Preventive Maintenance

Similar documents
Featuring Ozone-safe HFC134a. Hitachi Centrifugal Chillers NEW. GXG-S Series GSG-S Series. Debut

Centrifugal Chiller. GFG-S/SIT Series GXG-S/SIT Series GSG-S/SIT Series

Featuring Ozone-safe HFC134a. Hitachi Centrifugal Chillers. NEW GXG-S Series GSG-S Series Debut

High-efficiency Turbo Chiller (NART Series)

Hitachi Centrifugal Chillers

As a standard, heat exchangers are provided with flange water connections (BS Standard Table E). All evaporator are supplied fully insulated.

EN aquatech.piovan.com

ORTEC INDUSTRIAL FLUID CHILLERS FC SERIES ( TONS) Compressed Air, Gas & Fluid Technologies. i e n d. l y. t a. R e. f r. i g e.

ETI-Z Series Centrifugal Chiller Applied Low GWP Refrigerant to Contribute to the Prevention of Global Warming

Preventative Maintenance Tables

Water-cooled Centrifugal Chiller

DAIKIN Huizhou Factory Profile

"ETI-Z, GART-ZE/ZEI" Centrifugal Chillers using Low-GWP Refrigerants for Full Capacity Range

Innovation for a Better & Greener Future

Kelvin air conditioning. KELVIN Clim W280. Cooling Capacity: 280 ~ 1840 kw

Closing the Loop What s best for your system?

Technical instructions

Customers. The core of our innovation. Feeding&Conveying Drying Dosing Temperature Control Refrigeration. Granulation

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

CVGF. Water Cooled Centrifugal Chillers

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT

KELVIN Clim F497. Kelvin air conditioning

HATCHERY. ROSS TECH Hatchery Maintenance. August 2011

OIL COOLER INSTRUCTION HANDBOOK

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

Kelvin air conditioning. KELVIN Clim W250. Cooling Capacity: 250 ~ 1240 kw

Development of centrifugal chiller and heat pump using low GWP refrigerant

Handling or using the product improperly and in disregard of the instructions with this mark might result in serious bodily injury or death.

THE PRODUCTS YOU NEED. THE QUALITY YOU WANT. THE INNOVATION YOU DESERVE.

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

.2 Section Waste Management and Disposal.

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. CENTRIFUGAL PUMP Instruction Manual ACm60 / ACm75 / ACm150 / ACm150B2

Refrigeration & Air Conditioning Experiment No. 5. Experiment No. 5

HVAC Efficiency In Healthcare. Presenter Mr. Nate Lincoln

Component. Maintenance. Manual Z SERIES. Evaporator Assembly

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

(2) 325 tpd York Chlorine Liquefier Systems

Magnetic Bearing Technology: Achievements in Higher Efficiency

STARBOX - CONDENSER UNITS

Precise Temperature Control; Compact Footprint

INSTALLATION, OPERATION & MAINTENANCE MANUAL

SUBCRITICAL & TRANSCRITICAL SYSTEMS

The Refrigeration Cycle. Jerry Cohen President Jacco & Assoc.

LMF Rotary Screw Air Compressors kW LX Range

PDA20DX Air Purifying Dehumdifier Manual

REMOVE AND INSTALL AIR CLEANER ASSEMBLY

HVAC Water chiller selection and optimisation of operation

With the world-renowned SIGMA PROFILE

Ultimate energy saving technology

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

INSTALLATION MANUAL FOR ROTARY TWIN LOBE (ROOTS) BLOWERS / COMPRESSORS

Condensing Unit Installation and Operating Instructions

OIL-FREE ROTARY SCREW COMPRESSORS Fixed Speed Regulated Speed (RS) D75 D275 INTELLIGENT AIR TECHNOLOGY

ECOMax-HE Automatic Tube Cleaning System

500 EX Fusion Compressor Series

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

PDF Created with deskpdf PDF Writer - Trial ::

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Refrigeration air dryer

GENERAL 2004 HVAC SYSTEMS. Manual HVAC System - Sorento SPECIFICATIONS. Fig. 1: Air Conditioner Specifications Courtesy of KIA MOTORS AMERICA, INC.

