PIQUA OHIO PLACEMAKING INITIATIVE

Similar documents
R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

TOWN COUNCIL / PLANNING COMMISSION

open house 3 CITY OF SALEM Downtown Streetscape Plan

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Community Design Guidelines. Port Wallace DRAFT

Public responses to the question what do you want Muscatine to be, 20 years from now? (Responses were categorized as follows)

Transportation. Strategies for Action

7-PARKS, OPEN SPACE & PUBLIC ART

Queensborough Eastern Neighbourhood Node. Community Open House

Downtown Dubuque...it s a great time.

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

4 Semi-Private & Private Open Spaces

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

Rundel Library Elevated River Terrace Reconstruction City of Rochester, N.Y. Application Number July 2017

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Urban Analysis. Downtown Zanesville like any city, has been physically modified through time as it

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

appendix and street interface guidelines

public review draft Key objectives for this chapter are:

The Project. In 2013, construction was completed between 100 Street and 102 Street.

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Planning Board Briefing

The University District envisions, in its neighborhood

Water Works: Downtown Minneapolis Riverfront Destination

A Vision for Walnut Creek

THE NEIGHBORHOOD TODAY

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

Committee Meeting: Downtown Today & Concept Refinement September 11, 2017

Johnson Street Bridge Public Realm Update

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

SOUTH UNIVERSITY Street Design Alternatives in Progress

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Village of Pemberton DOWNTOWN ENHANCEMENT INITIATIVE FRONTIER STREET PILOT PROJECT WE NEED YOUR HELP TO REVIEW THE PLAN

Dyersville Downtown Plan. Open House October 24, 2017

City of Le Sueur DOWNTOWN MASTER PLAN Town Hall, September 19, 2018

WEST LOOP DESIGN GUIDELINES CHECKLIST

Community Design Plan

Planning Board Hearing October 20th, 2016

Town Center. Block 5 Existing multifamily residential units are expected to remain.

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

OF SOUTHWEST ECODISTIRCT

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Maplewood Avenue Downtown Complete Street Project

THEMES, VISION, + PRINCIPLES

DOWNTOWN RESIDENTIAL DISTRICT DEVELOPMENT OPPORTUNITES

Potential Green Infrastructure Strategies May 6, 2015 Workshop

VEHICULAR AND PEDESTRIAN CIRCULATION

DESIGN GUIDELINES CITY OF OTTAWA

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

38 Queen s University Campus Master Plan Part 1

APPENDIX C Township 9 Consistency with Applicable Plans

NOVEMBER 2016 AARP IN ST. LOUIS & CITIZENS FOR MODERN TRANSIT PLACEMAKING STRATEGIES FOR ST. LOUIS TRANSIT DRAFT

CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

Willamette Falls Downtown District Policies and Design Guidelines

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

QUESTION 8: What are your Public Realm priorities for implementation? What would you like to see happen first? TELL US WHAT YOU THINK

10.0 Open Space and Public Realm

The Lincoln Neighborhood Corridor Plan. The LiNC

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

New Park / Entry Court & Plaza Concept Design

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

Tonight s Agenda. 7:45 p.m. Next Steps 8:00 p.m. Close

Bow to Bluff Public Realm Plan Design Update

THE 355/270 CORRIDOR:

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18

The West Vaughan Employment Area Secondary Plan Policies

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

urban design Introduction

A larger version of this map is located on the last page of this PDF.

P A I N E S V I L L E D O W N T O W N P L A N

Turn to the River PUBLIC DESIGN CHARRETTE

3.1 community vision. 3.3 required plan elements

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

City of Ennis. Downtown Master Plan Catalyst Projects

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

6. DOWNTOWN. The Downtown Element focuses on supporting and expanding the vitality and enhancement of Downtown Chico as the City s central core.

