Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Similar documents
Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Chapter 9 Route window W18 Slough station. Transport for London

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

LOCAL PLANNING POLICY BERKSHIRE & BUCKINGHAMSHIRE ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London

Victoria Bridge Municipal Class EA Civic Works Committee

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 10. Route Window C5: Tottenham Court Road East

WELCOME TO PUBLIC INFORMATION CENTRE #2. Please Sign In

Start of works exhibition

Chapter 1. Introduction

20. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

21. GREENWICH ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In

12. Environmental baseline and assessment of impacts: Southeastern section

Slough International Freight Exchange Proposals, Colnbrook+

Welcome to the Public Consultation Exhibition

14. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 20

DESIGN OF FOOTBRIDGES

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

HOOLE ROAD BRIDGE PEDESTRIAN IMPROVEMENT AND FOOTBRIDGE FEASIBILITY REPORT

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

Key development locations along the route of the scheme are identified in Chapter 4.

Crossrail. Supplementary Environmental Statement 3. Mapping

Pedestrian and Cycle Bridge Feasibility Study Report Summary

Environmental Statement AP2 33

St. Clair Avenue West Area Transportation Master Plan

05 Baseline and Environmental Impacts: Maidenhead to Westbourne Park

CHATSWOOD TO SYDENHAM. Project Update NORTHERN SURFACE TRACK WORKS - CHANGES IN CONSTRUCTION METHODOLOGY

Appendix 2 Waterbeach Greenway Review

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Bridge Type Assessment and Evaluation

TRANSPORTATION COMMITTEE

Route Window Environmental Topic Summary of Significant Residual Impacts

In Title Your Area 10: Lower Boddington to Southam & Offchurch

Temporary Bridging. Issue 2

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

DraFt EnvironmEntal StatEmEnt

Chapter 5. Route Window C5: Tottenham Court Road Station

Public Consultation. Land at Monks Farm, North Grove. Welcome

Mavis Road Class Environmental Assessment

Meridian Water Phase 1 Application

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

Appendix 3 Horningsea Greenway Review

9. WESTMINSTER SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF

Electrifying the South Wales Mainline ABC Electrification Cardiff 26 th February 2016 Swansea 11 th March 2016

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

8. Environmental baseline and assessment of impacts: Western section

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

Euston Community Forum. 11 June Maria Fidelis School

Whitchurch Bridge Approach Road

Non-Technical Summary

Programmatic Implementation of ABC: Module 5 Public Outreach/ABC Results

UTT/16/1466/DFO GREAT DUNMOW MAJOR

Notting Hill Housing & The Development Team

Herne Hill and North Dulwich Herne Hill and North Dulwich Area Vision Map

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Public Meeting #3 May 9, 2009 MVVA Team

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

Purpose of Open House #3

PART 2 SOUTH DOWNS NATIONAL PARK AUTHORITY SECTION 1 SCHEDULE OF APPLICATION RECOMMENDATIONS

Longbridge Town Centre Phase 2 Planning Application

Feasibility study for new foot/cycle bridge across the River Tillingham

7.5 Impacts on the Section 4(f) Properties

Wednesbury to Brierley Hill Extension

Crossrail. Amendment of Provisions Environmental Statement AP4. May 2007

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

LONGDEN VILLAGE DEVELOPMENT STATEMENT

Plumstead Temporary Railway Sidings and Associated Permanent Works

The GATEWAYS Sub Area Master Plan. City of Walker

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Low Level Road Project. Canadian Consulting Engineers Award 2016

M4-M5 Link Rozelle Interchange factsheet 2017

7.4 Maintenance and Storage Facility

ONLINE PUBLIC INFORMATION CENTRE

Chapter 8: Cultural Heritage Assessment

Non-Technical Summary

Transport and Works Act 1992 Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006

Moston Vale Project development images

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety.

17A. Wind Microclimate

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

8.0 Design and Form of Development 43/

Burloak Drive Grade Separation

Roeshot & Burton SANG. Hinton Admiral Estate

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

XSW11, Plumstead Portal worksites, Interim Statement for NLBH. 1 Introduction Site Methodology and fieldwork objectives...4

South Whitehaven, Cumbria EIA

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change

Transcription:

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges Transport for London

MIDDLEGREEN ROAD, ST MARY S ROAD AND TRENCHES BRIDGES 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges 10.5 10.6 Baseline conditions Middlegreen Road bridge Middlegreen Road is an unclassified road that lies approximately midway between Langley and Slough stations in the Borough of Slough. Middlegreen Road Bridge provides a single lane over the Great Western Main Line where a signal operated contra-flow is in operation. There are no local bus services that operate a route over Middlegreen Road Bridge. Pedestrian movement over the bridge is possible using a narrow footway on the western side of the bridge; however, there are no footways on either of the approaches. Transport for London 10.7 St Mary s Road bridge St. Mary s Road is an unclassified road to the west of Langley Station, and approximately 500 m to the east of Middlegreen Road bridge. The road over the railway is open to one way traffic, controlled by traffic signals. There is a footway on the western side of the bridge allowing pedestrian movements. The bridge is in the Borough of Slough. 10.8 Currently one bus route runs along St Mary s Road from Langley Road in the south to its junction with Middlegreen Road in the north. This service runs approximately every two hours between the hours of 0800 and 1600 on weekdays and Saturdays. This service does not run on Sundays. Introduction 10.9 A recent survey showed that 122 and 33 pedestrians and cyclists respectively crossed St Mary s Bridge between the hours of 0700 and 1900. 10.1 10.2 10.3 In order to provide overhead line equipment along the Crossrail route bridge modifications will be required to: Middlegreen Road bridge; St Mary s Road bridge; and Trenches footbridge. One worksite is associated with each of the bridges: Middlegreen Road bridge worksite north; St Mary s Road bridge worksite south; and Trenches footbridge worksite north. It is expected that the construction for the three bridges will take three and a half months, seven months and 6 months respectively. 10.10 10.11 10.12 10.13 Langley Manor School is located immediately north of this Trading Estate. Trenches bridge This footbridge is to the west of Langley station and connects Alderbury Road West to the south with the Grand Union Canal to the north. Langley Trenches Footbridge is in the Borough of Slough. The bridge carries a public footpath and National Cycle Network in a north to south direction over the Great Western Main Line. It is also signed as the Colne Valley Trail for walkers and riders, however infrastructure is not particularly good for horses. A recent survey showed that644 pedestrians and 77 cyclists were observed to cross the bridge between 0700 and 1900. 10.4 The drawings provided at the end of this chapter present the main features of the route window and the assessed construction lorry routes. 10.14 Potential changes in baseline conditions Middlegreen Trading Estate is located on the north west side of the bridge. Currently lorries carrying abnormal loads have to access the site from the south side of St Mary s bridge due to junction alignment constraints. It is understood that the tenant will be moving from this site before the start of construction and it is unlikely that the new tenant will have abnormal lorry loads regularly delivered to the site. There is therefore no need to provide a temporary road bridge to ensure continued access to the Trading Estate. W17 page 3

ROUTE WINDOW W17 10.15 The permanent works Middlegreen Road bridge Middlegreen Road bridge works will take about three and half months to complete. Utilities will first be diverted across a temporary utilities bridge. The main bridge works will involve demolition of the brick arches, installation of new precast concrete arch units, in-fill and concreting over the arch units, provision of new parapets, reinstatement of track ballast, re-laying of utilities and finishing works. 10.23 This diversion has no impact for any road users, as the diversion lengths and demand are considered too low be. 10.16 St Mary s Road bridge A temporary pedestrian/services bridge will be provided before the existing bridge is demolished. Construction of the new bridge will then involve provision of the piers and the south abutment, prior to the installation of bedstone units and concrete beams. Finishing works will include the provision of bridge decks and parapets. On completion, the temporary bridge will removed. 10.17 Trenches footbridge Demolition of the existing superstructure will be undertaken, while retaining the brick abutments and piers. Bedstone units will then be cast into place before the new bridge is lifted into position and finishing works are completed. Worksite assessment (group 1) Figure 10.1: Middlegreen Road bridge worksite north 10.18 One worksite is immediately accessed off Middlegreen Road and is described below. The lorry route is shown on Map W17 (iv). 10.24 It is recommended that during the road closures, appropriate signage be used to alert road users to closures and possible diversion routes. 10.19 10.20 10.21 10.22 Middlegreen Road bridge worksite north There is one proposed worksite associated with the works at Middlegreen Road bridge. The Middlegreen Road bridge worksite north is located northwest of the bridge in an area of Bloom Park as shown in figure 10.1. Access to this site will be constructed directly from Middlegreen Road. Works at this site will require the bridge to be closed for a period of approximately five weeks. During this period pedestrians, cyclists and vehicles will need to be diverted. The vehicle diversion route from the south continues past the junction of Langley Road with Middlegreen Road to the junction with St Mary s Road. The route extends north along St Mary s Road and rejoins Middlegreen Road approximately 300 m north of St Mary s Road bridge. The total diversion is approximately 800 m. Cyclists and pedestrians will also be diverted over St Mary s Road bridge, but via a shorter route of 500 m. The route, from the south will be along Downs Road, through Springate Field on a proposed cycle route, along St Mary s Road where it re joins Middlegreen Road. There are no bus services along Middlegreen Road, and the diversion will therefore have no impact on public transport. 10.25 10.26 10.27 10.28 10.29 No traffic and transport impacts have been identified that are associated with this worksite. Lorry route assessment Lorry access to the worksite will be dependent on the bridge closures. Whilst the bridge remains open, lorries will access the worksite from the A4 London Road, Langley Road and Middlegreen Road. During the construction period when the bridge will have to be closed lorries will continue along Langley Road to the junction with St Mary s Road (approximately 1 km east of the Middlegreen junction). The route will follow St Mary s Road to its junction with Middlegreen Road, where the route continues south to the site access. Peak construction activities will occur for a period of approximately five weeks, during which time the number of lorries generated by the worksite will be eight per day. At other times the typical number of lorries will be approximately six per day. No traffic and transport impacts have been identified as a result of these lorry routes and volumes. W17 page 4

