OPERATING MANUAL. Página 1 de 25

Similar documents
requirements can be equipped with an additional product temperature control probe, and with a printer.

541D19 SERIES. Technical Manual. A Division of Aquion Partners L.P.

T-Series Air Conditioner T15 Model

1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708)

Rules for Safe Operation

T-Series Air Conditioner T20 Model

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-214(C) Series 61 Low Water Cut-Off OPERATION

L A signature series TA T N E RE O, A L L A T S IN

SPECTRACOOL Air Conditioner. N21 Model INSTRUCTION MANUAL nvent Rev. G P/N

REVISION STATUS AMENDED PAGES. Initial release D. All

T-SERIES Air Conditioner. T20 Model INSTRUCTION MANUAL nvent Rev. C P/N

Installation, Operation and Maintenance Manual for the Potable Water System Model: PWS-01 (380 VAC Suppy x 24 VDC Controls)

O P E R A T I N G I N S T R U C T I O N S

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

Operating Manual "Mark II" Solid-State Digital Automatic Controlled Sterilizers

TH100 Three in One Instant Hot Water Tap

MDX. Non-Cycling Refrigerated Compressed Air Dryers with zero-loss Intellidrain. Operation & Maintenance Manual MODELS MDX

ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS

T-SERIES Air Conditioner. T29 Model INSTRUCTION MANUAL nvent Rev. I P/N

Wilbur Curtis Company, Inc. Service Manual WB-10 Water Boiler

OPERATING INSTRUCTIONS KSG 40/60-2 KSG 50/70-2 KSG 50/80-2 KSG 50/95-2

O P E R A T I N G I N S T R U C T I O N S

BEFORE OPERATING THE MACHINE: WARNING

Water Distiller Service Manual

GENESIS Air Conditioners. All Models INSTRUCTION MANUAL nvent Rev. K P/N

Operating Manual. Reverse Osmosis Water Purifier. MELAdem 55

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63

T-SERIES Air Conditioner. T43 Model INSTRUCTION MANUAL nvent Rev. I P/N

CH250 AND CH251 CHILLERS

SMARTBOOST IMPORTANT SAFETY INFORMATION

DOMESTIC STEAM GENERATOR Installation Instructions

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL TANKBUDDY IMPORTANT SAFETY INFORMATION

MW001 Integrated Dishwasher. Manual for Installation, Use and Maintenance

T-Series Air Conditioner T53 Model

Series 47 and 247 Mechanical Water Feeders. Series 47-2 and Combination Mechanical Water Feeder/Low Water Cut-Off ! WARNING

T-SERIES Air Conditioner. T50 Model INSTRUCTION MANUAL nvent Rev. F P/N

Installation Manual CARBONATOR With Plain-Water Booster

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

MDX. Non-Cycling Refrigerated Compressed Air Dryers with zero-loss Intellidrain Drain Trap. Operation & Maintenance Manual MDX MODELS 18 THRU 250

PO Box 827 Hawley, MN (218) Fax (218)

HEATLESS DESICCANT AIR DRYER INSTRUCTION & MAINTENANCE MANUAL

SX-300 SX-500 SX-700

Operating and assembly manual: Electric instantaneous flow heater Admiral

CHAMPION PUMP OWNER S MANUAL

STEAMPRO. Steam Generator Troubleshooting and Service Guide

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL AUTOBOOSTER IMPORTANT SAFETY INFORMATION

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C)

Installation, Operation, and Maintenance Manual RTE14S & RTE14S-2. For the Taco Bell "Rethermalizer" Model Numbers

PROAIR Air Conditioner. CR23 Model INSTRUCTION MANUAL nvent Rev. D P/N

USER S MANUAL. Heat Recovery Ventilator. Vents Brig HRV 200 Vents Brig HRV 300

Control Panel For Water Wash Hoods AM2

Installation/Service Manual. Slow Exhaust Autoclave

2 INSTALLATION OPERATION TECHNICAL SPECIFICATIONS COMPONENTS FUNCTIONS REPAIR Series TS14/TDS14/PL138

Dual Column Dehydrating Breather Manual

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16

EBAC MODEL WM150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Installation & Operation