Lehigh Acres Land Development Regulations Community Planning Project

Downtown North Las Vegas Demonstration Site Project. Project Update

URBAN DESIGN + PLANNING BRIDGING COMMUNITIES

Blood Alley Square/Trounce Alley Redesign

The Master Plan Framework

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

IMAGINE CLEARWATER. Community Workshop 3. November 2016

East Bayshore Road Neighbourhood

Silverdale Regional Center

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP

Transcription:

PIQUA OHIO PLACEMAKING INITIATIVE A HANDBOOK to understanding the Placemaking Initiative for Piqua, Ohio June 15 2016 GAMBLE ASSOCIATES urban design BOOKER DESIGN COLLABORATIVE landscape architecture CITYVISIONS ASSOCIATES economic development GS&P ENGINEERING transportation planning

prepared for CITY OF PIQUA, OHIO prepared by GAMBLE ASSOCIATES urban design BOOKER DESIGN COLLABORATIVE landscape architecture CITYVISIONS ASSOCIATES economic development GS&P ENGINEERING transportation planning

The aim of this project is to redesign downtown public spaces to celebrate and enhance the spatial relationships between destinations; to create public spaces that offer an inviting public realm that contributes positively to the surrounding built environment and promotes high quality of place and quality of life experiences.

Concept sketch for connecting Lock Nine Park to the river The Great Miami River and River Trail

INTRODUCTION This Placemaking Initiative represents an implementation component of the Riverfront District Development Strategy (CityVisions Associates, 2013) and the Historic East Piqua Plan (MKSK, June 2015). The infrastructure and public space improvements directly relate to the goals of the community. The project advances a series of urban design interventions that catalyze private investment and should not be viewed merely as an open space beautification plan. The design of the spaces within the public realm downtown the former Miami and Erie canal corridor, recreational trail area, Lock Nine Park and mid-block connections - support the economic vitality of the city and fit within an overall development strategy that keeps existing businesses, attracts new activity and forges a stronger sense of place. The initiative focuses on connectivity and seamless transitions between destinations. The connection to the river needs to be enhanced in order to connect downtown to the local and regional trail system and provide non-trail users attractive new gathering points to view the river and the activities on it. The redesign effort re-establishes the link between downtown and the river by overcoming the physical characteristics of Lock Nine Park so that it may serve as the central, celebratory space that fully integrates the Great Miami River and its trail system with the downtown business district. Modifications to the levee wall in the form of widening and terracing are required to accomplish this while still maintaining the line of protection for flood control. The connection between the downtown riverfront and Historic East Piqua is enhanced through the trail system, a street extension and riverway improvements. The canal corridor increases activity between Spring and INTRODUCTION 1

Ash Streets and the riverfront, recalling the vitality that once sliced through the city along the Miami and Erie Canal. This historical connection to the heritage of the city has been lost and the improvements reconnect the city to the canal by celebrating the interface. The project allows for immersive experiences and provides hands-on connections to the past. The project s signature open space is Lock Nine Park. It is the trailhead to the local system and the 300 mile regional trail network. It offers exquisite views upstream and downstream, provides for adjacent commercial activity right atop the levee (a condition rare along the entire length of the Great Miami River) and incorporates historical artifacts of the actual (mostly buried) lock infrastructure. Through comprehensive design and infrastructure improvements such as lighting, water, landscaping treatments and public art, the pedestrian experience through downtown is amplified and celebrates Piqua s unique role as a recreational riverfront destination. FIVE FOCUS AREAS 1 2 3 4 5 Lock Nine Park Railroad Bridge Mid-Block Connections Canal Corridor Mo s Lounge 2 INTRODUCTION

Map of downtown Piqua, Ohio and five focus areas under study in this initiative 4 3 1 2 5 INTRODUCTION 3

01 LOCK 9 PARK LOCK 9 PARK 5

The revitalized Lock Nine Park includes terraced seating, a performance pavilion, spray park, and open lawn. Two tree groves anchor the open space which is designed to allow for a high degree of flexibility. When large scale events are planned for the performance area, controlled access points and greeter tents line the perimeter of the open space. Underground infrastructure enables lighting, sound systems and hook-ups for food vendors. A children s play area with water jets continues the former Miami and Erie Canal alignment north towards the Artisan Alley. Food, beverage and entertainment areas occupy spaces in the ground floors of the adjacent historic buildings that spill out onto outdoor terraces. While the existing levee wall is a barrier to a riverfront connection, with modifications it can be transformed into an asset with places to sit and view the Great Miami River. View of rehabilitated Lock Nine Park and former Miami and Erie canal alignment 6 LOCK 9 PARK

DESIGN COMPONENTS LOCK NINE PARK Open lawn Large gathering space for events Seasonal ice-skating in cold weather months Performance pavilion with stage and integral lighting and sound capabilities Terraced seating Planted / landscaped steps leading from the stage to the lower bike trail Reconfigured levee wall and regional flood protection armoring Water feature Terraced fountain along historic Miami and Erie Canal alignment Kids spray jets and artistic lighting Reuse of limestone from existing lock Interpretative signage and educational components Picnic areas Tree groves that define the Lawn with outdoor seating Terraces for entertainment and commercial activities Additional amenities Ornate rail/low wall along Water Street Pedestrian scaled lighting Electrical hook-ups for special event vendors LOCK 9 PARK 7

