REQUEST FOR PROPOSALS FOR THE PROVISION OF PREVENTIVE MAINTENANCE ON FACILITY HVAC SYSTEMS FOR SKOKIE PUBLIC LIBRARY

Similar documents
"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Preventative Maintenance Tables

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

CARNEGIE-STOUT PUBLIC LIBRARY REQUEST FOR PROPOSALS FOR HVAC MAINTENANCE

BID SPECIFICATIONS FOR HVAC MAINTENANCE & SERVICE LOCATED AT VARIOUS BUILDING LOCATIONS FOR CITY OF ZION, ILINOIS

CxA to Answer this Section

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

CONTENTS. B. System Design and Performance Requirements

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

PLP - TERMS AND CONDITIONS Philadelphia Gas Works Residential Parts & Labor Plan Contract

HEATING AND COOLING REBATES

HEATING AND COOLING REBATES

HEATING AND COOLING REBATES

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

Contact Phone Number: (609) Fax: (609)

Direct Fired Heater Model AD Specification

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Exhibit II Equipment Lists & Sample Service Sheet

SECTION FAN COIL UNITS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

RHGN-H: COMMERCIAL AIR HANDLER WITH VARIABLE FREQUENCY DRIVE (VFD) NOMINAL 10 TONS R-410A REFRIGERANT 2-STAGE AIR-FLOW

Advance Release September 2009

Green Maintenance Needed to Keep HVAC Systems Green

DESIGN GUIDELINES SECTION HVAC

RECOMMENDED PROCEDURES FOR THIRD-PARTY PREVENTATIVE MAINTENANCE PROVIDERS

City of Duluth Festival Center 04/25

TESTING, ADJUSTING AND BALANCING

Quotation For Small Purchases

DSV Model Air Cooled Self Contained Indoor Packaged Units 3-5 Tons Preliminary Application Data

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

Stanford University Facilities Design Guidelines SECTION DECENTRALIZED UNITARY HVAC EQUIPMENT

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

WMWLB / WMWFM / WTWLB / WTWFM Series Hydronic Heating Unit

This is to inform you the Equipment List has been added to this Invitation for Bid and the BID OPENING date has been postponed

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Sequence of Operations (excerpt)

OPERATION & INSTALLATION MANUAL

REQUEST FOR PROPOSALS CLEANING SERVICES

CS 2. Central Station Air Handlers Double Wall & Single Wall Installation, Operation & Maintenance Manual. Form No. 6120A

Commercial Maintenance Agreement (CMA) Benefits

COMcheck Software Version Review Mechanical Compliance Certificate

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

GARCIA GALUSKA DESOUSA Consulting Engineers

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

Evaporative Cooling products

GIRTON CABINET WASHER MODEL 794A

MISSION CRITICAL Air Conditioning Systems. Maintenance Guide. ClimateWorx International Inc. 14 Chelsea Lane, Brampton, Ontario, Canada L6T 3Y4

Residential Rebate Program Available to NYSEG and RG&E residential natural gas and electric customers.

Vapor-Compression Refrigeration

ROSWELL INDEPENDENT SCHOOL DISTRICT P.O. Box 1437 Roswell, New Mexico General Bid Conditions

ANNUAL HVAC SERVICE AGREEMENT

The County of Barry is accepting sealed bids for HVAC service. The term of the contract will be for the year beginning November 1, 2018 and ending

Air Handler Unit. Installation & Operations Manual. Table of Contents. Bulletin No. H-IM-AH August 2002 Part Number 4346B001

MIN. CCT. QTY RLA LRA HP FLA AMPACITY /1/ /3/

Sunny Hills. HVAC Maintenance Checklist Template. conducted for. Conducted on 31 Oct :40 PM. Prepared by Jon Nieve

TGIF-1. Indirect Fired Heating Systems. Technical Guide for: IF Indoor Installations. IFW Outdoor Installations. Applied Air. Keeps You.

Complete HVAC Capability. Central Station Air Handling Units. Publication No. WT-CSX-0616A

SECTION AIR COILS

KG 092 SHOWN READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

HVAC Controls Upgrades: Requirement Details ( )

Installation & Maintenance Instructions

Field Start-Up Sheet Direct Fired Gas Equipment

Preventative Maintenance Plan Information PO Box 507 Located at 1009 N. 20 th St. Morehead City, NC Phone: (252) Fax: (252)

Top of the World Tower

Liebert DataMate (1-3 Ton) Warranty Inspection Check Sheet

Service Step by Step Trouble-Shooting Check-List

Installation, Operating & Maintenance Instructions. Air Handler Models: AH & AV

1.1 This section applies to air handling units for HVAC Systems.

REPLACEMENT PARTS LIST

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

DIVISION 15 MECHANICAL

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS

Jr. Tech (JT-1, 2, 3) Knowledge Areas

#7: KMI Pulp Moulding System # KMI

Indirect Gas-Fired Make-Up Air

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Appendix 13. Categories of Cooling and Heating systems

HVAC 101. H V A C S y s t e m s

Florida Department of Transportation

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

Advance Product Data. Features/Benefits. 42WKN Hydronic Fan Coil Units

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

How about Savings in Time, Money, Energy and Longer Life?

