Technical Assessment Guideline Applicable for the Kiwa KQ Certification Scheme:

Similar documents
GASTEC QA. Evaluation Guideline KE 191. Amendment A1 Excess flow valves. KE A1 March 2012

GASTEC QA. Evaluation Guideline KE 192. Amendment A1 Rubber materials for seals and diaphragms for gas appliances and gas equipment

GASTEC QA. Approval Requirements 31-2

GASTEC QA. Approval Requirements 31-1

GASTEC QA. Approval Requirements 15. for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas. KE 15 January 2012

GASTEC QA. Approval Requirements 200. for the GASTEC QA product certificate for fusion fittings and saddles made from Polyethylene (PE)

Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU

GASTEC QA. Approval Requirements 6

BRL-K14026/ Evaluation Guideline. for the Kiwa product certificate for Extractable shower hoses for sanitary tapware

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

BRL-K602. Datum Evaluation Guideline

GASTEC QA. Approval Requirements 136

BRL-K618/ Evaluation Guideline. for the Kiwa product certificate for Water meters

IECRE OPERATIONAL DOCUMENT

BRL-K14008/ Evaluation guideline. for the Kiwa product certificate for Cartridges to be used for sanitary tapware: Mechanical mixers

INTERNATIONAL STANDARD

Conformity assessment procedures for the Alarm Components Scheme

TECHNICAL SPECIFICATION

BRL-K629/03. Date Evaluation Guideline. for the Kiwa product certificate for. Backflow protection devices. Family E, Types A, B, C and D

GASTEC QA. Approval Requirements 69-1

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

Chief Operating Officer Giampiero Belcredi

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

INTERNATIONAL STANDARD

Evaluation Guideline. regarding the Product Certificate GASKEUR Label HR (High Efficiency, Heating):2010 for Central Heating Appliances

BRL-K774/ Evaluation guideline. for the Kiwa product certificate for Compression fittings to tighten with matching clamping device

On Electromagnetic Compatibility

BRL-K762. Datum Concept design. Evaluation Guideline. for the Kiwa product certificate for steel pipes for the transport of drinking water

Centexbel. General certification regulations. Construction products

Loss Prevention Standard

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

Kiwa Regulations for Certification in accordance with the CPR

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

INTERNATIONAL STANDARD

AUGUST 2016 CONTENTS:

Evaluation guideline. for the Kiwa product certificate for external Polyurethane Coatings on ductile iron pipes for underground installation

1. Which national directives/laws control the placing on the market of equipment for explosive atmospheres?

Testing and certification services for solar products

CERTIFICATE. AXITEC GmbH Otto-Lilienthal-Str. 5 D Böblingen ISO 9001:2008

RULEBOOK ON ELECTROMAGNETIC COMPATIBILITY

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

PART 3 REQUIREMENTS FOR SPRINKLER SYSTEMS and SPRINKLER INSTALLERS

Loss Prevention Standard

CPVC solvent cements for CPVC pipes and fittings

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034

Mauritian Standards/Amendments Published in 2013

ISO INTERNATIONAL STANDARD. Oscillation-type density meters Part 1: Laboratory instruments

PQS Independent type-testing protocol

PQS Independent type-testing protocol

INTERNATIONAL STANDARD

VDE-QT-PV001:2012/01

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

Compilation of regulatory approaches used in various countries. Information received by the Secretariat through a survey in 2009

SUPPLEMENTARY REGULATIONS SPECIFIC TO CERTIFICATION OF PERSONAL PROTECTIVE EQUIPMENT (PPE)

PQS performance specification

CERTIFICATION MANUAL FOR NF PROGRAMMES MANAGED BY EUROVENT CERTITA CERTIFICATION: GENERAL PROVISIONS

IECEE OPERATIONAL DOCUMENT

MARKING EC Directive 97/23 PED (Pressure Equipment Directive)

Evaluation Guideline

ISO/TS TECHNICAL SPECIFICATION

American National Standard for Electrical Lamp Bases Specifications for Bases (Caps) for Electric Lamps

PQS performance specification

SPCR 183. RISE Research Institutes of Sweden AB Certification SPCR

Abu Dhabi Conformity Assessment Scheme for Small-scale Solar Photovoltaic Systems

