Lower Hill Infrastructure Project Meeting Minutes

Similar documents
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

SECTION 4(f) DE MINIMIS DOCUMENTATION

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017

Citizen Information Meeting

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Services Department F May 28, 2007

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Urban Planning and Land Use

Appendix G Response to Comments

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

Railyard Enterprise Project Steering Committee Meeting #4

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

California Environmental Quality Act (CEQA) Environmental Review Process

Planning & Zoning Commission Meeting Date: June 04, 2012

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

East Panorama Ridge Concept Plan Amendment

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Town Center (part of the Comprehensive Plan)

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Burton Station Village Community Meeting February 26, 2014

The transportation system in a community is an

Urban Planning and Land Use

Project Overview. Get Involved. Public Information Meeting. Contact Information

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Building Great Neighbourhoods. Strathcona

Clay Street Bridge Replacement Project

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

DESIGN CRITERIA PACKAGE

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

Planning & Zoning Commission Meeting Date: June 18, 2012

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

Rezoning Petition Pre-Hearing Staff Analysis March 19, 2018

Right-of-Way Acquisitions and Relocations Technical Memorandum

Capital Projects in and near Odenton Town Center

ARLINGTON COUNTY, VIRGINIA

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Camden County Development Regulations. Updated February 2017

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

Watertown City Council

This Review Is Divided Into Two Phases:

CHARTER TOWNSHIP OF VAN BUREN PLANNING COMMISSION November 12, 2014 MINUTES

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Endorsement of Design for Route 7/George Washington Boulevard Overpass. Algonkian and Broad Run

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

Michael D, Harvey, Current Planning Supervisor. This project was originally approved in 2012 by the BOCC and is summarized as follows:

CASE NUMBER: 15SN0594 APPLICANT: Racetrack Petroleum, Inc.

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

900 ALBERT PLANNING RATIONALE MARCH 21, 2016 TRINITY

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

1.0 Circulation Element

9 th Street Sub Area Plan

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

D ESIGN REVIEW COMMITTEE

City of Grande Prairie Development Services Department

Thanksgiving Point Office Site Plan Approval Planning Commission Report

STAFF REPORT TO THE CITY COUNCIL. Conduct Public Hearing to vacate certain public right of way adjacent to Sycamore Avenue and San Pablo Avenue

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

Institutional Master Plan The Arnold Arboretum of Harvard University

PLANNING COMMISSION. Submitted

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Transportation Improvements

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Staff Report and Recommendation

M E M O R A N D U M July 27, 2018

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

SMITHSONIAN INSTITUTION SOUTH MALL CAMPUS MASTER PLAN PUBLIC SCOPING REPORT. June Prepared by:

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

Section 1. Executive Summary

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

Access Management: An Overview

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

SMITHSONIAN INSTITUTION SOUTH MALL CAMPUS MASTER PLAN PUBLIC SCOPING REPORT. June Prepared by:

Colerain Township report to. Hamilton County Regional Planning Commission. December 2, 2010, 1:00PM. t a f f r e p o r t

Final Design Activity Descriptions July, 2017

Transportation Committee

Local Technical Assistance Program. FREE Road Maintenance and Safety Training for Municipal Employees

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Transcription:

Lower Hill Infrastructure Project Meeting Minutes SUBJECT: Scoping Field View MEETING DATE: January 28, 2014 (Revised 3-17-14 to address comments received from R. Collins, J. Bucher) MEETING TIME: 9:00 AM LOCATION: PennDOT District 11-0 Room 112 ATTENDANCE: NAME ORGANIZATION PHONE EMAIL Rich Yakupkovic PennDOT Design 412-429-4908 ryakupkovi@pa.gov Jacqueline Evans PennDOT ROW 412-429-4853 jaevans@pa.gov Dan Bliss PennDOT Geotech 412-429-4943 dbliss@pa.gov Jason Zang PennDOT Design 412-429-4912 jzang@pa.gov Tom Adams PennDOT CET 724-699-1409 thomaadams@pa.gov Bill Dipner PennDOT Maintenance 412-429-3814 wdipner@pa.gov Jason Molinero PennDOT Maintenance 412-429-4879 jmolinero@pa.gov Nick Krobot PennDOT Environmental 412-429-5084 nikrobot@pa.gov Victor DeFazio PennDOT Design 412-429-4859 vdefazio@pa.gov Bob Collins PennDOT Design/PM 412-429-4928 robecollin@pa.gov Clint Beck FHWA 717-221-3718 clint.beck@dot.gov Malek Francis PennDOT Utility 412-429-4949 mfrancis@pa.gov Cheryl Moon-Sirianni PennDOT Design 412-429-5005 csirianni@pa.gov Todd Kravits PennDOT Traffic 412-429-4975 tkravits@pa.gov Ray Maginness Baker Environmental 412-269-2749 rmaginness@mbakercorp.com Justin Smith Baker PM 412-269-6431 jsmith@mbakercorp.com Ed Telega Baker Highways 412-269-2064 etelega@mbakercorp.com Doug Straley SEA Project Executive 412-393-0207 straleyd@pgh-sea.com Tom Ryser SEA Rep PM 412-201-7344 tryser@pgh-sea.com Craig Dunham Dunham regroup - Penguins Rep 412-231-6449 craig@dunhamregroup.com Discussion 1. Project Overview Tom Ryser representing the Sports and Exhibition Authority (SEA) gave a project overview. The purpose of this project is to establish the infrastructure associated with redevelopment of the former Civic Arena site. In addition to establishing the street 1

grid system internal to the site bounded by Crawford Street to the east, Washington Place to the west, Bedford Avenue to the north and Centre Avenue to the south, the project will establish the right-of-way associated with each of the developable parcels created by the street grid system as well as the improvements of the perimeter roadways associated with the site. The project is located entirely within the City of Pittsburgh, Allegheny County. This project is considered Moderately Complex. The topography of the site changes significantly, and the streets are laid out to work with the challenging grades while providing reasonable development blocks. The street types range in function which is reflected in the widths of both the roadways, sidewalks and landscape conditions to promote the intended street character. All streets will be two-way traffic with onstreet parking. The project consists of 5 interior streets, and 4 exterior streets. All the streets are classified as Community Collectors with the exception of Street No. 3 and Street No. 4; they are classified as Local Roads. The first phase of final design and construction will be the internal streets east of and including Street No. 2. Currently there are no federal dollars allocated to this project. Until funding is in place, FHWA will not review any submissions. It is anticipated that some federal dollars will be acquired which may include through a Tiger Grant. Clint Beck indicated that the new Tiger Grant money could be used for the local roads as well. Bob Collins asked Clint Beck if PennDOT could do an advance review of the Design Field View even though it is without Federal money at this time. It was determined throughout the meeting that PennDOT would review the Design Field View Submission, Design Exception Request, Perform a Safety Review & meeting and attend a public meeting. A Final Design Office Meeting (FDOM) may be required subject to the type of funding. 2. Design Exceptions There is one design exception anticipated related to the community collectors. All potential Design exception will be submitted and go through the proper Department and FHWA approval process. The minimum design speed for collector and local roads are 25 MPH and 20 MPH respectively as per DM-2. The proposed roads need to fit within the existing topography and to meet the commitment of connecting Wylie from the Hill District through the site to Washington Place to re-create a grid system similar to what existed before construction of the Civic Arena. The adjacent streets, Bedford Avenue, Crawford Street, and Centre Avenue have vertical grades of 11.75%, 10.40% and 7.60% respectively. As per PennDOT design values, the maximum vertical grade is 14%, the maximum vertical grade on the project is 13.94% on the eastern portion of Street 5. The new internal intersections will need to be tabled at 2.00% maximum so the crosswalks meet 2

