Operating points for attention. Installation points for attention

Similar documents
INSTRUCTION GUIDE DIGITAL CONTROLLER

Haitian Jupiter Series

TLA-1245 EFFICIENT HEAT CYCLE SHRINK TUNNEL OPERATION MANUAL

3200 SERIES VACUUM CONVEYOR Special Capabilities Specification Sheet

Nu/Clean 624 XL Touch Screen Inline Aqueous Cleaner Technical Specifications & Pricing

STANDARD OPERATING PROCEDURES

Avi International Packaging Company

Air Pavilion Quiz. Name: Class: The Winds of Change is a wind machine. Does the wind push or pull?

Intelligent Speed Dome Installation Manual. Version 1.0.0

INSTRUCTION GUIDE DIGITAL CONTROLLER

Efficiency and Design Improvements in Multiple Hearth & Fluid Bed Incinerators

Proper maintenance of tunnel finisher will prolong its life and enable the equipment to produce the best possible quality.

Sensor Report. University of Florida Department of Electrical and Computer Engineering EEL5666 Intelligent Machines Design Laboratory

CONTENT CONNECT GROUP FOR POULTRY PROJECT. I. Site photo. Product features and main uses. Structural characteristics and working principle

Exercise 2-4. Heat Exchangers (Optional Exercise) EXERCISE OBJECTIVE DISCUSSION OUTLINE. Description of a brazed plate heat exchanger DISCUSSION

2200 SERIES VACUUM CONVEYOR Special Capabilities Specification Sheet

ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS

Wireless M2M Solutions

Microwave Shell Drying System

LONGONI ENGINEERING SRL

Reference report Traffic & Transportation

Microwave Shell Drying System

X T1220 LED FOG MACHINE USER MANUAL

Standard Operating Manual

OPERATING & SERVICE PARTS MANUAL HDS-215 COMBINATION SHRINK SYSTEM

Column swing gate turnstile CPW-321ASP

PESIT-Bangalore South Campus

Shrinking STCW 60 / STCW 80 Drying DU 60 / DU 80 Transporting CB 60 / CB 80

Cleaning the internal optics surfaces

LED New Light Source Reflow Oven. Model: T-960

Air Pavilion Quiz. Name: Class:

AUTOMATIC ROTARY SPRAYING MACHINE

Electronic Pellet Burner Controller NPBC-V3M

EN l CartWash Plus. CartWash Plus. Hygienically perfect cleaning of laundry carts

INTERNATIONAL MACHIINE CONCEPTS. Operating Manual. Tablet Counting and Filling Machine. Model IMC

PAMA PRODUCT PASTEURIZATION, HEATING AND COOLING SYSTEMS

User s Information Manual

Chocolate Cooling Tunnel

BODY ELECTRICAL AIR CONDITIONING. A compact, lightweight, and highly efficient straight flow (full-path flow) aluminum heater core has been adopted.

K Tronic Series Installation and Start Up Checkout Procedure.

Packaging Machinery and Engineered Food Plants

Technical Installation, Start-up, Operation & Maintenance Manual For ENERGENICS KARTWASH PREMIER WITH TOUCHPAD DISPLAY

This site is based on a but applies to all 1971-on Saab 99 and Saab 900.

Automated Sample Preparation: SPE GPC - EVAporation SUPERIORITY BY ADAPTATION. Visit us at

DN-400 Lead Free Wave Solder Machine

WASHING CYCLE. In the most sophisticated machine Version (DH 3), all the following steps are included.

BRIDGE MONITORING. Picture 1: Benjamin Sheares Bridge

IR Intelligent Speed Dome Installation Manual

Installation Guide: PowerAire Quad

Equipment Information

IR Intelligent Positioning System Installation Manual

Mini SMT Reflow Oven Model: T-961

Information 92 e. Be wise LINGLize. At Laumans the roofing tiles stand on their heads

H O B A R T F T F L I G H T - T Y P E W A R E W A S H E R. Energy efficient. Water efficient. Cleaning efficient. So you re efficient.

Heavy Duty Heater / Air Conditioner Model R-8545

Semi Auto Bottle-blowing Machine Mode: JND-880

SPC-101-S-LD. SPC-101-S-LD We can meet your various needs with a new washing method, and hot air heaters. Basic type Cleaning+Drying machine

Standard Operating Procedure M.I.C.E.

Installation Guide for inbiox60 Series Access Control Panel

Shrinking STCW 60 / STCW 80 Drying DU 60 / DU 80 Transporting CB 60 / CB 80

Quick Setup. November 30, 2006 Ver1.3

LHS PREMIUM LHS SYSTEM

Requests for Care and Maintenance

INPO Fire Protection Activities and Results

HD IR Vari-focal Dome Network Camera. Quick Start Guide. Version 1.0.0

INSTALLATION & OPERATION MANUAL

Please read operating instructions carefully before use and keep for further reference.

Crate washer EKW-1500

Role of Auxiliary Equipments in Plastic Processing

University of Houston Master Construction Specifications Insert Project Name

M.I.C.E. Motor-Free Technology

User Manual. Dryer Controller M720

Burner Management and Combustion Control. Copyright 2014 Rockwell Automation, Inc. All Rights Reserved.