CHILLER. Model CH3000. Operator s & Installation Manual

Slim Line Service Manual

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

Installation and Operating Instructions

PROAIR Air Conditioner. CR29 Model INSTRUCTION MANUAL nvent Rev. I P/N

CODE MODEL TYPE PRESS 60 N 616 T PRESS 60 N 616 T80

Model 7500EB Portable Eyewash with Heater

Installation, Operation and Maintenance Manual

SuperKlean Washdown Products

Sanitaire. Owner s Guide. 10 GALLON Box Extractor SC6088 Series IMPORTANT

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

WILKERSON MODELS DE3, DE4 AND DE5 COMPACT HEATLESS AIR DRYERS

HEATEC TEC-NOTE. Operation and maintenance Heatec thermal fl uid heaters industrial series IMPOPRTANT NOTICE! CONTENTS. Publication No.

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Installation & Operating Guide

Laing Thermotech. Autocirc The Instant Hot Water Pump Models E1-BCANCT1W-06 and E1-BCANRT1W. Installation & Operating Manual

ECONO FLO 2.7HP VARIABLE SPEED PUMP OWNER S MANUAL

Technical Specifications. Schedule 6(i) Electric operated Autoclave (2 Drum)

INSTRUCTIONS CertoClav EL

Rapid Heat Sterilizers with 6, 8, and 12 Minute Sterilization Cycle Times

INSTALLATION MANUAL. Domestic hot water tank with option kit for air to water heat pump system EKHWSU150B3V3 EKHWSU200B3V3 EKHWSU300B3V3 EKUHWB

VERTICAL HIGH OUTPUT VHC-IOM INSTALLATION AND MAINTENANCE INSTRUCTIONS VHC INSTALLER MUST BE A TRAINED, EXPERIENCED SERVICE TECHNICIAN

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

Forced draught gas burner

Food Waste Disposer Instruction Manual

Cordless Water Kettle LD-K3030A User Manual

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Zip Econoboil. On wall boiling water. Installation instructions & user manual. Model number: ,

SCHWAN INSTALLATION GUIDE

OWNER S MANUAL. Vintage Classic HEAT COOL models. Proudly Made in the USA

SAFETY AND OPERATING MANUAL

LABOKLAV. Autoclaves Made in Germany

CONTENT PAGE INFORMATION INSTALLATION BREWER SETUP BREWING CLEANING KEY BREWER GRINDER MANUAL MODE DILUTION GRINDER MODE PACKS MODE

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

KEEP FOR FUTURE REFERENCE 1 SCFM NOMINAL AIRFLOW SINGLE VACUUM SYSTEM DC-VOLTAGE POWER SYSTEM WITH MANUAL VALVE

PROAIR Air Conditioner. CR43 Model INSTRUCTION MANUAL nvent Rev. H P/N

IMPORTANT SAFETY INSTRUCTIONS EC-AG1-25 EC-AG1, EC-AG2 SAVE THESE INSTRUCTIONS.

TECHNICAL INSTRUCTIONS

Forced draught gas burner

T8190A/191108AJ Heating or Cooling Thermostat/Wallplate; T8190A/Q682B Heating/Cooling Thermostat/Subbase

Power Pack Service Manual

ECONO FLO VSA 165 VARIABLE SPEED PUMP OWNER S MANUAL

Transcription:

OPERATING MANUAL Página 1 de 25 A. J. COSTA (Irmãos) Lda. 1953/2003 50 Anos ao Serviço Médico-Hospitalar Tel. Geral (+351) 214 266 500. Fax(+351)214 262 421 Tel. Dep. Com [Eliwell, Dungs] (+351)214 266 504 Tel. Assitência Técnica (+351)214 266 502 Tel. Dep. Com. Equip. Méd. Hosp. (+351)214 266 505 Tel. Aprovisionamentos (+351)214 266 503 Tel. Dep. Com. [Sihi, Busch] (+351)214 266 508. Fax (+351)214 266 506