Declaration of Conformity

ISO INTERNATIONAL STANDARD

IAS Accreditation Number UL International Germany GmbH Address Admiral Rosendahl Strasse 23 Neu Isenburg Germany

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

This document is a preview generated by EVS

CERTIFICATION RULES OF THE MARK

INTERNATIONAL STANDARD

The New EMC Directive 2004/108/EC

Council Directive 93/68/EEC of 22 July 1993 amending Directives

INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Earth-moving machinery Field of vision of surveillance and rear-view mirrors Part 2: Performance criteria

Record of Amendments. Version Date Amendment Section/page affected

ISO/TS TECHNICAL SPECIFICATION. Medical devices Hierarchical coding structure for adverse events Part 1: Event-type codes

ISO 9001:2015 TRANSITIONS

INTERNATIONAL STANDARD

Loss Prevention Standard

Assessment Report Construction Product Regulation* * CPR - REGULATION (EU) No 305/2011

ECB S Recommendation for Service, Repair and Modification Operations on ECB S Certified Secure Storage Units, Data Cabinets and Data Rooms

Federal Law of the Russian Federation of December 27, 2009 N 347-FZ "Technical regulation on safety of low-voltage equipment" Part I

This annex is valid from: to Replaces annex dated: Location(s) where activities are performed under accreditation

DEPARTMENT OF TRADE AND INDUSTRY DEPARTEMENT VAN HANDEL EN NYWERHEID. NATIONAL REGULATOR FOR COMPULSORY SPECIFICATIONS ACT (Act 5 of 2008)

Table of Contents for the REGULATION (EU) 2017/745 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2017

Sýnishorn ISO INTERNATIONAL STANDARD IULTCS/IUP Leather Determination of abrasion resistance Part 2: Martindale ball plate method

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

This annex is valid from: to Replaces annex dated: Location(s) where activities are performed under accreditation

BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION EXECUTIVE SUMMARY

This document is a preview generated by EVS

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

ISO INTERNATIONAL STANDARD. Earth-moving machinery Field of vision of surveillance and rear-view mirrors Part 2: Performance criteria

ISO INTERNATIONAL STANDARD. Reaction to fire tests for floorings Part 1: Determination of the burning behaviour using a radiant heat source

Transcription:

Technical Assessment Guideline Applicable for the Kiwa KQ Certification Scheme: Solar products and components Accreditation Kiwa Italia S.p.A. Via Treviso 32/34 31020 San Vendemiano (TV) Italia Tel: +39 0438 411 755 Fax: +390438 22 428 Internet: www.1kiwa.com e-mail: info@kiwa.it 2004 Copyright, Kiwa Italia S.p.a. No part of this guideline shall be reproduced and / or published by print, photocopy, microfilm or in any other manner without the authorization of Kiwa. The use of these guidelines by third parties will be permitted only after written agreement signed by Kiwa as they are specified for use. Approval and Ratification This Guideline assessment was approved by the Director of Kiwa Italy. Page 1 of 14

Preface Kiwa This Guideline is prepared by Kiwa Italy, being active in the field of Certification of Multilayer piping systems and fittings. The approval and operational implementation of this Guideline is according to the procedures and regulations of the quality system of Kiwa Italy. Kiwa Italy will use this guide line assessment in consultation with Italy Kiwa Regulations for the Certification of the product. This regulation describes the methodologies applied by Kiwa Italy to conduct the necessary investigations prior to the issue of the certificate of product. TABLE OF REVISIONS Rev. Date rev. Description/summary of the revision (modified parts are shown by the sidebar) 1.2 October 10 Update of the activities: including of PV inverter 1.1 March 10 Editorial updates, update of requirements related to qualifications & use of mark. IEC reference for partial testing added. 1.0 August 09 Initial release Page 2 of 14

