INSTRUCTIONS REHAU PRO-BALANCE MIXING MODULE

Similar documents
Roth fixed-value control set with high-efficiency pump

DEVIATING VALVES ART K063

HKF 8180 Operating instructions

Mercury Mixing Kit (Code: ME1053)

DIRTMAG dirt separator with magnet, adjustable for vertical or horizontal pipe

Installation, commissioning and servicing instructions

Installation and Commissioning Instructions FMU3 Floor Mixing Unit with Grundfos UPM3 Pump

Allcan TM Installation Manual

RA15/6T & TB Conversion Valve

CALEFFI. Thermostatic regulating unit for heating systems. 166 series 01238/17 GB. replaces dp 01238/15 GB. Function

Thermostatic mixing valves with replaceable cartridge for centralized systems

Packaged Instantaneous Domestic Hot Water Generator Energy Source: Boiler Water

Data Sheet. Compact Mixing Shunt for Floor Heating, FHM-Cx. Application:

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

281 Series. ThermoBloc boiler protection recirculation and distribution unit. Installation, commissioning and servicing instructions

5231 Series. Low Lead High Flow Thermostatic Mixing Valves. Installation, commissioning and service instructions ASSE 1017 NA10341

Heat Link MECHANICAL ROOM IN A BOX. SSP Series SS Manifold Pump Panel Installation, Operation, and Maintenance Manual. L6SSPxx000x SSPLR106T SSPSS106B

Thermostatic mixing valves with interchangeable cartridges

Heat Link MECHANICAL ROOM IN A BOX. SSP Series. SS Manifold Pump Panel Installation, Operation, and Maintenance Manual. L6SSPxx000x-BMS SSPLR106T

water source / fan coils

TECHNICAL. Series 18. Pump Packages

FHM-Cx Mixing Shunts for Floor Heating

Model T-45NL: Certified in compliance with ASSE 1017, 1069, 1070, and ANSI/NSF 61 PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLING AND OPERATING!

Installation and Operation Instructions K36E Modular Heating Circuit - DN 25 Boiler charging set

RA 2000 Series RA 15/6T & TB Conversion Valve

Operating Guide. Termix Compact 28 VX-FI / HWP / HWS. 1.0 Table of Contents. 1.0 Table of Contents

2.A MANIFOLD SHUNTS MINI SHUNTS

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

union swing check valve spring loaded check valve purging valve pressure relief valve relief valve metered balancing valve

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

5231 Series. Low Lead High Flow Thermostatic Mixing Valves. Installation, commissioning and service instructions ASSE 1017 NA10341.

ECO1ZN3P, ECO2ZN4P ECO

CONNECTION OPTIONS FOR MANIFOLDS & CONTROL UNITS

Hydronic Mechanical Panels

Table of Contents. Installation, Operation, and Maintenance Manual ELBPxx

Taco 00 Series Cartridge Circulators

PATENTED TECHNOLOGY THE CORE OF ANY PROFESSIONAL HYDRONIC INSTALLATION

Pump assembly Instruction manual

PATENTED TECHNOLOGY THE CORE OF ANY PROFESSIONAL HYDRONIC INSTALLATION

SECTION METERS AND GAGES FOR HVAC PIPING

Akva Vita Instantaneous water heater

Systems for central heating

Akva Vita TDP-F District heating flat station for direct heating and domestic hot water systems

Dynalux. Floor Heating Manifolds Underfl oor heating circuit manifold

INSTRUCTIONS REHAU SILENT DIAL THERMOSTAT #

ASTRO EXPRESS 2 HOT WATER DELIVERY SYSTEM

ProRadiant Manifolds, Stations and Fittings

FHM-Cx Mixing Shunts for Floor Heating

BuildingName The Description of the Project P DOCUMENTS

Geothermal Flow Centers. Simply Smart. boschheatingandcooling.com

CALEFFI. Thermostatic mixing valves with replaceable cartridge for centralized systems. 5230, 5231 series 01080/13 NA ASSE Replaces 01080/11 NA