MIDDLEGREEN ROAD, ST MARY S ROAD AND TRENCHES BRIDGES 10.30 10.31 Worksite assessment (group 2) One worksite is immediately accessed off St Mary s Road and is described below. The lorry route is shown on Map W17 (iv). St Mary s Road bridge worksite south There is one worksite for the works at St Mary s Road bridge. It is located southwest of the bridge within Springate Field. An existing access on St Mary s Road will be used to access the proposed site. 10.34 10.35 10.36 Lorry route assessment Lorry access to the site will be from the A4 London Road, Langley Road and St Mary s Road. Direct access to the site will be from the existing access from St Mary s Road. Peak construction activities will occur for a period of approximately 12 weeks, during which time the number of lorries generated by the worksite will be 12 per day. At other times the typical number of lorries will be approximately eight per day. No traffic and transport impacts have been identified as a result of these lorry routes and volumes. Worksite assessment (group 3) 10.37 One worksite is immediately accessed off Waterside Drive and is described below. The lorry route is shown on Maps W17 and W16 (iv). Trenches Road bridge worksite north 10.38 There is one proposed worksite at Trenches Footbridge; Trenches bridge worksite north. This site is located to the northeast of the bridge in an area of open land shown in figure 10.3. 10.39 Access to the site will be via the industrial unit to the northeast of the bridge. A new access road will be constructed from the southwest corner of the industrial unit, along the tree line as shown above and into the southeast corner of the worksite. Figure 10.2: St Mary s Road Bridge worksite south 10.32 10.33 St Mary s Road bridge will be demolished and reconstructed on the same alignment with adequate track clearance. The replacement bridge will be the same width as the existing. Prior to demolition a temporary footbridge / cycleway will be constructed offline, to the west of the existing alignment. The temporary footbridge will ensure no disruption to pedestrians and cyclists during the construction period. On completion of the road bridge the temporary footbridge / cycleway will be removed. The road bridge will need to be closed to vehicular traffic for 10 weeks. During this time vehicles, including the local bus route, will be diverted over Middlegreen Road bridge, a diversion of approximately 800 m. This diversion will not constitute a impact to vehicle occupants or public transport users, as the diversion length is not sufficient to cause an impact. Road users will be notified prior to the junction with Langley Road and Middlegreen Road, as diverted traffic will use Middlegreen Road until it joins with St Mary s Road to the north. St Mary s Road bridge worksite south is shown in figure 10.2. Figure 10.3: Trenches footbridge worksite north 10.40 Complete demolition and reconstruction is proposed at Trenches Footbridge, located east of St Mary s Road bridge. The new bridge will be three metres wide in accordance with the W17 page 5

ROUTE WINDOW W17 10.41 10.42 10.43 10.44 10.45 10.46 10.47 recommendations of Sustrans for well-used un-segregated shared use foot/cycle paths. The footbridge will be closed for a period of three weeks. Pedestrians and cyclists will be diverted from the footbridge onto Maryside, south of the bridge to St Mary s Road bridge. On the northern side of the Great Western Main Line, the diversion follows a towpath alongside the Grand Union Canal back to the footbridge. The diversion length and duration of bridge closure are both not sufficient to cause a impact. It is recommended that during the above mentioned road closures that appropriate signage is used to alert pedestrians and cyclists to closures and possible diversion routes. No traffic and transport impacts have been identified that are associated with this worksite. Lorry route assessment Lorry access to the site will be from the A4 London Road onto the B470 High Street and Waterside Drive. During the whole construction period the number of lorries generated by the construction activities is expected to remain constant at an estimated rate of two lorries per day. No traffic and transport impacts have been identified as a result of these lorry routes and volumes. Mitigation and temporary impacts It is recommended that during road closures appropriate signage be used to alert all road users to closures and possible diversion routes to limit any impact on users during the construction period. Table10.1: Route window W17 Temporary impacts Potential impact Significance Committed Mitigation Diversion Assessment Traffic Levels and Delays to Vehicle Occupants CT1c Middlegreen Road bridge closed for five weeks, vehicle diversion of 0.8 km St Mary s Road bridge closed for 10 weeks, vehicle diversion of 0.8 km Vulnerable Road User Delay CT5b CT5c Middlegreen Road Bridge closed for five weeks, diversion of 0.5 km St Mary s Road bridge closed for 10 weeks, diversion of 0.5 km Divert vehicles over St Mary s Road bridge Divert vehicles over Middlegreen Road bridge Divert pedestrians & cyclists over St Mary s Road bridge Provide a temporary footbridge / cycleway Residual Impact Description Surveys have shown low demand Significance 10.48 10.49 In summary, there are no temporary traffic and transport impacts to report in this route window. Mitigation and permanent impacts There are no permanent impacts in this route window. Trenches Footbridge closed for three weeks, diversion of 0.5 km Public Transport Delay CT2b St Mary s Road bridge, closed for 10 weeks, diversion of 0.8 km Divert pedestrians & cyclists over St Mary s Road bridge Divert one bus route over Middlegreen Road bridge W17 page 6