INSTALLATION, COMMISSIONING AND OPERATING MANUAL

Public Services Building 155 N First Avenue Hillsboro, OR March 2012

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:

Operation Manual R205BV, R209BV

2. CURRICULUM. Sl. No.

9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS

Climate control precision in Hi-tech environments Jupiter and Mercury Close Control Units

INSTRUCTION & MAINTENANCE MANUAL

30 F to 300 F Process Temperatures* 1/2 to 7.5 HP Centrifugal Pumps ( GPM) 3/8-1 Solenoid Cooling Valves (VE & 300 F models)

MultiPlex INNOVATIVE COMPRESSED AIR SOLUTIONS LARGE CAPACITY TRUE-CYCLING TM REFRIGERATED COMPRESSED AIR DRYERS

Indholdsfortegnelse. Danvent Air Handling Units SERVICE MANUAL

Math & Physics. Complete combustion requires an Air-FuelRatio of 14.7 to 1 for combustion.

Frigi Tech International, Inc Prairie Wind Lane,. Houston, Texas T: F:

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP

Wallace & Tiernan Gas Feed Systems V2000 Chlorinator

CMA TECHNICAL MANUAL CONDENSING UNITS FOR OUTDOOR INSTALLATION O L S A F RA N

INSTALLATION, OPERATION & MAINTENANCE MANUAL FOR DRY PAK PACKAGED COMPRESSED AIR TREATMENT SYSTEM MODEL: DPP-150 WARNING

Refrigerated Compressed Air Dryer

INFRARED HVAC APPLICATION HVAC 101

13-1. Temperature Regulator

G Series. G Series Air Coils Installation ti Manual ENCASED/UNCASED AIR COILS. Geothermal/Water Source Heat Pumps R-410A Refrigerant 2-5 Ton

AIC Brazed Plate Heat Exchanger Operating and Instruction Manual

Service Step by Step Trouble-Shooting Check-List

High Productivity Dry Hobbing System

High-Performance, High-Reliability Gas Heat Pump

A Design for True Performance and Energy Savings In Refrigerated Compressed Air Dryers The Digital Scroll Dryer

Math. The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb.

Refrigeration Technology in Building Services Engineering

How To Make Lando Water Chillers? Leading the way of innovation. Here is the instruction to know more us how to

Technical Information 2015/01

Centrifugal Pump Efficiency Improvement Alternate Methods and Design Methodology

30RB/RQ 039S-160S. Air-Cooled Liquid Chiller Reversible Air-To-Water Heat Pump Nominal cooling capacity: kw Nominal heating capacity: kw

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

SMHA Hatch High temperature fan HT-fan Installation and Maintenance

G-7s. Instruction Manual. G-Series Cooler COUNTERTOP COOLER. Part No.11IPA

This Chapter Sponsored by CASTOOL Tooling Solutions

MFE400 SERVICE PARTS

SELF-PRIMING JET PUMPS

Transcription:

Preventive Maintenance

Preventive Maintenance for MHI Cen Preventive Maintenance Programs by Mitsubishi Heavy Industries Thermal Systems, Ltd. (MTH) keep your centrifugal chiller running with efficiency and confidence. Offering you maintenance programs to meet your needs with our knowledge and experience from genuine manufacturer. Maintenance Items and Programs : Standard : Option Advanced Support Program No. Items Descriptions Energy Stable Operation Cost Maintenance during a non operating period will be an 1 Annual Maintenance important opportunity to secure future operations. 1 2 (Compressor, Motor, Overhauling) Disassembling compressor and recondition or replace consumable parts with new one to ensure stable operations. Avoid possible technical problem by checking chiller 3 Periodical Visit for Inspections conditions. 2 A Customer Service representative will assist you 4 On Call Service during regular business hours. Maintain maximum operating efficiency by removing foreign debris and scales. 5 Condenser Tube Cleaning 6 (Starter Panel or Inverter Panel) Replace wear and tear parts in the starter panel and the control panel to ensure stable operations. 7 8 9 Replacement of Control, Electrical Equipment and Parts Eddy Current Testing ECT for Condenser and Evaporator Tube Protective Device Inspection (High Pressure Gas, etc.) 11 Performance Guarantee 1 1 Whenever the driving motors or the sensors does not function, it will be replaced per manufacturer's schedule. The tube will be checked for remained thickness or damage. e.g. Inspect operating point of pressure relief valve and make necessary adjustments or replace. Benefits of preventative maintenance are energy saving, 10 5 Years Maintenance stable operation, and cost saving. Chiller cooling capacity and performance will be in a planned range with adequate maintenances. 2 2 2 Chiller operation data will be available to monitor 12 Remote Monitoring through internet in real-time. 1 2 1: Refer to P4-P5 2: The customer must enter into a new contract at the 6th year to extend the service period. 3: Must order together with