521 Series. MixCal adjustable three-way thermostatic mixing valve. Installation, commissioning and service instructions

INSTALLATION INSTRUCTIONS WARRANTY

Technical Product Guide

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

Hydronic Separator. Hydro Separator. Hydro Separator. 548 tech brochure Hydro Separator ASME. tech brochure 01076

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

CALEFFI. Set point thermostatic regulating unit. 182 series 01190/18 GB. replaces dp 01190/15 GB

RADIANT PANEL SYSTEM CONTROL QUICK GUIDE

Circulators high efficiency ECM Circulators

HERZ Differential Pressure Control Valve 4002

HYDRONIC TEMPERING VALVES. Part No. High Temp F. Part No. Low Temp F

Armstrong Flo-H2O Water to Water Instantaneous Heater Installation and Maintenance & Operation

Installation, commissioning and servicing instructions. Technical Characteristics. -Lead Plumbing Law Certifi ed by IAPMO R&T

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION WATER TREATMENT

Semi-Automatic Suction Screen Filters 3"-4 Angle. Service & Maintenance Manual

Akva Lux TDP-F District heating flat station for direct heating and domestic hot water systems

Commercial Noritz Water Heater Multi-System Application Sheet

Radiator Valve Program

Akva Vita TDP District heating flat station for direct heating and domestic hot water systems

Installation and Commissioning Instructions

Adjustable three-way thermostatic mixing valve... connections ½", ¾", 1" NPT male union and sweat union and ¾" press

A. Detail drawing M1 Standard Chilled Water Schematic 1.03 DESCRIPTION OF THE PULLMAN CAMPUS CENTRAL CHILLED WATER LOOP SYSTEM:

Installation, Operating, and Maintenance Manual

Metering systems 0548EN April 2014

EZ Plate Instantaneous

Solar-Divicon and solar pump assembly. Please follow these safety instructions closely to prevent accidents and material losses.

Automatic Temperature Controller (ATC)

Applications and Piping Strategies for Condensing Boilers - Introduction

Crown Boiler Company

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

ProMinent ProMus Hydraulic Diaphragm Metering Pumps

General System Layout Sketch

Commercial, Residential & Institutional Pumps, Tanks, & Accessories

Valves, controls + systems. Local and district heating technology. Innovation + Quality. Product range. for improved.

Akva Lux VX District heating substation for indirect heating and domestic hot water systems

GEO-FLO PRODUCTS CORPORATION NEW PRODUCTS FOR Tom Wyer, MSME Product Development Engineer

AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: AP AQUAS Pool Package

Model AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description

Product Instructions. Hydronic Mixing Block Version Wiring Terminal Block Pressure/Temperature Sensor Delivery Fitting (3) Display Screen

Radiator valve inserts

1. Division 23 Section "Steam and Condensate Heating Piping" for steam and condensate meters.

PRESSURE INDEPENDENT CONTROL VALVE TECHNOLOGY. 3/16/2012 Fred Ferrara 1

propanel Series Installation Manual

HVAC No. MFG Part No. Description Size Price

Astro Express 2 - Hot Water Delivery System

TOWEL WARMERS ARE HEAVY! WE RECOMMEND THAT TWO PEOPLE INSTALL THE TOWEL WARMER!

Concealed Twin & Triple Thermostatic Shower Valve with Diverter. Installation & Operating Guide

Transcription:

INSTRUCTIONS REHAU PRO-BALANCE MIXING MODULE SPECIFICATIONS... 1 OVERVIEW... 2 PRECAUTIONS... 2 MOUNTING LOCATION... 2 CONNECTION TO BOILER PRIMARY PIPING:... 3 ELECTRICAL CONNECTION... 4 FLUSHING THE HEATING CIRCUITS... 4 ADJUSTMENT OF THE FLOOR HEATING FLOW TEMPERATURE... 4 OPERATION OF THE WATER FLOOR HEATING CONTROL UNIT... 5 PUMP INFORMATION:... 5 Specifications Maximum working temperature: 230 F (110 C) Maximum acceptable working pressure: 145 psi (10 bar ) Temperature regulation range: 68 158 F ( 20-70 C ) Nominal heat output: 47.800 BTU /HR** Pump: Grundfos UPS 15-58-130 mm 1 BSPM connections. 3 speed. 3 Speed-Cast Iron Integral Check Valve 115 VAC, 2 Pole, Single Phase Flow range: 0-17.5 U.S. GPM Head range: 0-19 FEET Min. fluid temperature: 36 F (2 C) Fittings: Brass Ms 58 Pipe systems: Brass Ms 63 O-Rings: EPDM Flat gaskets: AFM 34 or EPDM Plastic: Impact-resistant and temperature-resistant **For the achievement of the maximum heat output, the pressure in the boiler primary loop should be at minimum 2 psi / 150 mbar higher than the secondary floor heating circuit and the temperature of the primary should be ~ 25 F (15 C) higher than the desired radiant design temperature. www.rehau.com Construction Automotive Industry