MODEL HS115-3, HS115-4 & HS115-5 WIRING DIAGRAM ADDENDUM

HVAC/R Repair and Maintenance In The Current Economy. How To Minimize Costs

Series. Packaged Rooftop Units, heat pumps and Outdoor air handling Units. Features:

Description of All Alternatives Considered-

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

SECTION WATER-TUBE BOILERS

Transcription:

REQUEST FOR PROPOSALS FOR THE PROVISION OF PREVENTIVE MAINTENANCE ON FACILITY HVAC SYSTEMS FOR SKOKIE PUBLIC LIBRARY Skokie Public Library is requesting proposals for a contract for the provision of preventive maintenance on the facilities HVAC equipment. Sealed proposals, clearly labeled Proposal Preventive Maintenance on Facility HVAC Systems, will be received weekdays between 9:00am and 5:00pm in the Administrative Office, Skokie Public Library, 5215 Oakton Street, Skokie, IL 60077, until 5:00pm on February 28, 2018. Proposals received after 5:00pm on that day will not be accepted. All proposals will be required to include a list of three clients of a 50,000 square feet or larger facility. Request for proposal documents may be obtained on the library s website www.skokielibrary.info beginning 9am, February 9, 2018. A pre-proposal meeting and walk-through will be held at February 13, 2018 at 10am. We can also schedule an additional site visit at that time. Submit questions to: Submit sealed proposal to: Tim Murphy, Facilities Manager Skokie Public Library tmurphy@skokielibrary.info 847.324.3155 Administrative Office Attention: Richard Kong, Director Skokie Public Library 5215 Oakton Street Skokie, IL 60077 Proposals will be evaluated by the Director and Facilities Manager. The selected proposal will be presented to the Board of Library Trustees at their March 14, 2018 board meeting. All proposals should be open for acceptance for a period of 60 days from the deadline for receipt of quotes, and may not be revoked or withdrawn during that period. The library reserves the right to accept or reject any and all proposals, to waive technicalities, and to accept or reject any item of any proposal.

EVALUATION OF PROPOSALS 1. Firms bidding on RFP are responsible for all aspects of the project, including that their subcontractors (if applicable) meet the same expectations of responsibility as the awarded primary contract company. 2. All questions must be answered completely. Additional pages may be added if more is needed to answer a question. 3. To be considered qualified, a contractor must provide a list of clients as specified. 4. In selecting the contractor, experience, services offered, and reference feedback demonstrating quality of service will be considered as well as costs. 5. The library reserves the right to accept or reject any and all proposals, to waive technicalities, and to accept or reject any item of any proposal. Company Name: Representative Name: REQUIREMENTS 1. General 1.1. The Contractor shall employ personnel who are experienced and competent in all tasks to be provided under this agreement. The Contractor is responsible for making sure that their personnel and any of their subcontractors (if applicable) are properly trained to perform all tasks expected of them and of all safety requirements according to OSHA requirements. 1.2. The Contractor s and their subcontractor s (if applicable) employees shall be carefully interviewed, screened, and covered by Bond. Every employee who works in the library will be bonded for at least $5,000. 2. Insurance 2.1. The Contractor shall provide public liability and property damage insurance covering all of the Contractor s and their subcontractors (if applicable) operations in the library. General liability insurance coverage shall be for not less than $1,000,000 each occurrence, with additional umbrella liability of not less than $1,000,000.

