spanish Colonial Revival style of the building. At the south elevation, the bright colors are not easily visible from E. 4 th Avenue, a public right-of-way, and introducing them at this elevation would not conflict with Standard 9. However, the north (primary) façade faces directly onto E. 3 rd Avenue and is very visible from the public right-of-way. Using bright colors that are inconsistent with the Spanish Colonial Revival style on this façade would not be consistent with Standard 9. Similarly, wrapping the orange-yellow color to the east elevation (also easily visible from E. 3 rd Avenue) would not be consistent with Standard 9. According to city staff, the project applicant has proposed bright colors at the north façade in order to distinguish between the different uses of the two storefronts (Astaria restaurant and Draper University). This goal could be achieved through other means such as: colored awnings, glazed awning and/or signage. Signage mounted perpendicular to the façade of the building could be vertical or horizontal in orientation. In addition, signage could be emphasized by uplighting. It should be noted that if fabric awnings are used, traditional shed awnings are the most appropriate. 6 ARG has provided several alternate schemes for differentiating the Astaria restaurant storefront from the Draper University storefront as Attachment A to this report. The three schemes include: 1. Modern awnings (similar to proposed awnings) with glazing in the vertical surface and Astaria signage on glazing

28 January 2013 Page 11 2. Astaria signage mounted perpendicular to the façade of the building at the second floor and traditional awnings (of different colors) over storefront entrances 3. Astaria signage mounted perpendicular to the façade of the building at the second floor and modern awnings (similar to proposed project) with colored glazing in the roofs of awnings It is ARG s opinion that the proposed property is not consistent with Standard 9 due to the proposed colors at the first floors of the primary frontage (3 rd Ave). 10. New additions and adjacent or related new construction will be undertaken in such a manner that, if removed in the future, the essential form and integrity of the historic property and its environment would be unimpaired. The proposed project calls for the addition of signage reading Draper University to the front of the building above the first-floor beltcourse. In addition, the painted and neon Benjamin Franklin sign on the east elevation and painted Benjamin Franklin sign on the west elevation would be retained in place and encased in fascia with Draper University signs mounted to the exterior. The Draper University signage and fascia could be removed in the future, and the Benjamin Franklin sign would be left intact. Surface-mounted lighting, banners, signage, and new canopies/awnings would be installed on the building as part of the proposed project. When details for the attachment of these items are developed, they should be reviewed by a preservation professional or city staff to ensure that the method of mounting the new lighting and signage would not damage historic materials. It is ARG s opinion that the proposed property is consistent with Standard 10. VI. City of San Mateo Downtown Retail Core & Downtown Historic District Design Guidelines Downtown Design Guidelines The Downtown Design Guideline section of the City of San Mateo Downtown Retail Core and Downtown Historic District Design Guidelines (the Downtown Historic District Design Guidelines) applies primarily to new construction; however, there are several sections that are relevant to the proposed project at the Benjamin Franklin Hotel. ARG s findings for each design objective are noted below. G) Awnings/Canopies According to the Downtown Design Guidelines, Awnings and canopies add depth to the appearance of a storefront, provide a location for signage and shield pedestrians from sun and rain. They also can improve the look of a building when the size, location and color reflect the architecture and geometry of the building. Installation requires an encroachment permit from the Public Works Department if over the public right-of-way,

