CHAPTER 2 PROJECT DESCRIPTION

Similar documents
2 Project Description

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

PLANNING COMMISSION. Submitted

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

TENTATIVE MAP CHECKLIST

5.1 AESTHETICS AND VISUAL RESOURCES Physical Setting

DEFINITIONS AND RULES OF MEASUREMENT DEFINITIONS AND RULES OF MEASUREMENT 7-1

NOTICE OF PREPARATION

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Green Infrastructure & Low Impact Development

Juniper Networks CO-8

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Appendix D - Technical Design Criteria for BMPs

Toronto Complete Streets Guidelines

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

2.0 PROJECT DESCRIPTION

Homeowners Guide to Stormwater BMP Maintenance

NOTICE OF PREPARATION

Kittson Parkway / Watershed Park Parking Lot

Going Green with the NYS Stormwater Design Standards

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

APPENDIX C: STORMWATER CONTROL PLAN

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT

Urban Water Management and Soils (ESRM 311 & SEFS 507)

WAYNE GLEN (also known as the Richter Property) A model Low Impact Development (LID) community.

General Location Courtyard at LMH Final Development Plan and Final Plat

Description of Preferred Alternative

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

Appendix E: Illustrative Green Infrastructure Examples

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

VILLA STORIA PLANNED DEVELOPMENT. General Plan Amendment, Zone Amendment, Tentative Map, Development Plan, and Historic Permit

Green Infrastructure Overview

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

3. Are there any projects exempt from the definition of Regulated Projects?

BISCUIT RUN PARK MASTER PLAN

2016 WORKSHOP LVR Field Trip

III. PROJECT DESCRIPTION

Creekstön W.E.T, Inc Davis Canon Road San Luis Obispo, CA Mr. William Tickell

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Preparing a Stormwater Control Plan for a Small Land Development Project

Low Impact Development Site Design

UNIVERSITY OF MICHIGAN:

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Green Infrastructure and Low-Impact Development Technologies

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

YOSEMITE SQUARE. master plan manteca, ca. prepared for The City of manteca. submitted by yosemite square business park, llc

SECTION 2.0 INTRODUCTION

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Stormwater Control Plan: Small (Tier 1) Land Development Project

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

01 PROJECT DESCRIPTION

2.0 PROJECT DESCRIPTION

Project Narrative For Fruita RV Resort Conditional Use Permit

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

VEHICULAR AND PEDESTRIAN CIRCULATION

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Hidden Pointe Landscape Master Plan. June, archi terra

Introduction. The Project intends to fulfill the following key objectives:

Craven Street Stormwater Improvement Projects

Planning, Design, and Construction of Green Infrastructure.

Drexel, Barrell & Co.

Costs Design Construction Operation Maintenance

Costs Design Construction Operation Maintenance

LOW DENSITY RESIDENTIAL

Kirtland, Ohio - Comprehensive Plan Update 2022

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

MASTER PLAN. 201 Planning Concepts. Chapter 2

Worksheet #14 Water Runoff Management

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Planning Commission Staff Report March 15, 2007

Planning Commission Staff Report June 5, 2008

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

4. CONCEPT PLAN DEVELOPMENT

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Title 11 Streets and Sidewalks

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

San Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold

Section 3 Non-Structural BMPs

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology

Transcription:

CHAPTER 2 PROJECT DESCRIPTION 2.1 LOCATION AND EXISTING SETTING The project site refers to and encompasses the approximately 14.38 acres currently designated as Assessor s Parcel Number (APN) 077-530-019 in western Goleta at 7400 Cathedral Oaks Road (Figures 2-1 through 2-3). The project site is surrounded by the Glen Annie Golf Course to the north and east, El Encanto Creek to the west, and Cathedral Oaks Road to the south. Within the vicinity of the project are residential and recreational uses, including a multi-family residential development to the west, single-family residences located off of Cathedral Oaks Road to the south, and Glen Annie Golf Course to the north and east. Dos Pueblos Senior High School is approximately 0.5 mile to the southeast of the project site at Cathedral Oaks Road and Alameda Avenue. The land use on this parcel, which is currently a large fallow field with three small buildings, would change from agricultural to residential. However, there is no agricultural activity occurring on the site at this time. The project site currently contains a 2,015-square-foot residence, 726- square-foot garage, and 1,152-square-foot barn. The project site was occupied by an avocado orchard until the late 1990s, a remnant of which is evident on the northern third of the lot. The property is currently used in part for the storage of woodchips and firewood. 2.2 OBJECTIVES The objectives for the project are to: 1. Develop the property into a residential neighborhood for approximately 60 families. 2. Provide a variety of housing sizes. 3. Provide neighborhood amenities including a walking trail, a children s tot lot, and an open turf area. 4. Incorporate green building measures and sustainable site planning into the development s design. 2.3 PROPOSED PROJECT Project is defined by CEQA Guidelines 15378 as the whole of an action which has a potential for resulting in either a direct physical change in the environment, or a reasonablyforeseeable indirect physical change in the environment. In this instance, the project includes a subdivision for 64 lots on a 14.38-acre parcel and development of 60 single-family residences. A retention/detention basin is proposed in the southwest corner of the parcel, and a new storm drain would be installed. Runoff would drain into El Encanto Creek, located to the west of the project site. Additional improvements would consist of a community picnic area, an asphalt walking trail, an open turf area, and a children s tot lot. Infrastructure improvements would include a looped internal road system with one cul-de-sac and two intersections with Cathedral Oaks Road, installation of stormwater curb extensions, installation of landscaping, and installation of a 5- foot-wide interior sidewalk throughout the subdivision. Permeable paving throughout the April 2014 2-1

Shelby Residential Project EIR Chapter 2. Project Description subdivision would capture stormwater runoff and convey it to a series of catch-basins located on either the east or west side of the project. The residential units to be developed would consist of five residential dwelling types ranging in size from a single-story, 1,765-square-foot floor plan to a two-story, 3,870-square-foot floor plan. The typical roof height would range from 17 feet 9 inches to 23 feet 10 inches. The individual lot size would range from approximately 6,500 square feet to approximately 17,000 square feet. The landscape plan for the project includes various features for the sustainable management of stormwater and water quality. Stormwater curb extensions and permeable paver parking areas and driveways would provide a way to capture street stormwater runoff for treatment, filtration, and sediment dropout. Above-ground cisterns would be located at each residence to collect precipitation and roof drainage for use as supplemental irrigation. Bioswale and vegetated swale in the open space area and along Cathedral Oaks Road, as well as biofiltration/collection areas, would capture additional stormwater for filtration, infiltration, and sediment dropout. The landscape plan s aesthetic design solutions also call for various screen shrubs, accent trees, and canopy trees. The project would include underground connections for sewer, water, cable television, gas, and electricity. Water service would be provided by the Goleta Water District. Preliminary raw 1 earthwork volumes are estimated at 27,500 cubic yards of cut and 23,500 cubic yards of fill. The existing elevation on the property ranges from 145 feet above mean sea level along Cathedral Oaks Road northward to 252 feet above mean sea level at the northeast corner of the property, for an average slope of 7.8 percent. The finished grade elevation would range from approximately 150 feet above mean sea level to approximately 245 feet above mean sea level. The grading plan for the 60 new homes includes grading up to the property line and installation of a new storm drain that would discharge directly into El Encanto Creek. As currently designed, the buffer between the project and the edge of the riparian corridor of the creek varies in width and would be less than 100 feet in at least two locations. Accordingly, the project would not maintain a minimum 100-foot Streamside Protection Area (SPA) buffer as denoted by the City s General Plan/Coastal Land Use Plan (GP/CLUP) Conservation Element Policy CE 2.2. This policy calls for a 100-foot buffer (measured from the edge of the stream s riparian corridor). The buffer protects the biologic value and function of the stream. It also protects its associated riparian corridor to ensure water quality, prevent stream erosion, preserve stream aquatic values, and provide a riparian corridor for wildlife movement. However, CE 2.2a allows the SPA to vary in width under certain circumstances. 2.4 REQUIRED APPROVALS The project requires City approval of the following applications: Vesting tentative map (05-154-VTM), as shown on Figure 2-4, to allow division of the existing 14.38-acre parcel, APN 077-530-019, into 64 separate lots, including 60 single-family dwellings and four open space areas. 1 Raw earthwork volumes have not been factored to account for changes in volume due to bulking, over excavation and recompaction, and construction methods. April 2014 2-2

