Option A FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL. SR 836/I-395/I-95 Project

Similar documents
I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Lindsey Beane. Executive Summary

New Stanton Project Update July 3, 2012

I-90 Mississippi River Bridge & Interchange Project

Cleveland Innerbelt Bridge / Central Viaduct Cleveland City Planning Commission October 2, 2009

FDOT D4 Complete Streets

V. Gateways GATEWAYS / V-1

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

SR 916/NW/NE 135 Street Public Hearing

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

PROPOSED IMPROVEMENTS

Bridge Type Assessment and Evaluation

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

Beckett Bridge Replacement (Design) Riverside Drive from west of Chesapeake Drive to Pampas Avenue

Building Exterior Lighting Grant Program. Applications will be reviewed April 1, July 1 and October 1, 2019

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

5.7.6 St Peters Interchange Portal

County of Loudoun. Department of Planning MEMORANDUM. SUBJECT: ZMOD , Dulles North Business Park Comprehensive Sign Plan, 2 nd Referral

1 st now. Design Elements. iii STREET TREES PATTERNED CROSSWALKS SPECIAL SIDEWALK PAVING. First Street ELEMENTS TRANSIT SHELTER / LANTERN

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

TRANSPORTATION COMMITTEE

Welcome to the Sellwood Bridge Project Pre-Construction Open House

Sidewalks Street Lights

INNERBELT BRIDGE PUBLIC MEETING #2

Othello Neighborhood Design Guidelines

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

13. New Construction. Context & Character

COMMERCIAL DESIGN REVIEW APPLICATION

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

10/18/2010. Today s presentation will focus on what the construction engineer can do to help deliver a successful bridge project

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

New Auburn Village Center Study Auburn, Maine

APPENDIX A: Willamette River Bridge Survey

Downtown Cleveland Alliance/Tremont

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

Policies and Code Intent Sections Related to Town Center

Building & Site Design Standards Application

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009

An exciting lighting tour of Japan: Experience how Japan utilises lighting design and technology into city lighting projects

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager

Supporting our communities. Bridges

To submit comments: Public Art Installation // Fairport Public Art Trail

STOREFRONT DESIGN CRITERIA MANUAL

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

/05 Architectural Response

Request for Proposals For the purchase and redevelopment of Cityowned property in the Historic Downtown. 109 South Boyd Street

CENTRAL CITY NEIGHBORHOOD Site Plan and Design Review Guidelines Checklist

MAY 19. garden of glass featuring the samples

ARCHITECTURAL DESIGN REVIEW ORDINANCE DESIGN GUIDELINES DECEMBER 2000 PREPARED FOR THE MEREDITH PLANNING BOARD BY CHRISTOPHER P. WILLIAMS, ARCHITECTS

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

The University District envisions, in its neighborhood

This Review Is Divided Into Two Phases:

GUIDING PRINCIPLES IN THIS CHAPTER

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Public input has been an important part of the plan development process.

Campus Outdoor Lighting Plan

The Ambassador Bridge/ Gateway Project

Victoria Bridge Municipal Class EA Civic Works Committee

May 11, Re: Draft Environmental Impact Report for 6250 Sunset Project, ENV EIR. Dear Mr. Ibarra,

RA1.01. Project Description:

Project Purpose. Project Need

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Roosevelt Station: Transit-Oriented Development. Workshop #3 - February 22, 2017

Lighting Design Criteria: Codes and Standards

DRAFT Subject to Modifications

SR 483 Clyde Morris Boulevard FDOT District 5

THE SECRET LIFE OF OBJECTS

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

STAFF BRIEF. Design Guidelines for Lower Downtown Historic District, Appendix A: Standards and Guidelines for Signs (2014), pg.

Chapter 11. Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE 11.3 SITE PLANNING GUIDELINES 11.2 GENERAL DESIGN OBJECTIVES

Trotwood Branch Library Project Details for Artists Open To: Commission Amount:

DRAFT DESIGN GUIDELINES

INSTITUTIONAL USE DESIGN COMPATIBILITY TECHNIQUES

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Cities are dynamic and ever changing places with buildings, infrastructure and outdoor spaces constantly being improved and buildings replaced.

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Open House Wellesley Station Second Exit Construction Update and Public Art Concept

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued.