INDEX: 1 SAFETY MEASURES... 3 2 WARRANTY... 4 3 GENERAL DESCRIPTION OF UNICLAVE 77... 6 4 UNICLAVE 77 CYCLE INSTRUCTIONS... 7 5 STERILIZATION TYPICAL DIAGRAMS... 8 6 OPERATING INSTRUCTIONS... 9 7 DIMENSION CHARTS... 13 8 INSTALLATION INSTRUCTIONS... 14 8.1 PRECAUTIONS ON INSTALLATION... 14 8.2 INSTALLATION REQUIREMENTS... 14 9 EQUIPMENT INSTALLATION... 15 9.1 ELECTRICAL CONNECTION... 15 10 MAINTENANCE... 16 10.1 MAINTENANCE SCHEDULE... 16 10.1.1 DAILY... 16 10.1.2 WEEKLY... 16 10.1.3 MONTHLY... 16 10.1.4 ANNUALLY... 16 10.2 CHECKING THE PRESSURE/TEMPERATURE RATIO... 17 10.3 VACUUM TEST... 19 10.4 TEMPERATURE CONTROLLER TEST - AT SEA LEVEL... 19 10.5 FUNCTIONING OF THE SAFETY PRESSURE SWITCH... 19 10.6 ELECTRICITY... 20 10.7 CHECKING OF THE WATER OUTAGE SAFETY DEVICE... 20 10.8 DRAINAGE FILTER CLEANING... 21 11 TROUBLESHOOTING... 21 12 LIST OF COMPONENTS... 23 13 TECHNICAL FEATURES... 24 14 SCHEMATICS... 25 14.1 MECHANICAL SCHEMATIC... 25 14.2 ELECTRIC SCHEMATIC... 25 Page 2 of 25

1 SAFETY MEASURES These instructions for use should be read prior to Uniclave 77 process of installation. In this way, not only is the machine protected against possible failure, as errors on misuse are avoided. Use Uniclave 77 solely for the referred purposes in this instructions manual. The maker cannot be held responsible for any kind of malfunction or damage caused by misuse of this equipment. The Uniclave 77 must not be installed where a risk of explosion may exist. Uniclave 77 electrical security is only guaranteed if the equipment is grounded. The maker does not take responsibility in any malfunction, failure or interruption in the ground conductor. When carrying any kind of repair work, Uniclave 77 should be unplugged from its power supply; by disconnecting its circuit breaker. Do not wash Uniclave 77 s exterior with water or corrosive/abrasive products. Do not allow children or uninformed personnel to use Uniclave 77. Page 3 of 25

2 WARRANTY All products supplied by A.J.Costa (Irmãos) Lda, are fully tested, in site, before shipment to our clients. Each machine is subject to all operational tests in our rehearsal room, during which a full set of validation cycles are performed. Any damaged component due to manufacture or assembly defect, within twelve months from the date of shipment from our factory, is covered in this warranty. All defective components should be sent to our factory for inspection and replacement. The replacement component will be sent, free from charges, to the original delivery address. The shipment of the component(s) will be carried out by postal mail or normal freight. Replaced components shall remain with A.J.Costa (Irmãos) Lda. A.J.Costa (Irmãos) Lda, assures maintenance and service, except for labor costs which are not included. We reserve the right to charge for labor and transportation costs. Maintenance and service may only be carried out by A.J.Costa (Irmãos) Lda, or by certified representatives for such services. It should be noted that sometimes there is a considerable lapse of time until the equipment s set in use, which may cause problems outside our control. It is important that the equipment remains protected and that the reservoir lids remain closed. In any other way problems and premature damage may arise caused by entry and deposition of foreign particles, dirt, dust, etc., namely in the deposits, pumps, steam generator, valves or electrical components. Regarding the installation there should be taken special precautions so to assure that the plumbing residue, filings from pipes and threads, debris from sealers or fillings, do not enter the components or fluid circuits of Uniclave 77. After finalizing all plumbing work, all the Page 4 of 25

pipes should be cleansed, by flushing pressurized water through them and into the sewer, before connecting them to Uniclave 77. Periodically determine the hardness of the water that is used in Uniclave 77 for the adverse consequences caused by lime deposits and/or foreign particles may not be imputed to A.J.Costa (Irmãos) Lda. The non-compliance to this set of precautions and basic procedures, will nullify this warranty. Page 5 of 25