Santa Barbara County ST 154 To Santa Ynez Valley To San Luis Obispo To Ventura K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_1_Vicinity_Map.mxd Date: 4/2/2014 26629 San Luis Obispo Santa Maria Orcutt Lompoc 101 UV166 Goleta Santa Barbara City of Goleta UV33 101 101 ST 217 ST 144 ST 225 ST 192 City of Santa Barbara ± 0 1 2 Miles Source: ESRI World Imagery (2010) Legend Project Site Goleta Santa Barbara Santa Barbara Munipal Airport University of California Figure 2-1 Vicinity Map Shelby Residential Project EIR

Project Site K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_2_LandUse.ai Date: 7/24/2013 24991 Figure 2-2 Land Use Plan Shelby Residential Project EIR

Ancona Ave Santa Barbara County Ellwood Ridge Rd K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_3_Project_Site.mxd Date: 4/2/2014 26629 Del Pinon Redwood Way Pine Tree Pl Legend Project Site City Boundary ± Source: ESRI Imagery (2010) 0 125 250 500 Feet Brandon Dr Fir Tree Pl Cathedral Oaks Rd Forest Dr Spruce Dr Hillview Dr Northgate Dr Evergreen Dr Royal Linda Dr King Daniel Ln City of Goleta Belluno Dr Savona Ave Mirano Dr Glen Annie Golf Club Placer Dr Bassano Dr Aviano Ave Alameda Ave Driveway Figure 2-3 Project Site Shelby Residential Project EIR

K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_4_Vesting_Tentative_Map.ai Date: 7/24/13 24991 VESTING TENTATIVE MAP NO. 32,045 3 WEST CARRILLO STREET SUITE 205 SANTA BARBARA, CA 93101 (805) 962-4611 Source: L & P Consultants, June 2012 Figure 2-4 Vesting Tentative Map Shelby Residential Project EIR

Shelby Residential Project EIR Chapter 2. Project Description A rezone (05-154-RZ) to change the zoning designation of the project site from AG-II-10 (Agriculture II, 40-acre minimum parcel size) to 7-R-1 (Single Family Residential, 7,000- square-foot minimum lot size). A zone text amendment (05-154-OA) to Goleta Municipal Code (GMC) 35-219.6 to change the minimum lot width of parcels in the 7-R-1 zone district from 65 feet to 60 feet. A Development Plan (05-154-DP) pursuant to GMC 35-317 to provide project-specific development standards. Refer to Figures 2-5, 2-6, and 2-7. The applicant is also requesting amendments to the City s GP/CLUP as part of a separate project under CEQA (Case No. 05-154-GPA). A separate Supplemental Environmental Impact Report (SEIR) for the Shelby General Plan Amendment is being prepared by the City and is incorporated by reference (City EIR No. 12-EIR-003; Shelby GPA SEIR ). 2.5 SITE INFORMATION TABLE 2-1 SITE INFORMATION Existing General Plan Land Use Designation Zoning Regulations, Existing Zone District Agriculture Agriculture II, 40-acre minimum lot size Site Size Present Use and Development 14.38 acres Large fallow field containing a 2,015-square-foot residence, 726-square-foot garage, and 1,152-square-foot barn Surrounding Uses/Zoning North Glen Annie Golf Course Zoning: AG-II-100 (Agriculture II) (), County of Santa Barbara Access Utilities and Public Services South East West Existing Roadway Proposed Driveways Water Supply Sewage Power Natural Gas Cathedral Oaks Road Glen Annie Golf Course Zoning: AG-II-100 (Agriculture II) (), County of Santa Barbara El Encanto Creek and multi-family residential properties Zoning: DR- 8 (Design Residential) Cathedral Oaks Road Private, internal road system with two intersections with Cathedral Oaks Road Goleta Water District Goleta West Sanitary District Southern California Edison Southern California Gas Company Fire Santa Barbara County Fire Department Station #11 School Districts Goleta Union School District; Santa Barbara Unified School District April 2014 2-3