2.2. The Contractor shall provide Worker s Compensation Insurance, including occupational disease provisions, as required by Illinois statute for all of the contractor s and their subcontractors (if applicable) employees performing work related to this agreement. 2.3. To the fullest extent permitted by law, the Contractor and any of their subcontractors (if applicable) shall indemnify, keep and hold harmless the Owner and its agents, officers, and employees, against all injuries, deaths, losses, damages claims, suits, liabilities, judgments, costs and expenses which may arise directly or indirectly from any negligence or from the reckless or willful misconduct of the Contractor, its employees, or its subcontractors. The Contractor shall at its own expense, appear, defend, and pay all charges of attorneys and all costs and other expenses arising therefrom or incurred in connected therewith, and, if any judgment shall be rendered against the Owner in any such action, the Contractor shall, at its own expense, satisfy and discharge the same. 2.4. With the proposal, the Contractor shall provide proof of insurance and bonding. On or before the effective date of this agreement, the Contractor shall provide a certificate of insurance evidencing that Skokie Public Library has been named as additional insured and that the Contractor s insurance policies will not be changed or canceled during their term until after at least thirty days prior notice has been given by registered mail to Skokie Public Library. 3. Prevailing Wage 3.1. Some or all of the work herein may be subject to the provisions of the Prevailing Wage Act, 820 ILCS 130/.01 et. seq., providing for the payment of prevailing rate wages to all employees and subcontractors. The Contractor shall agree to indemnify the library for any and all violations of the prevailing wage laws and any rules and regulations now and hereafter issued pursuant to said laws. 4. Preventive Maintenance Inspections 4.1. Air conditioning 2 inspections including seasonal start up and shut down 4.2. Heating 2 inspections including seasonal start up and shut down 4.3. Exhaust fans 2 inspections 4.4. Please see Equipment Coverage (EC1) Skokie Public Library (Representative) (Date) Contractor (Representative) (Date)

Skokie Public Library HVAC Preventive Maintenance Services Equipment Coverage (EC1) Air Handling Units Quarterly Maintenance 1. Inspect coils for blockage and leaks 2. Inspect drain line and pans 3. Lubricate fan bearings as required 4. Lubricate motor bearings as required 5. Check belt tension and sheave. Replace belts annually 6. Check motor mounts and vibration pads 7. Inspect wiring and tighten connections 8. Check fan operations 9. Lubricate and adjust dampers and linkages as required 10. Check motor operating voltage and amperages 11. Inspect filters a. Change pleated filters quarterly b. Change bag filters and roll filters annually 12. Clean outside of air intake screens 13. Check heating and cooling coils Boilers Annual Inspection 1. Inspect fire side of boiler 2. Clean loose debris 3. Inspect firebrick and refractory 4. Visually inspect boiler pressure vessel for possible leaks 5. Disassemble, inspect, and clean low water cut off 6. Check blow down valve if applicable 7. Inspect and clean the burner and combustion control equipment 8. Re-assemble and re-fill 9. Check burner sequence of operation and combustion air equipment 10. Visually inspect the relief valves for leakage or signs of wear 11. Check fuel piping for leaks 12. Clean and adjust ignition electrodes 13. Inspect burner linkage for wear 14. Inspect burner fan wheel and air intake damper 15. Lubricate motor and shaft bearings (if required) 16. Clean contacts in program timer and check sequencing 17. Check setting and test all operating and limit controls Running Inspection 1. Inspect boiler and burner 2. Perform a combustion analysis (annually); adjust burner as needed 3. Blow down and check low water cut off and feed control valves 4. Check sequence and operation of flame safeguard controls

Chillers Preseason Inspection 1. Check main starter and controls panel. Tighten all electrical connections. Dry run starter and check operation 2. Leak test unit 3. Meg compressor and check operation (if applicable) 4. Sample oil for analysis (if applicable) 5. Check sump heater (if applicable) 6. Check and test all operating and safety controls 7. Check controls and operation of purge system 8. Condenser tube brushing in winter Seasonal Start Up 1. Review manufacturer s recommendation for start up 2. Check auxiliary equipment operation 3. Check refrigerant and oil levels 4. Check oil sump heater 5. Start chilled water pumps and water chiller 6. Check unit operation Operational Inspection 1. Review manufacturer s recommendation for start up 2. Check auxiliary equipment operation 3. Check refrigerant and oil levels including super heat and sub cooling 4. Check oil sump heater 5. Check unit operation Cooling Towers Annual Inspection 1. Power wash media of cooling tower 2. Clean out nozzles and flush pans 3. Open sump of tower and clean out debris 4. Fill sump and test fill valve 5. Grease fan and motor bearings 6. Check sump heater operation Running Inspection 1. Check sump heaters and thermostats for operation and calibration 2. Inspect electrical connections 3. Fill cooling tower 4. Vent condensate water loop 5. Circulate condenser water, test flow and clean strainer Seasonal 1. Drain and winterize cooling towers and lines

Exhaust Fans Annual Inspection 1. Replace and adjust belts annually 2. Check amp draw of motor 3. Check voltage 4. Check pulleys and tighten all set screws 5. Check motor bearings and oil/grease as needed 6. Check fan bearings and grease as needed 7. Check all mounting bolts and tighten as needed 8. Inspect motor and bearing mounts 9. Inspect exhaust wheel 10. Check for vibration 11. Check electrical connections 12. Check back draft damper for proper operation where accessible Pumps Annual Inspection 1. Lubricate pump bearing per manufacturer s recommendation 2. Lubricate motor bearings per manufacturer s recommendation 3. Tighten all nuts and bolts 4. Check motor mounts and vibration pads and adjust as needed 5. Check motor operating conditions 6. Visually check motor alignment and coupling 7. Inspect electrical connections and contactors 8. Check and clean strainers and check hand valves 9. Inspect mechanical seals and adjust as needed 10. Verify gauges for accuracy 11. Clean any strainers