Overview The REHAU PRO-BALANCE MIXIMG MODULE is intended for Supply & Return Header boiler supply configuratiohns only. This unit will not function properly in a closely spaced Tee configuration or with the use of a hydro separator. The REHAU PRO-BALANCE MIXIMG MODULE is intended for relatively small radiant heating applications using a fixed set point temperature supply. The module is designed to fit directly to the left or right of the REHAU PRO-BALANCE manifold. The supply temperature to the manifold may be adjusted gradually between 70 F and 160 F, by means of temperature controlled injection valve. The injection valve has features that can limit the manual adjustment of the valve to prevent tampering and/or over-heating. The module pump would be typically energized by the room thermostat via a relay. The relay could be energized by the thermostat or via the end of the actuator of one of the REHAU electronic boxes. Precautions Before starting work the installer must carefully read, understand and adhere to these instructions. The REHAU PRO-BALANCE MIXIMG MODULE may be mounted, operated and maintained only by trained hydronic personnel familiar with hydronic systems. Personnel undergoing training may only work on the product under the supervision of an experienced fitter. Only when these conditions are fulfilled, the manufacture is responsible for the equipment as provided in the legal regulations. All instructions in this assembly and operation manual must be observed when working with the water floor heating control unit. Any other application is not in compliance. The manufacturer shall not be responsible for incompetent use of the water floor heating control unit. Reconstructions and changes are not acceptable for reasons of safety. The water floor heating control unit may be repaired only by services approved by the manufacturer. Mounting Location The hydraulic connections are to be made as shown in fig.2. The control unit is supplied for connecting to the left of the Pro Balance manifold. If you want to mount it to the right of manifold, all you have to do is to rotate the eccentric-fitting and re-plug the thermometer on the supply of the unit. Depending on space limitations and dimensions of the manifold, it may be necessary to rotate the pump in the axis of the screw connections. To do this, loosen the two union nuts on the pump, rotate the pump into the required position, and then tighten the screw connections while holding both the pump and the screw connection element in place. On the supply inlet of the control unit the installation of a strainer with a mesh size of smaller 0.8 mm is recommended. This strainer should be maintained in regular intervals and cleaned if necessary. (This is a recommendation for the installer to keep the system clean.) REHAU PRO-BALANCE Mixing Module - Page 2

7.56 inch / 192 mm eccentric-fitting with immersion sleeve FLOOR HEATING SUPPLY Pro Balance manifold SBE thermostatic head 8.27 inch / 210 mm check valve flow direction for flushing Flushing drain FLOOR HEATING RETURN BOILER SUPPLY BOILER RETURN Fig.2 The module can be mounted either to the right or left of the 1 PRO-BALANCE manifold (1" BSP male threads). The Mixing Module has union nuts (G 1" BSP) and requires 1 flat gaskets. The Mixing Module can also be used with REHAU s HLB Brass manifolds (valveless style). The existing isolation ball valves from the PRO-BALANCE manifold - would normally be transferred to the boiler supply / boiler return of the module. Connection to Boiler Primary Piping: Closely Spaced Tee Configuration: The configuration of this unit does not suit such installations and should not be used as a piping strategy. Hydro Separator Configuration: The configuration of this unit does not suit such installations and should not be used as a piping strategy. Supply & Return Header Configuration: In such a configuration, sufficient positive pressure (2 psig minimum) differential exists between primary supply to the module and the module return to the primary return header ensure proper flow characterists. REHAU PRO-BALANCE Mixing Module - Page 3