Shelby Residential Project EIR Chapter 2. Project Description This page intentionally left blank April 2014 2-4

Source: L & P Consultants, January 2011 Figure 2-5 Development Plan Shelby Residential Project EIR K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_5_Dev_Plan.ai Date: 7/24/13 24991

TURF AREA FOR DETENTION, BIOFILTRATION AND OPEN PLAY COMMUNITY PICNIC AREA WALKING TRAIL BIOSWALE PERIMETER WALL @ OPEN SPACE - TUBULAR STEEL VIEW FENCING - 6 -HIGH CANOPY TREE / BENCH SEATING PEDESTRIAN BRIDGE OVER BIOSWALE WALKING TRAIL TURF AREA FOR DETENTION, BIOFILTRATION AND OPEN PLAY TOT LOT - BENCH SEATING - WALKING TRAIL SCREENING TREES TURF AREA FOR BIOFILTRATION, INFILTRATION STREET TREE PERMEABLE PAVING AT DRIVEWAY CORNER ACCENT TREE PEDESTRIAN CROSSING TYP. PERMEABLE PAVING PASSIVE OPEN SPACE - TURF AREA FOR BIOFILTRATION - BENCH SEATING - CANOPY TREES & ACCENT TREES 5 -WIDE INTERIOR SIDEWALK TYP. FRONT YARD LANDSCAPE SEE SEPARATE EXHIBIT CURB EXTENSION TYP. INTERIOR WALL AT STREETSCAPE - STUCCO BLOCK WALL WITH UPGRADED MATERIAL SUCH AS STONE VENEER - 6 -HIGH 5 -WIDE INTERIOR SIDEWALK STREET TREE K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_6_Landscape_Plan.ai Date: 7/24/2013 24991 PERMEABLE PAVING AT ENTRY 50 -WIDE LANDSCAPE BUFFER BIOSWALE PROPOSED 10 -WIDE ASPHALT BIKE PATH BIOSWALE WITHIN PARKWAY MEANDERING TURF AREA FOR BIOFILTRATION, INFILTRATION PERMEABLE PAVING AT PARKING AREA PERMEABLE PAVING AT DRIVEWAY TYP. FRONT YARD LANDSCAPE SEE SEPARATE EXHIBIT INTERIOR WALL - BETWEEN LOTS - PRECISION BLOCK WALL - 6 -HIGH PERIMETER WALL - COMBINATION BLOCK WALL & VIEW FENCING - 6 -HIGH Source: Katie O Reilly Rogers Inc. November 2010 Figure 2-6 Landscape Plan Shelby Residential Project EIR

STORMWATER CURB EXTENSION - mid-block application / can be staggered or placed symmetrically - provides a safer traffic environment / traffic calming effect - provides a more aesthetically pleasing streetscape * RAIN BARREL / CISTERN - above-ground barrel or cistern for each home - connect to downspout typical curb extension* *Graphics courtesy of San Mateo County Green Streets and Parking Lots Design Guidebook, First Ed., Jan. 2009 ^Graphics courtesy of Green Streets: Innovative Solutions for Stormwater and Stream Crossings, First Ed., June 2002 typical rain barrels PERMEABLE PAVING - DRIVEWAYS & PARKING AREAS - 7 application on both sides of street, with a 20 driveable area inbetween - creates a perceived narrowing of the street / traffic calming effect - provides a more maintenance-friendly driveway (no cracking) - provides a more aesthetically pleasing front yard and streetscape typical streetscape with permeable paving* plan view typical streetscape with permeable paving* * K:\Irvine\GIS\Projects\Goleta\00114_13_Shelby\mapdoc\EIR\Fig02_7_Landscape_Hydro.ai Date: 7/24/2013 24991 BIOFILTRATION / COLLECTION AREAS - located in open space areas and in front yards throughout site typical depressed collection areas for passive recreation use BIOSWALE / VEGETATED SWALE - located in open space area and along cathedral oaks road typical street with vegetated swale within parkway* typical bioswale in residential setting typical bioswale detail^ typical organic filter deta il^ typical driveway with combination permeable paving and grass strip* Source: Katie O Reilly Rogers Inc. November 2010 Figure 2-7 Landscape Hydrology Plan Shelby Residential Project EIR