3 GENERAL DESCRIPTION OF UNICLAVE 77 The vertical sterilizers, of the Uniclave 77 series, are designed for the sterilization of surgical instruments, liquids, rubber, and laboratory materials. The sterilizer is top-loaded, using specially designed steel baskets. The Uniclave 77 has variable controls that offer a range of cycles with temperatures varying between 100ºC and 135ºC and sterilization times between 0 and 120 minutes. Drying is improved by vacuum produced by thermal shock, using the water coil or by slow exhaust. Manufacture is standardized with two cylindrical sterilization chambers of 45 x 80 cm and 50 x 80, diameter x depth respectively (usable areas). The electric connection can be 3-phase (400 VAC) or 1-phase (230 VAC). The chamber and lid as well as the front and side panels are constructed in stainless steel. The lid is closed by means of several stainless steel screws and threaded handles. The hermetic sealing between the chamber and the lid is achieved by the compression of a silicone rubber ring. In all the sterilizer models constructed by A.J.Costa (Irmãos) Lda, the sterilizing chambers are tested both hydraulically and with steam during assembly. Page 6 of 25

4 UNICLAVE 77 CYCLE INSTRUCTIONS The vertical sterilizers of the Uniclave series are used in the sterilization of a wide variety of materials like surgical instruments, rubbers, plastics, laboratory material, etc. The use of Uniclave 77 in a laboratory should be performed by qualified technicians or by the direct supervision of a qualified technician, likewise should be this technician to establish the appropriate parameters for each material or load type. A.J. Costa (Irmãos), Lda recommends that the following parameters be used for the sterilization of typical loads: Thermo-sensitive materials (rubber, plastic, diathermy pencils) - Sterilization temperature: 121º C - Minimum sterilization time of 20 minutes - The drying procedure should be executed as specified in Operating instructions The total time of this sterilization cycle is approximately 60 minutes. Surgical instruments - Sterilization temperature: 134º C - Minimum sterilization time of 5 minutes - The drying procedure should be executed as specified in Operating instructions The total time of this sterilization cycle is approximately 45 minutes. Page 7 of 25

5 STERILIZATION TYPICAL DIAGRAMS TYPICAL DIAGRAM FOR THE STERILIZATION OF SURGICAL INSTRUMENTS TYPICAL DIAGRAM FOR THE STERILIZATION OF LABORATORY UTENSILS Page 8 of 25

6 OPERATING INSTRUCTIONS Front and rear view of Uniclave 77 6 11 4 3 5 10 7 8 9 1 2 Front View Rear View 1 - Sterilizer drain 3/4 thread 6 - Thermal switch with display 2 - Water inlet connection with flexible hose to 3/4 Male with shut off valve 7 - Three position switch 8 - Indication lights 3 - Power supply 9 - Condenser water tap 4 - Pressure/vacuum gauge 10 - Drying water tap 5 - Timer 11 - Drain tap Page 9 of 25

Operating instructions: 1. Make sure the DRAIN and DRYING taps are tightly closed. 2. Fill the sterilizer with water 2 cm above the level of the central resistance. Demineralised or distilled water is recommended. HEATING ELEMENTS WATER OUTAGE SAFETY DEVICE PROBE DRYING COIL TEMPERATURE PROBE DRAIN Inside view of Uniclave 77 chamber 3. Load the sterilizer with the material to be sterilized. 4. Close the lid of the sterilizer, by screwing the threaded handles. Page 10 of 25

5. Set the required sterilization temperature, on the temperature controller and indicator, located on the control panel. 6. Turn the three position main switch to the ON position. The green indicator ON will light and a buzzer will sound. 7. Turn the clock to the required sterilization time. The buzzer will stop and the resistances will start to heat up. 8. Open the CONDENSER tap slightly (just enough to condense the steam entering the drain). 9. As soon as the required sterilisation temperature is reached, the red indicator STERILIZATION will light and the sterilization timer will start counting. 10. At the end of the sterilization time, the buzzer will sound. Turn off the three-position switch to 0 and the indicator lamps will go off. Slowly open the DRAIN tap. 11. Before the pressure vacuum gauge, located on the control panel, shows 0 bar, the CONDENSER tap should be closed. Immediately afterwards, when 0 bar is reached, close the DRAIN tap and open the DRYING tap for water to run in the coil for a period of ± 20 min. (drying time). 12. At the end of the fore mentioned period, proceed as follows: 1. Close the DRYING tap. 2. Loosen the threaded handles that tighten the lid. 3. Turn the three-position switch to VACUUM BREAK position. 4. Open the lid, when the pressure vacuum gauge indicates 0 bar. Page 11 of 25