28 January 2013 Page 12 must maintain eight feet of clearance above the sidewalk, and should not conflict with street trees or other public improvements. Design Objective: Awnings shall: Fit the dimensions of the storefront openings to emphasize building proportions; Maintain views of important architectural details; Be aligned with other awnings on the block where appropriate; Coordinate with the color scheme of the entire building front; Be constructed with quality materials that maintain their integrity over the years. The proposed project would retain the current main/central awning and patch and repair to like new appearance. The existing awning meets most of this design objective. A color scheme has not yet been proposed, so it is not clear if it will coordinate with the color scheme of the entire building front. This aspect should be reviewed once that information is available. H) Maintain visually interesting activity at the sidewalk edge. In areas where retail frontage is required, new buildings must have 75% of the width along the street devoted to pedestrian entrances or transparent windows. In areas where retail frontage is not required, building should continue to provide interest along the sidewalk. This may be accomplished with transparent windows, display windows at least two foot deep, landscaping where appropriate, or architectural detailing. Design Objective: Provide visual interest to all facades fronting on a street. The proposed project would restore glazing to the north elevation s western storefront and replace the glazing on the eastern storefront. As a result, as proposed, the frontage would be composed almost entirely of glazed entrances and windows with structural piers between. It is ARG s opinion that the proposed project is consistent with this objective. Downtown Historic District Design Guidelines The Downtown Historic District Design Guidelines state that all downtown buildings that are individually eligible for the National Register of Historic Places and all buildings that are contributors to the Downtown Historic District are governed by the following Downtown Specific Plan Policy:

28 January 2013 Page 13 HP-5 Individually Eligible Buildings. Prohibit partial or complete demolition of individually eligible buildings unless health and safety requirements cannot be met. Provide for continued maintenance of individually eligible building. All exterior remodels shall conform with the Secretary of the Interior s Standards for Rehabilitation and the Guidelines for Rehabilitating Historic Structures. AA) Retain and preserve storefronts of historic buildings According to the Downtown Historic District Design Guidelines, San Mateo storefronts are generally the focus of historic buildings and are therefore important in defining the overall historic character. As described in the Secretary of the Interior s Standards and Guidelines, particular care is required in accomplishing work on storefronts so that the building s historic character is preserved in the rehabilitation process. Design Objective #1. Storefront Openings: Maintain the original size and shape of the storefront openings; Restore openings to their original shape if altered; Original windows should be preserved and replacement windows when necessary, should match the size, style, and configuration of the original; The Benjamin Franklin Hotel s storefronts have been substantially altered over the years. Although a comprehensive chronology of changes is outside the scope of this review and has not been developed, building permits indicate the storefront at 36 Third Avenue was altered in 1941. Drawings for alterations to the main entrance and 50 Third Street were issued in 1950. At the east storefront (50 Third Street), the overall window and entrance openings as well as a clerestory divided-light window have been maintained, but the windows themselves have been changed. The west storefront (44 Third Street) has been completely altered; in 1960 or 1970s the single storefront was divided into two. All glazing from the original storefront, with the exception of some clerestory windows, was removed or covered. The alterations to the west storefront interrupted the symmetry of the historic façade. The project would demolish the existing storefront openings and doorways on the north (principal) facade. With the possible exception of a transom over the western storefront, no original storefront windows or doors remain. While the proposed project would not restore the openings to their original shape, the proposed project would reinstate the overall symmetry of the first floor storefronts. Although detailed drawings have not been provided, it appears that the storefront window and door systems would be modern in character and would not replicate the historic. It is ARG s opinion that the proposed project is consistent with this objective.

28 January 2013 Page 14 Design Objective #2. Storefront Components: Protect original components through appropriate treatments such as cleaning, rust removal, limited paint removal, and reapplication of protective coating systems. The Benjamin Franklin Hotel s storefronts have been substantially altered. Only one section of transom may be original, and because of the extensive replacement of the rest of the original storefront, this remaining fragment does not represent the historic storefront feature. Therefore, because of its lack of integrity, the protection of original storefront components does not appear to be an issue in this project. It is ARG s opinion that the proposed project is consistent with this objective. Design Objective #3 Repair Storefronts: Repair storefronts by reinforcing the historic materials. Little historic storefront material remains on the front elevation. As a result, there is little historic material to repair. It is ARG s opinion that the proposed project is consistent with this objective. BB) Retain existing character when altering historic buildings. According to the Downtown Historic District Design Guidelines, alterations or construction of an exterior addition to a historic building may be needed to assure its continued use. It is most important, however, that alterations or new additions are constructed so that there is the least possible loss of historic materials and so that character-defining features are not obscured, damaged or destroyed. Alterations may include cutting new entrances or windows on secondary elevations, or floor area additions on secondary and non-streetwall elevations. New construction or additional stories required for a new use shall be set back from the wall plane, as inconspicuous as possible, and shall not alter the perceived street wall height of the existing building. New work should be compatible with the historic character of the district or alterations should be somewhat different from the historic construction so as not to confuse the viewer into believing the new construction is actually historic. Design Objective: Alterations/additions to historic building shall: Be compatible with the historic character of the district or neighborhood in terms of size, scale, design, material, color and texture; Be clearly differentiated so that a false historical appearance is not created; and Shall not radically change, obscure, or destroy character-defining materials, features, or finishes.