Arial view of rehabilitated Lock Nine Park and major activity zones Planted / landscaped steps Pedestrian scaled lighting Reuse of limestone from existing lock Terraced fountain along historic canal alignment 8 LOCK 9 PARK

Terraced seating for river overlook Tree groves Outdoor seating under shade Kids spray jets and artistic lighting Performance pavilion with roof-mounted solar panels Large gathering space for performances Ornate rail / low wall along Water Street LOCK 9 PARK 9

Park uses anticipating large-scale events Enlargement area of Lock Nine Park during a live concert performance 10 LOCK 9 PARK

Cross section of Lock Nine Park Beer garden / outdoor dining terrace Terraced fountain Planted / landscaped steps Terraced seating Performance pavilion Winter view of rehabilitated Piqua Granite and Piqua Mill buildings LOCK 9 PARK 11

02 LINEAR PARK BRIDGE RAILROAD BRIDGE 13

Ohio s Miami Valley benefits from a remarkable network of trails and bikeways and Ohio boasts over 800 river miles on 14 watercourses throughout the state. These placemaking enhancements make it easier for people walking, biking or running to negotiate the change in elevation between the downtown and the riverfront through a series of new trails, terraces, ramps and steps. Terraced steps connects the top of the levee to the lower bike path along the river and provides opportunities to enjoy the natural habitat and aquatic life. A new ramp terminates the repurposed railroad-era bridge and makes the path accessible for individuals of all abilities. New bike infrastructure and recreational amenities along the trail network grow and enhance the connectedness of the river and trails with the community and the downtown core. View towards the linear park bridge and bike trail 14 RAILROAD BRIDGE

LINEAR PARK BRIDGE Design components Removal of bridge wood decking and substructure Removal of existing railing New metal subdecking and poured-in-place concrete deck Glass block band along center span between existing trusses New steel and metal handrail with mesh infill panels Accent lighting and artistic lighting treatments Signage and wayfinding New handicapped-accessible ramp at terminus of bridge Maintenance and repairs of concrete abutments Vertical light tower as visual marker for trail and bridge RAILROAD BRIDGE 15

Current condition of Linear Park Bridge Conceptual design of Linear Park Bridge 16 RAILROAD BRIDGE

Arial view of accessibility ramp at terminus of linear park bridge Vertical light-tower as visual marker for trail and bridge Accent lighting and artistic lighting treatments Glass block band along center span New metal decking and poured-in-place concrete deck New accessible ramp New steel and metal handrail with mesh infill panels RAILROAD BRIDGE 17

03 MID-BLOCK CONNECTIONS MID-BLOCK CONNECTIONS 19

Through-block connections foster pedestrian activity between downtown destinations. They augment travel along Piqua s sidewalks rather than taking activity away by providing an alternate route to travel between destinations. The canal corridor, once the center of economic life in the city, is poised to be transformed again in the form of a shared street that allows pedestrians, cyclists and cars to share space. A variety of paving surfaces form a consistent pattern upon which pedestrian-scaled lighting and consistent signage forge a new identity for the pathways. Historic buildings, such as the Piqua Edison Electric Illuminating Company is already experiencing a rebirth. Paved surfaces are complimented with raingardens and bioswales that filter water collected off of nearby rooftops. View south towards rehabilitated Edison Building and proposed market place. 20 MID-BLOCK CONNECTIONS

MID-BLOCK CONNECTIONS Design components Integration of bioswales and stormwater retention areas New tree planting in selected areas Planting beds with native grasses and landscaping Buffer zones to surface parking Signage and wayfinding Consistent paving patterns Pedestrian-scaled lighting Light bollards Paved crosswalks across street right-of-ways MID-BLOCK CONNECTIONS 21

Proposed paving pattern 22 MID-BLOCK CONNECTIONS

Arial view of enhanced mid-block connection New tree planting in selected areas Paved crosswalks across street right-of-ways Integration of bioswales and stormwater retention areas Planting beds with native grasses and landscaping Consistent paving patterns MID-BLOCK CONNECTIONS 23