Notes: In case of laboratory sterilization cycles, the drying phase may be not required. Simply ignore instructions 11 and 12. At the end of the sterilization cycle proceed as in 12.2,.3 and.4. For very long sterilization cycles (laboratory), the input of water must be increased. The difference between the required temperature and the attained temperature is ± 2 C. The sterilization time is pre-programmed by the operator and automatically controlled. The drying time is controlled solely by the operator. Page 12 of 25

7 DIMENSION CHARTS Dimensions of the sterilizer Uniclave 77 and sterilization chamber. 1 - Sterilizer drain 3/4 1A - Installation Drain 1 1/2 female at ground level 2 - Water connection flexible hose to 3/4 M tap on the wall 3 - Power supply Chamber (Usable Dimensions [mm]) Ø 45 x 80 Ø 50 x 80 H (max) 1250 L (max) 790 P (max) 1000 A 75 B 175 C 100 D 930 Page 13 of 25

8 INSTALLATION INSTRUCTIONS The equipment installation should be accomplished with the help of the installation drawing, which indicates the service area and the necessary connections of the equipment. 8.1 PRECAUTIONS ON INSTALLATION It s important to verify the safety regulations concerning the legal requirements on your country regarding electric installation, pipefitting, drains, or any requirement specially connected with the installation of this type of equipment. 8.2 INSTALLATION REQUIREMENTS Prior to the installation of the Uniclave 77 be sure that all the necessary connections to the equipment s correct functioning are available, for that purpose consult the installation drawing. For the installation of the Uniclave 77, the following connections must be available: Drain pipe, 1 ½ `` female connection at ground level Electricity box at 1000 mm above the ground. 3-phase cable or 1-phase cable (according to the selected model) capable of supporting 400 V AC or 230 V AC 50 Hz + Neutral and Ground (3x2,5+N2,5 ) with power supply according to the model, and a differential protection of 300 ma. Page 14 of 25

9 EQUIPMENT INSTALLATION When assembling the 3/4 brass elbow (A) to the drain of the sterilizer, it is recommended that: - Hold the tube (1) with a pipe wrench so that the tubing inside the machine is not twisted. - Screw the elbow as shown by the arrow (2). Note: Make sure that minimum space for use and technical support is guaranteed. Make also sure that the Uniclave is levelled. 9.1 ELECTRICAL CONNECTION Make sure that the voltage, current, power supply and frequency characteristics are compliant with your country electrical output. To increase safety we advise connecting your equipment to a differential protection circuit with a nominal current of 300mA. Note: Electrical connections should always be performed by a qualified technician. Page 15 of 25

10 MAINTENANCE 10.1 MAINTENANCE SCHEDULE 10.1.1 Daily Clean external panels with special cleaning product for stainless steel. Clean internal chamber with special cleaning product for stainless steel. 10.1.2 Weekly Check that indicating lamps are working. Check Pressure/Temperature ratio during sterilization. 10.1.3 Monthly Perform a vacuum test. Clean drainage filter. Test temperature controller. Lubricate handles with non-melting grease ( Spanjard Non-Melting Grease ). Clean, check and replace purger, if necessary. 10.1.4 Annually Check bacteriological filter and replace it Check safety Pressure Switch operation Measure electrical supply in each phase Measure earth current Check, clean and lubricate or replace if necessary: - Electromagnetic valves - Safety valve - Drainage valve Page 16 of 25

Replace seals on both condensation and drying valve Replace lid gasket Check the water outage safety device Replace the purger ADVICES 1- If a problem occurs, the first step is to check the necessary elements for the correct functioning of the equipment: whether they are in working order or faulty. E.g.: Power supply, water... 2- Faults detected in the functioning of a component should be corrected. E.g.: valves, filters, pressure switch and thermostat. 3- Tubing should be checked for possible leaks. E.g.: drainage tube, steam... 4- The operating instructions should be followed. 5- In case of Maintenance Procedure, some tests, which may facilitate the diagnosis of faults, are described. E.g.: Vacuum test, test of pressure / thermostat 10.2 CHECKING THE PRESSURE/TEMPERATURE RATIO This ratio check should be carried out in accordance with the table below (the table refers to absolute pressures. 1 bar should be added to the pressure as read on the chamber s gauge). E.g.: When the pressure shown on the gauge is 1,1 bar, the absolute pressure is approximately 2,1 bar and the temperature should be 121ºC. Page 17 of 25