trifugal Chiller Stable Operation Energy Cost *MTH : Mitsubishi Heavy Industries Thermal Systems, Ltd. Basic Support program Indivisual Support Stable Operation Cost Cost Interval Notes Every year Every 50,000 hours or 7 years which ever comes first Every 5 years recommended for annual operation chillers which is continuously operated Every 3 months Obtain operating data and diagnose it, then make necessary adjustments or advices. 3 Ocationally Every year (during annual maintenance) or whenever necessary Using a brush with water to cleaning inside of tubes is regular. Chemical cleaning may be required for heavy conditions.the water box will be repainted and the gaskets will be replaced. The heat exchanger will be checked based on the heat transfer performance, and if it is judged to be necessary, the tube cleaning will be performed. Chemical cleaning will be changed separately. Starter Panel : Every 7 years Inverter Panel : Every 4 years In case of the inverter panel, some parts will be replaced every four years and the overhauling will be conducted every eight years. Every 5 years Every 5 years For an accurate ECT, chemical cleaning will be performed before ECT. Every year (during annual maintenance) It includes, safety valve operation check, display pressure gauge accuracy check and safety device operation check. One year of warrantee period after turn-over is included. This warranty covers only the equipment supplied by MTH*. Customers are also able to check the operating status in real-time remotely by using IDs or passwords. For detail about the connection, contact MTH*. Periodical Visit for Inspections. 3

5 Years Maintenance Program Performing preventive maintenance and replacing normal wear and tear or damaged parts, it will help you to reduce long term maintenance costs and chiller downtime compare with unscheduled maintenance. Unscheduled Maintenance Scheduled Maintenance Maintenance cost per year Maintenance cost per year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Year of Operation Year of Operation Remote Monitoring Program 24-hour and 365-day remote monitoring program is suitable for maintaining the performance and function of the centrifugal chiller. The remote monitoring program enables various performances. Customer Internet Emergency response Preventive maintenance Proposal for economic efficiency and energy-saving MTH* Monitoring center 24 hours and 365 days (1) Monitoring the operation status (2) Emergency response/treatment and report of the result (3) Submission of monthly report of data and customer s observation (4) Proposal for preventive maintenance and economical use based on the result of the analysis of accumulated data *MTH : Mitsubishi Heavy Industries Thermal Systems, Ltd. Condenser and Evaporator Maintenance Program Cleaning the tube ECT Insert a probe into the tube to estimate wall thickness by two directions X and Y. Mechanical / Chemical cleaning remove fouling agent and scale composition from the tubes of heat exchangers to keep its efficiency. ECT measures remained tube wall thickness and predicts possible refrigerant leak. 4

Standard Maintenance Schedule for MHI Centrifugal Chiller : Standard : Option No. S-1 S-2 S-3 S-4 S-5 S-6 S-7 S-8 Maintenance Programs Annual Maintenance (Compressor, Motor, Overhauling) Periodical Visit for Inspection (Starter Panel) (Inverter Panel) Replacement of Control, Electrical Equipment and Parts Eddy Current Testing ECT for Condenser and Evaporator Tube Protective Device Inspections Years of Operation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 S-9 5 Years Maintenance S-10 Performance Guarantee S-11 Remote Monitoring Note: This table shows a sample of maintenance plan for unit operates under 4,000 hrs per year. Required schedule may be different based on accutual condition of the unit. Annual Maintenance Items No. A-1 A-2 A-3 A-4 Major Maintenance Items Inspections for Refrigerant Leak and Oil Leak Repairing Refrigerant Leak and Oil Leak (if necessary) Replacement of Normal Wear and Tear Parts Inspection of Control Panel Descriptions Confirm no refrigerant leak by a detector and/or soap water. Confirm no oil leak by visual check. If any leak is found, the leak to be repaired. Repair work will be charged separately. Replacement of lubricant oil (or oil analysis), oil filter and refrigerant drier filter. Inspection and adjustment of temperature / pressure sensors. A-5 Inspection of Starter Panel General inspections, tightening nuts. A-6 A-7 Recommissioning Cleaning of Condenser Tubes Adjustment of parameter during test run. Tube cleaning by brushes. Touch-up painting at damaged point of water box. Apply new gaskets. 5