Equipment List EL1 Equipment Model # Location Centrifugal Chiller CH1 Carrier 19XR 375 ton 2nd floor mech Screw Chiller CH2 Trane RTHCIC 246 ton 2nd floor mech Condenser Pump CWP1 Century 54640 20hp 2nd floor mech Condenser Pump CWP2 Taco 6008 FE 20hp 2nd floor mech Condenser Pump CWP3 Taco 6008 FE 15hp 2nd floor mech Chilled Pump CHWP1 Marathon 9E256TTDR 20hp 2nd floor mech Chilled Pump CHWP2 Taco TA 1224B 20hp 2nd floor mech Chilled Pump CHWP3 Taco TA 1224B 20hp 2nd floor mech Cooling Tower CT1 BAC Series 1500 350 ton East roof Cooling Tower CT2 BAC Series 1500 250 ton East roof Boiler B1 Bryan hot water RV4000 4000MBH boiler Boiler B2 Bryan hot water RV4000 4000MBH Hot water pump HWP1 Beldor 7.5hp Hot water pump HWP2 Beldor 7.5hp Hot water pump SHWP1 Beldor 7.5hp Hot water pump SHWP2 Beldor 7.5hp Hot water pump SHWP3 23gpm (radiators) 2nd floor mech Hot water pump SHWP4 70gpm (reheat coils) 2nd floor mech Hot water pump SHWP5 40gpm (radiators) 2nd floor mech Hot water pump SHWP6 140gpm (reheat coils) 2nd floor mech Expansion tank ET1 Taco 2nd floor mech Expansion tank ET2 Taco boiler Air separator Taco AC4F 4"-16" 3300gpm boiler Air conditioner AC1 Liebert MM036A 3 ton IT server Air handler AHU001 Trane MCCA021 10000cfm 2nd floor mech Air handler AHU002 Trane MCCAO50 29400cfm 2nd floor mech Air handler AHU003 Trane MCCAO50 24000cfm 3rd floor mech Air handler AHU1 boiler Air handler AHU2 boiler EL1 (cont d)

Return Fan RF001 Trane 7.5hp 2nd floor mech Return Fan RF002 Greenheck B-6BISW21 30hp 2nd floor mech Return Fan RF003 Trane MCCAO40 20hp 3rd floor mech Return fan RF1 Return fan RF2 VFD AHU001 Square D Altivar 2nd floor mech VFD AHU002 Square D Altivar 2nd floor mech VFD AHU301 Square D Altivar 3rd floor mech VFD RF001 2nd floor mech VFD RF002 2nd floor mech VFD RF301 3rd floor mech VFD AHU1 VFD RF1 VFD AHU2 VFD RF2 Exhaust fan Greenheck G65-01 30hp Exhaust fan Dayton 2K2618 1/3hp Exhaust fan Exhaust fan Exhaust fan Suspended unit heaters (qty. 8) various locations Cabinet unit heater C1 west vestibule Cabinet unit heater C2 east vestibule VAV terminal boxes with reheats various locations (qty. 25) Reheat coils various locations Air compressor Gast 1hp 2nd floor mech Electric duct heaters (qty. 2) 1st floor Youth Electric duct heaters (qty. 1) 1st floor meeting Humidifier/dehumidifier IT server Combustion air supply fan Duct free split system (qty. 3) Mitsubishi Lower roof/upper roof SF 1 IFB L J Wing Heat Pump Samsung DVMS Lower roof

Filter and Belt Sizes FL/BL1 Unit Filters Belts Location AHU1 24x24x2-8 5VX600-1 20x24x2-6 20x20x2-1 24x24x12-8 24x20x12-6 20x20x12-1 AHU2 24x24x2-3 5VX600-3 24x20x2-3 24x24x12-3 24x20x12-3 RF1 BX51-2 RF2 3BP140-1 EF1 AP51-1 AHU001 24x24x36-15 Optibelt C162 banded 2nd floor mech 24x12x36-5 Roll filters RF001 B162-2 AHU002 24x24x36-15 Optibelt C162 banded 2nd floor mech 24x12x36-5 Roll filters RF002 B162-2 AHU003 24x24x2-6 5VX550-3 3rd floor mech 18x24x2-4 RF 3 2BX93-2