PRESSURE/TEMPERATURE RATIO TABLE C K BAR C K BAR 70 343.15 0.3116 110 383.15 1.4327 71 344.15 0.3253 111 384.15 1.4815 72 354.15 0.3396 112 385.15 1.5316 73 346.15 0.3543 113 386.15 1.5832 74 347.15 0.3696 114 387.15 1.6362 75 348.15 0.3855 115 388.15 1.6906 76 349.15 0.4019 116 389.15 1.7456 77 350.15 0.4189 117 390.15 1.8039 78 351.15 0.4365 118 391.15 1.8628 79 352.15 0.4547 119 392.15 1.9233 80 353.15 0.4736 120 393.15 1.9854 81 354.15 0.4931 121 394.15 2.0492 82 355.15 0.5133 122 395.15 2.1145 83 356.15 0.5342 123 396.15 2.1816 84 357.15 0.5557 124 397.15 2.2504 85 358.15 0.5780 125 398.15 2.3210 86 359.15 0.6011 126 399.15 2.3933 87 360.15 0.6249 127 400.15 2.4675 88 361.15 0.6495 128 401.15 2.5435 89 362.15 0.6749 129 402.15 2.6215 90 363.15 0.7011 130 403.15 2.7013 91 364.15 0.7281 131 404.15 2.7831 92 365.15 0.7561 132 405.15 2.8670 93 366.15 0.7849 133 406.15 2.9528 94 367.15 0.8146 134 407.15 3.041 95 368.15 0.8453 135 408.15 3.131 96 369.15 0.8769 136 409.15 3.223 97 370.15 0.9094 137 410.15 3.317 98 371.15 0.9430 138 411.15 3.414 99 372.15 0.9776 139 412.15 3.513 100 373.15 1.0133 140 413.15 3.614 101 374.15 1.0500 141 414.15 3.717 102 375.15 1.0878 142 415.15 3.823 103 376.15 1.1267 143 416.15 3.931 104 377.15 1.1668 144 417.15 4.042 105 378.15 1.2080 145 418.15 4.155 106 379.15 1.2504 146 419.15 4.271 107 380.15 1.2941 147 420.15 4.389 108 381.15 1.3390 148 421.15 4.510 109 382.15 1.3852 149 422.15 4.634 Page 18 of 25

10.3 VACUUM TEST Switch the sterilizer off with the chamber at a vacuum of -0,9 bar and wait for one hour. If, past that time, the pressure in the chamber is not between -0,9 and -0,85bar, this will indicate that there is a leak in the chamber or in one of its components. - Drainage valve - Electromagnetic purging valve - Electromagnetic airing valve - Safety valve - Gasket sealing - Connections pieces 10.4 TEMPERATURE CONTROLLER TEST - AT SEA LEVEL Fill the sterilizer with water 2 cm above the level of the temperature controller probe element. - Set the controller to 110ºC - Switch on the sterilizer (With the lid open) and wait for the water to start boiling. CONCLUSION: The temperature inside the chamber at this point is 100ºC and the temperature controller should indicate between 98 and 102ºC. This is only valid at sea level. 10.5 FUNCTIONING OF THE SAFETY PRESSURE SWITCH Raise the pressure inside the chamber and check that the pressure switch works at a pressure of 2,5 bar 138ºC. Page 19 of 25

10.6 ELECTRICITY Place an Ammeter on the measuring point. The following are acceptable values: 3F-230V-6000W / 3F-400V-6000W R - 8 a 10 Amperes 1F-220V-6000W R - 26 a 28 Amp S - 8 a 10 Amperes T - 8 a 10 Amperes GROUND Up to 300 ma This test can also be carried out using a pincer type Ammeter. 10.7 CHECKING OF THE WATER OUTAGE SAFETY DEVICE Fill the sterilizer without fully covering the central heating element (about ½ covered) and switch it on, following normal procedure. The device should operate under these circumstances, and the central blue button should be triggered. The device can only be rearmed after cooling down, by pushing in the blue button with a screwdriver. Page 20 of 25

10.8 DRAINAGE FILTER CLEANING 2- Retaining trap of impurities 3- Lid seal 4- Large lid Periodically remove the filter lid (4), with dirt retaining mesh (2), wash thoroughly and reassemble replacing the lid gasket (3). If the mesh (2) is damaged, replace it with a new one. Page 21 of 25