Electrical Connection All electrical connections must be performed by an authorized specialist in accordance with the local regulations governing electrical installation work. The electrical cables must not come into contact with any hot parts. The circulation pump is supplied with a 3 wire 110VAC PVC shielded cord. In order to make sure that the pump only runs if heat requirement exists, it is recommended to connect the pump to a pump relay (e.g. pump logic of an electrical connection box, which activates the actuators). This can be achieved using the any of the REHAU electrical zone controls. Flushing the Heating Circuits After the REHAU PRO-BALANCE Mixing Module is connected to the heating system, isolate the mixing module using the ball valves supplied with the manifold or via a shut-off valves mounted elsewhere. Switch off the pump and close all heating circuits at the manifold. Closing the manifold circuits is typically assured because the REHAU actuators are normally closed (NC) actuators, however the actuators can also be removed. Connect a flushing and draining hose to the SBE connections shown in fig.2. Open the heating circuit to be flushed and flush through until the air and any dirt are completely removed from the circuit. For easier flushing and/or filling of the heating circuits a check valve above the pump is placed preventing a short circuit. Important: It should be flushed only in the flow direction. The drain connection must always be open; otherwise, the high water pressure could damage the heating system. Also read the instructions on flushing as outlined in the installation/operating instructions for the manifold. Flushing the Mixing Module / Manifold from the boiler room may also be practical and in this case, the thermostatic injection valve can be removed via the knurled nut allowing flow to pass. Adjustment of the Floor Heating Flow Temperature When maximum power is required (rated power) the supply temperature of the boiler must be at least 60 F higher than the required temperature of the flow temperature in the floor circuit. The flow temperature may be adjusted gradually between 70 F and 160 F. The regulating hand wheel of the thermostat is supplied with a scale 1-7 (fig.4;a). Please see the temperatures set on the scale in the table below: Regulating Hand Wheel Numeric Indication & Corresponding Temperature 1 2 3 4 5 6 7 70 F 85 F 100 F 115 F 125 F 145 F 160 F 20 C 28 C 37 C 45 C 53 C 62 C 70 C Notes: REHAU PRO-BALANCE Mixing Module - Page 4

- For future reference, the temperature table above should be posted / lanyard on or near the Mixing Module. - Always verify the supply temperature when the system has reached a steady state to verify / correct the set temperature. Differences may occur depending on the temperature of the boiler water injected through the thermostatic valve. Use the mini-thermometer on the pump discharge side for supply temperature verification. - During initial / cold start up of the heating system, the operator must avoid the temptation to set the hand adjustment to its maximum setting. Only set & lock the hand wheel at its design temperature and allow the system to come up to temperature naturally. If the operator / installer incorrectly sets the temperature too high attempting to accelerate the heat up period, there is no electrical or mechanical feed back to reduce the supply temperature other than the room thermostat (pump on / off). This Mixing Module is not equipped with an independent floor heating limiting device. To avoid damage to the floor structure caused by unnecessarily high temperature, the flow temperature set value for the thermostat must be defined via traditional heat load calculation techniques. Therefore, it is most important to set the determined temperature value and check it by means of thermometer during operation of the floor heating system. When you are certain that the temperatures are correct, then you can place blocking elements (B) immediately before and after the pointer (C). Operation of the Water Floor Heating Control Unit The injection valve of the unit is designed as a proportional regulator and is controlled by a thermostat with capillary tube and sensor for the floor heating circuit supply. Any deviation from the set value causes an immediate change in the opening range of the valve thus proportionally changing the amount of hot water injected from the boiler circuit. The injected amount of hot water is mixed with the water returned from the heating circuit, thus maintaining the flow temperature value constant within a narrow temperature range. The respective temperature of the floor heating circuit supply may be read directly on the thermometer. A check valve is placed at the connection to the boiler return. It prevents a back-flow of heating water from the boiler circuit return. Pump Information: REHAU PRO-BALANCE Mixing Module - Page 5