04 CANAL CORRIDOR CANAL CORRIDOR 25

Communities across the country are eager to showcase and celebrate aspects of their authenticity and uniqueness. The former Miami and Erie Canal alignment that contributed to the growth and prosperity of the community will be transformed into an inviting public space that integrates with adjoining buildings along the corridor. What were once the rear of buildings will be re-oriented to become funky front doors for artisanal studios, indoor shops and organic food markets. The canal corridor will be a shared street that allows access for service vehicles but includes a bike path to forge a stronger connection between the downtown businesses and the Great Miami River Trail. Consistent signage and wayfinding assists in repositioning the modestly-scaled buildings into active new uses. View north along former Miami and Erie canal alignment and future artisanal alley 26 CANAL CORRIDOR

CANAL CORRIDOR Design components Relocation of existing utilities and overhead power lines Integration of bioswales and stormwater retention areas New tree planting in selected areas Planting beds with native grasses and landscaping Accent lighting and artistic lighting treatments Signage and wayfinding Consistent paving patterns Pedestrian-scaled lighting Light bollards Paved crosswalks across street right-of-ways Pervious pavements CANAL CORRIDOR 27

Relocation of existing overhead utilities Cross section former Miami and Erie canal corridor Bioswales and stormwater retention areas Pedestrian -scaled lighting Signage and wayfinding Rooftop amenity Light bollards 28 CANAL CORRIDOR

Arial view of canal corridor Planting beds with native grasses and landscaping New tree planting in selected areas Integration of bioswales and stormwater retention areas Light bollards Consistent paving patterns Rooftop amenity Pervious pavements CANAL CORRIDOR 29

05 MO S LOUNGE MO S LOUNGE 31

The Piqua Place-Making initiative supports, complements and enhances the overall Downtown and Riverfront District Development Strategy. The strategy prioritized the redesign and redevelopment of Lock Nine Park and identified a number of catalytic development projects downtown and along the river that would be ideal candidates for renewal. Piqua is one of a very few locations with existing buildings on the levee itself, providing services, amenities, and magnificent river views directly on the trail system. One such building is the former Mo s restaurant. The front of the building faces Main Street and the rear of the building faces the trail. It is vitally important that the design for this building be fully integrated with the public spaces that surround it. Outdoor seating areas enliven the area on the Main Street Level. Lower level amenities like a bike repair shop or canoe put-in serve the trail. View of rehabilitated Mo s building on Main Street and enhanced access to the river 32 MO S LOUNGE

MO S LOUNGE Design components Demolition of rear/east addition Removal of tree overgrowth and underbrush Redesign of interior spaces for restaurant and dining Exterior terraces, decks and river overlook Main Street façade improvements Lower-level trail amenities Expanded trail path Signage and wayfinding Stairway connection between Main Street and Trail MO S LOUNGE 33

View of former Mo s lounge on Main Street Install new blade signage Increase transparency Install bike lane Establish new riverfront access Rehabilitate building Add street trees Demolish structure Remove underbrush 34 MO S LOUNGE

Arial view of rehabilitated Mo s building and enhanced access to the river Expanded trail path Stairway connection between Main Street and Trail Redesign of interior spaces for restaurant and dining Lower-level trail amenities Exterior terraces, decks and river overlook Removal of tree overgrowth and underbrush MO S LOUNGE 35

NEXT STEPS FOR PUBLIC REALM IMPROVEMENTS 1. Initiate Construction Documents for Riverfront Park / Lock Nine Park 2. Initiate Design Work for the former Miami and Erie Canal Corridor Downtown Ped / Bike Connector - Phase I: Water to High (including Farmers Market Public Parking Lot at Main and Water and High Street streetscape from Main to Spring including treatments at Main and High and the public square area) - Phase II: High to Greene 3. Riverwalk and Watercraft Access (including all of the existing and proposed park space from Bike Bridge south to East Main Street Bridge, and GMR to Main Street including areas between Piqua Milling and Mo s and area between Mo s and E. Main Street bridge) 4. ADA Ramp and Bridge Improvements 5. Zollinger Commons (including midblock pedestrian way north to Fort Piqua Plaza) 36 NEXT STEPS

PIQUA OHIO PLACEMAKING INITIATIVE

The Piqua Placemaking Initiative forges stronger connections between downtown and the Great Miami River 678 Massachusetts Ave. #502 Cambridge, MA 02139 www.gambleassoc.com 617 292 9912 Please refer to side sleeve for project pocket guide