1. GENERAL... 4 1.1 APPLICATION... 4 1.2 REFERENCE DOCUMENTS... 4 2. REQUIREMENTS FOR KIWA KQ SOLAR PRODUCTS AND COMPONENTS.... 5 2.1 GENERAL... 5 2.2 REQUIREMENTS TO THE KIWA KQ SOLAR PRODUCTS AND COMPONENTS.... 5 2.2.1. Offering stage & receiving the client order... 5 2.2.2. Laboratory Test... 5 2.2.3. Initial Factory Inspection... 6 2.2.4. Kiwa KQ surveillance agreement... 6 2.2.5. Kiwa KQ Solar products and components Manufacturer documentation... 6 2.2.6. Kiwa KQ Solar products and components Marking... 6 2.2.7. Kiwa KQ - Solar products and components - Certification... 7 2.3 THE USE OF THE KIWA KQ MARK... 7 3. REQUIREMENTS QUALITY SYSTEM FOR THE PRODUCTION OF SOLAR PRODUCTS AND COMPONENTS... 8 3.1 GENERAL... 8 3.2 INTERNAL QUALITY CONTROL (OF THE MANUFACTURER)... 8 3.3 PROCEDURES AND OPERATION INSTRUCTIONS... 8 3.4 EXTERNAL INSPECTION... 9 4. REQUIREMENTS RELATED TO THE QUALIFICATION OF STAFF... 10 4.1 GENERAL... 10 4.2 QUALIFICATION REQUIREMENTS... 10 5. LIST OF REFERENCE STANDARDS... 11 6. ANNEX I: KIWA CERTIFICATES... 12 7. ANNEX II: ADDITIONAL REQUIREMENTS PER PRODUCTS... 13 7.1 ADDITIONAL REQUIREMENT FOR PV MODULES... 13 7.1.1 Integration to the chapter 2.2.1... 13 7.1.2 Integration to the chapter 2.2.2... 13 7.1.3 Integration to the chapter 2.2.5... 13 7.1.4 Integration to the chapter 3.2... 13 7.2 ADDITIONAL REQUIREMENT FOR PV INVERTERS... 14 7.2.1 Integration to the chapter 2.2.2... 14 7.2.2 Integration to the chapter 3.2... 14 Page 3 of 14

1. General The requirements specified in this Guideline (Technical Document) are applied by Kiwa Italy for any requests for release and / or maintenance of a certificate of products relating to solar products and components. In addition to the requirements contained in this Guideline, Kiwa Italy imposes further conditions on the general procedures for certification specified in regulations of general certification Kiwa Italy. 1.1 Application The release of a certificate, as requested to Kiwa Italy, will be performed based on the Guidelines (Technical Document) which are in force at the time of the request. In the event that reports are produced by testing laboratory / factory inspection showing that the products meet the requirements of this Guideline, it is needed to demonstrate that these reports are produced taken the following minimum standards for accreditation into consideration: IEC/ISO 17025 for test laboratory EN 45004 for the factory inspection services EN 45011 for the certification services Kiwa Italy considers conformity of these accreditations by the certification issued by Accredia (under preparation) or any other entity who has signed with Accredia a mutual recognition agreement. The scope of accreditation shall extend to all the examinations under this guideline. In case of failure to provide any certificate of accreditation, Kiwa Italy independently verify compliance with the standards of accreditation. 1.2 Reference Documents 1) Kiwa Italia Product Certification Release of Product Certification (PG-09 Rev. 02, Certificazione di Prodotto) 2) Kiwa Italia Product Certification Inspections to the Product Certification (PG-10 Rev. 02, Audit - Certificazione di Prodotto) 3) Kiwa Italia Product Certification Rules (RG-05 Rev. 00, Regolamento Certificazione di Prodotto) 4) Technical Assessment Guideline for Kiwa KQ Certification (DT Ki 0409) - Solar products and components 5) Kiwa KQ solar products and components Pricelist and template for quotations 6) Kiwa Photovoltaic (PV) Certification Scheme - PV Panel Data Guide 7) Kiwa Photovoltaic (PV) Certification Scheme Template for the manufacturer declaration 8) Kiwa Photovoltaic (PV) Certification Scheme Template for subcontracting test laboratory 9) Kiwa KQ solar products and components Report factory inspection 10) Kiwa Italia Product Certification Template for the Non-Conformity Report (RGS 030 Rev 2, Rapporto di Non Conformita Prodotto) 11) Kiwa KQ solar products and components - Template for the Surveillance Agreement 12) Kiwa KQ solar products and components - Template for the Certificates Page 4 of 14