[Overhauling] Every component of the centrifugal chiller plays important role. In an extended use, deterioration continues due to rotation, heating, cooling and vibration at parts that cannot be checked in daily/periodical checks. If the maintenance of the components is ignored, it will cause accident and shorten the service life as well as deterioration of the function and performance of the centrifugal chiller. For the purpose of preventive maintenance, periodical overhaul maintenance is indispensable. In order to operate the compressor for a long period of time, periodical overhauling is required considering the wear condition of the sealing parts of the high speed rotating object and service life of the bearing, etc. Concerning other electrical parts (starter panel, inverter panel, multi-function microcomputer operation panel, controllers and safety devices) and mechanical parts (heat exchange tubes, accessories, etc.), this periodical overhauling is also indispensable for maintaining the function and performance. Major Components Multi-function microcomputer operation panel Safety valve Economizer Motors for control valve Electrical parts such as level gauge Compressor / motor Condenser and water box Electrical parts for resistance thermometer, etc. Evaporator and water box Parts to be replaced every year such as refrigerant filter and dryer, Sub-cooler Precautions on Water Control The water control is extremely important for maintaining performance of the centrifugal chiller, economical operation and preventing accidents due to corrosion. Cooling Water 6 Heat exchange is performed between the cooling water and atmosphere in the cooling tower, and this causes mixing of components from the atmosphere such as nitrogen oxide and carbon dioxide into the cooling water, deteriorating the water quality. If the cooling water is continuously circulated with the blowing and/or supplying the cooling water insufficient due to splashing of the cooling water and the evaporation loss, it will also deteriorate the water quality. By this, the heat exchange rate of the condenser decreases due to adverse conditions inside the tube including slime fouling, existence of some sediment, corrosion tendency resulting from acidified condition and scale adhesion, which may increase power consumption and condenser pressure, thus resulting in some problems such as failure stoppage and tube corrosion. For prevention of such problems, follow the instruction manual for water quality control including when to start the operation. Periodical cleaning of the tube is necessary as a rule. Multi-year maintenance extended course and annual maintenance course include the tube cleaning. Even if you selected other course, the tube cleaning will be optionally available.

Maintenance of Compressor and Motor Disassembling / maintenance / assembling Check / inspection Compressor disassembly Motor stator Compressor / motor Standard replacement parts Inspection Compressor assembly (Bearings) (Gaskets / O-rings) Gear / pinion gear liquid penetrant testing Impeller liquid penetrant testing Rotor dynamic balance check Major Electrical Parts Starter Inverter panel Multi-function microcomputer operation panel Starter panel will be used in case of This photo shows an inverter panel of 6.6kW. The opening door is an optional item. Controllers, measuring instruments, valves, etc. Level gauge, measuring motor valve, pressure switch, resistance thermometer, etc. (1)Level gauge (2)Motor for control valve (3)Pressure switch (4)Resistance thermometer (1) (2) (3) (4) Removing the scales requires chemical cleaning. This service will also be optionally available irrespective of the course. What we recommend the most to know the condition inside the tube appropriately is ECT (eddy-current test). This test will also be optionally available irrespective of the course. Chilled Water For the chilled water is circulated in the sealed system, the chilled water does not get contact with the atmosphere so much as compared with the cooling water. This makes the quality of the chilled water less deteriorated than the cooling water. From the preventive maintenance perspective; however, we still recommend to conduct ECT every 5 to 7 years as a rule. This test will be optionally available irrespective of the course. When the chilled water systems are equipped with thermal storage tanks, carbon dioxide or oxygen could enter into the water due to contact with the atmosphere, which make the circumstance to be corrosion-prone. In this case, please analyze the water quality as with the cooling water, and conduct water control in accordance with the instruction manual based on the result of the analysis. 7

MHI CENTRIFUGAL CHILLER Preventive Maintenance www.mhi-mth.co.jp/en/ (Wholly-owned subsidiary of MITSUBISHI HEAVY INDUSTRIES, LTD.) Chiller & Heat Pump Engineering Department Service Section 1-1, Shinhama 2-chome, Arai-Cho, Takasago, Hyogo Pref., Japan Phone : 81-79-445-6657 Telefax: 81-79-445-9913 Because of our policy of continuous improvement, we reserve right to make changes in all specifications without notice. MTHES001, 1610 (0.1) R4 Printed in Japan