28 January 2013 Page 15 The proposed project does not include any additions. The proposed alterations are compatible with the historic district. Additionally, new features, such as the storefronts, are clearly modern. The proposed project appears to be consistent with this Design Objective in terms of size, scale, design, materials, and texture. The proposed project would introduce bright colors at the first floors of the north, south, and east elevations. At the south elevation, the bright colors are not easily visible from E. 4 th Avenue or other public right-of-ways. As a result, at this façade, compatibility with the historic character of the Downtown Historic District is less of a consideration. However, the bright colors at the first floors of the north (primary) façade and the east elevation are visible from E. 3 rd Avenue. The bright colors are inconsistent with the Spanish Colonial Revival style of the building and are therefore not consistent with this design objective in terms of color. Additionally, in the Downtown Historic District, the colors of the ground floor storefronts are consistent across each façade and relate to the color scheme of the building s upper floors. This pattern of consistent color schemes is found throughout the district on contributing and noncontributing buildings alike. VII. Conclusions/Recommendations The proposed project is not consistent with Standard 9 of The Secretary of the Interior s Standards for Rehabilitation (The Standards) or the City of San Mateo Downtown Retail Core & Downtown Historic District Design Guidelines in terms of the proposed colors on the primary (3 rd Avenue) frontage. If the color scheme of the first floor of the north façade and east elevation were revised to be more compatible with the historic building, the project could be consistent with The Standards and the City of San Mateo Downtown Retail Core & Downtown Historic District Design Guidelines. A project that follows The Standards is considered to have mitigated any potential impacts to a less-than-significant level. 7 As defined by CEQA, the proposed project would then not result in substantial adverse change, material impairment, or cumulative impacts to the individual resource, the Benjamin Franklin Hotel, or the San Mateo Downtown Historic District. As the project develops, there are some aspects of the project that should be reviewed in more detail in order to evaluate their consistency with The Standards and the City of San Mateo Downtown Retail Core & Downtown Historic District Design Guidelines. The building permit drawing set should address the following items in detail:

28 January 2013 Page 16 Details on entrance canopies/awnings Details on storefronts (including colors) Details on the fascia encasing the Benjamin Franklin signs and installation of the new Draper University signs Details on mounting methods for signage, lighting, and banners 1 CEQA Guidelines 15064.5(a). 2 CEQA Guidelines 15064.5(b). 3 CEQA Guidelines 15064.5(b)(1). 4 CEQA Guidelines 15064.5 (b)(3). 5 For the purposes of completing this review, ARG relied on existing documentation and did not conduct additional research on the building. 6 Chad Randl. National Park Service Preservation Brief 44 <http://www.nps.gov/hps/tps/briefs/brief44.htm> Accessed 23 January 2013. 7 CEQA Guidelines 15064.5 (b)(3)>

APPLICANT S PROPOSED DESIGN BENJAMIN FRANKLIN HOTEL 01/21/13

Adagio Hotel, San Francisco Glass faced awning ALTERNATE A Exterior Design Alternatives BENJAMIN FRANKLIN HOTEL 01/21/13

Ramona Building, Sacramento Vercal Blade Sign ALTERNATE B Padre Hotel, Bakersfield Canvas Awnings Exterior Design Alternatives BENJAMIN FRANKLIN HOTEL 01/21/13

Ramona Building, Sacramento Vercal Blade Sign ALTERNATE C Tinted-glass awning Exterior Design Alternatives BENJAMIN FRANKLIN HOTEL 01/21/13