The Autoclave does not switch on The required pressure is not reached or takes too long Termination of sterilisation is not Signalled Water does not drain away Temperature and pressure do not correspond Abnormal Drying (Weak vacuum) Leakage of Lid Seal One or more circuit breakers are triggered 11 TROUBLESHOOTING MALFUNCTION CHECK Electrical circuit x x x Drainage Valve and Filter x x x Pressure switch and thermostat x x Purging Valve and Purifier x x x Heating Elements Safety valve "Shortage of Water" Indicator light ON Buzzer x x x x Vacuum gauge x Timer Command Fuse x Perform Vacuum Test See Operating Instructions Air in Chamber during Sterilisation Test pressure switch and thermostat Lid Seal - Adjustment of Lid x x x x x x Page 22 of 25

12 LIST OF COMPONENTS POSITION ON DESIGNATION REFERENCE QUANTITY DIAGRAM F1 Command and control circuit fuse 5x20 3A 205311005003 1 D2 Automatic Safety Device 204110000160 1 P3 Pressure switch H545-25-M540 75421H54SM54 1 I4 Contact block E22B2 1350100E22B2 2 I4 Selector E22VJ1 135010E22VG1 1 EV5 Solenoid valve SCE 263A306 SCXE... 7546AE263A30 1 S7 Green ON light 2081430012VD 1 S8 Red STERILIZING light 2081430012VM 1 T9 Timer 0-2 hours 205923000001 1 B10 Buzzer SMJA - 12V 201800050480 1 RL11 Double relay 220V 208001102220 1 CT12 Thermal switch 50 to 150 ºC 031060P20151 1 CNT13 Contactor CE15BN4B 133CE15BN4B0 1 3R14 Left side heating element 2000W 8315RL204550 1 3R14 Right side heating element 2000W 8315RLD24550 1 3R14 Central heating element 2000W 8315RC204550 1 MV15 Vacuum gauge -1+5 bar [WIKA] 0963WIKAH105 1 VM16 Water valve for condenser 75510000CV3 1 VM17 Water valve for drying 75510000CV3 1 MP18 Bakelite handle 831504100000 1 PG19 Steam trap BPT 13A 754110110003 1 VS20 Spring type safety valve 1/2 75487G3CAP00 1 VM21 Manual Drainage Valve 3/4 755330000004 1 J22 Silicone lid gasket 8399PBS01010 1 FT23 Bronze Y drainage filter 3/4 753716000004 1 3DJ24 16 Amp. Circuit Breaker (3ph. 380V) 204410100160 3 3DJ24 25 Amp. Circuit Breaker (3ph. 220V) 204410900200 3 3DJ24 32 Amp. Circuit Breaker (1ph. 220V) 204410300320 1 ------ Ceramic seal for drainage valve 756VED00000 1 FT25 Bacteriological filter 0802GPB01V00 1 Page 23 of 25

13 TECHNICAL FEATURES The difference between the required temperature and the reached temperature is 2 degrees Celsius. The sterilization and drying times are programmed by the operator: Uniclave 77 Ø 45 x 80 / Ø 50 x 80 Characteristics Standard Special Special Power Supply 3F - 400VAC/50Hz 3F - 230VAC/50Hz 1F - 230VAC/50Hz Voltage (V) 400 230 230 Intensity (A) 3 x 16A 3 x 16A 1 x 32A Electric Cable 5G2,5 4G2,5 4G6 Electric Resistance 3 x 2000W 3 x 2000W 3 x 2000W CONSUMPTION Characteristics Electricity Uniclave 77 Ø 45 x 80 2 kw when heating up to 134 C 0,25 kw during the 10 minutes Sterilization at 134 C Uniclave 77 Ø 50 x 80 3 kw when heating up to 134 C 0,25 kw during the 10 minutes Sterilization at 134 C Distilled Water 11 litres per cycle 20 litres per cycle Page 24 of 25

14 SCHEMATICS 14.1 MECHANICAL SCHEMATIC The mechanical diagram has the following drawing code: 2.5710.1010 14.2 ELECTRIC SCHEMATIC The electric diagram has the following drawing code, according to the model: 1-Phase : 230VAC/50Hz - 2.5710.1020 3-Phase : 400VAC/50Hz - 2.5710.1030 3-Phase : 230VAC/50Hz - 2.5710.1040 Page 25 of 25