2. Requirements for Kiwa KQ Solar products and components. 2.1 General This chapter outlines the requirements which shall be met for Kiwa KQ Solar products and components. 2.2 Requirements to the Kiwa KQ Solar products and components. With reference to procedure PG-09 the following is applicable for the certification of Kiwa KQ Solar products and components: 2.2.1. Offering stage & receiving the client order During the offering stage the following documents shall be used: 1) Kiwa KQ Solar products and components template of the offer 2) Kiwa KQ Solar products and components price list Contract review is performed by the Product Manager for the Kiwa KQ Solar products and components. The contract review includes the check on the sampling according to IEC 61040/prototype. An integration of this chapter is given in the Annex II of this TD. 2.2.2. Laboratory Test The Solar products and components shall be conducted to the tests as specified in the standards as reported in Annex II of this TD. The Solar products and components used for testing can be selected by the manufacturer taken the following conditions into considerations: I: the manufacturer shall declare that the manufacturing process of the products used for testing shall be according the process applicable for the mass production of the Solar products and components II: the manufacturer shall declare that the Solar products and components are either - Prototypes or - That the sampling procedure according IEC 60410 has been used to select the samples. The tests shall be performed preferably by an accredited test laboratory according to ISO/IEC 17025 or by a laboratory which has proven to Kiwa to be able to work on this level. The ISO/IEC 17025 accreditation shall be performed by an EA/ILAC recognized accreditation body. Prior subcontracting testing work to a test laboratory Kiwa Italy shall review the laboratory and conclude that the laboratory is competent to perform the work in accordance to this guideline. The test laboratory receives the following documents: 1) Subcontracting order, including Annex I 2) The documentation of the product. Kiwa remains the right to perform a topic audit to the test laboratory and/or perform witness testing. Page 5 of 14

The test laboratory delivers a test report according in which the test results are presented. 2.2.3. Initial Factory Inspection In parallel to the type testing Kiwa Italia will perform an Intial Factory Inspection of the manufacturing sites. During the initial factory inspection the quality management and factory production testing related to the mass production is audited. The following documents are applicable during the audit: 1) PG-10, Rev. 02; Audit for Product Certification 2) Kiwa Factory Inspection Report which including the Observations (RGS 029) 3) Reports of non-compliance of the product (RGS 030) The Initial Factory Inspection shall be performed by auditors which are qualified according EN 45011. Prior subcontracting the Initial Factory Inspection to an external auditor Kiwa Italy shall review the competences of the related auditor / audit team and conclude that the qualification requirements according ISO 19011 are met (see clause 4 for further details). Kiwa Italy intends to use Kiwa staff to perform the Initial Factory Inspection but may use external auditors as well. Kiwa remains the right to attend the Initial Factory Inspection or parts of it. The auditor / audit team delivers a Factory Inspection report. To take a positive certification decision the Initial Factory Inspection shall: I: All major non-conformities shall be closed by the auditor / audit team; II: Corrective measures to resolve minor non-conformities shall be approved by the auditor / audit team. The verification of correct implementation of the corrective measure shall find place during the next scheduled audit. Further details are given in clause 3 of this Guidelines. 2.2.4. Kiwa KQ surveillance agreement The Kiwa KQ surveillance agreement specifies the right and duties of both the agreement holder (contract holder) and Kiwa Italy to maintain the Kiwa KQ certification based upon: I: results of the annual factory inspection II: result of the annual inspection of the product The Kiwa KQ surveillance agreement, according to the Kiwa template, shall be confirmed and signed by both parties, 2.2.5. Kiwa KQ Solar products and components Manufacturer documentation One set of instructions shall be supplied with each consignment, written in the language(s) of the country into which the devices will be delivered. They shall include all relevant information of the panels, as reported in Annex II of this TD. 2.2.6. Kiwa KQ Solar products and components Marking The products shall be marked clearly and permanently with at least the following information: Kiwa Solar Marks (see clause 2.3) Page 6 of 14