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

District Design Guidelines - Cultural District

TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

Glen Road Pedestrian Bridge Environmental Assessment

CREATE A VIBRANT MIXED-USE COMMUNITY

MAIN STREET DESIGN GUIDELINES CONTEXT

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Transcription:

ELECTRONIC COPY AESTHETIC VOLUME 2 2.28.17 APPROVED SIGNATURE BRIDGE PACKAGE, APTES, AND SIGNATURE BRIDGE RELATED ATCS SR 836/I-395/I-95 Project Florida Department of Transportation District 6 & Miami-Dade Expressway Authority Miami-Dade County Financial Project Numbers: 251688-1-52-01, 429300-2-52-01, 423126-2-52-01, 423126-1-52-01, 251688-1-56-02 Federal Aid Project Number: 3951-501-I, 0951-685-I MDX Work Program Number: 83611 Contract Number: E-6J53

FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL Option A SR 836/I-395/I-95 Project Florida Department of Transportation District 6 & Miami-Dade Expressway Authority Miami-Dade County Financial Project Numbers: 251688-1-52-01, 429300-2-52-01, 423126-2-52-01, 423126-1-52-01, 251688-1-56-02 Federal Aid Project Number: 3951-499-I MDX Work Program Number: 83611 Contract Number: E-6J53 6.20.16

Signature Bridge OPTION A A SIGNATURE ICONIC BRIDGE FOR MIAMI INSPIRED BY THE PERFORMING ARTS This Signature Bridge design is a functional bridge sculpture inspired by dance as a contemporary form. The bridge is art performing outside the Adrienne Arsht Center for the Performing Arts (Arsht Center). There are two gateway pylons, one for the eastbound bridge and one for the westbound bridge. The dramatic pylons of the cable-stayed bridges are positioned as reflective pairs at the boundaries of NE 2nd Ave. and Biscayne Blvd., creating openness and light for expansive urban green space. The orientation and positioning of the signature pylons complement the surrounding built environment. With the westbound bridge pylon closer to NE 2nd Ave., the bridge cable stays draw visitors in to the entrance of the Arsht Center - a focal point. The one-of-a-kind cable-stayed pylons are 350 ft. tall sculptures of inwardarching sweeping curves. The arms intersect the deck and provide a special driver s gateway. Below the deck, the sweeping curves extend to the ground for a gateway inviting pedestrians to the Arsht Center on one side and the Frost and Perez Museums on the other side. These gateways offer unique pathways for the urban landscape experience. There are many exciting views from multiple vantage points that creates a vibrant interest and movement. As the slender arm of the pylon extends upward to receive the cablestays, a dynamic 3-dimensional cable arrangement unfolds enhancing the energy connection to the sculptural design. The fan arrangement of eleven stays on each side of the pylon create an exciting pass through experience for drivers. Elegant and slender structural elements are made possible through the use of an innovative cable-stayed system that carries the cable-stay bundles continuously through each pylon where they are symmetrically anchored to the deck. This design supports a 980 ft. suspended superstructure that floats across Biscayne Blvd. and NE 2nd Ave. where it connects with slender singular curved piers. At the top of the pylon is an angled and elongated diamond shaped glass feature that houses an aviation beacon and LED lighting for an array of color. There is a rotating translucent ring at the top of the shorter pylon leg. The ring tells a story to those watching as the movement is correlated to the rhythm of music, wind, traffic volumes, weather or other patterns of interest. The pylon is made of smooth white concrete with white stays emphasizing the contemporary shape by day and the spirited colorful aesthetics created by lighting at night. The white concrete superstructure is a custom made closed box section of curved flat planes and uniform depth. This shape by its nature and concrete material will provide the quietest space possible below. The curved and tapered superstructure provides an organic shape that enhances the light under each bridge. A vertical clearance exceeding the RFP requirements makes up a majority of the alignment. There is a symbiotic relationship between the sweeping curves of the organically shaped pylon and the sweeping curves of the superstructure shape and bridge roadway layout. The transition spans of the superstructure continue with the same concrete cross section as the cablestayed spans allowing it to blend into the box girder shape of the expanding roadway. The horizontal and vertical transitions from the approach spans to the signature bridge occur entirely within the transition spans with smooth and gradual transition of the superstructure shape. The slender concrete piers blossom from the ground with layered sweeping curves and openings at the top. The visual aesthetic ties both the urban garden space and the vertical arches of the pylon together SIGNATURE BRIDGE FEATURES RFP REQUIREMENTS Pylon Height 250 min. 350 Signature Bridge Suspended Length Total 500 min. 980 Signature Bridge Vertical Clearance Separation of Signature Structures- NE 2nd Ave. Cable-Stay Height of Top Cable Distance from Arsht Center to Edge of Westbound Bridge at NE 2nd Ave. Number of Piers East of NE 1st Ave. in contemporary shaping. The white smooth texture continues the rhythm of color and style in a family of design elements. At night, light seeks to reveal the supple nature of the pylon s form by balancing soft surface illumination with a more dramatic revelation of the upwardly