current ADA requirements. A combination of tabling the intersections and the existing topography may eliminate the ability to meet a design speed of 25 MPH on every vertical curve. 3. Environmental / NEPA Clearance NEPA clearance discussions, led by Nick Krobot, indicated that the Environmental Document is anticipated to be a CEE Level 1b. If there is public controversy or unforeseen environmental impacts that environmental document may be elevated to a CEE level 2 or Environmental Assessment. The community involvement program to date including the 11-year planning process culminating in the Pittsburgh Area District Master Development Plan (2/2010) and the State Historic Code consultation process (including 1 stakeholder meeting, 8 Interested Party meetings, and 2 Public Meetings) where, apart from opponents focused on preserving the former arena, the redevelopment of the 28-acre Lower Hill site was widely supported. Project opposition is not anticipated. The interior and exterior roads have also been place on the Southwestern Pennsylvania Transportation Improvement Program. During the process, a public meeting was held and it was approved at a public meeting by the Southwest Planning Commission Board. An Environmental Document (ED) has been drafted in a letter CEE format with the infrastructure improvements as the primary project. The ED also addresses the reasonably foreseeable future full site development under the secondary and cumulative impact section of the ED. Nick Krobot suggested that an additional public meeting be held to provide opportunity for community input on the preliminary design phase of the infrastructure project including the anticipated ED findings of no significant impact. Nick Krobot said that he would be willing attend the public meeting and to review and comment on the ED, but that PennDOT would not be able to approve the ED until officially involved in the project through a related funding source or other means. Nick Krobot asked if a noise study had been conducted. Ray Maginness from Baker responded that it was completed. Baker would forward the study to Nick (copy attached). 4. Utilities New utility lines for gas, electric and communications will be placed in coordination with the internal street grid system. The project will include storm, sanitary, and water for the internal streets. In addition to completing a D-4181 and D-419 an Incorporation Agreement is required for the federally funded roads. The proposed tree wells on the perimeter sidewalks necessitate the relocation of a 16" Pittsburgh Water and Sewer Authority (PWSA) water line and 10" Equitable Gas 3

Company high pressure gas line on both Bedford Avenue and Crawford Street. Construction of an 8" sanitary sewer on Crawford Street will be required by PWSA to separate the existing combined sewer. All inlets on Bedford Avenue would be pulled from the combined line and connected to the separated storm. The combined line on Crawford Street would be converted to storm and redirected to the new Centre Avenue storm. An independent project administered by PWSA is currently advertised that separates the combination storm sewer line along Centre Avenue. The internal streets storm and sewer system will be designed to connect to the new system on Centre Avenue. 5. Right-of-Way Two property owners are involved within the project area: the SEA and the Urban Redevelopment Authority (URA). The existing exterior streets are owned by the City of Pittsburgh. Right-of-way for the city streets will be established as part of this project and will be located at the back edge of the sidewalk. As shown on the design plans, the ADA ramps, traffic signal poles and signing are located within the sidewalk, therefore additional ROW at the intersections will not be required. An acceptance of ROW resolution has been passed by City Council that depicts these limits. Tom Ryser will forward a copy of the resolution to Jackie Evans. The SEA owns the property to the west (lower lot) of an existing retaining wall and a natural buffer dividing the parking lots into an upper lot and lower lot. The upper most parking lot that is adjacent to Crawford Street (Melody Tent site) is owned by the URA. See attached drawing. The SEA is an authority of the City; therefore any construction within the City ROW will not be an issue. Cheryl Moon-Sirianni asked whether the SEA can hold the construction contract for this project. Clint Beck stated that he did not find a reference stating that owner must hold the construction contract for the project. Clint Beck will provide a response. SEA would like to hold the contracts similar to previous federal projects completed on the North Shore and Convention Center. 6. Traffic Signals The intersection of Street No. 1 and Centre Avenue and the intersection of Street No. 2 and Centre Avenue are identified as meeting traffic signal warrants. The existing traffic signal at the intersection of the existing Lemieux Place and Bedford Avenue will be upgraded and relocated to match the new alignment of Street No. 1. 4

7. ADA Stop signs will be placed on the minor road approach of the new unsignalized intersections of Street No. 2/Bedford Avenue, Street No. 2/Street No. 4, Street No. 2/Street No. 3, Street No. 5/Crawford Street, Street No. 3/Center Avenue and Street No. 5/Washington Place. The internal intersections of Street No. 5/Street No. 1 and Street No. 5/Street No.2 will be four-way stop controlled. All the new internal intersections are tabled at 2.00% maximum to meet current ADA requirements. Some ADA ramps where the proposed streets tie to the existing streets may require Technically Infeasible Forms because of the existing grades. 8. Pavement Design A pavement design will be needed or documentation provided justifying the typical 10 concrete city standard concrete pavement section will be required. Jason Molinero stated that the project is not large enough to justify a life cycle cost analysis. Baker will provide a pavement design report. The information presented in these minutes represents the author s interpretation and understanding of the discussions and decisions that occurred during the meeting. Any clarifications, corrections, or additions to these minutes are to be provided to the author within fifteen (15) days of the date issued. No response implies that information presented is agreed to be correct as written. 5