2.2.7. Kiwa KQ - Solar products and components - Certification The Kiwa KQ Solar products and components Certificate can be granted based upon the positive review of the below mentioned aspects: I: Laboratory test II: Initial Factory Inspection III: Manufacturer Documentation IV: Signature of the Kiwa KQ surveillance agreement Kiwa Type Testing Certificate can be granted based upon the positive review of the below mentioned aspect: I: Laboratory test The review is performed by a Kiwa Certification Officer who is qualified as such for Kiwa KQ Solar products and components Certification. The template of the Kiwa KQ Solar products and components is given in Annex I. 2.3 The use of the Kiwa KQ Mark Based upon the granting of the Kiwa KQ Certification the manufacturer is obliged to affix the Kiwa KQ Mark on each produced product. The Kiwa KQ Mark shall be part of the type label of the product, be presented in full color or in black-white and show as the following. The dimensions of KIWA logo may be increased or decreased uniformly, keeping the ratio of the size and if the writing remains legible. The logo may be used only for the products certified by Kiwa, on letterhead, advertising material and / or promotion. Can not be used in a misleading manner and can not be interpreted as a certification system or references to other products not be tested by KIWA. Kiwa reserves the right to take legal action to protect its image if the logo was used in a manner inconsistent with the contractual and / or to bring disrepute to the image Kiwa. Page 7 of 14

3. Requirements quality system for the production of Solar products and components 3.1 General This chapter outlines the requirements that must be satisfied by the quality system of the manufacturer and the methods used by Kiwa Italy for the evaluation of it. 3.2 Internal quality control (of the manufacturer) As part of its quality system, the manufacturer must have a scheme of internal quality control (IQC scheme). This IQC scheme shall include: the aspects that are subject to inspection Inspection methods adopted the frequency of inspections the procedures for recording and archiving of results. The manufacturer shall prepare and adopt a plan for internal quality control of its production, as defined in the following table, and make it available to the inspector during the performance of audits. Subject Aspect Method Frequency Registration Incoming control: Material Certificates - Row material Dimensions - Semi-finished products Appearance Production process Procedures Work instructions Used apparatus Finished products See Annex II of this TD Status of measuring & test equipment Internal transport List of equipment Calibration reports Maintenance reports Storage Package Identification Marking 3.3 Procedures and operation instructions The manufacturer shall demonstrate a procedure for: A. the management of semi-finished or finished products discarded or subjected to repairs; B. management of complaints about the products and / or services provided. C. work instructions and records of inspection used. Page 8 of 14

3.4 External inspection The quality system of the manufacturer will be assessed by Kiwa Italy at least according to the issues mentioned in the Kiwa Regulations for the Certification of the Product. Upon ratification of this Guideline for evaluation, this frequency was set at 1 inspection per year. Page 9 of 14

4. Requirements related to the qualification of staff 4.1 General This chapter contains the requirements regarding the qualification of staff involved in the activity of Kiwa KQ Solar products and components Certification. 4.2 Qualification requirements Sales representative and back office staff: Read & Understand this Technical Document Testing staff: according to EN 17025 auditor & lead auditor: according to ISO 19011 - successfully completed secondary education - auditor training of 40hrs - 20 days of auditing experience - 3 years of appropriate practical workplace experience in the Solar products and components or - 3 years of appropriate practical workplace experience in Testing, Certification and Factory Inspection of Energy using Products and receiving: Specific training in Solar products and components sector which includes manufacturer production process and related quality aspects. Successfully complete 3 factory inspections under supervision of a qualified auditor. - Proven personal competences as laid down in the Staff appraisal requirements of Kiwa Italia certification officer: - successfully completed secondary education - auditor training of 40hrs 3 years of appropriate practical workplace experience in Product Certification for Energy related systems and specific training in Solar products and components. - Experiences as a manager for the minimum of 1 year - Proven personal competences as laid down in the Staff appraisal requirements of Kiwa Italia (manager) - Detailed knowledge of certification regulations and in particular the Kiwa KQ Solar products and components Certification Scheme. - A clear view on the certification items within the Solar sector and understanding of the development of standards for Solar products and components testing and certification. Page 10 of 14