Heller Industries A688951: Rev-D Jan-2007 Oven System Setup Wizard: Software version

Flight conveyor dishwashers and basket washers

NEWIN Centrifual Fan Forced Draft Cooling Tower Product Introduction

The following report is prepared and published by:

Illustra Essentials HD IR Vari-Focal Dome Network Camera Quick Start Guide

BASIL 6700 TUNNEL CAGE WASHER

SMF SOLUTIONS FOR PRODUCTION BIG PET BOTTLES AND JARS

CL64T INDUSTRIAL TOTE WASHER

KG/H PET Bottle Washing Line


Design and Implementation of Sewage Treatment Control System

SCIF SOP for BSL 2 samples on Aria3

Agilent Vac Elut SPS 24 Manifold User Guide

Duct smoke housings, 4-wire D341/D341P and D342/D342P

Eaton Contamination Control Products FT1555-BM bench mount capping machine operating instructions

Customers. The core of our innovation. Feeding&Conveying. Drying Dosing Temperature Control Refrigeration Granulation

Dryer Controller M720

ACTIVE INFRARED BARRIER

CIRRUS AIRPLANE MAINTENANCE MANUAL

Basic System Includes:

Lonix Access Control Operation & Maintenance Manual

PLATE HEAT EXCHANGERS. Operation and Maintenance Manual

Use and maintenance Manual Longitudinal profile welding Model: LRW-130

Remote flower watering and monitoring, part II (automatic garden watering)

OPERATING AND MAINTENANCE MANUAL

Toplock Indoor. Originalbedienungsanleitung

Information 103 e. Be wise LINGLize. New drying technology at RAPIS brickworks

Transcription:

IMC-RBX Series Steam shrinking Tunnel Operating points for attention l The machine should be manipulated in the best condition by the person in charge of operating the machine. l The tools and other things are forbidden to be putted on or in the machine. l When the tunnel is heating, touching the inside metal is forbidden to avoid the burns and scald. l Verify the machine, being aware of the electrics and scald, cut off the circuit or stop the related heating master control assembly switches first if necessary. l Turn off the switch after the machine working, and then begin cleaning operation. Installation points for attention l The machine position and installation should keep the glory hole and the conveyor belt parallel and vertical, and keep the center of the notch inside machine cavity and the center of the conveyor belt in the same level. l The position of the entrance and exit of the machine decides according to the peripheral equipment. Being aware of whether the hot air or steam from the machine cavity affects the other equipments around. It is recommended to leave machine s fore and back parts at least 0.6 meter away from any wall, column, etc. l It is recommended to leave the fan entrance and exit of the machine not in the same level with the ventilation system or other outlet, avoiding the lost of the heat of the tunnel and other damage to low the quality of shrinking and waste energy. l It is recommended to connect the 1.5 square conveyor line with the machine and use 3&220V380V415V60/50HZ power supply and 5A electromagnet switches(nfb). l The specific interface is like the following picture

l SP-1M: The length of the machine is 1000mm, which adopts SUS stainless steel mechanism and 2 pairs of steam pipe. It is suitable for the shrinking of the cap machine and lower speed machine. l SP-2M: The length of the machine is 2000mm, which adopts SUS stainless steel mechanism and 3 pairs of steam pipe. It is suitable for the shrinking of the long type containers and higher speed machine.

n <steam blower> Blower: Use to discharge the steam from the shrinking tunnel, the model is 3&370W 380V. l The order of the machine switch on open the intake valve open the conveyor belt switch and the fans switch open the sewage valve switch, after the discharge all the sewage, close the valve switch. adjust the nozzle gas volume and the fans air volume of the shrinking tunnel, if be set beforejust need to verify them. start shrinking when open the machine for one minute and the temperature of the tunnel is stable. l Adjustment According to the picture (1) Adjust the position of the 3 pairs of the gas ejector pipe according to the position of the bottle label. (2) Cylindrical type bottles, like the left picture.

3Other bottle types,the nozzle adjustment is like the left picture. And shrink the label from the bottom to the top according to the largest bottle diameter. 1Nozzle valve: 2Intake pipe: 3Sewage valve: Adjust the flow volume from the steam and control it. The pipe for steam enter usually connects the 1/2 pipe port. The 1/4 pipe port is usually blocked. After the daily operation close the steam port, open the sewage valve to discharge the Condensate.

l Shutdown procedures open the steam intake valve open the condensate valve for 2 minutes stop the conveyor belt switch stop the fans switch stop the sewage valve Safety points for attention n Be care of the thermal injuryheat energy is used in this area; please avoid the bodies touch to avoid the scald. n The machine use high-currentbe care of the electrics safeties. n Avoid the debris into the machine. If have, remove it to avoid charred and attachment to keep shrink quality. n Don t put the shrinking materials onto the machine to avoid them deformation. n The maintenance of circuit is only for verifying and maintenance. Don t change the circuit. We are not liable for the maintenance. n Please contact and ask our engineer department for help if it is necessary for you to change the machine s hardware and software. n Our company reserves the right to modify the machine and the manual.