thrust, cable engaged arm. The internally lighted ring is a dynamic center point, evocative of the movement of dance. When lighted actively with changing color, the cables take on a gossamer feel and can flutter with movement in the night. This one-of-a-kind, Signature Iconic Bridge will be recognized worldwide as the symbol of Miami s vibrant energy and international culture. It will be the symbol of Miami s magical charm that stirs our souls in the colorful rhythm of life. Miami is a place of celebration and in the joy of celebration, we dance. SIGNATURE BRIDGE OPTION A ENHANCEMENTS BEYOND RFP REQUIREMENTS SIGNATURE BRIDGE ENHANCEMENTS 23-6 at Biscayne Biscayne Blvd.: 23-6 NE 1st Ave.: 37-1 NE 2nd Ave.: 34-7 45 min. 133 190 min. 329-5 top cable 200 min. 200 to edge of bridge 220 to edge of roadway 23 10 piers for maximum openness ENHANCEMENTS Deviations from the Contract Documents and Alternate Technical Concepts (ATCs) submitted/in process. Many enhancements were designed into this Signature Bridge for Miami including greater height, longer suspended span length, fewer piers and expansive open green spaces. The Signature Bridge enhancements table highlights these enhancements next to the required criteria for comparison. The following is a description of the ATCs that are submitted or in the process for these enhancements. SIGNATURE BRIDGE ALIGNMENT GEOMETRY The alignment geometry for this Signature Bridge is part of ATC- FAM-001 395 ATC 1: EB and WB Alignment Greatest Spread at the Arsht Center. This achieves the required 200 ft. distance of the I certify that the Signature Bridge and Transition Span depicted in the renderings are dimensionally accurate to +/- 3 ft. for the cable layout, apex height, minimum height of highest cable attachment to pylon, suspended span length, total signature bridge span length, bridge pier/pylon locations and to within 10% difference on rendered member sizes. I certify that sufficient preliminary engineering has been performed to ensure the viability of this Signature Bridge Option being proposed. W. Denney Pate, P.E. Design Structures Engineer of Record (Signature Bridge), FIGG Signature Bridge architect, FIGG bridge from the Arsht Center along NE 2nd Ave. while also creating the greatest openness between the eastbound and westbound bridges. The eastbound bridge is further away from the Arsht Center than in the RFP concept plans. This 310% increase in open green space will be part of a transformative urban design that invites the community to celebrate the performing and visual arts. This layout has been shared with the Arsht Center and Miami-Dade County including our design-build team s commitment to develop a plan that achieves their desired parking. As part of this alignment, Ramp D-1 and G have been combined and relocated within the existing alignment of Ramp D. This provides for safer pedestrian mobility between Museum Park and the Arsht Center and opens up three acres of green space to the local community. Additional information is being prepared to address FDOT comments on this ATC. Signature Bridge Commitment Statements SIGNATURE PIER SHAPE The thematic sculptural pier shapes shown for this Signature Bridge will be submitted as an ATC. The organic curved shaping was designed to complement the sweeping vertical arches of the pylons. The contemporary styling follows the philosophy outlined in the Aesthetics Manual Guidelines. PIER LOCATIONS The pier layout shown for this Signature Bridge will be submitted as an ATC. In the three block area in front of the Arsht Center, the bridge features 10 piers. This is a reduction of 13 piers (56% fewer piers) from the RFP concept plans. Directly in front of the Arsht Center are two pylons which suspend the bridge superstructure over the full block without any piers between NE 2nd Ave. and Biscayne Blvd. By touching lightly on the land with fewer piers, the open space and light maximizes creative urban design for community events, parking and pedestrian connectivity. The Signature Bridge design meets all of the Department s design objectives including the provisions for additional I-395 mainline capacity for improved mobility, a Signature Bridge span over Biscayne Blvd., satisfy all Department commitments, and implementation of the philosophy on bridge aesthetics per the Aesthetics I certify that all levels of illumination shown on the lighting sheets for the Signature Bridge Option being proposed are viable. I certify that all nighttime time renderings illumination ion Manual. levels are shown accurately. For the color lighting shown on the Team Templates I certify that the renderings are shown accurately consistent with the fixtures being provided. W. Denney Pate, P.E. Randy Burkett, FIALD, IESNA, LC Design Structures Engineer of Record Lighting Designer (Signature Bridge), FIGG Randy Burkett Lighting Design, Inc. 1

Aesthetic Signature Bridge Aesthetic Signature Bridge Renderings

Template e 1 - Biscayne NB, Daytime

Template e 1 - Biscayne NB, Nighttime

Template e 2 - Biscayne SB, Daytime

Template e 2 - Biscayne SB, Nighttime

Template e 3 - Birdseye, Daytime

Template e 3 - Birdseye, Nighttime

Template e 4 - I-395 EB, Daytime

Template e 4 - I-395 EB, Nighttime

Template e 5 - I-395 WB, Daytime

Template e 5 - I-395 WB, Nighttime

Template e 6 - EB Looking West, Zone 3

Template e 7 - WB Looking West, Zone 3

Template e 8 - Arsht Center, Daytime

Template e 8 - Arsht Center, Nighttime

Team Template e 9 - Biscayne SB, Nighttime

Team Template e 10 - Between EB and WB, Daytime

Team Template e 10 - Between EB and WB, Nighttime