5. List of reference standards Number UNI-EN 17020: 2004 Title General criteria for the operation of various types of bodies performing inspections (ISO/IEC 17020:1998) UNI-EN 45011: 1998 General requirements for bodies operating product certification systems (ISO/IEC Guide 65: 1996) UNI-EN-ISO/IEC 17025: 2005 EN-IEC 61215: 2005 EN-IEC 61646: 2008 EN-IEC 61730-1: 2007 EN-IEC 61730-2: 2007 IECEE Retesting Guidelines IECEE Retesting Guidelines ENEL - Dicembre 2009 Ed. 1.1-7/244 VDE V 0126-1-1 Released 2006-02 General requirements for the competence of testing and calibration laboratories (ISO/IEC 17025: 2005) Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval (IEC 61215: 2005) Thin-film terrestrial photovoltaic (PV) modules Design qualification and type approval (IEC 61646: 2008) Photovoltaic (PV) module safety qualification Part 1: Requirements for construction (IEC 61730-1: 2004) Photovoltaic (PV) module safety qualification Part 2: Requirements for testing (IEC 61730-2: 2004) Product or Process Modifications Requiring Limited CBTL Retesting to Maintain Certification for - IEC 61215:1993 Ed. 1.0 and IEC 61215:2005 Ed. 2.0 Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval. - IEC 61646:1996 Ed. 1.0 Thin-film terrestrial photovoltaic (PV) modules Design qualification and type approval Product or Process Modifications Requiring Limited CBTL Retesting to Maintain Safety Certification for - IEC 61730-1:2004 Ed. 1.0 and IEC 61730-2:2004 Ed. 1.0 Photovoltaic module safety qualification Part 1: Requirements for construction and Part 2: Requirements for testing Guida per le connessioni alla rete elettrica di ENEL distribuzione Automatic disconnection device between a generator and the public low-voltage grid Page 11 of 14

6. ANNEX I: KIWA CERTIFICATES Name of Certificate EN-IEC 61215 / EN-IEC 61730-2 Type Testing EN-IEC 61646 / EN-IEC 61730-2 Type Testing EN-IEC 61215 / EN-IEC 61730-2 Product Certificate EN-IEC 61646 / EN-IEC 61730-2 Product Certificate KQ Certificate for inverter Page 12 of 14

7. ANNEX II: ADDITIONAL REQUIREMENTS PER PRODUCTS 7.1 Additional requirement for PV modules 7.1.1 Integration to the chapter 2.2.1 During the preparation stage the client shall complete and sign the following documents: 1. PV Panels data guide 2. Template of the Manufacturer s declaration The documents shall be received and checked on completeness by the Certification Officer. 7.1.2 Integration to the chapter 2.2.2 Depending on the applied technology one or more of the following standards are applicable: I: Crystalline silicon terrestrial (PV) modules test in according to EN-IEC 61215 II: Thin-film terrestrial (PV) modules in according to EN-IEC 61646 III: PV module safety qualification (class II) in according to EN-IEC 61730-2 IV: IECEE Retesting Guidelines: Product or Process Modifications Requiring Limited CBTL. Retesting to Maintain Certification for EN-IEC 61215, EN-IEC 61646 and Safety Certification for EN-IEC 61730-2 7.1.3 Integration to the chapter 2.2.5 One set of instructions shall be supplied with each consignment, written in the language(s) of the country into which the devices will be delivered. They shall include all relevant information of the panels, in particular: electrical data; dimensions; datasheet of all single components; instruction for mounting. 7.1.4 Integration to the chapter 3.2 The manufacturer shall prepare and adopt a plan for internal quality control of its production, as defined in the following table, with reference to the ICQ related to finished products, and make it available to the inspector during the performance of audits. Subject Aspect Method Frequency Registration Finished products: The output power of the Photovoltaic Panels panel shall be in accordance to the specifications - Clause 20 of the checklist - Control of output power Page 13 of 14

7.2 Additional requirement for PV inverters 7.2.1 Integration to the chapter 2.2.2 Depending on the applied technology one or more of the following standards are applicable: I: ENEL - Dicembre 2009 Ed. 1.1-7/244: guida per le connessioni alla rete elettrica di ENEL distribuzione II: VDE V 126-1-1 Released 2006-02: Automatic disconnection device between a generator and the public low-voltage grid 7.2.2 Integration to the chapter 3.2 The manufacturer shall prepare and adopt a plan for internal quality control of its production, as defined in the following table, with reference to the ICQ related to finished products, and make it available to the inspector during the performance of audits. Subject Aspect Method Frequency Registration Finished products: Insulation test on the Inverters basis of EN 60146-1-1 Page 14 of 14